ENG2022-0533+City_Application+10.31.2022_3.00.29_PM+3194947Of EDAtO4O
RIGHT OF WAY CONSTRUCTION
PERMIT APPLICATION
Complete and submit this Application in accordance with the Submittal
'NC, i ago Requirements outlined in Right -of -Way permit Handout E6,1.
If any field is not applicable to your project, write "N/A" instead of leaving blank.
All fields required. Incomplete Applications will be denied.
SECTION A
General Info
Project Name Housing Hope ELC Field Apartments
Site Address or if no site address use Property Address at NW corner of project area: 8215 236th St. SW, Edmonds
Associated Permits: BLD BLD2022-1319 I PLN PLN2022-0042 I ENG BLD2022-1323
Owner
Name of Company Owner Edmonds Lutheran Church; Developer Housing Hope Franchise Ordinance No:
Point of contact Developer Jeff Chandler, Housing Hope
Title
Housing Developer
Address
Edmonds Lutheran Church - 23525 84th Ave. W
City
Edmonds
I State WA
Zip 98026
Phone
(425) 322-3723 Developer Housing Hope
Email
JeffChandler@housinghope.org (Developer Housing Hope)
OwnerContractor and Authorized Agent of
Name of Company Kirtley-Cole Associates LLC
Primary Name John Safstrom
Agent Name Todd Nelson
Title Superintendent
Title Co -Manager
Mobile 425-231-6719
Address 2820 Oakes Avenue, Suite B
Email jsafstrom@kirtley-cole.com
City Everett
State WA
Zip 98201
Secondary Name Todd Nelson
Phone 425-609-0401
Title Co -Manager
Email tnelson@kirtley-cole.com
Mobile 425-231-6701
City of Edmonds Business License No: 602442850-001-0001
Email tnelson@kirtley-cole.com
State License No: KIRTLAL951 BC
M Contractor verifies it is currently bonded
IIx Contractor verifies it currently has general liability insurance
NOTE: ECDC 18.6o.o2o requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city
engineer.
Type of Development - Check ALL that applN
X Multifamily residential ❑ Commercial ❑ City project
❑ Single family residential subdivision ❑ Single family -other ❑ Industrial
❑ Demo and rebuild or from vacant land?
❑ Other, please specify:
❑ Utility Franchise Work associated with development (check one of the above boxes as well)
❑ Traffic Control Only (no associated development)
❑ Utility Franchise Work (no associated development)
City of Edmonds ROW construction permit Application --Page i of 3 Updated 3/25/2021
Include an overall narrative description of the proposed work. Be specific and detailed:
Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc.
Include whether this is construction, maintenance, or repair.
Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for
underground utilities, etc.)
Kirtley-Cole will be .. . IR in 2361h Street SW and the ad a acent ROW to complete the following new construction wo
1) Install one Type 11 SDMH and 50 feet of 12" CFEP via a 10'dpep o.pen trench excavat4on and asphalt
•.• patch / • 1 Strppt SW.1 work will temporarily
days worth of •,• Ompact iq Pxpprt -• • •11• - 1work,
traffir • 1 • - • - • to • 11 • - - /work-
3
RIGHT-OF-WAY
CLOSURE
AREA
TOTAL
DURATION
(Number of Months)
Sidewalk 72 hours +
LF
x
LF
SF
Alley 72 hours +
LF
x
LF
SF
Parking 72 hours +
LF
x
LF
SF
SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTIONC.
Type of Utility Facilities
1. The work in the right of way is on or for the following type of facilities:
❑ telecommunications ❑ cable ❑ power ❑ gas
❑ water ❑ sewer ❑ storm
Details of W ork to be Completed
i. Does the utility owner have existing overhead infrastructure in the area of work?
2. 1 Will any equipment be added underground or above ground (e.. pedestals, vaults, etc.)?
If yes, describe:
3.
Does the proposed work connect a lot or commercial development with utilities that serve more
than one lot or commercial development?
4.
Does the work involve rebuilding or relocating an existing aboveground utility system which
connects a lot or commercial development to an existing underground common utility system?
5.
Does the work involve proposed additions to an aboveground utility stem? If es:
Are the additions for the purpose of serving new commercial development?
Are the additions for the purpose of serving a single-family residential subdivision?
Details
of • to be Completed
Yes
No
6.
Does your project involve rebuilding or replacing utility equipment which currently serves more
than one lot or commercial development?
If yes, answer the following questions related to project area, i.e. the actual area in which the
project is proposed:
6a.
Does your project involve wires/cables/lines? If yes:
How many are existing ? How many are to be added?
City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021
6b.
Does your project involve poles? If yes:
How many poles are existing in the project area?
What is the height of the existing poles?
How many poles are to be removed?
Are additional poles to be laced?
How many? I I What is the height of the additionalpoles?
6c.
Are any poles to be modified/rebuilt/replaced? If yes:
How many? I I What is the height of the poles after?
Describe the modification rebuild:
SECTION C
Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as
required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have
certification verifying completion of the required training in their possession.
Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be
patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS.
Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to
any permit approval.
Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials,
officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever,
foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or
omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose
acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and
specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any
respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the
expiration, revocation, or termination of any resulting permit approval.
Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and
requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to
the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal
Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable
requirements of state and federal law.
Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a
licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by
owner to act on its behalf and have authority to bind the owner to this application.
Fees. The Applicant is responsible for all fees
APPLICANT SIGNATURE: DATE: /D-Z8-Z0Z2_
APPLICANT PRINTED NAME: Todd Nelson
APPLICANT TITLE: Co -Manager
NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE
City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021