Loading...
ENG2024-0051 SEWER AVAILABILITY RECORD�'0 of E PAIOl- v s lNC. SECTION A SEWER AVAILABILITY APPLICATION Complete and submit this form through www.MyBuildin Permit.corr. Submit as a new application using the following prompts: Application Type — Utilities, Activity Type — Utility Availability, Scope of Work — Sanitary Sewer Main. Information Contact/Applicant Name S7-1 K. Low -'f LEA- eNCrL.s 1TG'G'f5. Phone Number 1,90 V r Lt Email ► Pr•" . GOB Address S1 CiTy State zip 9 9 1V i i-oject Name 222.GN g Address 2,>1-40 Sv Pr City to State Zip ®1� Parcel No. 2 0525ooto a oo Does the property currently have sewer service? 11 Yes (City of Edmonds sewer) ❑ No Proposed Development Describe project (number of buildings, number of units, number of stories per building): pw s - u N 1•r '61tj .�F skMkt uy �.�oA e � 'twG �"�D R.� eS Aa 7,000 5x. In what phase is the project? ❑ Design Review ❑ Building Permit ❑ Preliminary Plat ❑ Rezone or Other Associated permit application number(s), if applicable: vlZ'.mLl — 000 5 SECTION B Applicability Exemptions from Utility Availability Study: 1) Single-family residence' 2) Multi -family project of four units or less; 3) Short plat subdivision (four single-family lots or less). Please check one of the following: 0 A utility availability study IS NOT requested/required. The applicant certifies that this project is exempt from needing a study as described above and is not requesting a full utility availability study at this time. Please sign below and submit this form through www.M% nuudingPermit.com. ❑ A utility availability study IS requested/required for the project, and associated fees will be due. Please submit the complete application through �,ww.i%!BuildingPermit.com. i APPLICANT SIGNATURE: APPLICANT PRINTED NAME: J DATE: CAL 0 i v� Form Updated 3/28/2023