Loading...
ENG2024-0052 WATER AVAILABILITY RECORDWATER AVAILABILITY APPLICATION Complete and submit this form through www.MyBuildingPermit.com. Submit as a new application using the following prompts: Application Type - Utilities, Activity Type - Utility Availability, Scope of Work - Water Main. SECTION A Applicant Information Contact/Applicant Name SVK L — Ti��. 1 Phone Number G -) GV ti Email (r! C 1 . C am Address2-11U. W WS City s State W p, Zip Propert�, Information Project Name 3 W 5114���T p . , MII W T IF Address 4J 6 v N City fV OAO ✓ a state VA zip $ O Parcel No. 27 0S23 00 10 (100 Does the property currently have water service? Yes (City of Edmonds water) o No Proposed Development Describe project (number of buildings, number of units, number of stories per building): Q►az-litJ►-' �1wlcsl,E� �AcMtLY }�OME -1 rt�JU-S'i"O'Q`i '4S'000 ST In what phase is the project? ❑ Design Review ❑ Building Permit ❑ Preliminary Plat ❑ Rezone or Other Associated permit application number(s), if applicable: _D'JZ.C.202.R - 000rj SECTION B Exemptions from Utility Availability Study: " Single-faa.:uy residence j 1Viulti-.a...ily project of four units or less with combo water/fire lines; 3) Sho p a vision" four our, lots or less). Please check onVIA the following: utility availability study IS NOT requested/required. The applicant certifies that this project is exempt from needing a study as described above and is not requesting a full utility availability study at this time. Please sign below and submit this form through www.M�-BuildingPermit.com. ❑ A utility availability study IS requested/required for the project, and associated fees will be due. Please submit the complete application through ,vww.M�-BuildingPermit.com. APPLICANT SIGNATURE: DATE: a7'A31/2 APPLICANT PRINTED NAME: E2.(K 44. L-um Form Updated 3/28/2023