Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
APPROVED ENG2024-0568 ROW PERMIT
RIGHT OF WAY EUC PERMIT PERMIT NUMBER City of • • . :0 LM www.edmondswa.gov i Description: PUD - POTHOLING POWER FOR CITY WATER MAIN PROJECT ISSUED: 12/20/2024 Address: 7330 172ND ST SW EDMONDS WA 98026-5121 EXPIRES: 06/20/2025 Permit Type: RIGHT OF WAY EUC Permit Subtype: STANDARD Parcel Number: 00513100013909 NAME TYPE NAME ADDRESS PHONE APPLICANT MOE MATTHEWS PO BOX 1107, EVERETT WA 98206 (425)783-5681 CONTACT SNOHOMISH COUNTY PUD PO BOX 1107, EVERETT WA 98206 (425)783-8262 CONTRACTOR SNOHOMISH COUNTY PUD PO BOX 1107, EVERETT WA 98206 (425)783-4353 OWNER AMY M & MICHAEL A SAMORA 7330 172ND ST SW, EDMONDS WA 98026 FEE INFORMATION DESCRIPTION AMOUNT PAID CITY TECHNOLOGY FEE - PER PERMIT $45.00 $45.00 ENG - INSPECTIONS - 4.1.24 $132.00 $132.00 ROW - STANDARD - 4.1.24 $396.00 $396.00 REQUIREMENTS REQUIREMENT TYPE NOTES TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their posession. RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday - No Exceptions WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the work. INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM 24 HR NOTICE REQUIRED The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit. RELEASED BY: MAJ DATE: 12/20/2024 Printed: Friday, December 20, 2024 4:27:53 PM 1 of 2 RIGHT OF WAY EUC PERMIT PERMIT NUMBE3 City of Edmonds www.edmondswa.gov • • CONDITIONS CONDITION TYPE ALERT RESIDENTS ALERT AFFECTED RESIDENTS AND OR BUSINESSES PRIOR TO WORK START. It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in DAMAGE TO FRONTAGE City right of Ways or Easements to City Standards caused by or occurring during the permitted IMPROVEMENTS project. MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD ESC REQUIREMENTS REQUIREMENTS. Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the HOLD HARMLESS issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT. INSPECTIONS www.mybuildingpermit.com POTHOLING VERIFY CLEAR BORE CROSSINGS. RESTORE LANDSCAPE Restore landscape to like or better conditions Sound or noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on SOUND AND NOISE weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites and activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. All utilities shall be located prior to any excavation. New locates shall be called for if at time of UTILITY LOCATES excavation, original locates are no longer identifiable. INSPECTIONS INSPECTION TYPE DATE RESULT COMPLETE A-1 JOB START X-2 ENGINEERING FINAL** E-7 RESTOR LIMITS Printed: Friday, December 20, 2024 4:27:53 PM 2 of 2 WO# 100141377 Lti�y of ED%�O� ANC. 1 g90 SECTION A RIGHT OF WAY CONSTRUCTION PERMIT APPLICATION Complete and submit this Application in accordance with the Submittal Requirements outlined in Right -of -Way permit Handout E63. RECEIVED IIMM11 Wel PZI 1! CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT If any field is not applicable to your project, write "N/A" instead of leaving blank. All fields required. Incomplete Applications will be denied. General Info Project Name Relocation for City of Edmonds Phase 15 Water Main Replacement Site Address or if no site address use Property Address at NW corner of project area: 7330 172nd St SW Edmonds, WA 98026 Associated Permits: BLD PLN ENG Owner and Entity Name of Company Holding Franchise (if applicable) Snohomish County PU D Franchise Ordinance No: NSA Point of Contact Joint Use Title Address PO Box 1107 city Everett, WA 98206-1107 State Zip Phone Email Permits@snopud.com Contractor and Authorized Agent of Owner (see note below) Name of Company Same as above Contractor Contacts During Construction Primary Name Agent Name Title Title Mobile Address Email City State Zip Secondary Name Phone Title Email Mobile City of Edmonds Business License No: 313-005-741 Email State License No: ❑ Contractor verifies it is currently bonded Contractor verifies it currently has general liability insurance NOTE: ECDC 18.6o.02o requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city engineer. ❑ Multifamily residential ❑ Commercial P'City project ❑ Single family residential subdivision ❑ Single family -other ❑ Industrial ❑ Demo and rebuild or from vacant land? ❑ Other, please specify: ❑ Utility Franchise Work associated with development (check one of the above boxes as well) ❑ Traffic Control Only (no associated development) City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021 ❑ Utility Franchise Work (no associated development) Project Description Include an overall narrative description of the proposed work. Be specific and detailed: Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc. Include whether this is construction, maintenance, or repair. Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for underground utilities, etc.) PUD to pothole underground utility crossings at 3 locations for City of Edmonds' Phase 15 water main replacement project. Work to take up to two business days to complete. At Loc A, Westbound lane of 172nd St SW to be closed for 4-5hrs between 8AM-3PM. One flagger. At Loc B, Westbound lane of 174th St SW to be closed for 4-5hrs between 8AM-3PM. One flagger. At Loc C, Southbound lane of 72nd Ave W to be closed for 4-5hrs between 8AM-3PM. Up to two flaggers. RIGHT-OF-WAY CLOSURE AREA TOTAL DURATION (Number of Months) Sidewalk 72 hours + LF JxJ LF SF Alley 72 hours + LF JxJ F SF Parking 72 hours + LF JxJ LF SF SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTION C. 1. The work in the right of way is on or for the following type of facilities: ❑ telecommunications ❑ cable ❑ power ❑ gas ❑ water ❑ sewer ❑ storm Details of Work to be Completed 1. Does the utility owner have existin overhead infrastructure in the area of work? Yes V No 2. Will any equipment be added underground or above ground (e.g. pedestals, vaults, etc.)? X If yes, describe: 3. Does the proposed work connect a lot or commercial development with utilities that serve more than one lot or commercial development? X 4. Does the work involve rebuilding or relocating an existing aboveground utility system which connects a lot or commercial development to an existing underground common utility system? X 5. Does the work involve proposed additions to an aboveground utility system? If es: X Are the additions for the purpose of serving new commercial development? Are the additions for the purpose of serving a single-family residential subdivision? Details of Work to be Completed Yes No 6. Does your project involve rebuilding or replacing utility equipment which currently serves more X than one lot or commercial development? City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021 If yes, answer the following questions related to project area, i.e. the actual area in which the project is proposed: 6a. Does your project involve wires/cables/lines? If yes: X How many are existing? I I How many are to be added? 6b. Does your project involve poles? If yes: X How many poles are existing in the project area? What is the height of the existing poles? How many poles are to be removed? Are additional poles to be laced? How many? I I What is the height of the additionalpoles? 6c. Are any poles to be modified/rebuilt/replaced? If yes: X How many? I I What is the height of the poles after? Describe the modification rebuild: SECTION C Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their possession. Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS. Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to any permit approval. Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials, officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever, foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the expiration, revocation, or termination of any resulting permit approval. Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable requirements of state and federal law. Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by owner to act on its behalf and have authority to bind the owner to this application. Fees. The Applicant is responsible for all permit fees. APPLICANT SIGNATURE: �1_ /2Q.rL DATE: 12/18/2024 APPLICANT PRINTED NAME: Andy Tran APPLICANT TITLE: Distribution Engineer NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021 SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM SNOHOMISH COUNTY LFD[O= PUBLIC UTILITY DISTRICT NO 1 LOCATION 7330 172ND ST SW EDMONDS, WA 98026 AREA LYNNWOOD POLE NO. 229370 SW1/4S 8 T 27 R 4 DATE 12/18/2024 ORDER 100141377 REASON FOR WORK PUD TO POTHOLE AT ENGINEER AXTRAN OPERATION 0060 3 LOCATIONS FOR CITY OF DRAFTER UGND NO. EDMONDS WATER MAIN PROJECT. scALE 1"=200' APPROVED DATE PRINTED FOREMAN RECORDS NESC VIOLATIONS FOREMAN ■ NO ❑ YES (SEE NOTES) PERMITS DATE WORK COMPLETED ❑ RESTORATION REQUIRED ■ CITY ❑ ADDITIONAL WORK REQUIRED ❑ SNO COUNTY (TCP) NOTES (i.e. REDLINE INFO): ❑ SNO COUNTY (BLANKET) ❑ SND COUNTY (MAJOR) ❑ OTHER: ❑ NO PERMIT REQUIRED ❑ RESTORATION REQUIRED ❑ MULTIPLE JOB PHASES (i.e. OH, UG) FEES REQ'D ❑ YES ■ No EASEMENTS ❑ REQUIRED E# ■ NOT REQUIRED PRIMARY OVERHEAD ❑ RESIDENTIAL REQUEST NO. ❑ COMMERCIAL LEO# DATE APPROVED FOREIGN CONTACTS ❑ JPN# PRIMARY UNDERGROUND ❑ RESIDENTIAL ❑ JOINT TRENCH ZIPLY & CATV ❑ COMMERCIAL ❑ JOINT BORE ZIPLY & CATV BASIC FEE N/A POLE STENCILING FROM TO TAKE OFF POLE LEU# @ $ /,_$ MISCELLANEOUS FEES VAULT PRE-CONST. REQUIRMENTS PERMIT E ❑ BACKHOE ■ FLAGGING S ■ ONE CALL DATE $ No. $ FIBER TOTAL DUE S ❑ YES ■ NO DATE PAID STREET LIGHTING RECEIPT No. ❑ YES ■ NO ENGINEER ANDY TRAN M&R IN AS -BUILT PHONE (425) 783-8262 GIS M&R OUT CELLULAR (425) 359-1123 GIS QC JOINT USE OWNER/CONTRACTOR IS RESPONSIBLE FOR EROSION CONTROL AND DRAINAGE O EXISTING POLE 0 EXISTING POLE -TO BE REMOVED • NEW POLE * NEW POLE TO REPLACE EXISTING POLE oc DATE SUBSTATION PRV & MDL CIRCUIT NO. 92 & 1839 PHASE 1, 2, AND 3 TRANSFER OF UTILITIES, REMOVAL OF POLE AND FINAL RESTORATION TO BE CONSISTENT WITH APPLICABLE POLE ATTACHMENT AGREEMENT(S) AND JOINT OWNERSHIP POLE AGREEMENT. CREW TO POTHOLE (3) LOCATIONS TO VERIFY UNDERGROUND CROSSINGS WITH EXISTING WATER MAIN FOR CITY OF EDMONDS WATER MAIN REPLACEMENT PROJECT. OA POTHOLE CABLE# 14121. MEASURE DEPTH AT LOCATION AS PAINTED. REFER TO ATTACHED UG DWGS# 1951-1, 1951-2, AND 1951-S1. DEPTH TO TOP OF CONDUIT FROM GRADE ------- CONDUIT SIZE ___. © POTHOLE UG SEC CABLE. MEASURE DEPTH AT LOCATION AS PAINTED. LOC B DOES NOT HAVE AN UG PIED DWG. DEPTH TO TOP OF CONDUIT FROM GRADE ------- CONDUIT SIZE CABLE DIRECT BURIED? Y/N © POTHOLE CABLE# 1987. MEASURE DEPTH AT LOCATION AS PAINTED. REFER TO ATTACHED UG DWG# 956-5, 956-2, AND 956-S1. DEPTH TO TOP OF CONDUIT FROM GRADE ------- CONDUIT SIZE RESTORATION LIMITS TO BE DETERMINED BY CITY ENGINEERING INSPECTOR 7321 172ND ST SW EDMONDS 17110 1 7 - - 087 123 21 w 50-344 50/ 9 0/08 Q 1 PRV E 16797 7517 = 92 1 A —------------- --------- 172ND STSW� 0 1 239 95 FU65 A-7 41 L-130 -A 477 0 25- 488 7415 SL-1301; © 0-3892 4788 405 30 `� 11 312 LAYOUTS 1" = 150' N 6909 174TH ST SW EDMONDS 6909 819 © 6907 -110800-A C- 67 -19615 66 - ------------- -�'------- N FU40 17 SW 6908 50/08 6830 802 25 96 0 E-40424 4 188932 1 25-352516 6906 A-7466 6906 6828 037-8559 17439 145 121051 17501 AL-114026-Y OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY UTILITIES MAY REQUIRE A SEPERATE PERMIT. 17812 72ND AVE W EDMONDS Applicant shall repair/replace all ENGINEERING DIVISION damage to utilities or frontage APPROVED AS NOTED improvements in City right-of-way per city standards that is caused or occurs during the permitted project. JP11 "J,,.,44p 12/20/2024 VV RECEIVED Dec 20 2024 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT LANE CLOSURE IN ADVANCE OR AN INTERSECTION (WORK AREA ON THE SIDE ROAD) W20-7B BE PREPARED TO STOP OPTIONAL IF 40 MPH OR LESS N V J N Z N W20-4 W20-7A IAH LANE ONE AD AD ROAD WORK OT AHEAD X X 74TH AVE W P� STOP x W20-7A x ONE LANE = ROAD W20-4 AHEAD X ROAD = WORK W20-1 AHEAD ZzO ENGINEERING DIVISION APPROVED AS NOTED jell LV,_& j,$, 4.t 12/20/2024 vv GENERAL NOTES 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES (OPTIONAL). 3. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 4. PROTECTIVE VEHICLE RECOMMENDED -MAY BE A WORK TRUCK 5. ALL SIGNS MINIMUM 48" X 48", UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28" REFLECTIVE CONES. SEE TABLE 1 FOR SPACING DISTANCES. 7. ALL SPACING MAY BE ADJUSTED TO ACCOMODATE AT -GRADE INTERSECTIONS AND/OR DRIVEWAYS. SIGN SPACING FREEWAYS & EXPRESSWAYS 55-70 MPH 1500'± RURAL HIGHWAYS 60-65 MPH 800'± RURAL ROADS 45-55 MPH 500'± RURAL ROADS & URBAN ARTERIALS 35-40 MPH 350'± RURAL ROADS & URBAN ARTERIALS RESIDENTIAL & BUSINESS DISTRICTS 25-30 MPH 200'± (2) URBAN STREETS 25 MPH OR LESS 100'± (2) (1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT -GRADE INTERSECTIONS AND DRIVEWAYS. (2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. TABLE 1 CHANNELIZATION DEVICE SPACING (FEET) MPH TAPER TANGENT 50-65 10 TO 20 80 35-45 10 TO 20 60 25-30 10 TO 20 40 SNOHOMMIISHCOUNTY l vnal PUBLIC UTILITY DISTRICT NO 1 I F(;FNn: • CHANNELIZING DEVICE r FLAGGING STATION = PORTABLE SIGN AND SUPPORT �® WORK VEHICLE WITH FLASHING LIGHT WORK AREA TRAFFIC CONTROL PLAN RECEIVED PROJECT CITY OF EDMONDS PHASE 15 WATER MAIN REPLACEMENT Dec 20 2024 LOCATION 7330 172ND ST SW EDMONDS, WA 98026 CITY OF EDMONDS ENGINEER ANDY TRAM DATE 12/4/2024 ORDER 100141377 DEVELOPMENT EPARTMENRVICES PHONE (425) 783-8262 CELLULAR (425) 359-1123 oa LANE CLOSURE ON A TWO-LANE LOW -VOLUME ROAD (ONE FLAGGER OPERATION) ROAD W20-1 WORK = AHEAD x ONE LANE W20-4 ROAD = AHEAD x W20-7A x 6i` zz0 x s T, WW20-7A x ONE LANE i ROAD W20-4 AHEAD x ROAD i WORK W20-1 AHEAD SIGN SPACING = X FREEWAYS & EXPRESSWAYS 55-70 MPH 1500'± RURAL HIGHWAYS 60-65 MPH 800'± RURAL ROADS 45-55 MPH 500'± RURAL ROADS & URBAN ARTERIALS 35-40 MPH 350'± RURAL ROADS & URBAN ARTERIALS RESIDENTIAL & BUSINESS DISTRICTS 25-30 MPH 200'± (2) URBAN STREETS 25 MPH OR LESS 100'± (2) (1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT -GRADE INTERSECTIONS AND DRIVEWAYS. (2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. GENERAL NOTES: 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES (OPTIONAL). 3. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 4. PROTECTIVE VEHICLE RECOMMENDED -MAY BE A WORK TRUCK. 5. ALL SIGNS MINIMUM 48" X 48", UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28'' REFLECTIVE CONES. SEE TABLE 1 FOR SPACING DISTANCES. 7. ALL SPACING MAY BE ADJUSTED TO ACCOMODATE AT -GRADE INTERSECTIONS AND/OR DRIVEWAYS. BUFFER DATA LONGITUDINAL BUFFER SPACE = B SPEED (MPH) 25 1 30 35 1 40 1 45 1 50 55 1 60 65 1 70 LENGTH (FEET)l 155 1 200 1 250 1 305 1 360 1 425 1 495 1 570 645 1 730 TRANSPORTABLE ATTENUATOR ROES AHEAD DISTANCE = R HOST VEHICLE WEIGHT 9,900 TO 22,000 LBS. HOST VEHICLE WEIGHT > 22,000 LBS. < 45 MPH 45-55 MPH > 55 MPH < 45 MPH 45-55 MPH > 55 MPH 100 123' 172' 74' 100' 150' TABLE 1 CHANNELIZATION DEVICE SPACING (FEET) MPH TAPER TANGENT 50-65 10 TO 20 80 35-45 10 TO 20 60 25-30 10 TO 20 40 • CHANNELIZING DEVICE r FLAGGING STATION = PORTABLE SIGN AND SUPPORT ®® WORIT VEHICLE WITH FLASHING LIGWORK AREA SNOHOMISH COUNTY L7_DaUL TRAFFIC CONTROL PLAN PUBLIC UTILITY DISTRICT NO I PROJECT CITY OF EDMONDS PHASE 15 WATER MAIN REPLACEMENT ENGINEERING DIVISION LOCATION 6909 174TH ST SW EDMONDS, WA 98026 APPROVED AS NOTED ENGINEER ANDY TRAM DATE 12Z4Z2024 ORDER 100141377 dill U/O.AU. 4Z 12/20/2024 vv PHONE (425) 783-8262 CELLULAR (425) 359-1123 ca 0 .N E V) 0 Q 7 0 O I, UF OF UJ �N U Q0 0o 0 Lu J ~ Q 1.0 LANE CLOSURE IN ADVANCE �E AN-NTERSECTION (WORK AREA ON THE THROUGH ROAD) ROAD W20-1 WORK 5 � AHEAD x ONE LANE � W20-4 ROAD AHEAD z x > W20-7A ■� x CY z z M M M X X X ROAD WORK ■ 1■n1_ AHEAD ONE LANE W20-1 AHEAD W20-7A W20-4 48" x 24" END x G2 0 - 2 ROAD WORK (OPTIONAL) 48" x 24' t Hi ON AL [ROADG 2 0- 2 x (OPTIONAL) W20-4 o W20-7A ONE LANE W20-1 p ROAD AHEAD ROAD ■ 1■n1_ WORK AHEAD X X X STOP 179TH ST SW p W20-7A ■ BE PREPARED W 2 0- 7 6 TO STOP ONE LANE ROAD W20-4 AHEAD ROAD = WORK W20-1 AHEAD ENGINEERING DIVISION APPROVED AS NOTED ,% d] U/44U,44 12/20/2024 vv GENERAL NOTES 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES (OPTIONAL). 3. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 4. PROTECTIVE VEHICLE RECOMMENDED -MAY BE A WORK TRUCK 5. ALL SIGNS MINIMUM 48" X 48", UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28" REFLECTIVE CONES. SEE TABLE 1 FOR SPACING DISTANCES. 7. ALL SPACING MAY BE ADJUSTED TO ACCOMODATE AT -GRADE INTERSECTIONS AND/OR DRIVEWAYS. SIGN SPACING FREEWAYS & EXPRESSWAYS 55-70 MPH 1500'± RURAL HIGHWAYS 60-65 MPH 800'± RURAL ROADS 45-55 MPH 500'± RURAL ROADS & URBAN ARTERIALS 35-40 MPH 350'± RURAL ROADS & URBAN ARTERIALS RESIDENTIAL & BUSINESS DISTRICTS 25-30 MPH 200'± (2) URBAN STREETS 25 MPH OR LESS 100'± (2) (1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT -GRADE INTERSECTIONS AND DRIVEWAYS. (2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. TABLE 1 CHANNELIZATION DEVICE SPACING (FEET) MPH TAPER TANGENT 50-65 10 TO 20 80 35-45 10 TO 20 60 25-30 10 TO 20 40 I F(;FNn: • CHANNELIZING DEVICE r FLAGGING STATION = PORTABLE SIGN AND SUPPORT �® WORK VEHICLE WITH FLASHING LIGHT WORK AREA SNOHOMISH COUNTY LFIUJLD TRAFFIC CONTROL PLAN PUBLIC UTILITY DISTRICT NO 1 PROJECT CITY OF EDMONDS PHASE 15 WATER MAIN REPLACEMENT LOCATION 17812 72ND AVE W EDMONDS, WA 98026 ENGINEER ANDY TRAN DATE 12/16/2024 ORDER 100072258 PHONE (425) 783-8262 CELLULAR (425) 359-1123 oa RECEIVED Dec 20 2024 CITY OFDEVELOPMENT EDMONDS CITY OF EDMONDS MyBuildingPermit.com DEVELOPMENT SERVICES DEPARTMENT Right-ot-way Application #1592340 - WO 100141377 Relo for Edm Phase 15 Water M Applicant First Name Last Name Company Name Moe Matthews Snohomish County PUD Number Street Apartment or Suite Number E-mail Address PO Box 1107 permits@snopud.com City State Zip Phone Number Extension Everett WA 98206 (425) 783-5681 Contractor Company Name Owner Number Street Apartment or Suite Number City State Zip Phone Number Extension State License Number License Expiration Date UBI # E-mail Address Project Location Number Street Floor Number Suite or Room Number 7330 172ND ST SW City Zip Code County Parcel Number EDMONDS 98026 00513100013909 Associated Building Permit Number Tenant Name Additional Information (i.e. equipment location or special instructions)_ Work Location Property Owner First Name Last Name or Company Name Amy M & Michael A Samora Number Street Apartment or Suite Number 7330 172ND ST SW City State Zip EDMONDS WA 98026 Certification Statement - The applicant states: I certify that I am the owner of this property or the owner's authorized agent. If acting as an authorized agent, I further certify that I have full power and authority to file this application and to perform, on behalf of the owner, all acts required to enable the jurisdiction to process and review such application. I have furnished true and correct information. I will comply with all provisions of law and ordinance governing this type of application. If the scope of work requires a licensed contractor to perform the work, the information will be provided prior to permit issuance. Date Submitted: 12/19/2024 Submitted By: Moe Matthews Page 1 of 2 CITY OF EDMONDS MyBuildingPermit.com Right -of -Way Application #1592340 - WO 100141377 Relo for Edm Phase 15 Water M Project Contact Company Name: Snohomish County PUD Name: Andy Tran Email: permits@snopud.com Address: PO Box 1107 Phone #: (425) 783-8262 Everett WA 98206 Project Type Activity Type Scope of Work Utility Purveyor Utility Work Disturbance of Surface Project Name: WO 100141377 Relo for Edm Phase 15 Water Main Repl WO 100141377 Relocation for City of Edmonds Phase 15 Water Main Replacement located at 7330 172nd St SW, Edmonds 98026. Crews to pothole underground utility crossings at 3 Description of locations for water main replacement project. Work to take up to (2) business dates to complete. Work: Loc A - westbound lane of 172nd St SW to be closed 4-5 hrs between 8am-3pm. One flagger Loc B - westbound name of 174th St SW to be closed 4-5 hrs between 8am-3pm. One flagger Loc C - southbound name of 72nd Ave W to be closed 4-5 hrs between 8am-3pm. Up to two flaggers. Project Details Project Information Job Number 100141377 Page 2 of 2