Loading...
ENG2024-0051+Utility_Application+2.1.2024_12.39.11_PM+4034588ofE�'n SEWER AVAILABILITY APPLICATION Complete and submit this form through www.MyBuildingPermit.com. Submit as a new application using the following prompts: Application Type — Utilities, Activity Type — Utility Availability, Scope of Work — Sanitary Sewer Main. SECTION A InformationApplicant Contact/Applicant NameS7-1 k uM -'f LEA- eNCrL.s EJG 1TG'G'f5. Phone Number V r Li Email C ► P/M" . GOB Address Q 'IV State vi >C zip C) ti2,i Property Information Project Name Lf0 N 0 'iCV73 — �.i 1,-.1 Ftr�fl AiGly Address 101.40 '5V "i; —r V v' t City to State � Zip Parcel No. 2 0525ooto a oo Does the property currently have sewer service? 11 Yes (City of Edmonds sewer) ❑ No Proposed Development Describe project (number of buildings, number of units, number of stories per building): In what phase is the project? ❑ Design Review ❑ Building Permit ❑ Preliminary Plat ❑ Rezone or Other Associated permit application number(s), if applicable: D1ZC9_QEL1 — 000 5 SECTION B Applicability Exemptions trom Utility Availability Study: 1) SiMje-family residenc • 2) Multi -family project of four units or less; 3) Short plat subdivision (four single-family ots or less). Please check one of the following: 0 A utility availability study IS NOT requested/required. The applicant certifies that this project is exempt from needing a study as described above and is not requesting a full utility availability study at this time. Please sign below and submit this form through www.M}.-BuildingPermit.com. ❑ A utility availability study IS requested/required for the project, and associated fees will be due. Please submit the complete application through �,ww-Al BuildingPermit.com. APPLICANT SIGNATURE: L% ' DATE: Q 01 APPLICANT PRINTED NAME: SQ IK. �t, LUMP Form Updated 3/28/2023