Loading...
APPROVED STM RESUB2 BLD2024-0547+Storm_Drainage_Report+11.5.2024_1.55.21_PM+4602799A RNu1NEERINu �ERVI�ES, PI-I-C 47151421d Place SW #B, Edmonds, WA 98026 FurrEngineering@gmail.com RESUB Nov 05 2024 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT BLD2024-0547 Technical Information Report REID SINGLE FAMILY RESIDENCE Edmonds, Washington - King County Parcel # 27032300101 100 326 Sunset Ave. Edmonds, WA 98020 For: Kevin and Carolyn Reid 326 Sunset Ave. Edmonds, WA 98020 ckreid93@comcast.com April 15, 2024 Revised: 8/ 13/2024 111#1:7b11► .I 46937 GISTE SSIONAL Prepared by: J. Vidal, E.I.T. Jean-luc@furrengineering.com (206)605-8017 FES Project #23088 0/28/24 COMPLIES WITH APPLICABLE CITY STORMWATER CODE 1 12/20/2024 1 www.furrengineering.com Table of Contents 1.0 PROJECT OVERVIEW..........................................................................................1 2.0 CONDITIONS AND REQUIREMENTS SUMMARY................................................2 Analysis of the (9) Minimum Requirements/Additional LID Requirements .............2 Additional Requirements.......................................................................................6 3.0 OFF -SITE ANALYSIS............................................................................................7 DEFINE AND MAP THE STUDY AREA................................................................7 RESOURCE REVIEW...........................................................................................9 PugetSound......................................................................................................... 9 No mapped floodplains exist on site......................................................................9 FieldInspection...................................................................................................10 Drainage System Description and Problem Description......................................10 4.0 STORMWATER ANALYSIS AND DESIGN.........................................................12 WaterQuality......................................................................................................13 Emergency Overflow...........................................................................................13 FloodPlain..........................................................................................................13 DIRECT DISCHARGE ANALYSIS......................................................................14 5.0 CONVEYANCE SYSTEM ANALYSIS AND DESIGN...........................................19 6.0 SPECIAL REPORTS AND STUDIES...................................................................20 8.0 ESC ANALYSIS AND DESIGN............................................................................22 9.0 BOND QUANTITIES............................................................................................23 10.0 OPERATIONS AND MAINTENANCE MANUAL..................................................24 APPENDIX A: 332 SUNSET AVE TECHNICAL INFORMATION REPORT..................28 Page i 1.0 PROJECT OVERVIEW The Reid SFR is in Edmonds, Washington. The site is bound by urban residential homes to the north, south, east and west by Sunset Avenue North. More generally, the site is located within the SE 1/4 of the NE 1/4, Section 23, Township 27 North Range 3 East WM. The project area consists of a single parcel #27032300101100, 326 Sunset Ave. N and approximately 0.182ac in size. The site has an existing single family residence. The site currently takes access from an alley to the south. The site slopes to the W at approximately 3% and is covered mostly by impervious surface (roof and paving). There is an existing detention system that drains through a weephole in the curb along Sunset Ave N. The project proposes to construct a new 3-story single family residence and detached garage. The vehicle access will be from the alley. The existing sidewalk will be replaced with a new sidewalk. Existing detention system and weephole to be removed. Typical urban Landscaping and screening is proposed. Site soils analysis was performed by Cobal Geosciences, Inc. and found the site is underlain by Whidbey Formation deposits which become denser with depth. On page 6 of the report, the soils are characterized as very fine grained and represent an aquitard and the unweathered Whidbey Deposits act as a restrictive layer due to poor hydraulic conductivity. Groundwater was not detected during soil investigation. "Infiltration is not feasible due to the presence of mottled fine grained soils and a very shallow restrictive layer. We recommend direct or perforated connection of new runoff devices to City infrastructure." The project is subject to Category 2 Stormwater Site Plans and is required to utilize on -site stormwater management techniques to the maximum extent feasible. The project proposes to connect to the existing storm system in the adjacent property owner to the north (within a recorded easement). The project stormwater is considered "DIRECT DISCHARGE" because it is conveyed within an engineered storm drainage system that will discharge into the Puget Sound. The facility will be sized to Flow Control Duration Standard — Matching Forested Conditions using WWHM 2012 in accordance with the 2019 Department of Ecology Stormwater Management Manual of Western Washington (SWMMWW) and the 2022 City of Edmonds Stormwater Addendum. Page 1 2.0 CONDITIONS AND REQUIREMENTS SUMMARY Hearing Examiners TBD Analysis of the (9) Minimum Requirements/Additional LID Requirements MR #1. Preparation of Stormwater Site Plans This report will serve as the Stormwater Site Plan, prepared per City code and the SMMWW. MR #2. Construction Stormwater Pollution Prevention Construction Stormwater Pollution Prevention Plans are prepared per the SMMWW to address the 13 elements. A SWPPP will be provided as a separate document for approval. MR #3. Source Control of Pollution ECDC 18.030.060.3 Source Control of Pollution. All known, available and reasonable source control BMPs must be required for all projects approved by the city. Source control BMPs must be selected, designed, and maintained in accordance with Volume IV of the SWMMWW. All single-family residential projects shall, at a minimum, incorporate required BMPs from SWMMWW Volume IV, S411 — BMPs for Landscaping and Lawn/Vegetation Management. BMPS for Landscaping • All landscape clippings will be disposed of in a recycling bin picked up by the local waste management company. Additional BMP's for Landscaping • Cover all "exposed" soils with 2" thick mulch per BMP C121 o for more than 1 week during the dry season o for more that two days • Mulch mowing when practical BMPs for Pesticides Use a minimum risk pesticide safe the environment. • Remove infested vegetation by mechanical method • if applying a pesticide use as directed only in the area of the infestation during a day that is not windy or rain forecast Recommended Pesticides Wondercide Outdoor Pest Control Spray Active Ingredients: Cedarwood Oil 12.63% Sesame Oil 2.73% Sodium Lauryl Sulfate (derived from plants) 1.09% Inert Ingredients (Water, Glyceryl Monooctanoate, Soap, Decanoic acid, Monoester with 1,2,3-Propanetriol) 83.55% Page 2 EcoSmart Insect Killer Granules Active Ingredients: Clove Oil 2.00% Thyme Oil 0.60% Inert Ingredients (Corn Cobbs and Wintergreen oil) 97.40% BMPs for Vegetation Management Prepare all soils with at least an 8" "topsoil" with at least 8% organic matter to provide a sufficient vegetation -growing medium. grass seed mix should be per the tables for "Landscaping Seed Mix" or "Low -Growing Turf seed mix" in BMP C120 MR #4. Preservation of Natural Drainage Systems and Outfalls Under existing conditions, stormwater sheet flows toward Sunset Ave N. and flows north along the curb for approximately 250'. Stormwater enters the catch basin and flows through an 12" pipe offsite to a discharge point within BNSF right-of-way and discharges into the Puget Sound approximately 370ft downstream of the project site. After development, stormwater will be conveyed by an 8" storm header to the storm drainage system on 332 Sunset Ave N., which is itself connected to the storm drainage system on 340 Sunset Ave N., which direct discharges to the Puget sound via a connection to that same catch basin. Therefore, the existing drainage pattern will remain unchanged. MR #5. On -site Stormwater Management/LID Flow control BMPS, such as post construction soil amendment will be used for On -site Stormwater Management. Site soils analysis was performed by Cobal Geosciences, Inc. and found the site is underlain by Whidbey Formation deposits which become denser with depth. On page 6 of the report, the soils are characterized as very fine -grained and represent an aguitard and the unweathered Whidey Deposits act as a restrictive layer. "Infiltration is not feasible due to the presence of mottled fine grained soils and a very shallow restrictive layer. We recommend direct connection of new runoff devices to City infrastructure." ECDC 18.030.060.D.5.b.v "Direct Discharge Requirement. Projects that discharge directly to Puget Sound through the city's MS4 (in accordance with the restrictions applicable to direct discharges to Puget Sound presented in Section 3.4.7 of Volume I of the SWMMWW) do not have to achieve the LID performance standard, nor consider bioretention, rain gardens, permeable pavement, or full dispersion, but must implement BMP T5.13 (Post -Construction Soil Quality and Depth); BMPs T5.10A (Downspout Full Infiltration Systems), T5.10B (Downspout Dispersion Systems), or T5.10B (Perforated Stub -out Connections); and BMP T5.11 (Concentrated Flow Dispersion) or T5.12 (Sheet Flow Dispersion); if feasible for all new plus replaced hard surfaces and land disturbed. See the SWMMWW and the Edmonds Stormwater Addendum for additional details on on -site Stormwater management BMP feasibility." Page 3 The project proposes to implement BMP T5.13 (Post -Construction Soil Quality and Depth) See the following List #2: On -site Stormwater Management BMPs for Projects Triggering Minimum Requirements #1 through #9 For each surface, consider the BMPs in the order listed for that type of surface. Use the first BMP that is considered feasible. No other Onsite Stormwater Management BMP is necessary for that surface. Feasibility shall be determined by evaluation against: • Design criteria, limitations, and infeasibility criteria identified for each BMP in the SMMWW, and • Competing Needs Criteria listed. • See also Volume III, Appendix III-D for a summary of infeasibility criteria for all BMP's • The City of Edmonds allows bypass up to 1,OOOsf MAX, only after demonstrating that collection of these areas is infeasible. I. Lawn and landscaped areas: 1. Post -Construction Soil Quality and Depth BMP T5.13 on Pg. 911; This BMP will be implemented to the maximum extent feasible. See the plan for this BMP location and option. II. Roofs: 1. Full Dispersion (65/10) BMP T5.30 on Pg. 939, or Downspout Full Infiltration Systems BMP T5.10A on Pg. 905; A minimum forested or native vegetation flowpath length of 100 feet (25 feet for sheet flow from a nonnative pervious surface) cannot be achieved. There is not at least 1 foot or more of permeable soil from the proposed bottom of the infiltration system to the seasonal high groundwater table or other impermeable layer. 2. Bioretention BMP T7.30 on Pg. 959, must have a minimum horizontally projected surface area below the overflow which is at least 5 percent of the total surface are draining to it; Where the minimum vertical separation of 1 foot to the seasonal high groundwater or other impermeable layer would not be achieved below bioretention 3. Downspout Dispersion systems BMP T5.10B on Pg. 905; For splash blocks, a vegetated flow path at least 50 feet in length from the downspout to the downstream property line, structure, stream, wetland, slope over 15 percent (unless a geotechnical assessment and soils report is prepared addressing the potential impact of the proposed system), or other impervious surface is not feasible. 4. Perforated Stub -out Connections BMP T5.10C on Pg. 905; Page 4 The only location available for the perforated stub -out connection is under impervious or heavily compacted soils. 5. Detention Vaults and Pipes; Downstream analysis in Minimum Requirement No. 4, or available City data, indicate that peak flow control from the site is not beneficial. III. Other Hard Surfaces: Full Dispersion (65/10) BMP T5.30 in accordance with Volume VI Section 2.3, or Downspout Full Infiltration Systems BMP in accordance with Volume III, Section 3.9.3. A minimum forested or native vegetation flowpath length of 100 feet (25 feet for sheet flow from a nonnative pervious surface) cannot be achieved. 2. Permeable pavement BMP T5.15 in accordance with Volume III, Section 3.5. Where the seasonal high groundwater or an underlying impermeable/low permeable layer would create saturated conditions within 1 foot of the bottom of the lowest gravel base course. 3. Bioretention BMP T7.30 on Pg. 959, must have a minimum horizontally projected surface area below the overflow which is at least 5 percent of the total surface are draining to it; Where the minimum vertical separation of 1 foot to the seasonal high groundwater or other impermeable layer would not be achieved below bioretention 4. Sheet Flow Dispersion BMP T5.12 on Pg. 908 or Concentrated Flow Dispersion BMP on Pg. 905 For flat to moderately sloped areas, at least a 10-foot-wide vegetation buffer for dispersion of the adjacent 20 feet of contributing surface cannot be achieved. 5. Detention Vaults and Pipes; Downstream analysis in Minimum Requirement No. 4, or available City data, indicate that peak flow control from the site is not beneficial. THE PROJECT PROPOSES A "DIRECT DISCHARGE" OF ALL IMPERVIOUS SURFACES AND THEREFORE NO OTHER "ROOF" OR "HARD SURFACES" BMP'S WILL BE ADDRESSED. MR #6. Runoff Treatment The project PGHS, 1,105sf is LESS than the 5,OOOsf threshold, therefore, run off treatment is NOT REQUIRED. The roof will be coated to eliminate pollutants entering the drainage system. MR #7. Flow Control The project has a total (ON+OFF-SITE) impervious area of 6,113 sf < 10,000 sf threshold, therefore flow control per MR #7 is NOT REQUIRED. We propose to DIRECT DISCHARGE into the storm system that is hydraulically connected to the Puget Sound. See section 4 of the drainage report for clarification of flow control, calculations, and analysis. Page 5 MR #8. Wetlands Protection There are no wetlands on the site or nearby the site. MR #9. Operation and Maintenance Operation and Maintenance of the storm drainage system for this project will be provided in Section 10. Stormwater conveyance will be analyzed in Section 5 of this report Financial Liability A bond quantities worksheet for construction and landscaping will be provided. Additional Requirements Protection of LID Facilities during and after construction Areas identified for LID (infiltration/bioretention) shall be shown of the TESC plan and protected by fencing. Construction in these areas shall be limited to light duty vehicles and/or hand work. After construction, surficial LID BMP's (bioretention/raingardens) shall remain protected until site is full stabilized. Downstream Analysis This Category 2 Project will identify off -site impacts of stormwater (conveyance capacity, flooding, erosion (stream bank), through site visit and resource review. Propose mitigation measures when stormwater issues are identified. Page 6 3.0 OFF -SITE ANALYSIS DEFINE AND MAP THE STUDY AREA The site is located at 326 Sunset Ave N., Edmonds. See Figure 1 and Figure 2 for maps of the study area. 7­1 7-424 O 77,23 o WA-0 Figure 1: City of Edmonds GIS Vicinity Map Page 7 Figure 2: City of Edmonds GIS TOPOGRAPHY Page 8 RESOURCE REVIEW Adopted Basin Plans: Puget Sound Floodplain/Floodway (FEMA) Map No mapped floodplains exist on site. City of Edmonds GIS Critical Areas o Landslide and Erosion Layers shows a "very" small Erosion Hazard Area (15%-40%). No other landslide or erosion hazards adjacent to the site. [. 10 6 �O �7// 4ft A small portion of the seismic hazard area is on the west edge of the site. . A-rl .r. . .Jr Page 9 o The floodplain is west of the site. Iff F"A I1 o review of the remaining sublayers (i.e. creeks, earth subsidence, etc.) shows no additional critical areas on or adjacent to the site. Field Inspection Date: April 4, 2024 Time: 10:10 pm Weather Observation: overcast, 46°F, 15mph wind in a NNW direction 24-hour precipitation: 0.00 inches (wunderground website) Monthly Precipitation: 2.72 inches (wunderground website) A field investigation was performed by Jean -Luc Vidal, E.I.T. of Furr Engineering Services to determine the existing upstream and downstream storm drainage patterns. Drainage System Description and Problem Description Upstream There is no significant upstream run-on from the adjacent single family residences. Downstream Stormwater sheet flows toward Sunset Ave N. and flows north west along the curb for approximately 250'. Stormwater enters the catch basin and flows through an 12" pipe offsite to a discharge point within BNSF right-of-way and discharges into the Puget Sound approximately 370ft downstream of the project site. See the exhibit on the following page. Page 10 mm Page 11 4.0 STORMWATER ANALYSIS AND DESIGN The project is subject to Category 2 Stormwater Site Plans and is required to utilize on -site stormwater management techniques to the maximum extent feasible. The facility will be sized to Flow Control Duration Standard — Matching Forested Conditions using WWHM 2012 in accordance with the 2019 Department of Ecology Stormwater Management Manual of Western Washington (SWMMWW) and the 2022 City of Edmonds Stormwater Addendum. Existing Site Hydrology The Reid SFR is in Edmonds, Washington. The site is bound by urban residential homes to the north, south, east and west by Sunset Avenue North. More generally, the site is located within the SE 1/4 of the NE 1/4, Section 23, Township 27 North Range 3 East WM. The project area consists of a single parcel #27032300101100, 326 Sunset Ave. N and approximately 0.182ac in size. The site has an existing single family residence. There is an existing detention system that drains through a weephole in the curb of Sunset Ave N. The site currently takes access from an alley to the south. The site slopes to the W at approximately 3% and is covered mostly by impervious surface (roof and paving). This area per NRCS Soil survey classifies this area as Alderwood-Urban land complex, 2-8 percent, hydrologic soil group "B" (moderately well drained). See the following existing conditions area breakdown table, and the Existing Conditions Exhibit at the end of this section. EXISTING CONDITIONS Sf ac PARCEL AREA 7,920.00 0.182 DISTURBED AREA ON -SITE 7,920.00 0.182 IMPERVIOUS 5,134 0.118 HOUSE 3,470 0.080 WALKWAY 1008 0.023 DECK 128 0.003 DRIVEWAY 528 0.012 PERVIOUS (LS) 2,786 0.064 DISTURBED AREA (OFF -SITE) 162 0.004 IMPERVIOUS 162 0.004 SIDEWALK/DRIVEWAY 162 0.004 PERVIOUS (LS) 0 0.000 Tablet: Existing Conditions area breakdown Page 12 Developed Site Hydrology The project proposes to construct a new 3-story single family residence and detached garage. Vehicle access will be from the alley. The following table shows the lot area breakdown. PROPOSED DEVELOPED sf ac DISTURBED AREA (ON -SITE) 7,920 0.182 IMPERVIOUS 6,119 0.140 PGHS 1,112 0.026 DRIVEWAY 1,112 0.026 HOUSE ROOF 3,331 0.076 GARAGE ROOF 436 0.010 CONCRETE WALL 211 0.005 WALK/PAVERS 1,030 0.024 PERVIOUS (LS) 1,801 0.041 DISTURBED AREA (OFF -SITE) 162 0.004 PGHS 136 0.003 DRIVEWAY 136 0.003 CONCRETE SIDEWALK 26 0.001 IMPERVIOUS ON/OFF-SITE 6,281 0.144 Table 2: Developed On/Off-Site area break down The project proposes to collect all on -site runoff in trench and yard drains and convey it along the south side of the proposed building into the storm drain system on the 332 Sunset Ave N property. The project roof runoff will enter downspout on the north side and discharge into the storm pipe on the north side of the house. Stormwater will enter a Type 2, 48" CB where it will connect to the existing storm system within the adjacent property at 340 Sunset Ave. N. A storm drainage easement for use of the existing private storm drainage system will be required to the project parcel. The project proposes to construct a water feature that will not be connected to the stormwater system, HOWEVER, it is included in the above analysis for additional conservative analysis. Water Quality The project PGHS, 1,248sf which is LESS than the 5,000sf threshold, therefore, run off treatment is NOT REQUIRED. Additionally, a catch basin will be fitted with a floatable separator. The roof will be coated to eliminate pollutants entering the drainage system. Emergency Overflow Not required Flood Plain Review of the City website GIS map shows that this property is outside of the 100- year flood Zone. Page 13 DIRECT DISCHARGE ANALYSIS The project to proposes to direct discharge into the existing drainage system, connecting to the existing private discharge system in the adjacent property 332 Sunset Ave N. First, it must be determined that the existing drainage system has capacity for the additional runoff associated with the new development. This will be accomplished by using WWHM analysis of the Reid property, as well as data concerning the existing drainage basin and properties calculated in the Technical Information Report for 332 Sunset Ave N. (see Appendix A pages 15 and 16). The existing drainage basin encompasses approximately 3.90ac shown in the Basin Analysis Exhibit. Stormwater generally sheet flows to the west and enters the catch basin within Sunset Ave N near the 340 Sunset Ave. N. address. However, stormwater from the project site will be collected on site and discharged into the existing discharge system within the adjacent property at 332 Sunset Ave. N. It appears that stormwater from the adjacent properties 332, 340 ,and 336 Sunset Ave. N are connected to the same CB. �� �--�� 1 elS rFn Z O iL--� I A l Figure 3: DOWNSTREAM MAP J� ' oy3° J---------— — — — — — — — Page 14 WWHM INPUT FOR REID SF AC PREDEVELOPED TOTAL 0.186 C, Forest,Flat 8,082 0.186 DEVELOPED TOTAL 0.186 C, Pasture,Flat 1,801 0.041 DRIVEWAYS/FLAT 1,247 0.029 ROOF TOPS/FLAT 3,767 0.086 SIDEWALKS/FLAT 1,267 0.029 Table 3:WWHM input table for the Reid SFR The previous table was used as input into WWHM to obtain the flows from the proposed Reid SFR project. Data concerning the 100 year flows of the existing 332/340/336 Sunset Ave. N. residences, as well as the Basin area tributary are found in Appendix A, page 15. See the following table. REID PROPERTY 332, 336,340 ADDRESSES SUNSET AVE N BASIN Flow Frequency Flow Frequency Flow Frequency Flow(cfs) 15m Flow(cfs) 15m Flow(cfs) 15m 100 Year = 0.1215 1 100 Year = 0.4845 100 Year = 2.2933 Table 4: 100 Year Flow Analysis PIPE DATA REACH 1 REACH 2 REACH 3 REACH 7 REACH 8 REACH 9 PIPE SIZE (IN) 12 12 12 8 8 8 PIPE MATERIAL N12, SD N12, SD N12, SD PVC PVC PVC PIPE LENGTH (FT) 103 21 153 48 36 56 0 UP TO DOWNSTREAM (FT) 0.53 0.25 30.17 .48 .36 2.23 SLOPE (FT/FT) 0.0051 0.0119 0.1972 0.01 0.01 3.98 MANNINGS EQ. QFULL (CFS) 2.78 4.22 17.19 1.313 1.313 2.619 Table 5: Downstream Pipe Data Table The above table shows the pipe data and Manning equation (Qfull) for the three pipe reaches shown in the above figure. Analysis of PIPE CAPACITY using Manning equation Q(full) = 1.49/n*A*R2/3*S1/2 =(1.49/0.012)(7r/4*8)(0.5/2)2/3(0.006)1/2 Page 15 REACH ID WWHM 100YR (cfs) MANNING (Qfull cfs) Pipe Reach 7 0.1215 << 1.313 I Reid Pipe Reach 8 0.1215 << 1.313 Reid Pipe Reach 9 0.1215 << 2.619 Reid Pipe Reach 1 0.6060 << 2.78 Reid+340/336/332 Pipe Reach 2 0.6060 << 4.22 Reid+340/336/332 Pipe Reach 3 2.293 << 17.19 TOTAL BASIN AREA Table 6: Flow comparison WWHM vs Manning for each Reach Review of the above table, it can be shown that the proposed and existing pipes have capacity to convey the proposed project stormwater runoff for the 100yr storm. Page 16 CB#3 TYPE 1 TOP 40.82 12" W IE 36.82 12"EIE36.92 d y REACH 1 .A 103 LF 41.10 GV < c, �.. \ > 41.92 N y \ Q POLE \ BOX \ b � ' N BOX \ POWER BOX DISTURBED \ POWER 1RANSFORM AREA \ \ �C'V / 4/ OnI. /A / `MFNT J ryn f NISH ;LOOF•'• +�'• /4` . w,�•a'.R 45. w • •i ;••. y 4 ��`• •DECK. :.l.`�d :a •! ••••; DECK 4T •. .. '•i '• 4' A. fa• z �. °'. •4 PN 27032300101200 •.: •' •'('' ELY SCO1T/CHRISRNEday••,'• 320 SUNSET AVE N •'� •, 11 `J • EXISTING .� •� +�'—•. .�(~•• RESIDENCE #320 . J S•�C'C r• +' I /// Q.• PH 27032300101600 45.20 3 •', • • KIRSCH GABRIEL.E •. 401 2ND AVE N a•'.:. .• �REC. NO. \ 201409185002 4715 142nd PI. SW #B, Edmonds, WA 98026 ph 206.890.8291 PROPERTY BOUNDARY :1 DISTURBED AREA ROOF a. 'd CONCRETE DECK EXISTING CONDITIONS Sf ac PARCELAREA 7,920 0.182 DISTURBED AREA ON -SITE 7,920 0.182 IMPERVIOUS 5,134 0.118 HOUSE 3,470 0.080 WALKWAY 1008 0.023 DECK 128 0.003 DRIVEWAY 528 0.012 PERVIOUS (LS) 2,786 0.064 DISTURBED AREA (OFF -SITE) 162 0.004 IMPERVIOUS 162 0.004 SIDEWALK/DRIVEWAY 162 0.004 PERVIOUS (LS) 0 0.000 20 10 0 20 40 SCALE: 1 INCH = 20 FEET Cf) z z O w Q H Iz Q M CJ� L j p C) o v) z CU � zU) 0C\l CJ) CM X Lu `p JV Date: 10/28/2024 FES Project No: 23088 Reference Sheet: Drawing No: 3.00 / .11 cl A A .1 REACH I rLm • 103 LF ti.10 c2 5 41.92 0 4715 142nd Pl. SW #13, �� / / .1,11 . POLE Edmonds, WA 98026 DETENTION SYSTEM AND ph 206.890.8291 WEEPHOLE TO BE REMOVED POWER o TRANSFORM DISTURBED RWMAREA LEGEND 0 7 F mw Ile )949_'99E�� - CB TYPE 1 119-TOP 39.90 RESIDENCE NOJ 2- W IE 37 58 2 409185ft IE -37.1�8 PROPERTY BOUNDARY 4 pp, DOSTING 6 E IE 37.68 RESIDENCE #M2 REACH 9 PN 27032300100900 56 LF DISTURBED AREA BURDETT CHRISTOPHER IAJSA M SUNSET AVE IN 0 42 • ROOF LLI LL_ CONCRETE II-__ Cn PO Cn Lu C) U) 2: A k 'A' 4 L3 ASPHALT Lu I. EACH 8 -1 0— "A" ir HIR- ...... . . A.- /36 LF U) .4- 52 A J?E� I CD Lu C\1 ROpO RE E, 3ir FENCE REACff-7 C2 48 LF / / �Nb �. ,. 45.39 07" 41�0, ggFq \ .�' /° a \ �� 090� z s: PN 27032300101200 ELy %;KCHRISTINE , ,\ ° °- - 320 AVE N EXI511NC 0 RESIDENCE #320 • 4 PIN 27032300101600B KIRSCH G RIELLE AAVE . t. 401 2ND N 4 A. & vlow. as Lu B)r iv Date: 10/28/2024 FES Project No: 23088 \ Reference Sheet: 20 10 0 20 40 PN 270323001019008, FIELDS MARJORIE M GREEN DON W 327 2ND AVE N xii Drawing No: SCALE: 1 INCH = 20 FEET PROPOSED DEVELOPED sf ac DISTURBED AREA (ON -SITE) 7,920 0.182 IMPERVIOUS 6,119 0.140 PGHS 1,112 0.026 DRIVEWAY 1,112 0.026 HOUSE ROOF 3,331 0.076 GARAGE ROOF 436 0.010 CONCRETE WALL 211 0.005 WALK/PAVERS 1,030 0.024 PERVIOUS (LS) 1,801 0.041 DISTURBED AREA (OFF -SITE) 162 0.004 PGHS 136 0.003 DRIVEWAY 136 0.003 CONCRETE SIDEWALK 26 0.001 IMPERVIOUS ON/OFF-SITE 6,281 0.144 5.0 CONVEYANCE SYSTEM ANALYSIS AND DESIGN The on -site conveyance system will be designed to convey the 25-year, 24-hour and 100-year, 24-hour storm events. Using Mannings equation a, 6-inch pipe @ 2.0% slope has the capacity to convey 0.86cfs. 8-inch pipe @1.0% slope has the capacity to convey 1.85cfs. Page 19 6.0 SPECIAL REPORTS AND STUDIES Geotechnical Evaluation, Proposed Residence, 326 Sunset Avenue, Edmonds, Wa, by Cobalt Geosciences, LLC, dated September 13, 2023 Page 20 7.0 OTHER PERMITS The following permits and/or approvals are thought to be required as part of this project: • Clearing and Grading Permit • Right -Of -Way use Permit • Land Use Permit Page 21 8.0 ESC ANALYSIS AND DESIGN TESC measures are put into place to prevent sediment from leaving the site. The site is generally flat. The proposed TESC plan will include, but not be limited to, the following guidelines set in the jurisdictions Minimum Requirement "Construction Stormwater Pollution Prevention". A SWPPP will be provided to address: Clearing Limits — Clearing limits specify the boundary of the work to be done. Clearing are defined on the TESC plans and will be flagged in the field. 2. Cover Measures — Cover measures are involved (typically) with the means to control erosion of exposed soil and are specified on the TESC plans. 3. Perimeter Protection — Perimeter protection keeps site sediment from leaving the construction site. This type of protection typically involves a silt fence. The silt fence and clearing limits are shown on the TESC plans. 4. Traffic Area Stabilization — Traffic area stabilization is addressed by a stabilized construction entrance. 5. Sediment Retention — Retention will be established by silt fences around the perimeter and catch basin inserts that will control of the on -site sediment - laden water. 6. Surface Water Collection — Surface water will sheet flow to a downstream catch basin with inlet protection per Edmonds Standard Plan ER-902. 7. Dewatering Control — Any water from dewatering shall be filtered or contained so sediment can filter out prior to discharge downstream. 8. Dust Control — Dust control will be provided by sprinkling. 9. Wet Season Construction — Construction will be conducted according to the jurisdiction's standards during the wet season. 10. Construction Within Sensitive Areas and Buffers - Any construction within the wetland buffer will be subject to sensitive areas restrictions and is contained in the TESC notes. 11. Maintenance — Maintenance requirements are detailed in the TESC notes within the engineering plans. 12. Final Stabilization — Upon completion of the project, all disturbed areas will be stabilized and Best Management Practices removed. 13. LID BMP's —Protect areas that will be designated as infiltration. Do not allow turbid runoff to enter excavated infiltration facilities. If the soil porosity is compromised, additional excavation is required to reach suitable soils. Page 22 9.0 BOND QUANTITIES NA Page 23 10.0 OPERATIONS AND MAINTENANCE MANUAL The conveyance system on this project will be privately owned and maintained by the Owner. See the following. Page 24 Table V-4.5.2(5) Maintenance Standards - Catch Basins Results Maintenance Conditions When Maintenance is Expected Component Defect Needed When Main- tenance is performed No Trash or debris loc- Trash or debris which is located imme- ated imme- diately in front of the catch basin opening or diately in is blocking inletting capacity of the basin by front of catch more than 10%. basin or on Trash or debris (in the basin) that exceeds grate open- 60 percent of the sump depth as measured ing. from the bottom of basin to invert of the low- No trash or est pipe into or out of the basin, but in no debris in the Trash & case less than a minimum of six inches catch basin. Debris clearance from the debris surface to the invert of the lowest pipe. Inlet and out- let pipes free Trash or debris in any inlet or outlet pipe of trash or blocking more than 1/3 of its height. debris. General Dead animals or vegetation that could gen- No dead erate odors that could cause complaints or animals or dangerous gases (e.g., methane). vegetation present within the catch basin. Sediment (in the basin) that exceeds 60 per- cent of the sump depth as measured from the bottom of basin to invert of the lowest pipe into or out of the basin, but in no case No sediment Sediment less than a minimum of 6 inches clearance in the catch from the sediment surface to the invert of the basin lowest pipe. Structure Top slab has holes larger than 2 square Top slab is Damage to inches or cracks wider than 1/4 inch. (Intent free of holes Frame and/or is to make sure no material is running into and cracks. Top Slab basin). Frame is sit- Table V-4.5.2(5) Maintenance Standards - Catch Basins (continued) Results Maintenance Conditions When Maintenance is Expected Component Defect Needed When Main- tenance is performed Frame not sitting flush on top slab, i.e., sep- ting flush on aration of more than 3/4 inch of the frame the riser rings from the top slab. Frame not securely or top slab and firmly attached attached. Basin Maintenance person judges that structure is replaced or unsound. repaired to Fractures or design stand - Cracks in Grout fillet has separated or cracked wider ards. Basin Walls/ than 1 /2 inch and longer than 1 foot at the g Bottom joint of any inlet/outlet pipe or any evidence Pipe is of soil particles entering catch basin through regroutcd cracks. and secure at basin wall. Basin Settlement/ If failure of basin has created a safety, func- replaced or Misalignment tion, or design problem. repaired to design stand- ards. No veget- Vegetation growing across and blocking ation block - more than 10% of the basin opening. ing opening to basin. Vegetation Vegetation growing in inlet/outlet pipe joints No that is more than six inches tall and less veget- than six inches apart. ation or root growth present. Contamination See Detention Ponds (No. 1). No pollution and Pollution present. Cover Not in Cover is missing or only partially in place. Catch basin Catch Basin Place Any open catch basin requires main- cover is Cover tenance. closed Locking Mech- Mechanism cannot be opened by one main- Mechanism anism Not tenance person with proper tools. Bolts into opens with Table V-4.5.2(5) Maintenance Standards - Catch Basins (continued) Results Maintenance Conditions When Maintenance is Expected Component. Defect Needed When Main- tenance is performed Working frame have less than 112 inch of thread. proper tools. One maintenance person cannot remove lid Cover can be Cover Difficult after applying normal lifting pressure. removed by to Remove (Intent is keep cover from sealing off access one main - tenance per - to maintenance.) son. Ladder meets design stand Ladder Rungs Ladder is unsafe due to missing rungs. not ards and Ladder Unsafe securely attached to basin wall, mis- allows main - alignment, rust, cracks, or sharp edges. tenance per- son safe access. Grate open - Grate opening Grate with opening wider than 7/8 inch. ing meets Unsafe design stand- ards. Metal Grates Trash and Trash and debris that is blocking more than Grate free of (If Applic- Debris 20% of grate surface inletting capacity. trash and able) debris. Grate is in Damaged or Grate missing or broken member(s) of the place and Missing. grate. meets design standards. APPENDIX A: 332 SUNSET AVE TECHNICAL INFORMATION REPORT AI p N�GINEERING ERMEI, PLLC 471514211 Place SW #B. Edmonds, WA 98026 FurrEngineering@gmail.com CITY OF EDMONDS #BLD2021-1482 Technical Information Report BURDETT SINGLE FAMILY RESIDENCE Edmonds, Washington - King County Parcel # 27032300100900 332 Sunset Ave. Edmonds, WA 98020 For: Chris and Lisa Burdett November 01, 2021 Revised: February 16, 2022 Revised: April 8, 2022 Prepared by: Dean A. Furr, P.E. FES Project #21073 www.furrengineering.com Table of Contents 1.0 PROJECT OVERVIEW..........................................................................................1 2.0 CONDITIONS AND REQUIREMENTS SUMMARY................................................2 Analysis of the (9) MINIMUM REQUIREMENTS/ADDITIONAL LID REQUIREMENTS.................................................................................................2 Additional Requirements.......................................................................................6 3.0 OFF -SITE ANALYSIS............................................................................................7 DEFINE AND MAP THE STUDY AREA................................................................7 RESOURCEREVIEW...........................................................................................9 PugetSound......................................................................................................... 9 No mapped floodplains exist on site......................................................................9 FieldInspection...................................................................................................10 Drainage System Description and Problem Description......................................10 4.0 STORMWATER ANALYSIS AND DESIGN.........................................................12 ExistingSite Hydrology.......................................................................................12 Developed Site Hydrology...................................................................................12 On-Site................................................................................................................12 Off -Site (Frontage Improvements are not required).............................................13 WaterQuality......................................................................................................13 Emergency Overflow...........................................................................................14 FloodPlain..........................................................................................................14 DIRECT DISCHARGE ANALYSIS......................................................................14 5.0 CONVEYANCE SYSTEM ANALYSIS AND DESIGN...........................................21 6.0 SPECIAL REPORTS AND STUDIES...................................................................22 7.0 OTHER PERMITS................................................................................................23 8.0 ESC ANALYSIS AND DESIGN............................................................................24 9.0 BOND QUANTITIES............................................................................................25 10.0 OPERATIONS AND MAINTENANCE MANUAL..................................................26 Page i 1.0 PROJECT OVERVIEW The Burdett SFR is in Edmonds, Washington. The site is bound by urban residential homes to the north, south, east and west by Sunset Avenue North. More generally, the site is located within the SE 1/4 of the NE 1/4, Section 23, Township 27 North Range 3 East WM. The project area consists of a single parcel #27032300100900, 332 Sunset Ave. N and approximately 0.27ac in size. The site has an existing single family, detached garage and ADU. The site currently takes access from Sunset Ave. N and the alley to the south. The site slopes to the W at approximately 3% and is covered mostly by impervious surface (roof and paving). The project proposes to construct a new 2-story single family residence and attached garage. The primary vehicle access will be from the alley, while a single on -site parking stall will be from a replaced driveway cut in Sunset Ave. N. The existing concrete in the landscaping strip will be replaced by gravel and the existing sidewalk will be replaced with a new sidewalk. Typical urban Landscaping and screening is proposed. Site soils analysis was performed by Cobal Geosciences, Inc. and found the site is underlain by Whidbey Formation deposits which become denser with depth. On page 6 of the report, the soils are characterized as very fine grained and represent an aquitard and the unweathered Whidey Deposits act as a restrictive layer. "Infiltration is not feasible due to the presence of mottled fine grained soils and a very shallow restrictive layer. We recommend direct connection of new runoff devices to City infrastructure." The project is subject to Category 2 Stormwater Site Plans and is required to utilize on -site stormwater management techniques to the maximum extent feasible. The project proposes to connect to the existing storm system in the adjacent property owner to the north (within a recorded easement). The project stormwater is considered "DIRECT DISCHARGE" because it is conveyed within an engineered storm drainage system that will discharge into the Puget Sound. The facility will be sized to Flow Control Duration Standard — Matching Forested Conditions using WWHM 2012 in accordance with the 2014 Department of Ecology Stormwater Management Manual of Western Washington (SWMMWW) and the 2017 City of Edmonds Stormwater Addendum. Page 1 2.0 CONDITIONS AND REQUIREMENTS SUMMARY Hearing Examiners TBD Analysis of the (9) MINIMUM REQUIREMENTS/ADDITIONAL LID REQUIREMENTS MR #1. Preparation of Stormwater Site Plans This report will serve as the Stormwater Site Plan, prepared per City code and the SMMWW. MR #2. Construction Stormwater Pollution Prevention Construction Stormwater Pollution Prevention Plans are prepared per the SMMWW to address the 13 elements. A SWPPP will be provided as a separate document for approval. MR #3. Source Control of Pollution ECDC 18.030.060.3 Source Control of Pollution. All known, available and reasonable source control BMPs must be required for all projects approved by the city. Source control BMPs must be selected, designed, and maintained in accordance with Volume IV of the SWMMWW. All single-family residential projects shall, at a minimum, incorporate required BMPs from SWMMWW Volume IV, S411 - BMPs for Landscaping and Lawn/Vegetation Management. BMPS for Landscaping • All landscape clippings will be disposed of in a recycling bin picked up by the local waste management company. Additional BMP's for Landscaping • Coverall "exposed" soils with 2" thick mulch per BMP C121 o for more than 1 week during the dry season o for more that two days • Mulch mowing when practical BMPs for Pesticides The current home owner have pets that will be in lawn/landscape areas and will only use pesticides as a last resort. However, if they find that conventional non -chemical means of pest control is not working, it is recommended to use a minimum risk pesticide safe for pets and the environment. • Remove infested vegetation by mechanical method • if applying a pesticide use as directed only in the area of the infestation during a day that is not windy or rain forecast Recommended Pesticides Wondercide Outdoor Pest Control Spray Active Ingredients: Cedarwood Oil 12.63% Sesame Oil 2.73% Page 2 Sodium Lauryl Sulfate (derived from plants) 1.09% Inert Ingredients (Water, Glyceryl Monooctanoate, Soap, Decanoic acid, Monoester with 1,2,3-Propanetriol) 83.55% EcoSmart Insect Killer Granules Active Ingredients: Clove Oil 2.00% Thyme Oil 0.60% Inert Ingredients (Corn Cobbs and Wintergreen oil) 97.40% BMPs for Vegetation Management • Prepare all soils with at least an 8" "topsoil" with at least 8% organic matter to provide a sufficient vegetation -growing medium. • grass seed mix should be per the tables for "Landscaping Seed Mix" or "Low -Growing Turf seed mix" in BMP C120 MR #4. Preservation of Natural Drainage Systems and Outfalls The site is slopes to the west. After development the existing drainage pattern will remain unchanged. MR #5. On -site Stormwater Management/LID Flow control BMPS, such as post construction soil amendment will be used for On -site Stormwater Management. Site soils analysis was performed by Coba/ Geosciences, Inc. and found the site is underlain by Whidbey Formation deposits which become denser with depth. On page 6 of the report, the soils are characterized as very fine grained and represent an aguitard and the unweathered Whidey Deposits act as a restrictive layer. 'Infiltration is not feasible due to the presence of mottled fine grained soils and a very shallow restrictive laver. We recommend direct connection of new runoff devices to City infrastructure. " ECDC 18.030.060.D.b.iv "Direct Discharge Requirement. Projects that discharge directly to Puget Sound through the city's MS4 (in accordance with the restrictions applicable to direct discharges to Puget Sound presented in Section 2.5.7 of Volume I of the SWMMWW) do not have to achieve the LID performance standard, nor consider bioretention, rain gardens, permeable pavement, or full dispersion, but must meet the following:" (A) Projects must implement BMP T5.13 (Post -Construction Soil Quality and Depth); BMPs T5.10A Downspout Full Infiltration Systems, T5.10B Downspout Dispersion Systems, or T5.10B Perforated Stub -out Connections; and BMP T5.11 Concentrated Flow Dispersion or T5.12 Sheet Flow Dispersion; if feasible for all new plus replaced hard surfaces and land disturbed. See the SWMMWW and the Edmonds Stormwater Addendum for additional details on on -site stormwater management BMP infeasibility. The project proposes to implement BMP T5.13 (Post -Construction Soil Quality and Depth) Page 3 (B) Edmonds Way Specific Requirements. After applying the requirements in subsection (D)(5)(b)(iv)(A) of this section, for all remaining project site runoff (e.g., from unmanaged surfaces, or from overflow from on -site BMPs), the post - development 10- and 100-year recurrence interval peak flows shall not exceed 0.25 and 0.45 cubic feet per second per acre of impervious surface area, respectively. See the Edmonds Stormwater Addendum for additional details. The project is not along Edmonds Way. See the following List #2: On -site Stormwater Management BMPs for Projects Triggering Minimum Requirements #1 through #9 For each surface, consider the BMPs in the order listed for that type of surface. Use the first BMP that is considered feasible. No other Onsite Stormwater Management BMP is necessary for that surface. Feasibility shall be determined by evaluation against: Design criteria, limitations, and infeasibility criteria identified for each BMP in the SMMWW, and Competing Needs Criteria listed. • See also Volume III, Appendix III-D for a summary of infeasibility criteria for all BMP's • The City of Edmonds allows bypass up to 1,O00sf MAX, only after demonstrating that collection of these areas is infeasible. I. Lawn and landscaped areas: 1. Post -Construction Soil Quality and Depth BMP T5.13 on Pg. 911; This BMP will be implemented to the maximum extent feasible. See the plan for this BMP location and option. II. Roofs: 1. Full Dispersion (65/10) BMP T5.30 on Pg. 939, or Downspout Full Infiltration Systems BMP T5.10A on Pg. 905; These BMPs are NOT proposed, because the site does not have Native Vegetation and "Infiltration is not feasible due to the presence of mottled fine __grained soils and a very shallow restrictive laver" per Geotech Report. 2. Bioretention BMP T7.30 on Pg. 959, must have a minimum horizontally projected surface area below the overflow which is at least 5 percent of the total surface are draining to it; This BMP is NOT proposed, because "Infiltration is not feasible due to the presence of mottled fine __grained soils and a very shallow restrictive layer" per Geotech Report. 3. Downspout Dispersion systems BMP T5.10B on Pg. 905; Dispersion is NOT proposed because of the unavailable flow path required for this BMP to perform adequately. Page 4 4. Perforated Stub -out Connections BMP T5.10C on Pg. 905; This BMP is NOT proposed, because "Infiltration is not feasible due to the presence of mottled fine __grained soils and a very shallow restrictive layer" per Geotech Report. 5. Detention Vaults and Pipes; Any form of detention or stormwater flow control is unnecessary, because the project proposes to "Direct Discharge" into the Puget Sound. Analysis of the Downstream Conveyance system, Minimum Requirement #4 and the "Direct Discharge Analysis" Section of this report shows that there is no additional benefit to providing "Detention'; because the downstream pipes have capacity to convey the 100 year Burdett runoff as well as the entire 100 year developed basin runoff to the Puget Sound. III. Other Hard Surfaces: 1. Full Dispersion (65/10) BMP T5.30 in accordance with Volume VI Section 2.3, or Downspout Full Infiltration Systems BMP in accordance with Volume III, Section 3.9.3. These BMP's are NOT proposed, because the site does not have Native Vegetation and "Infiltration is not feasible due to the presence of mottled fine _grained soils and a very shallow restrictive" per Geotech Report. 2. Permeable pavement BMP T5.15 in accordance with Volume III, Section 3.5. This BMP is NOT proposed, because "Infiltration is not feasible due to the presence of mottled fine grained soils and a very shallow restrictive layer" per Geotech Report. 3. Bioretention BMP T7.30 on Pg. 959, must have a minimum horizontally projected surface area below the overflow which is at least 5 percent of the total surface are draining to it; This BMP is NOT proposed, because "Infiltration is not feasible due to the presence of mottled fine _-grained soils and a very shallow restrictive layer" per Geotech Report. 4. Sheet Flow Dispersion BMP T5.12 on Pg. 908 or Concentrated Flow Dispersion BMP on Pg. 905 Dispersion is NOT proposed because of the unavailable flow path required for this BMP to perform adequately. 5. Detention Vaults and Pipes; Any form of detention or stormwater flow control is unnecessary, because the project proposes to "Direct Discharge" into the Puget Sound. Analysis of the Downstream Conveyance system, Minimum Requirement #4 and the "Direct Discharge Analysis" Section of this report shows that there is no additional benefit to providing "Detention'; because the downstream pipes have capacity to convey the 100 year Burdett runoff as well as the entire 100 year developed basin runoff to the Puget Sound. Page 5 THE PROJECT PROPOSES A "DIRECT DISCHARGE" OF ALL IMPERVIOUS SURFACES AND THEREFORE NO OTHER "ROOF" OR "HARD SURFACES" BMP'S WILL BE ADDRESSED. MR #6. Runoff Treatment The project PGHS, 1,549sf is LESS than the 5,OOOsf threshold, therefore, run off treatment is NOT REQUIRED. Additionally, an on -site catch basin will be fitted with a floatable containment structure. The roof will be coated to eliminate pollutants entering the drainage system. MR #7. Flow Control The project has a total (ON+OFF-SITE) impervious area of 7,151sf < 10,000 sf threshold, therefore flow control per MR #7 is NOT REQUIRED. We propose to DIRECT DISCHARGE into the storm system that is hydraulically connected to the Puget Sound. See section 4 of the drainage report for clarification of flow control, calculations, and analysis. MR #8. Wetlands Protection There are no wetlands on the site or nearby the site. MR #9. Operation and Maintenance Operation and Maintenance of the storm drainage system for this project will be provided in Section 10. Stormwater conveyance will be analyzed in Section 5 of this report Financial Liability A bond quantities worksheet for construction and landscaping will be provided. Additional Requirements Protection of LID Facilities durinq and after construction Areas identified for LID (infiltration/bioretention) shall be shown of the TESC plan and protected by fencing. Construction in these areas shall be limited to light duty vehicles and/or hand work. After construction, surficial LID BMP's (bioretention/raingardens) shall remain protected until site is full stabilized. Downstream Analysis This Category 2 Project will identify off -site impacts of stormwater (conveyance capacity, flooding, erosion (stream bank), through site visit and resource review. Propose mitigation measures when stormwater issues are identified. Page 6 3.0 OFF -SITE ANALYSIS DEFINE AND MAP THE STUDY AREA Th offsite Analysis was prepared in accordance with Section 6.2.2 "Additional Requirements", of the 2017 City of Edmonds Stormwater Addendum. The site is located at 332 Sunset Ave N., Edmonds. See Figure 1 and Figure 2 for maps of the study area. O O O❑ e Figure 1: City of Edmonds GIS Vicinity Map Page 7 Aim'. AMMOW 4., J46� 71 /"., rl ';77 70 ��;- - 2 vq� 4— -W PD7-1 M CR *1 Ah. Ar 31, Figure 2: City of Edmonds GIS TOPOGRAPHY Page 8 RESOURCE REVIEW Adopted Basin Plans: Puget Sound Floodplan/Floodway (FEMA) Map No mapped floodplains exist on site. City of Edmonds GIS Critical Areas o Landslide and Erosion Layers shows a "very" small Erosion Hazard Area (15%-40%). No other landslide or erosion hazards adjacent to the site. o A small portion of the seismic hazard area is on the west edge of the site. Page 9 o The floodplain is west of the site. o review of the remaining sublayers (i.e. creeks, earth subsidence, etc.) shows no additional critical areas on or adjacent to the site. Field Inspection Date: May 10, 2021 Time: 3:30pm Weather Observation: partly sunny, 65°F, 10mph wind in a NW direction 24-hour precipitation: 0.05 inches (wunderground website) Monthly Precipitation: 1.23 inches (wunderground website) A field investigation was performed by Dean A. Furr, P.E. of Furr Engineering Services to determine the existing upstream and downstream storm drainage patterns. Drainage System Description and Problem Description Upstream There is no significant upstream run-on from the adjacent single family residences. Downstream Stormwater sheet flows toward Sunset Ave N. and flows north west along the curb for approximately 165'. Stormwater enters the catch basin and flows through an 12" pipe "offsite" to a discharge point within BNSF right-of-way and discharges into the Puget Sound approximately 250ft downstream of the project site. See the exhibit on the following page. Page 10 0 Page 11 4.0 STORMWATER ANALYSIS AND DESIGN The project is subject to Category 2 Stormwater Site Plans and is required to utilize on -site stormwater management techniques to the maximum extent feasible. The facility will be sized to Flow Control Duration Standard — Matching Forested Conditions using WWHM 2012 in accordance with the 2014 Department of Ecology Stormwater Management Manual of Western Washington (SWMMWW) and the 2017 City of Edmonds Stormwater Addendum. Existing Site Hydrology The Burdett SFR is in Edmonds, Washington. The site is bound by urban residential homes to the north, south, east and west by Sunset Avenue North. More generally, the site is located within the SE 1/4 of the NE 1/4, Section 23, Township 27 North Range 3 East WM. The project area consists of a single parcel #27032300100900, 332 Sunset Ave. N and approximately 0.29ac in size. The site has an existing single family, detached garage and shed. The site currently takes access from Sunset Ave. N and the alley to the south. The site slopes to the W at approximately 3% and is covered mostly by impervious surface (roof and paving). This area per NRCS Soil survey classifies this area as Alderwood-Urban land complex, 2-8 percent, hydrologic soil group "B" (moderately well drained). See the following existing conditions area breakdown table, and the Existing Conditions Exhibit at the end of this section. EXISTING CONDITIONS sf ac PARCEL AREA (AFTER BLA) 12,724.30 0.29 DISTURBED AREA ON -SITE 11,833.60 0.27 IMPERVIOUS 6,754 0.16 HOUSE 1,721 0.04 GARAGE 616 0.01 ADU 561 0.01 DRIVEWAY 3857 0.09 SIDEWALK 111 0.00 PERVIOUS (LS) 5,080 0.12 DISTURBED AREA (OFF -SITE) 314 0.01 SIDEWALK/DRIVEWAY 156 0.00 CONCRETE (LANDSCAPE STRIP) 158 0.00 Table 1: Existing Conditions area breakdown Developed Site Hydrology On -Site The project proposes to construct a new 2-story single family residence and attached garage. The primary vehicle access will be from the alley, while a single on -site parking stall will be from a replaced driveway cut in Sunset Ave. N. The existing concrete in the landscaping strip will be replaced by gravel and the existing Page 12 sidewalk will be replaced with a new sidewalk. Typical urban Landscaping and screening is proposed. The following table shows the lot area breakdown. PROPOSED DEVELOPED Sf ac DISTURBED AREA (ON -SITE) 11,834 0.27 IMPERVIOUS 7,151 0.164 HOUSE 4,776 0.11 DRIVEWAY (SOUTH) 1,125 0.03 PARKING STALL 306 0.007 WATER FEATURE 84 0.002 SIDEWALK 111 0.003 PAVERS 749 0.017 PERVIOUS (LS) 4,683 0.107 DISTURBED AREA (OFF -SITE) 314 0.01 SIDEWALK/DRIVEWAY 156 0.00 GRAVEL (LANDSCAPE STRIP) 158 0.00 IMPERVIOUS ON/OFF-SITE 7,466 0.17 Table 2: Developed On/Off-Site area break down The project proposes to collect all on -site runoff in catch basins and convey it along the south side of the proposed building and direct discharge to the existing storm system within Sunset Ave. N. The project roof runoff will be collected to the roof level between the main house and garage. Stormwater will enter downspout on the north side and discharge into the storm pipe on the north side of the house. Stormwater will enter a Type 2, 48" CB where it will connect to the existing storm system within the adjacent property at 340 Sunset Ave. N. A storm drainage easement for use of the existing private storm drainage system will be required to the project parcel. The project proposes to construct a water feature that will not be connected to the stormwater system, HOWEVER, it is included in the above analysis for additional conservative analysis. Off -Site The project proposes to replace the existing driveway with a City of Edmonds Type III driveway. Additionally, the existing concrete within the landscape strip will be replaced with washed gravel and existing sidewalk will be replaced and will be ADA compliant. DISTURBED AREA (OFF -SITE) 314 0.01 SIDEWALK/DRIVEWAY 156 0.00 GRAVEL (LANDSCAPE STRIP) 158 0.00 Table 3: Off -Site Area breakdown Water Quality The project PGHS, 1,549sf which is LESS than the 5,000sf threshold, therefore, run off treatment is NOT REQUIRED. Additionally, a catch basin will be fitted with a floatable separator. The roof will be coated to eliminate pollutants entering the drainage system. Page 13 Emergency Overflow Not required Flood Plain Review of the City website GIS map shows that this property is outside of the 100- year flood Zone. DIRECT DISCHARGE ANALYSIS The project to proposes to direct discharge into the existing drainage system. First, it must be determined that the existing drainage system has capacity for the additional runoff associated with the new development. The existing drainage basin encompasses approximately 3.90ac shown in the Basin Analysis Exhibit. Stormwater generally sheet flows to the west and enters the catch basin within Sunset Ave N near the 340 Sunset Ave. N. address. However, stormwater from the project site will discharge into the existing CB within the adjacent property at 340 Sunset Ave. N. It appears that stormwater from the Burdett SFR project and the adjacent 340/336 Sunset Ave. N residences are connected to the same CB. REACH 3 REACH t REACH 2 Figure 3: DOWNSTREAM MAP WWHM INPUT FOR BURDETT SF AC HOUSE 4,776 0.110 DWAY/STALL 1,431 0.033 SIDEWALK/PAVERS/WATER 944 0.022 PERVIOUS 4,683 0.107 TOTAL 11,833.60 0.272 WWHM INPUT FOR 340_336 AC PARCEL 0.460 IMPERVIOUS 0.414 PERVIOUS 0.046 TOTAL 0.460 EXISTING BASIN sf ac Page 14 BASIN 171,115.81 3.93 LAND USE sf ac IMPERVIOUS 119,781 2.75 PERVIOUS (A/B SOIL) 51,335 1.18 ASSUME 70% ASSUME A/B LAWN Table 4:WWHM input table for the Burdett and adjacent 340_336 address The previous table was used as input into WWHM to obtain the flows from the proposed Burdett SFR project and the existing 340/336 Sunset Ave. N. residences, as well as, the Basin area tributary to Pipe Reach 1 within Sunset Ave. N. See the following table. BURDETT PROJECT 340 336 ADDRESSES Sunset Ave. N Basin Flow Frequency Flow Frequency Flow Frequency Flow(cfs) 080115m Flow(cfs) 080215m Flow(cfs) 050115m 2 Year = 0.0523 2 Year = 0.1327 2 Year = 0.8755 5 Year = 0.0713 5 Year = 0.1809 5 Year = 1.1937 10 Year = 0.0853 10 Year = 0.2164 10 Year = 1.4277 25 Year = 0.1046 25 Year = 0.2654 25 Year = 1.7512 50 Year = 0.1202 50 Year = 0.3051 50 Year = 2.0130 100 Year = 0.1370 100 Year = 0.3475 100 Year = 2.2933 Table 5: WWHM Developed Flow analysis PIPE DATA REACH 1 REACH 2 REACH 3 PIPE SIZE (IN) 12 12 12 PIPE MATERIAL N12, SD N12, SD N12, SD PIPE LENGTH (FT) 103 21 153 A UP TO DOWNSTREAM (FT) 0.53 0.25 30.17 SLOPE (FT/FT) 0.0051 0.0119 0.1972 MANNINGS EQ. QFULL (CFS) 2.78 4.22 17.19 Table 6: Downstream Pipe Data Table The above table shows the pipe data and mannings equation (Qfull) for the three pipe reaches shown in the above figure. Analysis of PIPE CAPACITY using Mannings equation Q(full) = 1.49/n*A*R2/3*S1/2 =(1.49/0.012)(7T/4*8)(0.5/2)2/3(0.006)1/2 REACH ID WWHM 100YR (cfs) MANNINGS (Qfull cfs) Pipe Reach 1 0.4845 << 2.78 Burdett+340/336 Pipe Reach 2 0.4845 << 4.22 Burdett+340/336 Pipe Reach 3 2.293 << 17.19 TOTAL BASIN AREA Table 7: Flow comparison WWHM vs Manning for each Reach Page 15 Review of the above table, it can be shown that the existing pipes have capacity to convey the proposed project stormwater runoff for the 100yr storm. Page 16 N 36.57 36.67 r-CB#3 TYPE 1 ALA ffaN 20,.,M, -CB TYPE 1 TOP 39.90 12' W IE 37.58 9• PIN T1*4 30 15 0 30 60 4715 142nd PI. SW #B, SCALE: 1 INCH = 30 FEET Edmonds, WA 98026 ph 206.890.8291 EXISTING CONDITIONS Sf ac PARCEL AREA (AFTER BLA) 12,724.30 0.29 DISTURBED AREA ON -SITE 11,833.60 0.27 IMPERVIOUS 6,754 0.16 HOUSE 1,721 0.04 GARAGE 616 0.01 ADU 561 0.01 DRIVEWAY 3857 0.09 SIDEWALK 111 0.00 PERVIOUS (LS) 5,080 0.12 DISTURBED AREA (OFF -SITE) 314 0.01 SIDEWALK/DRIVEWAY 156 0.00 CONCRETE (LANDSCAPE STRIP) 158 0.00 EX HOUSE/CARPORT EX DRIVEWAY � DISTURBED AREA z H m Cf) _ Lu Lu LL Z Cn p II--- II--- Lu Q z � O m W. DAF Date: 06/24/2021 Project No: BURDE17 SFR Reference Sheet: 21073 Drawing No: 6/� 30 15 0 30 60 SCALE: 1 INCH = 30 FEET r-,m 4715 142nd PI. SW #B, Edmonds, WA 98026 ph 206.890.8291 PROPOSED DEVELOPED Sf ac DISTURBED AREA (ON -SITE) 11,834 0.27 IMPERVIOUS 7,151 0.164 HOUSE 4,776 0.11 DRIVEWAY (SOUTH) 1,125 0.03 PARKING STALL 306 0.007 WATER FEATURE 84 0.002 SIDEWALK 111 0.003 PAVERS 749 0.017 PERVIOUS (LS) 4,683 0.107 DISTURBED AREA (OFF -SITE) 314 0.01 SIDEWALK/DRIVEWAY 156 0.00 GRAVEL (LANDSCAPE STRIP) 158 0.00 IMPERVIOUS ON/OFF-SITE 7,466 0.17 �>>91 r DISTURBED AREA PROP BUILDING PROP PERVIOUS _ci PAVERS WATER FEATURE ON -SITE PAVING/CONCRETE �o OFF -SITE PAVING/SIDEWALK OFF ��� SITE DECK (OPEN SPACE) �y .3 IF .::�...:..:...... �.::.:.. . .........:..:..:..:.. OFF -SITE GRAVEL m X W W o= z LL p C/) Lu H 0 0 O oC U m w O J Lu Bir DAF Date: 06/24/2021 Project No: BURDE7 SFR Reference Sheet: Drawing No: N 36.57 30.67 \ �-CB#3 TYPE 1 40.82 1 ' W IE 38.82 12 IE 36.92 s� DISTURBED AREA \ � 11,833.6SF EX CB 1 ................. 12 I 37.35 / 12' E 37.45 b REPLACED ROOF \ AND ASPHALT/ \5,346 SF N312'40'E 6.67' ` Fki "s°z Po� RFS�OF�tic CF r-,M 4715 142nd PI. SW #B, Edmonds, WA 98026 ph 206.890.8291 REPLACED AND NEW IMPERV. Sf ac REPLACED IMPERVIOUS 5,346 0.00 ELDGS A%D DRI''E':VAY 51:)46 0.12 NEW IMPERVIOUS 1,805 0.04 FART 0::H0USE A % D %E' lv, D':� ,' 1,505 0.04 NEW PLUS REPLACED IMPERVIOU 7,151 0.16 REPLACED NEW III IN 30 15 0 30 60 SCALE: 1 INCH = 30 FEET 0 Lu 0— cc C/) Lu Lu 0 01: 0- Z:) w m a- M Q z it DAF Ddw 06/24/2021 Project No: BURDE17 SFR Reference Sheet: 21073 Drawing No: 14LF, 12" CONC. PIPE EX. CB TOP 41.10 12"OUT N 36.57 12" IN E 36.67 v DISCHARGE INTO PUGET SOUND 12" CONC. I.E. 3.7 OUT CON. CONNECTION 12" IE 6.4 IN/OUT EXIST. CB TOP 39.96 12" OUT NW 35.71 CB#3 TYPE 1 12" IN S 35.81 TOP 40.82 12" W IE 36.82 12" E IE 36.92 1 / 7/ EX. CB TYPE 1 / TOP 40.35 12" W IE 37.35 / 12" E IE 37.45 - CB TYPE 1 TOP 39.90 !� 12" W IE 37.58 8" N IE 37.68 �6"EIE37.68 BASIN LINE EXISTING BASIN sf ac BASIN 171,115.81 3.93 LAND USE sf ac IMPERVIOUS 119,781 2.75 PERVIOUS (A/B SOIL) 51,335 1.18 Return Period Flow(cfs) 25 Year = 1.7512 50 Ye a r = 2.0130 100 Ye a r = 2.2933 PIPE DATA PIPE SIZE (IN) 12 PIPE MATERIAL N12, SD PIPE LENGTH (FT) 153 A UP TO DOWNSTREAM (FT) 30.17 SLOPE (FT/FT) 0.1972 QFULL (CFS) 17.19 PIPE DATA PIPE SIZE (IN) 12 PIPE MATERIAL Conc. (avg) PIPE LENGTH (FT) 14 A UP TO DOWNSTREAM (FT) 2.7 SLOPE (FT/FT) 0.1929 QFULL (CFS) 15.69 14 100 50 0 100 200 SCALE: 1 INCH = 100 FEET r-,m 4715 142nd PI. SW #B, Edmonds, WA 98026 ph 206.890.8291 m 2 X Lu C_/) J z Q Z C/) Q m LL Lu 0 m DAF Date: 08/26/2020 Project No: HURST SHORT PLAT Reference Sheet: Drawing No: 5.0 CONVEYANCE SYSTEM ANALYSIS AND DESIGN The on -site conveyance system will be designed to convey the 25-year, 24-hour and 100-year, 24-hour storm events. Using Mannings equation a, 6-inch pipe @ 2.0% slope has the capacity to convey 0.86cfs. 8-inch pipe @1.0% slope has the capacity to convey 1.85cfs. Page 21 6.0 SPECIAL REPORTS AND STUDIES Geotechnical Evaluation, Proposed Residential Development, 332 Sunset Avenue North, Edmonds, Wa, by Cobalt Geosciences, LLC, dated May 27, 2021 Page 22 COBALT G E 0 S C I E N C E S May 27, 2021 Chris and Lisa Burdett C/O Blake Fisher blake Pblakefisherarchitecture. com RE: Geotechnical Evaluation Proposed Residential Development 332 Sunset Avenue North Edmonds, Washington Cobalt Geosciences, LLC P.O. Box 82243 Kenmore, Washington 98028 In accordance with your authorization, Cobalt Geosciences, LLC has prepared this letter to discuss the results of our geotechnical evaluation at the referenced site. The purpose of our evaluation was to provide recommendations for foundation design, grading, and earthwork. Site Description The site is located at 332 Sunset Avenue North in Edmonds, Washington. The site consists of one rectangular shaped parcel (No. 27032300100900) with a total area of 0.27 acres. The western portion of the site is developed with a single-family residence with shallow basement. A driveway extends through much of the property. There is a detached garage in the eastern portion of the property and another access from an alley to the south. There is an 8-12 inch tall curb/wall along the sidewalk west of the residence. Site vegetation includes grasses, bushes, shrubs, and small diameter trees. The site is nearly level to very slightly sloping in multiple directions. There is a slight slope near the eastern property line extending downward to the east and southeast. The proposed development includes a new residence in the area of the existing residence. The new residence may include slab -on -grade areas that would require backfilling of the current shallow basement. Foundation loads will generally be light and grading may include cuts of 2 to 3 feet and fills of about 5 to 6 feet. Area Geology The Geologic Map of the Edmonds East and West Quadrangle, indicates that the site is underlain by Whidbey Formation. Whidbey Formation includes till like deposits, fine grained silts with sand and clay, and local lacustrine silts. These materials are usually impermeable and are typically dense to very dense below a weathered zone. Soil & Groundwater Conditions As part of our evaluation, we excavated two hand borings within the property, where accessible. www.cobaltgeo.com (2o6) 331-1097 May 2'7, 2021 Page 2 of 10 Geotechnical Evaluation The explorations encountered approximately 6 inches of grass and topsoil underlain by approximately 3 to 4 feet of loose to medium dense, silty -fine to medium grained sand trace gravel (Weathered Whidbey Formation). These materials were underlain by dense to very dense, silty -fine to fine grained sand trace gravel (Whidbey Formation), which continued to the termination depths of the explorations. Groundwater was not encountered in the explorations; however, the shallow soils were mottled. Perched groundwater could be present at shallow depths below the site during the winter months. We anticipate that groundwater could be within 4 feet of the ground surface during the winter months. Water table elevations often fluctuate over time. The groundwater level will depend on a variety of factors that may include seasonal precipitation, irrigation, land use, climatic conditions and soil permeability. Water levels at the time of the field investigation may be different from those encountered during the construction phase of the project. Erosion Hazard The Natural Resources Conservation Services (NRCS) maps for Snohomish County indicate that the site is underlain by Alderwood-Urban land complex (2 to 8 percent slopes). These soils would have a slight erosion potential in a disturbed state depending on the slope magnitude. It is our opinion that soil erosion potential at this project site can be reduced through landscaping and surface water runoff control. Typically, erosion of exposed soils will be most noticeable during periods of rainfall and may be controlled by the use of normal temporary erosion control measures, such as silt fences, hay bales, mulching, control ditches and diversion trenches. The typical wet weather season, with regard to site grading, is from October 31st to April ist. Erosion control measures should be in place before the onset of wet weather. Seismic Hazard The overall subsurface profile corresponds to a Site Class D as defined by Table 1613.5.2 of the International Building Code (IBC). A Site Class D applies to an overall profile consisting of stiff/medium dense soils within the upper too feet. We referenced the U.S. Geological Survey (USGS) Earthquake Hazards Program Website to obtain values for Ss, Sl, FQ, and F,,. The USGS website includes the most updated published data on seismic conditions. The following tables provide seismic parameters from the USGS web site with referenced parameters from ASCE 7-10 and 7-16. Seismic Design Parameters (ASCE 7-10) Site Spectral Spectral Site Design Spectral Design Class Acceleration Acceleration Coefficients Response Parameters PGA at 0.2 sec. (g) at 1.o sec. (g) Fa Fv SDs SD1 D 1.272 0.499 1.0 1.501 o.848 0.499 0.516 www.cobaltgeo.com (2o6) 331-1097 May 2'7, 2021 Page 3 of 10 Geotechnical Evaluation Seismic Design Parameters (ASCE 7-16) Site Spectral Spectral Site Design Spectral Design Class Acceleration Acceleration Coefficients Response Parameters PGA at 0.2 sec. (g) at 1.o sec. (g) Fa F, SDs SD1 D 1.288 0.454 1.0 Null 1.031 Null 0.548 Additional seismic considerations include liquefaction potential and amplification of ground motions by soft/loose soil deposits. The liquefaction potential is highest for loose sand with a high groundwater table. The site has a low likelihood of liquefaction. For items listed as "Null" see Section 11.4.8 of the ASCE. Conclusions and Recommendations General The site is underlain by Whidbey Formation deposits which become denser with depth. There may be areas of fill associated with development in this part of Edmonds. Fill depths would likely be 3 feet or less. The proposed residence may be supported on a shallow foundation system bearing on medium dense or firmer native soils or on structural fill placed on the native soils. Local overexcavation or recompaction of loose weathered native soils may be necessary depending on the proposed elevations and locations of the new footings. Since the new residence will have slab on grade areas over a current basement. It is imperative that the existing foundation and slabs be fully removed and that any loose soils be removed to the level of medium dense or firmer soils prior to fill placement. New fills must be compacted per the recommendations in this report in order to limit the likelihood of total and differential settlement of the new building. Site Preparation Trees, shrubs and other vegetation should be removed prior to stripping of surficial organic -rich soil and fill. Based on observations from the site investigation program, it is anticipated that the stripping depth will be 6 to 12 inches. Deeper excavations will be necessary in areas of existing foundation systems and in any areas underlain by undocumented fill. The native soils consist of silty -sand with gravel to sandy silt with gravel. Most of the native soils may be used as structural fill provided they achieve compaction requirements and are within 3 percent of the optimum moisture. Some of these soils may only be suitable for use as fill during the summer months, as they will be above the optimum moisture levels in their current state. These soils are variably moisture sensitive and may degrade during periods of wet weather and under equipment traffic. In general, we recommend importing select fill or crushed rock to support new footings and slab areas. www.cobaltgeo.com (2o6) 331-1097 May 2'7, 2021 Page 4 of 10 Geotechnical Evaluation Imported structural fill should consist of a sand and gravel mixture with a maximum grain size of 3 inches and less than 5 percent fines (material passing the U.S. Standard No. 200 Sieve). Structural fill should be placed in maximum lift thicknesses of 12 inches and should be compacted to a minimum of 95 percent of the modified proctor maximum dry density, as determined by the ASTM D 1557 test method. Temporary Excavations Based on our understanding of the project, we anticipate that the grading could include local cuts on the order of approximately 6 feet or less for foundation removal and utility placement. Temporary excavations should be sloped no steeper than 1.5H:1V (Horizontal:Vertical) in loose native soils and fill, 1H:1V in medium dense native soils and 3/41-1:1V in dense to very dense native soils, if encountered at depth. If an excavation is subject to heavy vibration or surcharge loads, we recommend that the excavations be sloped no steeper than 2H:1V, where room permits. Temporary cuts should be in accordance with the Washington Administrative Code (WAC) Part N, Excavation, Trenching, and Shoring. Temporary slopes should be visually inspected daily by a qualified person during construction activities and the inspections should be documented in daily reports. The contractor is responsible for maintaining the stability of the temporary cut slopes and reducing slope erosion during construction. Temporary cut slopes should be covered with visqueen to help reduce erosion during wet weather, and the slopes should be closely monitored until the permanent retaining systems or slope configurations are complete. Materials should not be stored or equipment operated within io feet of the top of any temporary cut slope. Soil conditions may not be completely known from the geotechnical investigation. In the case of temporary cuts, the existing soil conditions may not be completely revealed until the excavation work exposes the soil. Typically, as excavation work progresses the maximum inclination of temporary slopes will need to be re-evaluated by the geotechnical engineer so that supplemental recommendations can be made. Soil and groundwater conditions can be highly variable. Scheduling for soil work will need to be adjustable, to deal with unanticipated conditions, so that the project can proceed and required deadlines can be met. If any variations or undesirable conditions are encountered during construction, we should be notified so that supplemental recommendations can be made. If room constraints or groundwater conditions do not permit temporary slopes to be cut to the maximum angles allowed by the WAC, temporary shoring systems may be required. The contractor should be responsible for developing temporary shoring systems, if needed. We recommend that Cobalt Geosciences and the project structural engineer review temporary shoring designs prior to installation, to verify the suitability of the proposed systems. Foundation Design The proposed residence may be supported on a shallow spread footing foundation system bearing on undisturbed dense or firmer native soils or on properly compacted structural fill placed on the suitable native soils. Any undocumented fill and/or loose native soils should be removed and replaced with structural fill below foundation elements. Structural fill below footings should consist of clean angular rock 5/8 to 4 inches in size. We should verify soil conditions during foundation excavation work. www.cobaltgeo.com (2o6) 331-1097 May 2'7, 2021 Page 5 of 10 Geotechnical Evaluation For shallow foundation support, we recommend widths of at least 16 and 24 inches, respectively, for continuous wall and isolated column footings supporting the proposed structure. Provided that the footings are supported as recommended above, a net allowable bearing pressure of 2,000 pounds per square foot (psf) may be used for design. A 1/3 increase in the above value may be used for short duration loads, such as those imposed by wind and seismic events. Structural fill placed on bearing, native subgrade should be compacted to at least 95 percent of the maximum dry density based on ASTM Test Method D1557. Footing excavations should be inspected to verify that the foundations will bear on suitable material. Exterior footings should have a minimum depth of 18 inches below pad subgrade (soil grade) or adjacent exterior grade, whichever is lower. Interior footings should have a minimum depth of 12 inches below pad subgrade (soil grade) or adjacent exterior grade, whichever is lower. If constructed as recommended, the total foundation settlement is not expected to exceed 1 inch. Differential settlement, along a 25-foot exterior wall footing, or between adjoining column footings, should be less than 1/2 inch. This translates to an angular distortion of 0.002. Most settlement is expected to occur during construction, as the loads are applied. However, additional post -construction settlement may occur if the foundation soils are flooded or saturated. All footing excavations should be observed by a qualified geotechnical consultant. Resistance to lateral footing displacement can be determined using an allowable friction factor of 0.4o acting between the base of foundations and the supporting subgrades. Lateral resistance for footings can also be developed using an allowable equivalent fluid passive pressure of 225 pounds per cubic foot (pcf) acting against the appropriate vertical footing faces (neglect the upper 12 inches below grade in exterior areas). The frictional and passive resistance of the soil may be combined without reduction in determining the total lateral resistance. Care should be taken to prevent wetting or drying of the bearing materials during construction. Any extremely wet or dry materials, or any loose or disturbed materials at the bottom of the footing excavations, should be removed prior to placing concrete. The potential for wetting or drying of the bearing materials can be reduced by pouring concrete as soon as possible after completing the footing excavation and evaluating the bearing surface by the geotechnical engineer or his representative. Concrete Retaining Walls The following table, titled Wall Design Criteria, presents the recommended soil related design parameters for retaining walls with a level backslope. Contact Cobalt if an alternate retaining wall system is used. This has been included for new cast in place walls, if proposed. Wall Design Criteria "At -rest" Conditions (Lateral Earth Pressure — EFD+) 55 pcf (Equivalent Fluid Density) "Active" Conditions (Lateral Earth Pressure — EFD+) 35 pcf (Equivalent Fluid Density) Seismic Increase for "At -rest" Conditions (Lateral Earth Pressure) 21H* (Uniform Distribution) 1 in 2,500 year event Seismic Increase for "At -rest" Conditions (Lateral Earth Pressure) 14H* (Uniform Distribution)1 in 500 year event www.cobaltgeo.com (2o6) 331-1097 May 2'7, 2021 Page 6 of 10 Geotechnical Evaluation Seismic Increase for "Active" Conditions 7H* (Uniform Distribution) (Lateral Earth Pressure) Passive Earth Pressure on Low Side of Wall Neglect upper 2 feet, then 250 pcf EFD+ (Allowable, includes F.S. = 1.5) Soil -Footing Coefficient of Sliding Friction (Allowable; 0.40 includes F.S. = 1.5) 'H is the height of the wall; Increase based on one in 500 year seismic event (10 percent probability of being exceeded in 50 years), +EFD — Equivalent Fluid Density The stated lateral earth pressures do not include the effects of hydrostatic pressure generated by water accumulation behind the retaining walls. Uniform horizontal lateral active and at -rest pressures on the retaining walls from vertical surcharges behind the wall may be calculated using active and at -rest lateral earth pressure coefficients of 0.3 and 0.5, respectively. A soil unit weight Of 125 pcf may be used to calculate vertical earth surcharges. To reduce the potential for the buildup of water pressure against the walls, continuous footing drains (with cleanouts) should be provided at the bases of the walls. The footing drains should consist of a minimum 4-inch diameter perforated pipe, sloped to drain, with perforations placed down and enveloped by a minimum 6 inches of pea gravel in all directions. The backfill adjacent to and extending a lateral distance behind the walls at least 2 feet should consist of free -draining granular material. All free draining backfill should contain less than 3 percent fines (passing the U.S. Standard No. 200 Sieve) based upon the fraction passing the U.S. Standard No. 4 Sieve with at least 30 percent of the material being retained on the U.S. Standard No. 4 Sieve. The primary purpose of the free -draining material is the reduction of hydrostatic pressure. Some potential for the moisture to contact the back face of the wall may exist, even with treatment, which may require that more extensive waterproofing be specified for walls, which require interior moisture sensitive finishes. We recommend that the backfill be compacted to at least 90 percent of the maximum dry density based on ASTM Test Method D1557. In place density tests should be performed to verify adequate compaction. Soil compactors place transient surcharges on the backfill. Consequently, only light hand operated equipment is recommended within 3 feet of walls so that excessive stress is not imposed on the walls. Stormwater Management Feasibility The site is underlain by relatively dense Whidbey Formation. These soils are very fine grained and represent an aquitard. The shallow soils were mostly mottled and the unweathered Whidbey Deposits act as a restrictive layer. Infiltration is not feasible due to the presence of mottled fine grained soils and a very shallow restrictive layer. We recommend direct connection of new runoff devices to City infrastructure. We understand that the proposed system includes a new tightline to a nearby catchbasin northwest of the property. We should be provided with final plans for review to determine if the intent of our recommendations has been incorporated or if additional modifications are needed. www.cobaltgeo.com (2o6) 331-1097 May 2'7, 2021 Page 7 of 10 Geotechnical Evaluation Slab -on -Grade We recommend that the upper 12 inches of the existing fill and/or native soils within slab areas be re -compacted to at least 95 percent of the modified proctor (ASTM D1557 Test Method). We anticipate that new slab on grade will be supported on deeper fills due to basement removal. All fill must be compacted to the above standard in lifts of 12 inches or less. Compaction equipment should include a large ho-pack or 10 ton minimum drum roller. We should verify fill suitability and compaction during construction. Often, a vapor barrier is considered below concrete slab areas. However, the usage of a vapor barrier could result in curling of the concrete slab at joints. Floor covers sensitive to moisture typically requires the usage of a vapor barrier. A materials or structural engineer should be consulted regarding the detailing of the vapor barrier below concrete slabs. Exterior slabs typically do not utilize vapor barriers. The American Concrete Institutes ACI 36oR-o6 Design of Slabs on Grade and ACI 302.1R-04 Guide for Concrete Floor and Slab Construction are recommended references for vapor barrier selection and floor slab detailing. Slabs on grade may be designed using a coefficient of subgrade reaction of 210 pounds per cubic inch (pci) assuming the slab -on -grade base course is underlain by structural fill placed and compacted as outlined in Section 8.1. A 4- to 6-inch-thick capillary break layer should be placed over the prepared subgrade. This material should consist of pea gravel or 5/8 inch clean angular rock. A perimeter drainage system is recommended unless interior slab areas are elevated a minimum Of 12 inches above adjacent exterior grades. If installed, a perimeter drainage system should consist of a 4-inch diameter perforated drain pipe surrounded by a minimum 6 inches of drain rock wrapped in a non -woven geosynthetic filter fabric to reduce migration of soil particles into the drainage system. The perimeter drainage system should discharge by gravity flow to a suitable stormwater system. Exterior grades surrounding buildings should be sloped at a minimum of one percent to facilitate surface water flow away from the building and preferably with a relatively impermeable surface cover immediately adjacent to the building. Erosion and Sediment Control Erosion and sediment control (ESC) is used to reduce the transportation of eroded sediment to wetlands, streams, lakes, drainage systems, and adjacent properties. Erosion and sediment control measures should be implemented, and these measures should be in general accordance with local regulations. At a minimum, the following basic recommendations should be incorporated into the design of the erosion and sediment control features for the site: • Schedule the soil, foundation, utility, and other work requiring excavation or the disturbance of the site soils, to take place during the dry season (generally May through September). However, provided precautions are taken using Best Management Practices (BMP's), grading activities can be completed during the wet season (generally October through April). • All site work should be completed and stabilized as quickly as possible. • Additional perimeter erosion and sediment control features may be required to reduce the possibility of sediment entering the surface water. This may include additional silt fences, silt www.cobaltgeo.com (2o6) 331-1097 May 2'7, 2021 Page 8 of 10 Geotechnical Evaluation fences with a higher Apparent Opening Size (AOS), construction of a berm, or other filtration systems. • Any runoff generated by dewatering discharge should be treated through construction of a sediment trap if there is sufficient space. If space is limited other filtration methods will need to be incorporated. Groundwater Influence on Construction Groundwater was not encountered in the explorations. Groundwater could be present at shallow depths during the wet season, perched on the dense fine grained native soils. We do not anticipate that significant volumes of groundwater will be encountered in shallow excavations during the dry season. If groundwater is encountered, we anticipate that sump excavations and small diameter pumps systems will adequately de -water short-term excavations, if required. Any system should be designed by the contractor. We can provide additional recommendations upon request. Utilities Utility trenches should be excavated according to accepted engineering practices following OSHA (Occupational Safety and Health Administration) standards, by a contractor experienced in such work. The contractor is responsible for the safety of open trenches. Traffic and vibration adjacent to trench walls should be reduced; cyclic wetting and drying of excavation side slopes should be avoided. Depending upon the location and depth of some utility trenches, groundwater flow into open excavations could be experienced, especially during or shortly following periods of precipitation. In general, silty soils were encountered at shallow depths in the explorations at this site. These soils have low cohesion and density and will have a tendency to cave or slough in excavations. Shoring or sloping back trench sidewalls is required within these soils in excavations greater than 4 feet deep. All utility trench backfill should consist of imported structural fill or suitable on site soils. Utility trench backfill placed in or adjacent to buildings and exterior slabs should be compacted to at least 95 percent of the maximum dry density based on ASTM Test Method D1557. The upper 5 feet of utility trench backfill placed in pavement areas should be compacted to at least 95 percent of the maximum dry density based on ASTM Test Method D1557. Below 5 feet, utility trench backfill in pavement areas should be compacted to at least 90 percent of the maximum dry density based on ASTM Test Method D1557. Pipe bedding should be in accordance with the pipe manufacturer's recommendations. The contractor is responsible for removing all water -sensitive soils from the trenches regardless of the backfill location and compaction requirements. Depending on the depth and location of the proposed utilities, we anticipate the need to re -compact existing fill soils below the utility structures and pipes. The contractor should use appropriate equipment and methods to avoid damage to the utilities and/or structures during fill placement and compaction procedures. www.cobaltgeo.com (2o6) 331-1097 May 2'7, 2021 Page 9 of 10 Geotechnical Evaluation CONSTRUCTION FIELD REVIEWS Cobalt Geosciences should be retained to provide part time field review during construction in order to verify that the soil conditions encountered are consistent with our design assumptions and that the intent of our recommendations is being met. This will require field and engineering review to: ■ Monitor and test structural fill placement and soil compaction ■ Observe bearing capacity at foundation locations ■ Observe slab -on -grade preparation ■ Monitor foundation drainage placement ■ Observe excavation stability Geotechnical design services should also be anticipated during the subsequent final design phase to support the structural design and address specific issues arising during this phase. Field and engineering review services will also be required during the construction phase in order to provide a Final Letter for the project. CLOSURE This report was prepared for the exclusive use of Chris and Lisa Burdett and their appointed consultants. Any use of this report or the material contained herein by third parties, or for other than the intended purpose, should first be approved in writing by Cobalt Geosciences, LLC. The recommendations contained in this report are based on assumed continuity of soils with those of our test holes and assumed structural loads. Cobalt Geosciences should be provided with final architectural and civil drawings when they become available in order that we may review our design recommendations and advise of any revisions, if necessary. Use of this report is subject to the Statement of General Conditions provided in Appendix A. It is the responsibility of Chris and Lisa Burdett who is identified as "the Client" within the Statement of General Conditions, and its agents to review the conditions and to notify Cobalt Geosciences should any of these not be satisfied. Sincerely, Cobalt Geosciences, LLC HONry9 WACl- sy� z� 54896 <� , FSSISTER�� \� ZONAL 5/27/2021 Phil Haberman, PE, LG, LEG Principal �� V�lashi Enwsnwmne rnaoaa C1Q12513 Red Geo O PHILUP HASEMAN www.cobaltgeo.com (2o6) 331-1097 May 2'7, 2021 Page 10 of to Geotechnical Evaluation Statement of General Conditions USE OF THIS REPORT: This report has been prepared for the sole benefit of the Client or its agent and may not be used by any third party without the express written consent of Cobalt Geosciences and the Client. Any use which a third party makes of this report is the responsibility of such third party. BASIS OF THE REPORT: The information, opinions, and/or recommendations made in this report are in accordance with Cobalt Geosciences present understanding of the site specific project as described by the Client. The applicability of these is restricted to the site conditions encountered at the time of the investigation or study. If the proposed site specific project differs or is modified from what is described in this report or if the site conditions are altered, this report is no longer valid unless Cobalt Geosciences is requested by the Client to review and revise the report to reflect the differing or modified project specifics and/or the altered site conditions. STANDARD OF CARE: Preparation of this report, and all associated work, was carried out in accordance with the normally accepted standard of care in the state of execution for the specific professional service provided to the Client. No other warranty is made. INTERPRETATION OF SITE CONDITIONS: Soil, rock, or other material descriptions, and statements regarding their condition, made in this report are based on site conditions encountered by Cobalt Geosciences at the time of the work and at the specific testing and/or sampling locations. Classifications and statements of condition have been made in accordance with normally accepted practices which are judgmental in nature; no specific description should be considered exact, but rather reflective of the anticipated material behavior. Extrapolation of in situ conditions can only be made to some limited extent beyond the sampling or test points. The extent depends on variability of the soil, rock and groundwater conditions as influenced by geological processes, construction activity, and site use. VARYING OR UNEXPECTED CONDITIONS: Should any site or subsurface conditions be encountered that are different from those described in this report or encountered at the test locations, Cobalt Geosciences must be notified immediately to assess if the varying or unexpected conditions are substantial and if reassessments of the report conclusions or recommendations are required. Cobalt Geosciences will not be responsible to any party for damages incurred as a result of failing to notify Cobalt Geosciences that differing site or sub -surface conditions are present upon becoming aware of such conditions. PLANNING, DESIGN, OR CONSTRUCTION: Development or design plans and specifications should be reviewed by Cobalt Geosciences, sufficiently ahead of initiating the next project stage (property acquisition, tender, construction, etc), to confirm that this report completely addresses the elaborated project specifics and that the contents of this report have been properly interpreted. Specialty quality assurance services (field observations and testing) during construction are a necessary part of the evaluation of sub -subsurface conditions and site preparation works. Site work relating to the recommendations included in this report should only be carried out in the presence of a qualified geotechnical engineer; Cobalt Geosciences cannot be responsible for site work carried out without being present. www.cobaltgeo.com (2o6) 331-1097 • 340 �r ✓ k. w 3-26 +► 403 320 - F `�' y'd► 401 � >Q ��� r HB-1 Approximate N Hand Boring Location n �V Not to Scale Cobalt Geosciences, LLC Proposed Residence SITE PLAN P.O. Box 82243 Kenmore, WA 98028 COBALT 332 Sunset Avenue North (2o6) 331-1097 GEOSCIENCES Edmonds, Washington FIGURE >< 1^'ww.cobaltgeo.com cobaltgeo(&gmail.com Unified Soil Classification System (USCS) MAJOR DIVISIONS SYMBOL TYPICAL DESCRIPTION Clean Gravels Gw Well -graded gravels, gravels, gravel -sand mixtures, little or no fines Gravels (more than 50% (less than 5% fines) GP Poorly graded gravels, gravel -sand mixtures, little or no fines COARSE GRAINED SOILS of coarse fraction retained on No. 4 sieve) Gravels with Fines (more than 12% fines) GM Silty gravels, gravel -sand -silt mixtures GC Clayey gravels, gravel -sand -clay mixtures (more than 50% retained on Clean Sands :•: sw Well -graded sands, gravelly sands, little or no fines No. 200 sieve) Sands (50% or more of coarse fraction (less than 5% fines) sP Poorly graded sand, gravelly sands, little or no fines passes the No. 4 sieve) Sands with Fines sM Silty sands, sand -silt mixtures (more than 12% fines) sc Clayey sands, sand -clay mixtures ML Inorganic silts of low to medium plasticity, sandy silts, gravelly silts, FINE GRAINED (50% or more Silts and Clays (liquid limit less than 50) Inorganic cL or clayey silts with slight plasticity Inorganic clays of low to medium plasticity, gravelly clays, sandy clays silty clays, lean clays Organic rganic oL Organic silts and organic silty clays of low plasticity passes the MH Inorganic silts, micaceous or diatomaceous fine sands or silty soils, No. 200 sieve) Silts and Clays (liquid limit 50 or more) Inorganic elastic silt CH Inorganic clays of medium to high plasticity, sandy fat clay, or gravelly fat clay Organic OHOrganic clays of medium to high plasticity, organic silts HIGHLY ORGANIC SOILS Primarily organic matter, dark in color, and organic odor PT Peat, humus, swamp soils with high organic content (ASTM D4427) Classification of Soil Constituents MAJOR constituents compose more than 50 percent, by weight, of the soil. Major constituents are capitalized (i.e., SAND). Minor constituents compose 12 to 50 percent of the soil and precede the major constituents (i.e., silty SAND). Minor constituents preceded by "slightly" compose 5 to 12 percent of the soil (i.e., slightly silty SAND). Trace constituents compose o to 5 percent of the soil (i.e., slightly silty SAND, trace gravel). Relative Density (Coarse Grained Soils) Consistency (Fine Grained Soils) N, SPT, Relative N, SPT, Relative Blows/FT Density Blows/FT Consistency 0-4 Very loose Under 2 Very soft 4 -10 Loose 2-4 Soft 10 - 30 Medium dense 4-8 Medium stiff 30 - 50 Dense 8 -15 Stiff Over 50 Very dense 15 - 30 Very stiff Over 3o Hard Grain Size Definitions Description Sieve Number and/or Size Fines <#200 (o.o8 mm) Sand -Fine #200 to #40 (o.o8 to 0.4 mm) -Medium #40 to #10 (0.4 to 2 mm) -Coarse #10 to #4 (2 to 5 mm) Gravel -Fine #4 to 3/4 inch (5 to 19 mm) -Coarse 3/4 to 3 inches (19 to 76 mm) Cobbles 3 to 12 inches (75 to 305 mm) Boulders >12 inches (305 mm) 1 Moisture Content Definitions 1 Dry Absence of moisture, dusty, dry to the touch Moist Damp but no visible water Wet Visible free water, from below water table Cobalt Geosciences, LLC P.O. Box 82243 Kenmore, WA 98028 Soil Classification Chart Figure Ci (2o6) 331-1097 _ www.cobaltgeo.com cobaltgeo(&gmail.com Hand Boring HB-1 Date: May 2021 Depth. 6' Groundwater: None Contractor: Elevation: Logged By: PH Checked By: SC N 0) o -0 Moisture Content (%) Plastic I Liquid U L E Limit Limit F � N Material Description o ? o DCP Equivalent N-Value C 0 10 20 30 40 50 -------- ---- — — -- SM Topsoil/Grass -------------------------------------------- Loose to medium dense, silty -fine to medium grained sand with gravel, dark yellowish brown, moist. (Weathered Whidbey Formation) 2 -Grades to sandy silt 3 4 ------- 5 ----. -- SM --------------------------------------------- Dense to very dense, silty -fine to medium grained sand with gravel, mottled yellowish brown to grayish brown, moist. (Whidbey Formation) 6 7 End of Hand Boring 6' 9 10 Hand Boring HB-2 Date: May 2021 Depth: 6' Groundwater: None Contractor: Elevation: Logged By: PH Checked By: SC 0 0) J o -0 Moisture Content (%) Plastic Liquid IL U L E 15 3 Limit Limit � � Q N Material Description c ? o DCP Equivalent N-Value o C 0 10 20 30 40 50 1 2 3 4 5 7 8 9 10 --- --- -------------------------------------------- SM Loose to medium dense, silty -fine to medium grained sand with gravel, dark yellowish brown, moist. (Weathered Whidbey Formation) -Grades to sandy silt FIE_jnF e to very dense, silty -fine to medium grained sand with gravel, mottled yellowish brown to grayish brown, moist. (Whidbey Formation) of Hand Boring 6' Proposed Residence 332 Sunset Avenue North Edmonds, Washington Hand Boring Logs Cobalt Geosciences, LLC P.O. Box 82243 Kenmore, WA 98028 (2o6) 331-1097 www.cobaltgeo.com cobaltgeo(digmail.com 7.0 OTHER PERMITS The following permits and/or approvals are thought to be required as part of this project: • Clearing and Grading Permit Right -Of -Way use Permit • Land Use Permit Page 23 8.0 ESC ANALYSIS AND DESIGN TESC measures are put into place to prevent sediment from leaving the site. The site is generally flat. The proposed TESC plan will include, but not be limited to, the following guidelines set in the jurisdictions Minimum Requirement "Construction Stormwater Pollution Prevention". A SWPPP will be provided to address: Clearing Limits — Clearing limits specify the boundary of the work to be done. Clearing are defined on the TESC plans and will be flagged in the field. 2. Cover Measures — Cover measures are involved (typically) with the means to control erosion of exposed soil and are specified on the TESC plans. 3. Perimeter Protection — Perimeter protection keeps site sediment from leaving the construction site. This type of protection typically involves a silt fence. The silt fence and clearing limits are shown on the TESC plans. 4. Traffic Area Stabilization — Traffic area stabilization is addressed by a stabilized construction entrance. 5. Sediment Retention — Retention will be established by silt fences around the perimeter and catch basin inserts that will control of the on -site sediment - laden water. 6. Surface Water Collection — An interceptor ditch with check dams is shown in the plans and will be implemented in the field if necessary. 7. Dewatering Control — Any water from dewatering shall be filtered or contained so sediment can filter out prior to discharge downstream. 8. Dust Control — Dust control will be provided by sprinkling. 9. Wet Season Construction — Construction will be conducted according to the jurisdiction's standards during the wet season. 10. Construction Within Sensitive Areas and Buffers - Any construction within the wetland buffer will be subject to sensitive areas restrictions and is contained in the TESC notes. 11. Maintenance — Maintenance requirements are detailed in the TESC notes within the engineering plans. 12. Final Stabilization — Upon completion of the project, all disturbed areas will be stabilized and Best Management Practices removed. 13. LID BMP's — Protect areas that will be designated as infiltration. Do not allow turbid runoff to enter excavated infiltration facilities. If the soil porosity is compromised, additional excavation is required to reach suitable soils. Page 24 9.0 BOND QUANTITIES NA Page 25 10.0 OPERATIONS AND MAINTENANCE MANUAL The conveyance system on this project will be privately owned and maintained by the Owner. See the following. Page 26 Table V-4.5.2(5) Maintenance Standards - Catch Basins Results Maintenance Conditions When Maintenance is Expected Component Defect Needed When Main - tenance is performed No Trash or debris loc- Trash or debris which is located imme- ated imme- diately in front of the catch basin opening or diately in is blocking inletting capacity of the basin by front of catch more than 10%. basin or on Trash or debris (in the basin) that exceeds grate open- 60 percent of the sump depth as measured ing. from the bottom of basin to invert of the low- No trash or est pipe into or out of the basin, but in no debris in the Trash & case less than a minimum of six inches catch basin. Debris clearance from the debris surface to the invert of the lowest pipe. Inlet and out- let pipes free Trash or debris in any inlet or outlet pipe of trash or blocking more than 1/3 of its height. debris. General Dead animals or vegetation that could gen- No dead erate odors that could cause complaints or animals or dangerous gases (e.g., methane). vegetation present within the catch basin. Sediment (in the basin) that exceeds 60 per- cent of the sump depth as measured from the bottom of basin to invert of the lowest pipe into or out of the basin, but in no case No sediment Sediment less than a minimum of 6 inches clearance in the catch from the sediment surface to the invert of the basin lowest pipe. Structure Top slab has holes larger than 2 square Top slab is Damage to inches or cracks wider than 1/4 inch. (Intent free of holes Frame and/or is to make sure no material is running into and cracks. Top Slab basin). Frame is sit- Table V-4.5.2(5) Maintenance Standards - Catch Basins (continued) Results Maintenance Conditions When Maintenance is Expected Component Defect Needed When Main- tenance is performed Frame not sitting flush on top slab, i.e., sep- ting flush on aration of more than 314 inch of the frame the riser rings from the top slab. Frame not securely or top slab attached and firmly attached. Basin Maintenance person judges that structure is replaced or unsound. repaired to Fractures or design stand - Cracks in Grout fillet has separated or cracked wider ards. Basin Walls/ than 112 inch and longer than 1 foot at the g Bottom joint of any inlet/outlet pipe or any evidence Pipe is of soil particles entering catch basin through regrouted cracks. and secure at basin wall. Basin Settlement If failure of basin has created a safety, func- replaced or %lisalignment tion, or design problem. repaired to design stand- ards. No veget- Vegetation growing across and blocking ation block - more than 10% of the basin opening. ing opening to basin. Vegetation Vegetation growing in inlet/outlet pipe joints that is more than six inches tall and less No veget- than six inches apart. ation or root growth present. Contamination "Detention No pollution and Pollution See Ponds" (No. 1). present. Cover Not in Cover is missing or only partially in place. Catch basin Catch Basin Place Any open catch basin requires main- cover is Cover tenance. closed Locking Mech- Mechanism cannot be opened by one main- Mechanism anism Not tenance person with proper tools. Bolts into opens with Table V-4.5.2(5) Maintenance Standards - Catch Basins (continued) Results Maintenance Conditions When Maintenance is Expected Component Defect i Needed When Main - tenance is performed Working frame have less than 112 inch of thread. proper tools. One maintenance person cannot remove lid Cover can be Cover Difficult after applying normal lifting pressure. removed by to Remove (Intent is keep cover from sealing off access one main - tenance per - to maintenance.) son. Ladder meets design stand Ladder Rungs Ladder is unsafe due to missing rungs. not ards and Ladder Unsafe securely attached to basin wall, mis- allows main - alignment, rust, cracks, or sharp edges. tenance per- son safe access. Grate open - Grate opening Grate with opening wider than 7/8 inch. ing meets Unsafe design stand- ards. Metal Grates Trash and Trash and debris that is blocking more than Grate free of (If Applic- Debris 20% of grate surface inletting capacity. trash and able) debris. Grate is in Damaged or Grate missing or broken member(s) of the place and Missing. grate. meets design standards.