Loading...
Building Permit_1Type: PLUMBING Subtype: COMMERCIAL PLUMBING I Status: ISSUED Parcel No: 27043100402800 Site Address: 24105 78TH PL W Edmonds,WA 98026 Subdivision: LAKE MCALEER VILLA TRACTS, 005593, 004911 Lot: 0 Fire Sprinklers: Lot Area: Zoning: Valuation: $0.00 Occupancy Type: Construction Type: Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Scope of Work: MATHAY PARK RESTOOMS PLUMBING BLD2023-1127 Applied: 5/31/2024 Issued:10/1/2024 Final: Expiration Date: 10/1/2026 Issued by: NED I WA State Contractor L & I #: FLOWCCP837LE I CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT KYLE WOODS 700 MAIN ST, EDMONDS WA (425)599-3847 KYLE.WOODS@EDMONDSWA.GOV 98020 CONTACT CITY OF EDMONDS, PARKS 700 MAIN ST, EDMONDS WA (425)599-3847 kyle.woods@edmondswa.gov AND REC 98020 CONTRACTOR FLOW CONTROL PLUMBING 621 SR 9 NE PMB C2, LAKE (425)512-9495 LLC STEVENS WA 98258 CONTRACTOR 2 ACCORD CONTRACTORS LLC 15405 SE 37TH ST 100, (425)754-6759 keith@accordcontractors.com BELLEVUE WA 98006 OWNER EDMONDS CITY OF 250 5TH AVE N, EDMONDS WA (425)344-1505 98020 PREVIOUS plumber, BREMERTON WA ROBERT 1 CRESTIK CONTRACTOR 98311 FEE INFORMATION DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT# CITY TECHNOLOGY FEE - PER 001.000.321.99.100.00 $45.00 $45.00 6/4/24 R37555 PERMIT EACH PLUMBING FIXTURE ON ONE 001.000.345.83.000.00 $51.00 $51.00 9/30/24 R40371 TRAP PLUMBING BASE FEE 001.000.322.10.000.00 $57.00 $57.00 6/4/24 R37555 WATER HEATER - TANKLESS 001.000.345.83.000.00 $17.00 $17.00 9/30/24 R40371 TOTALS: $170.00 $170.00 CONDITION TYPE STATUS NOTES Printed: Tuesday, December 31, 2024 1:14:37 PM 1 of 2 PLUMBING Permit - City of • • • •:� i 1 1 www.edmondswa.gov • 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. 7INSPECTIONTPE INSPECTOR COMPLETED RESULT NOTES FINAL** 10/2/2024 CORRECTION Pre-fab CXT Restroom 12:00:00 AM REQUIRED X-0 PLUMBING FINAL** 10/2/2024 CORRECTION Not ready. System to be supplied with permeant 12:00:00 AM REQUIRED water supply and sewer connections. Hot water tank to be functioning. X-0 PLUMBING FINAL** B-3 PLUMB ROUGH IN 10/2/2024 CORRECTION Pre -Fab CXT Restroom 12:00:00 AM REQUIRED B-3 PLUMB ROUGH IN 10/2/2024 CORRECTION Corrections 12:00:00 AM REQUIRED • Unable to verify test on ground work piping, system to exposed and full of water with a 10' of head • Provided photos do not indicate if the piping has proper slope. • Unable to verify backfill/bedding material of trenches meets UPC standards • Unable to verify all fittings used in ground work are approved for installed use or proper direction of flow • Provide proof of trap primers for floor drains • Provide proof of glue used to connect exposed ABS piping in mechanical/storage is listed for use B-3 PLUMB ROUGH IN —7 Printed: Tuesday, December 31, 2024 1:14:37 PM 2 of 2