Building Permit_1Type: PLUMBING Subtype: COMMERCIAL PLUMBING I Status: ISSUED
Parcel No: 27043100402800 Site Address: 24105 78TH PL W Edmonds,WA 98026
Subdivision: LAKE MCALEER VILLA TRACTS, 005593, 004911 Lot: 0
Fire Sprinklers: Lot Area: Zoning:
Valuation: $0.00 Occupancy Type: Construction Type:
Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0
Scope of Work: MATHAY PARK RESTOOMS PLUMBING BLD2023-1127
Applied: 5/31/2024
Issued:10/1/2024
Final:
Expiration Date: 10/1/2026
Issued by: NED
I WA State Contractor L & I #: FLOWCCP837LE I
CONTACTS
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
KYLE WOODS
700 MAIN ST, EDMONDS WA
(425)599-3847
KYLE.WOODS@EDMONDSWA.GOV
98020
CONTACT
CITY OF EDMONDS,
PARKS
700 MAIN ST, EDMONDS WA
(425)599-3847
kyle.woods@edmondswa.gov
AND REC
98020
CONTRACTOR
FLOW CONTROL PLUMBING
621 SR 9 NE PMB C2, LAKE
(425)512-9495
LLC
STEVENS WA 98258
CONTRACTOR 2
ACCORD CONTRACTORS LLC
15405 SE 37TH ST 100,
(425)754-6759
keith@accordcontractors.com
BELLEVUE WA 98006
OWNER
EDMONDS CITY OF
250 5TH AVE N, EDMONDS WA
(425)344-1505
98020
PREVIOUS
plumber, BREMERTON WA
ROBERT 1 CRESTIK
CONTRACTOR
98311
FEE INFORMATION
DESCRIPTION
ACCOUNT AMOUNT
PAID
PAID DATE RECEIPT#
CITY TECHNOLOGY FEE - PER
001.000.321.99.100.00
$45.00
$45.00
6/4/24
R37555
PERMIT
EACH PLUMBING FIXTURE ON ONE
001.000.345.83.000.00
$51.00
$51.00
9/30/24
R40371
TRAP
PLUMBING BASE FEE
001.000.322.10.000.00
$57.00
$57.00
6/4/24
R37555
WATER HEATER - TANKLESS
001.000.345.83.000.00
$17.00
$17.00
9/30/24
R40371
TOTALS: $170.00
$170.00
CONDITION TYPE
STATUS
NOTES
Printed: Tuesday, December 31, 2024 1:14:37 PM 1 of 2
PLUMBING Permit
-
City of • • •
•:� i 1 1
www.edmondswa.gov •
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision.
2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or
other administrative deviation from adopted codes ordinances or policies must be
specifically requested in writing and be called out and identified. Processing fees for such
requests shall be established by Council and shall be paid upon submittal and are
nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted
by the Building Official prior to use or occupancy of the building or structure. Check the
job card for all required City inspections including final project approval and final
occupancy inspections.
5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW.
Property owners who hire an unlicensed plumber may assume the risks and potential
monetary liability for work performed by unlicensed plumbing contractors. For more
information contact L&I Department of Licensing at 1-800-647-0982.
7INSPECTIONTPE INSPECTOR
COMPLETED
RESULT
NOTES
FINAL**
10/2/2024
CORRECTION
Pre-fab CXT Restroom
12:00:00 AM
REQUIRED
X-0 PLUMBING FINAL**
10/2/2024
CORRECTION
Not ready. System to be supplied with permeant
12:00:00 AM
REQUIRED
water supply and sewer connections. Hot water tank
to be functioning.
X-0 PLUMBING FINAL**
B-3 PLUMB ROUGH IN
10/2/2024
CORRECTION
Pre -Fab CXT Restroom
12:00:00 AM
REQUIRED
B-3 PLUMB ROUGH IN
10/2/2024
CORRECTION
Corrections
12:00:00 AM
REQUIRED
• Unable to verify test on ground work piping, system
to exposed and full of water with a 10' of head
• Provided photos do not indicate if the piping has
proper slope.
• Unable to verify backfill/bedding material of
trenches meets UPC standards
• Unable to verify all fittings used in ground work are
approved for installed use or proper direction of flow
• Provide proof of trap primers for floor drains
• Provide proof of glue used to connect exposed ABS
piping in mechanical/storage is listed for use
B-3 PLUMB ROUGH IN
—7
Printed: Tuesday, December 31, 2024 1:14:37 PM 2 of 2