Loading...
Building PermitStatus: READY TO Type: RESIDENTIAL BLDG Subtype: ADDITION ISSUE Parcel No: 01144700000500 Site Address: 21813 86TH PL W EDMONDS,WA 98026 Applied: 10/16/2024 Subdivision: 011447 Lot: 0 Issued: Fire Sprinklers: Lot Area: 8,441 Zoning: RS-8 Final: Valuation: $23,525.14 Occupancy Type: Construction Type: Expiration Date: Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Issued by: Scope of Work: RIGSBY-ELEVATOR ADDITION I WA State Contractor L & I #: IRONSBC961LC I NAME TYPE NAME ADDRESS PHONE EMAIL 21806 2ND AVE W, BOTHELL MIKE.G@ARETE- APPLICANT MICHAEL GARRETT (208)661-3253 WA 98021 ARCHITECTURE. DESIGN CONTACT ARETE ARCHITECTURE 21806 2ND AVE W, BOTHELL (208)661-3253 Mike.g@arete-architecture.design WA 98021 CONTRACTOR IRONS BROTHERS 1510 NE 170TH ST #2, (206)306-7767 office@ironsbc.com CONSTRUCTION INC SHORELINE WA 98155 21813 86TH PL W, EDMONDS OWNER JAMES M & DEBRA S RIGSBY WA 98026 DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # APPLIANCE VENT 001.000.345.83.000.00 $17.00 $17.00 12/31/24 R42352 BLD - RES - PERMIT - VALUATION 001.000.345.83.000.00 $483.00 $483.00 12/31/24 R42352 BASED BLD - RES - PLAN REVIEW 001.000.345.83.000.00 $410.55 $410.55 10/17/24 R40747 CITY TECHNOLOGY FEE - PER 001.000.321.99.100.00 $45.00 $45.00 10/17/24 R40747 PERMIT ENG - INSPECTIONS - 4.1.24 001.000.345.83.400.00 $264.00 $264.00 12/31/24 R42352 MECHANICAL BASE PERMIT FEE 001.000.322.10.000.00 $57.00 $57.00 12/31/24 R42352 STATE BUILDING CODE SURCHARGE 001.000.237.150 $6.50 $6.50 12/31/24 R42352 RES TOTALS: $1,283.05 $1,283.05 7 •W CONDITION TYPE STATUS NOTES Printed: Friday, January 03, 2025 9:40:32 AM 1 of 3 'RESIDENTIAL BLDG PermitCity - • • • • EL 98020 1 . •. • 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:OOam to 6:OOpm on weekdays and 10:OOam to 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. CARBON MONOXIDE ALARMS SHALL BE INSTALLED OUTSIDE OF EACH SEPARATE SLEEPING AREA IN THE IMMEDIATE VICINITY OF THE BEDROOMS AND ON EACH LEVEL IN FOR CARBON MONOXIDE SYSTEMS NEW CONSTRUCTION AND IN EXISTING DWELLINGS WHEN ALTERATIONS, REPAIRS OR INFORMATION ADDITIONS REQUIRING A PERMIT OCCUR, OR WHEN ONE OR MORE SLEEPING ROOMS ARE ADDED OR CREATED. It is the owner's responsibility to repair/replace all damage of utilities or frontage DAMAGE TO FRONTAGE FOR improvements in City right of Ways or Easements to City Standards caused by or IMPROVEMENTS INFORMATION occurring during the permitted project. ELECTRICAL PERMIT FOR Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309. NFORMATION FOR MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD ESC REQUIREMENTS INFORMATION REQUIREMENTS. FOR SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT. INSPECTIONS INFORMATION www.mybuildingpermit.com Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION Provide manufactures installation instructions on site for Building Inspector. Sound or noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of FOR 7:OOam to 6:OOpm on weekdays and 10:OOam and 6:OOpm on Saturdays, excluding SOUND AND NOISE INFORMATION Sundays and Federal Holidays. At all other times the noise originating from construction sites and activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. SPECIAL INSPECTION REPORTS FOR Submit all special inspection reports to the City Building Official on a weekly basis. NFORMATION FOR All utilities shall be located prior to any excavation. New locates shall be called for if at UTILITY LOCATES INFORMATION time of excavation, original locates are no longer identifiable. Printed: Friday, January 03, 2025 9:40:32 AM 2 of 3 RESIDENTIAL BLDG '-rmit AveCity of Edmonds PERMIT NUM •:� i 1 www.edmondswa.gov Lw.A& INSPECTIONS• INSPECTIONTYPE •. INSPECTOR COMPLETED RESULT NOTES A-1 BUILDING PRECON B-1 SETBACKS B-2 FOOTINGS B-2 SLAB INSULATION B-3 EXT WALL SHEATHING B-3 EXTERIOR INSULATION B-3 MECH ROUGH IN B-3 ROOF SHEATHING B-4 FRAMING B-7 BUILDING OTHER INSP X-3 BUILDING FINAL" E-3 STRM FOOTING DRAIN E-3 STRM TIGHTLINE X-2 ENGINEERING FINAL Printed: Friday, January 03, 2025 9:40:32 AM 3 of 3