Loading...
APPROVED ENG2024-0561 ROW PERMITRIGHT OF WAY EUC PERMIT PERMIT NUMBER City of Edmonds 98020 ENG2024-0561 www.edmondswa.gov i Description: PUD - REPLACE 1 BO POLE ISSUED: 01/09/2025 Address: 23577 74TH AVE W EDMONDS WA 98026-8500 EXPIRES: 07/08/2025 Permit Type: RIGHT OF WAY EUC Permit Subtype: STANDARD Parcel Number: 27043200301700 I 11-14111 a NAME TYPE NAME ADDRESS PHONE APPLICANT MOE MATTHEWS PO BOX 1107, EVERETT WA 98206 (425)783-5681 CONTACT SNOHOMISH COUNTY PUD PO BOX 1107, EVERETT WA 98206 (425)783-8262 CONTRACTOR SNOHOMISH COUNTY PUD PO BOX 1107, EVERETT WA 98206 (425)783-4353 OWNER LYLE B & BEATE PETER 23577 74TH AVE W, EDMONDS WA 98026-8500 FEE INFORMATION DESCRIPTION AMOUNT PAID CITY TECHNOLOGY FEE - PER PERMIT $45.00 $45.00 ENG - INSPECTIONS - 4.1.24 $264.00 $264.00 ROW - STANDARD - 4.1.24 $396.00 $396.00 REQUIREMENTS REQUIREMENT TYPE NOTES TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their posession. RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday - No Exceptions WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the work. INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM 24 HR NOTICE REQUIRED The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit. RELEASED BY: MAJ DATE: 01/09/2025 Printed: Thursday, January 09, 2025 9:27:07 AM 1 of 2 RIGHT OF WAY EUC PERMIT PERMIT NUMBE3 City of Edmonds www.edmondswa.gov • • CONDITIONS CONDITION TYPE ALERT RESIDENTS ALERT AFFECTED RESIDENTS AND OR BUSINESSES PRIOR TO WORK START. It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in DAMAGE TO FRONTAGE City right of Ways or Easements to City Standards caused by or occurring during the permitted IMPROVEMENTS project. MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD ESC REQUIREMENTS REQUIREMENTS. Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the HOLD HARMLESS issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT. INSPECTIONS www.mybuildingpermit.com POTHOLING VERIFY CLEAR BORE CROSSINGS. RESTORE LANDSCAPE Restore landscape to like or better conditions Sound or noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on SOUND AND NOISE weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites and activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. All utilities shall be located prior to any excavation. New locates shall be called for if at time of UTILITY LOCATES excavation, original locates are no longer identifiable. INSPECTIONS INSPECTION TYPE DATE RESULT COMPLETE A-1 JOB START E-7 TRAFFIC CTRL X-2 ENGINEERING FINAL** Printed: Thursday, January 09, 2025 9:27:07 AM 2 of 2 WO# 100072258 OP104 RECEIVED Lti�y of ED%4,,, lNC. 1 g90 SECTION A RIGHT OF WAY CONSTRUCTION PERMIT APPLICATION Complete and submit this Application in accordance with the Submittal Requirements outlined in Right -of -Way permit Handout E63. DEC 11 2024 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT If any field is not applicable to your project, write "N/A" instead of leaving blank. All fields required. Incomplete Applications will be denied. General Info Project Name BO Pole Replacement (PLI 251563) Site Address or if no site address use Property Address at NW corner of project area: 235577 74th Ave W Edmonds, WA 98026 Associated Permits: BLD PLN ENG Owner and Entity Holding Franchise (if applicable) NameofCompany Snohomish County PUD Franc hiseOrdinanceNo: N/A Point of Contact Joint Use Title Address PO Box 1107 city Everett state WA zip 98206-1107 Phone Email Permits sno ud.com Contractor and Authorized Agent of Owner Name of Company Same as above (see note below) Contractor Contacts During Construction Primary Name Agent Name Title Title Mobile Address Email City State Zip Secondary Name Phone Title Email Mobile City of Edmonds Business License No: Email State License No: 313-005-741 ❑ Contractor verifies it is currently bonded Contractor verifies it currently has general liability insurance NOTE: ECDC 18.6o.02o requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city engineer. ❑ Multifamily residential ❑ Commercial ❑ City project ❑ Single family residential subdivision ❑ Single family -other ❑ Industrial ❑ Demo and rebuild or from vacant land? (Other, please specify: Pole Replacement ❑ Utility Franchise Work associated with development (check one of the above boxes as well) ❑ Traffic Control Only (no associated development) City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021 ❑ Utility Franchise Work (no associated development) Project Description Include an overall narrative description of the proposed work. Be specific and detailed: Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc. Include whether this is construction, maintenance, or repair. Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for underground utilities, etc.) PUD to replace BO PLI 251563 and its anchor (guy pole) in the same location. Ground disturbance will only be in soft surfaces. No bores. Northbound shoulder lane of 74th Ave W will be closed for 4-8hrs between 7AM-3PM for pole and anchor replacement. Vegetation trimming will be required to replace the anchor. RIGHT-OF-WAY CLOSURE AREA TOTAL DURATION (Number of Months) Sidewalk 72 hours + LF JxJ LF SF Alley 72 hours + LF JxJ F SF Parking 72 hours + LF JxJ LF SF SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTION C. 1. The work in the right of way is on or for the following type of facilities: ❑ telecommunications ❑ cable Wpower ❑ gas ❑ water ❑ sewer ❑ storm 1. CompletedDetails of Work to be Does the utility owner have existin overhead infrastructure in the area of work? • 2. Will any equipment be added underground or above ground (e.g. pedestals, vaults, etc.)? X If yes, describe: 3. Does the proposed work connect a lot or commercial development with utilities that serve more than one lot or commercial development? X 4. Does the work involve rebuilding or relocating an existing aboveground utility system which connects a lot or commercial development to an existing underground common utility system? X 5. Does the work involve proposed additions to an aboveground utility system? If es: X Are the additions for the purpose of serving new commercial development? Are the additions for the purpose of serving a single-family residential subdivision? Details of • to be Completed Z" 6. Does your project involve rebuilding or replacing utility equipment which currently serves more X than one lot or commercial development? City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021 If yes, answer the following questions related to project area, i.e. the actual area in which the project is proposed: 6a. Does your project involve wires/cables/lines? If yes: X How many are existing? I I How many are to be added? 6b. Does your project involve poles? If yes: V How many poles are existing in the project area? 1 What is the height of the existing poles? 30' How many poles are to be removed? 1 Are additional poles to be laced? 1 How many? 1 1 1 What is the height of the additionalpoles? 35' 6c. Are any poles to be modified/rebuilt/replaced? If yes: V How many? 1 1 1 What is the height of the poles after? 35' Describe the modification rebuild: Replacing 30' wood pole with a 35' wood pOle. SECTION C Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their possession. Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS. Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to any permit approval. Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials, officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever, foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the expiration, revocation, or termination of any resulting permit approval. Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable requirements of state and federal law. Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by owner to act on its behalf and have authority to bind the owner to this application. Fees. The Applicant is responsible for all permit fees. APPLICANT SIGNATURE: 01001M APPLICANT PRINTED NAME: Andy Tran APPLICANT TITLE: Engineering Tech III NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE 12/10/2024 City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021 SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM SNOHOMMIISHnCOUNTY PUBLIC UTILITY DISTRICT NO 1 LOCATION 23577 74TH AVE W EDMONDS, WA 98026 AREA LYNNWOOD POLE NO. 15895 SW1/4S 32 T 27 R 4 DATE 11/14/2024 ORDER 100072258 REASON FOR WORK PUD TO REPLACE (1) BO POLE. ENGINEER AXTRAN OPERATION 0104 DRAFTER UGND NO. SCALE 1=100' FOREMAN RECORDS NESC VIOLATIONS FOREMAN ■ NO ❑ YES (SEE NOTES) PERMITS DATE WORK COMPLETED ❑ RESTORATION REQUIRED ■ CITY ❑ ADDITIONAL WORK REQUIRED ❑ SNO COUNTY (TCP) NOTES (i.e. REDLINE INFO): ❑ SNO COUNTY (BLANKET) ❑ SND COUNTY (MAJOR) ❑ OTHER: ❑ NO PERMIT REQUIRED ❑ RESTORATION REQUIRED ❑ MULTIPLE JOB PHASES (i.e. OH, UG) FEES REQ'D ❑ YES ■ ND EASEMENTS ❑ REQUIRED E# ■ NOT REQUIRED PRIMARY OVERHEAD ❑ RESIDENTIAL REQUEST NO. ❑ COMMERCIAL LEO# DATE APPROVED $ -$ FOREIGN CONTACTS ■ JPN# PRIMARY UNDERGROUND ❑ RESIDENTIAL ❑ JOINT TRENCH ZIPLY & CATV ❑ COMMERCIAL ❑ JOINT BORE ZIPLY & CATV BASIC FEE ❑ POLE STENCILING FROM TO TAKE OFF POLE LEU# MISCELLANEOUS FEES VAULT PRE-CONST. REQUIRMENTS PERMIT E ❑ BACKHOE ❑ FLAGGING $ ■ ONE CALL DATE $ No. $ FIBER TOTAL DUE 3 ❑ YES ■ NO DATE PAID STREET LIGHTING RECEIPT No. ❑ YES ■ NO ENGINEER ANDY TRAN M&R IN AS -BUILT PHONE (425) 783-8262 GIS M&R OUT CELLULAR (425) 359-1123 GIS QC JOINT USE O EXISTING POLE 0 EXISTING POLE -TO BE REMOVED • NEW POLE * NEW POLE TO REPLACE EXISTING POLE APPROVED s DATE 12/9/2024 SUBSTATION Bi DATE PRINTED CIRCUIT NO. 12-260 PHASE 132 TRANSFER OF UTILITIES, REMOVAL OF POLE AND FINAL RESTORATION TO BE CONSISTENT WITH APPLICABLE POLE ATTACHMENT AGREEMENT(S) AND JOINT OWNERSHIP POLE AGREEMENT. OA PLI# 251563 RMV EXISTING SG TO POLE E-197. RMV EXISTING DG AND AHR. RMV 30' WOOD POLE. OWNER/CONTRACTOR IS RESPONSIBLE FOR EROSION CONTROL AND DRAINAGE SET 35' CL2 WOOD POLE (PW2035, N0110), IN -PLACE. SET DEPTH = 5.5' USE 5/8" GRVL BCKFLL, CMPCT IN 6" LFTS INSTIL (1) 3/8" SG (G0202) TO POLE E-197. INSTL (1) 3/8" DG & (1) 8" AHR, L= 7' EAST (GO113, A0101). LAYOUT 1" = 100' N 12 OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY UTILITIES MAY REQUIRE A SEPERATE PERMIT. Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per city standards that is caused or occurs during the permitted project. 19 ENGINEERING DIVISION APPROVED AS NOTED d dl (NQ✓. JO, ,44.t 01 /08/2025 VV RECEIVED DEC 11 2024 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT C Ln N J a 0 Ln Ln N J a 00 Ln N N r- 0 0 0 0 a 0 m i C 0 .j 0 Q c 0 i C 0 .j 0 0 E m C 0 0 a 0 c� 00 C w,4- iN o> ao �Z i� ww J~ �Q �o SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM WORK ON SHOULDER OR PARKING LANE N FOR PARKING LANE CLOSURE, t 48" x 24" NO PARK BARRICADES REQUIRED + s END G20-2 WITHIN CLOSURE AREA I ROAD WORK ARK x (OPTIONAL) FROM TO 0 TOW AWAY AREA I MIN-. • • 50' (100' FOR SPEED LIMIT 45 M P H I W • OR ABOVE) DISPLAYED 72 HOURS IN ADVANCE OF CLOSURE Q I •® • P L I 2 5 � 5 63 ZI • • I NO ENCROACHMENT ON THIS • TRAVELED LANE IS PERMITTED. IF ENCROACHMENT IS NECESSARY, • LANE SHALL BE CLOSED. • o0 • W20-301 SHALL BE USED FOR SPEED LIMITS 45 MPH OR ABOVE • • SHOULDER > I x CLOSED Of SHOULDER s WORK W21-5 W20-301 IF USED, W20-301 SHALL BE PLACED Q - I x WORD W20-1 BETWEEN W20-1 AND W21-5 USING N AHEAD SPACING DISTANCE (X) I RECEIVED DEC 11 2024 ENGINEERING DIVISION TRAFFIC CONTROL INSPECTION SHALL BE APPROVED AS NOTED REQUIRED WHENEVER WORK ZONE IS SET UP CITY OF EDMONDS � jdl �i6� p 01/08/2025 DEVELOPMENT -Vv SERVICES DEPARTMENT SNOHOMISH COUNTY TRAFFIC CONTROL PLAN LFDU PUBLIC UTILITY DISTRICT NO 1 PROJECT BO PLI 251563 REPLACEMENT LOCATION 23577 74TH AVE W EDMONDS, WA 98026 ENGINEER ANDY TRAM DATE 12/10/2024 ORDER 100072258 PHONE (425) 783-8262 CELLULAR (425) 359-1123 RECEIVED DEC 11 2024 CITY OF EDMONDS M BuildingPermit.com CITY OF EDMONDS Right -of -Way Application #1588599 - 100072258 Replace Pole SERVICESLOPMENT DEPARTMENT Applicant First Name Last Name Company Name Moe Matthews Snohomish County PUD Number Street Apartment or Suite Number E-mail Address PO Box 1107 permits@snopud.com City State Zip Phone Number Extension Everett WA 98206 (425) 783-5681 Contractor Company Name Owner Number Street Apartment or Suite Number City State Zip Phone Number Extension State License Number License Expiration Date UBI # E-mail Address Project Location Number Street Floor Number Suite or Room Number 23577 74TH AVE W City Zip Code County Parcel Number EDMONDS 98026 27043200301700 Associated Building Permit Number Tenant Name Additional Information (i.e. equipment location or special instructions)_ Work Location Property Owner First Name Last Name or Company Name Lyle B & Beate Peter Number Street Apartment or Suite Number 23577 74TH AVE W City State Zip EDMONDS WA 98026-8500 Certification Statement - The applicant states: I certify that I am the owner of this property or the owner's authorized agent. If acting as an authorized agent, I further certify that I have full power and authority to file this application and to perform, on behalf of the owner, all acts required to enable the jurisdiction to process and review such application. I have furnished true and correct information. I will comply with all provisions of law and ordinance governing this type of application. If the scope of work requires a licensed contractor to perform the work, the information will be provided prior to permit issuance. Date Submitted: 12/10/2024 Submitted By: Moe Matthews Page 1 of 2 CITY OF EDMONDS MyBuildingPermit.com Right -of -Way Application #1588599 - 100072258 Replace Pole Project Contact Company Name: Snohomish County PUD Name: Andy Tran Email: permits@snopud.com Address: PO Box 1107 Phone #: (425) 783-8262 Everett WA 98206 Project Type Activity Type Scope of Work Utility Purveyor Utility Work Disturbance of Surface Project Name: 100072258 Replace Pole Description of Replace disturbe and anchor ance, no pavement cutperform s. Northbound vegetation Work: Northbound shoulder of 74th AVE will be closed for 4-8 hours between 7am-3pm. Project Details Project Information Job Number 100072258 Page 2 of 2