BLD2024-1376+Supplementals_Critical_Area_Determination_-_Building+10.16.2024_3.45.13_PM+4564419. of to.y
v C��
MyBuildingPermit.com
Jurisdiction: Edmonds
Project Name: Rigsby Elevator
Application ID: 1561958
Supplemental Name: Critical Area Determination - Building
A site specific Critical Area Determination, issued by the Planning Division is required for any ground disturbing activities at the time
of application. A determination is valid for 5 years from the date in which the determination was made; after such date the city shall
require a new determination.
Does the property have a current Critical Area Determination on file with the City?
NO
If you answered YES, what is the Critical Area # (CRAXXXX-XXXX)?
If you answered NO, please apply prior to submitting for your permit. You can apply through MBP, Land Use, Critical Areas.