REVIEWED BLD2024-1376+Structural_Calculations+10.16.2024_3.44.36_PM+4564396Page 1 of 6
m _ • _ •
info@?b2engineers.com
425-318-7047 (0)
425-318-0031 (C)
REVIEWED
BY
CITY OF EDMONDS
RIGSBY ELEVATOR ADDITION
STRUCTURAL CALCULATIONS
21813 86TH PLACE WEST, EDMONDS, WA 98026
PROJECT NO: 24181 DATE:08/07/24
PREPARED BY: BASRI BASRI PE, SE
)esign Criteria
International Building Code (IBC) 2021
American Society of Civil Engineers (ASCE) 7-16
Pro
�5 of WAS/,,
A T9 43789 11 �l�j
cTURAL ENG\G\
SS�ONAL EN
Structural design of elevator addition framing at the back of the house utilizing conventional wood framing on
shallow concrete foundation.
Please see attached calculations for your reference
Live Load and Other Structural Criteria
Roof Snow (psf)
25
Residential Live Load (psf)
40
Balcony, Deck and Platform Live Load (psf)
60
Office Live Load (psf)
50
Garage Live Load (psf)
40 with 3000# point load
Retail, Corridor, Walkway Live Load (psf)
100
Allowable Soil Bearing Pressure (psf)
1500 (assumed)
Soil Active Pressure (pcf)
35 (assumed)
Seismic Criteria
Ss, %g
140
S1, %g
45
Risk Category
II
Site Class
D
Ductility Factor, R
6.5
Seismic Performance Category
D
Wind Criteria
Ultimate Wind Speed, mph
98
Building Classifications
II
Wind Exposure Category
B
Topographic Effect, Kzt
1.0
Project: Rigsby Elevator Addition
Location: UPPER FLOOR JOIST
Floor Joist
Floor Joist [2021 International Building Code(2018 NDS)]
1.5 IN x 9.25 IN x 12.0 FT @16O.C.
#2 - Douglas -Fir -Larch - Dry Use
Section Adequate By: 48.4%
Controlling Factor: Moment
DEFLECTIONS Center
Live Load 0.16 IN L/916
Dead Load 0.07 in
Total Load 0.22 IN L/643
Live Load Deflection Criteria: L/480
Total Load Deflection Criteria: U400
REACTIONS A B
Live Load 320 lb 320 lb
Dead Load 136 lb 136 lb
Total Load 456 lb 456 lb
Bearing Length 0.49 in 0.49 in
SUPPORT LOADS A B
Live Load 240 plf 240
plf
Dead Load 102 plf 102
plf
Total Load 342 plf 342
plf
MATERIAL PROPERTIES
#2 - Douglas -Fir -Larch
Base Values
Adjusted
Bending Stress: Fb = 900 psi
Fb' = 1139 psi
Cd=1.00 CF=1.10 Cr-1.15
Shear Stress: Fv = 180 psi
Fv' = 180 psi
Cd=1.00
Modulus of Elasticity: E = 1600 ksi
E' = 1600 ksi
Comp. -L to Grain: Fc - -L = 625 psi
Fc - -L = 625 psi
Controlling Moment: 1368 ft-lb
6.0 Ft from left support of span 2 (Center Span)
Created by combining all dead loads and live loads on span(s) 2
Controlling Shear: 456 lb
At left support of span 2 (Center Span)
Created by combining all dead loads and live loads on span(s) 2
Comparisons with required sections: Read
Provided
Section Modulus: 14.42 in3
21.39 in3
Area (Shear): 3.8 in2
13.88 in2
Moment of Inertia (deflection): 61.55 in4
98.93 in4
Moment: 1368 ft-lb
2029 ft-lb
Shear: 456 lb
1665lb
0 The Vitruvius Project, Inc. P g
o�
StruCalc Version 11.1.8.0 8/7/2024 9:43:22 PM
J015T DATA Center
Span Length 12 ft
Unbraced Length -Top 0 ft
Unbraced Length -Bottom 0 ft
Floor sheathing applied to top of joists -top of joists fully braced.
Floor Duration Factor 1.00
JOIST LOADING
Uniform Floor Loading
Center
Live Load LL =
40
psf
Dead Load DL =
17
psf
Total Load TL =
57
psf
TL Adj. For Joist Spacing wT =
76
plf
Project: Rigsby Elevator Addition
Location: ROOF COLLAR TIE 2X6 AT 24
Collar Tie
Collar Tie [2021 International Building Code(2018 NDS)]
1.5INx5.5INx5.0FT(4+1)@24O.C.
#2 - Douglas -Fir -Larch - Dry Use
1.5 x 3.5 Solid Sawn Lumber with minimum Ft = 575
Section Adequate By: 284.6%
Controlling Factor: Shear
DEFLECTIONS Center
Right
Live Load 0.01 IN L/4338
-0.01
IN 2L/2406
Dead Load 0.01 in
-0.01
in
Total Load 0.02 IN L/2931
-0.02
IN 2L/1626
Live Load Deflection Criteria: L/240 Total Load Deflection Criteria: U180
RAFTER REACTIONS
LOADS
REACTIONS
Lower Live Load @ A & B
132 plf
264 lb
Lower Dead Load @ A & B
63 plf
126 lb
Lower Total Load @ A & B
195 plf
390 lb
Collar Tie Tension
459 lb
RAFTER SUPPORT DATA
B
Bearing Length 0.42 in
RAFTER DATA
Interor Lave
Span Length
4 ft 1 ft
Unbraced Length -Bottom
4.22 ft 0 ft
Rafter Pitch
4 12
Collar Tie Location
1.67 ft
Roof Duration Factor
1.15
Peak Notch Depth
0.00
Base Notch Depth
0.00
RAFTER LOADING
Uniform Floor Loading
Roof Live Load:
LL =
25
psf
Roof Dead Load:
DL =
12
psf
Slope Adjusted Spans And Loads
Interior Span:
L-adj =
4.22
ft
Eave Span:
L-Eave-adj =
1.05
ft
Rafter Live Load:
wL-adj =
45
plf
Eave Live Load:
wL-Eave-adj =
45
plf
Rafter Dead Load:
wD-adj =
23
plf
Rafter Total Load:
wT-adj =
68
plf
Eave Total Load:
wT-Eave-adj =
68
plf
0 The Vitruvius Project, Inc. P g r�9fl 6
o�
StruCalc Version 11.1.8.0 8/7/2024 9:43:22 PM
MATERIAL PROPERTIES
Base Values
Adiusted
Bending Stress: Fb = 900 psi
Fb' = 1547 psi
Cd=1.15 CF=1.30 Cr-1.15
Shear Stress: Fv = 180 psi
Fv' = 207 psi
Cd=1.15
Modulus of Elasticity: E = 1600 ksi
E' = 1600 ksi
Comp. -L to Grain: Fc -1= 625 psi
Fc - -L = 625 psi
Controlling Moment: 150 ft-lb
1.964 Ft from left support of span 2 (Center Span)
Created by combining all dead loads and live loads
on span(s) 2
Controlling Shear: -296 lb
3.795 Ft from left support of span 2 (Center Span)
Created by combining all dead loads and live loads
on span(s) 2, 3
Comparisons with required sections: Read
Provided
Section Modulus: 1.16 in3
7.56 in3
Area (Shear): 2.14 in2
8.25 in2
Moment of Inertia (deflection): 2.3 in4
20.8 in4
Moment: 150 ft-lb
975 ft-lb
Shear: -296lb
1139lb
COLLAR TIE DESIGN
1.5 x 3.5 Solid Sawn Lumber with minimum Ft = 575
Base Values Adiusted
Tension Parallel to Grain Ft = 575 psi Ft' = 992 psi
Cd=1.15 C1=0.00
Collar Tie Location 1.67 ft
Collar Tie Tension 459 lb
Collar Tie Capacity 5207 lb
Nailing Required @ Both Ends
16d Common 3 Nails
16d Sinker 4 Nails
16d Box 4 Nails
LOADING DIAGRAM
1ft 4ft
1.67 ft
8ft
Project: Rigsby Elevator Addition The Vitruvius Project, Inc. P g r9�16
Location: 2-2X10 BEAM AT UPPER FLOOR /
Uniformly Loaded Floor Beam of
Uniformly Loaded Floor Beam [2021 International Building Code(2018 NDS)]
(2)1.5INx9.25INx10.0FT
#2 - Douglas -Fir -Larch - Dry Use
Section Adequate By: 26.8% StruCalc Version 11.1.8.0 8/7/2024 9:43:22 PM
Controlling Factor: Moment
CAUTIONS
* Laminations are to be fully connected to provide uniform transfer of loads to all members
DEFLECTIONS Center
Live Load 0.07 IN L/1689
Dead Load 0.11 in
Total Load 0.18 IN L/660
Live Load Deflection Criteria: L/360 Total Load Deflection Criteria: U360
REACTIONS A
B
Live Load 500
lb
500
lb
Dead Load 780
lb
780
lb
Total Load 1280
lb
1280
lb
Bearing Length 0.68
in
0.68
in
BEAM DATA
Center
Span Length
10
ft
Unbraced Length -Top
0
ft
Floor Duration Factor
1.15
Notch Depth
0.00
MATERIAL PROPERTIES
#2 - Douglas -Fir -Larch
Base Values
Adjusted
Bending Stress:
Fb = 900 psi Fb' = 1139 psi
Cd=1.15 CF=1.10
Shear Stress:
Fv = 180 psi Fv' = 207 psi
Cd=1.15
Modulus of Elasticity:
E = 1600 ksi E' =
1600 ksi
Comp. -L to Grain:
Fc -1= 625 psi Fc -1'
= 625 psi
Controlling Moment:
3200 ft-lb
5.0 ft from left support
Created by combining all dead
and live loads.
Controlling Shear:
-1280 lb
At support.
Created by combining all dead
and live loads.
Comparisons with required sections: Read
Provided
Section Modulus:
33.73 in3
42.78 in3
Area (Shear):
9.28 in2
27.75 in2
Moment of Inertia (deflection):
107.99 in4
197.86 in4
Moment:
3200 ft-lb
4059 ft-lb
Shear:
-1280 lb
3830lb
FLOOR LOADING
Side 1
Side 2
Floor Live Load
FILL =
25 psf
0 psf
Floor Dead Load
FDL =
15 psf
0 psf
Floor Tributary Width
FTW =
4 ft
0 ft
Wall Load
WALL =
90
plf
Beam Total Live Load:
wL =
100
plf
Beam Total Dead Load:
wD =
150
plf
Beam Self Weight:
BSW =
6
plf
Total Maximum Load:
wT =
256
plf
Project: Rigsby Elevator Addition
Location: 4X8 HEADER
Uniformly Loaded Floor Beam
Uniformly Loaded Floor Beam [2021 International Building Code(2018 NDS)]
3.5 IN x 7.25 IN x 4.0 FT
#2 - Douglas -Fir -Larch - Dry Use
Section Adequate By: 444.8%
Controlling Factor: Moment
DEFLECTIONS Center
Live Load 0.01 IN L/9264
Dead Load 0.01 in
Total Load 0.01 IN L/4698
Live Load Deflection Criteria: L/360 Total Load Deflection Criteria: U360
REACTIONS A B
Live Load 320 lb 320 lb
Dead Load 311 lb 311 lb
Total Load 631 lb 631 lb
Bearing Length 0.29 in 0.29 in
BEAM DATA Center
Span Length 4 ft
Unbraced Length -Top 0 ft
Floor Duration Factor 1.15
Notch Depth 0.00
MATERIAL PROPERTIES
#2 - Douglas -Fir -Larch
Base Values
Adjusted
Bending Stress:
Fb = 900 psi
Fb' = 1346 psi
Cd=1.15 CF=1.30
Shear Stress:
Fv = 180 psi
Fv' = 207 psi
Cd=1.15
Modulus of Elasticity:
E = 1600 ksi
E' = 1600 ksi
Comp. -L to Grain:
Fc -1= 625 psi
Fc -1' = 625 psi
Controlling Moment:
631 ft-lb
2.0 ft from left support
Created by combining all dead
and live loads.
Controlling Shear:
631 lb
At support.
Created by combining all dead
and live loads.
Comparisons with required sections: Read
Provided
Section Modulus:
5.63 in3
30.66 in3
Area (Shear):
4.57 in2
25.38 in2
Moment of Inertia (deflection):
8.52 in4
111.15 in4
Moment:
631 ft-lb
3438 ft-lb
Shear:
631 lb
3502lb
0 The Vitruvius Project, Inc. P g9�f 6
o�
StruCalc Version 11.1.8.0 8/7/2024 9:43:23 PM
FLOOR LOADING
Side 1 Side 2
Floor Live Load FILL = 40 psf 0 psf
Floor Dead Load FDL = 15 psf 0 psf
Floor Tributary Width FTW = 4 ft 0 ft
Wall Load
WALL =
90 plf
BEAM LOADING
Beam Total Live Load:
wL =
160
plf
Beam Total Dead Load:
wD =
150
plf
Beam Self Weight:
BSW =
6
plf
Total Maximum Load:
wT =
316
plf
Project: Rigsby Elevator Addition
Location: PERIMETER FOOTING
Footing
Footing [2021 International Building Code(2018 NDS)]
Footing Size: 14.0 IN Wide x 10.0 IN Deep Continuous Footing With 6.0 IN Th
x 18.0 IN Tall Stemwall
Long itudinalReinforcement: (2) Continuous #4 Bars
TransverseReinforcement: #4 Bars @ 9.00 IN. O.C. (unnecessary)
Section Footing Design Adequate
FOOTING PROPERTIES
Allowable Soil Bearing Pressure:
Qs = 1500 psf
Concrete Compressive Strength:
F'c = 2500 psi
Reinforcing Steel Yield Strength:
Fy = 40000 psi
Concrete Reinforcement Cover:
c = 3 in
FOOTING SIZE
Width:
W = 14 in
Depth:
Depth = 10 in
Effective Depth to Top Layer of Steel:
d = 6.25 in
STEMWALL SIZE
Stemwall Width: 6 in
Stemwall Height: 18 in
Stemwall Weight: 150 pcf
FOOTING CALCULATIONS
Bearing Calculations:
Ultimate Bearing Pressure:
Qu =
696 psf
Effective Allowable Soil Bearing Pressure:
Qe =
1375 psf
Width Required:
Wreq =
0.59 ft
Beam Shear Calculations (One Way Shear):
Beam Shear:
Vu1 =
0 lb
Allowable Beam Shear:
Vc1 =
469 lb
Transverse Direction:
Bending Calculations:
Factored Moment:
Mu =
649 in -lb
Nominal Moment Strength:
Mn =
0 in -lb
Reinforcement Calculations:
Concrete Compressive Block Depth:
a =
0.38 in
Steel Required Based on Moment:
As(1) =
0.00 in2
Min. Code Req'd Reinf. Flex. Members (ACI-150.1)As(2) =
0.24 in2
Controlling Reinforcing Steel:
As-reqd =
0.24 in2
Selected Reinforcement:
Trans: #4's @ 9.0
in. o.c.
Reinforcement Area Provided:
As =
0.24 in2
Development Length Calculations:
Development Length Required:
Ld =
15 in
Development Length Supplied:
Ld-sup =
1 in
Longitudinal Direction:
Reinforcement Calculations:
Min. Code Req'd Reinf. Flex. Members (ACI-150.1): As(2) =
0.28 in2
Controlling Reinforcing Steel:
As-reqd
= 0.28 in2
Selected Reinforcement:
Longitudinal: (2) Cont.
#4 Bars
Reinforcement Area Provided:
As =
0.39 in2
18V 6
of
StruCalc Version 11.1.8.0 8/7/2024 9:43:23 PM
LOADING DIAGRAM
�6in�
10 in
n n
T
3 in
T
1.166667 ft
FOOTING LOADING
Live Load:
PL =
Dead Load:
PD =
Total Load:
PT =
Ultimate Factored Load:
Pu =
400 plf
300 plf
813 plf
1135 plf