Loading...
REVIEWED RESUB 2-BLD2024-0257+Geotechnical_Report+9.6.2024_6.27.26_PM+4486166NELSON GEOTECHNICAL ASSOCIATES. INC. March 1, 2024 Daniel Bockretsion Via Email: danielbockretsion@gmail.com Geotechnical Engineering Evaluation Bockretsion Residential Redevelopment 1520 —10`h Place North Edmonds, Washington NGA File No. 1497924 Dear Daniel: BLD2024-0257 17311-135th Ave. N.E. Suite A-500 Woodinville, WA 98072 (425) 486-1669 www.nelsongeotech.com We are pleased to submit the attached report titled "Geotechnical Engineering Evaluation — Bockretsion Residential Development —1520 - 10' Place North — Edmonds, Washington." This report summarizes our observations of the existing surface and subsurface conditions within the property and provides general recommendations for the proposed site development. Our services were completed in general accordance with the proposal signed by you on January 26, 2024. The property is square in shape and covers 0.26 acres in area. It is currently occupied by a single-family residence in the central to northwestern portion. The property is bordered by 101h Place North to the northwest and neighboring residences on all other sides. Topographically, the site is relatively level to gently sloping down to the northwest. We understand the plans for development include demolishing the existing residence and constructing a new single-family residence. We have been requested to provide this report for determination of geological hazards affecting the site, as well as development considerations for the proposed residential redevelopment. Specific grading and stormwater plans have not been developed, but we understand that stormwater may be directed to on -site infiltration systems, if feasible. As part of our study, we propose to collect samples and determine the infiltration rate based on the Department of Ecology's 2019 Stormwater Management Manual for Western Washington (2019 SWMMWW). According to this manual, we understand that long-term design infiltration rates for this site are to be determined by performing on - site infiltration testing consisting of the Small Pilot Infiltration Test (PIT). We explored the site subsurface soil conditions with one hand auger and five trackhoe excavated test pit explorations on February 15, 2024. Our explorations indicated that the site was generally underlain by competent, native recessional outwash soils at relatively shallow depths, below a surficial layer of undocumented fill and/or topsoil. It is our opinion that the planned development is feasible from a geotechnical standpoint, provided that our recommendations are incorporated into the design and construction of this project. We recommend that the future residence structures be founded on medium dense or better native recessional outwash soils for bearing capacity and settlement considerations. These soils should generally be encountered approximately 0.5 to 1.5 feet below the existing ground surface. However, deeper areas of loose soil and/or undocumented fill could also exist within unexplored areas of the site. If undocumented fill is encountered in unexplored areas of the site, it should be removed and replaced with structural fill for foundation and pavement support. RESUB Sep 09 2024 NELSON GEOTECHNICAL ASSOCIATES, INC. Geotechnical Engineering Evaluation Bockretsion Residential Development Edmonds, Washington NGA File No. 1497924 March 1, 2024 Summary — Page 2 In the attached report, we have also provided general recommendations for site grading, slabs -on - grade, structural fill placement, utilities, pavement, erosion control, and drainage. We should be retained to review and comment on final development plans and observe the earthwork phase of construction. We recommend that Nelson Geotechnical Associates (NGA) be retained to review the geotechnical aspects of the project plans prior to construction. We also recommend that NGA be retained to provide monitoring and consultation services during construction to confirm that the conditions encountered are consistent with those indicated by the explorations, to provide recommendations for design changes should the conditions revealed during construction differ from those anticipated, and to evaluate whether or not earthwork and foundation installation activities comply with contract plans and specifications. It has been a pleasure to provide service to you on this project. Please contact us if you have any questions regarding this report or require further information. Sincerely, NELSON GEOTECHNICAL ASSOCIATES, INC. Khaled M. Shawish, PE Principal TABLE OF CONTENTS INTRODUCTION..........................................................................................................1 SCOPE........................................................................................................................ 2 SITECONDITIONS....................................................................................................... 2 SurfaceConditions....................................................................................................... 2 Subsurface Conditions.................................................................................................. 3 Hydrogeologic Conditions............................................................................................ 4 SENSITIVE AREA EVALUATION....................................................................................4 SeismicHazard............................................................................................................. 4 ErosionHazard............................................................................................................. 5 CONCLUSIONS AND RECOMMENDATIONS.................................................................. 5 General......................................................................................................................... 5 Erosion Control and Slope Protection Measures......................................................... 6 Site Preparation and Grading....................................................................................... 6 Temporary and Permanent Slopes............................................................................... 7 Foundations.................................................................................................................. 8 StructuralFill................................................................................................................ 9 Slab-on-Grade............................................................................................................ 10 Pavements.................................................................................................................. 10 Utilities....................................................................................................................... 11 SiteDrainage.............................................................................................................. 11 CONSTRUCTION MONITORING................................................................................. 12 USEOF THIS REPORT................................................................................................ 13 LIST OF FIGURES Figure 1— Vicinity Map Figure 2 — Site Plan Figure 3 — Soil Classification Chart Figures 4 and 5 — Log of Exploration NELSON GEOTECHNICAL ASSOCIATES, INC. Geotechnical Engineering Evaluation Bockretsion Residential Development 1520 — 10th Place North Edmonds, Washington INTRODUCTION This report presents the results of our geotechnical engineering investigation and evaluation of the planned Bockretsion Residential Development project in Edmonds, Washington. The property is located at 1520 — 10th Place North in Edmonds, Washington as shown on the Vicinity Map in Figure 1. The parcel number is 27031300409000. The purpose of this study is to explore and characterize the site's surface and subsurface conditions and to provide geotechnical recommendations for the planned site development. The property is square in shape and covers 0.26 acres in area. It is currently occupied by a single-family residence in the central to northwestern portion. The property is bordered by 10th Place North to the northwest and neighboring residences on all other sides. Topographically, the site is relatively level to gently sloping down to the northwest. Vegetation within the site consists of grass yard areas, landscaping plants, and sparse young to mature trees. We understand the plans for development include demolishing the existing residence and constructing a new single-family residence. We have been requested to provide this report for determination of geological hazards affecting the site, as well as development considerations for the proposed residential redevelopment. The existing site layout is shown on the Site Plan in Figure 2. We have also evaluated the feasibility of stormwater infiltration within the site based on the Washington State Department of Ecology's 2019 Stormwater Management Manual for Western Washington. According to this manual, laboratory analysis of soil samples collected in the field can be used to determine the infiltration system design along with long-term design infiltration rates due to the site being located within recessional outwash soils. We have been requested by you to provide on -site infiltration testing with a small-scale Pilot Infiltration Test (PIT) in accordance with the aforementioned manual. NELSON GEOTECHNICAL ASSOCIATES, INC. Geotechnical Engineering Evaluation Bockretsion Residential Development Edmonds, Washington SCOPE NGA File No. 1497924 March 1, 2024 Page 2 The purpose of this study is to explore and characterize the site surface and subsurface conditions and provide general recommendations for site development. Specifically, our scope of services includes the following: 1. Reviewing available soil and geologic maps of the area as well as other relevant geotechnical information, as provided. 2. Exploring the subsurface soil and groundwater conditions within the site using trackhoe- excavated test pits. Excavation services were provided by NGA. 3. Providing long-term design infiltration rates based on on -site Small Pilot Infiltration Testing (PIT) per the 2019 SWMMWW. 4. Performing laboratory grain -size sieve analysis on soil samples, as necessary. 5. Providing recommendations for earthwork, foundation support, and slabs -on -grade. 6. Providing recommendations for temporary and permanent slopes. 7. Providing recommendations for subsurface utilities and pavement subgrade preparation, as necessary. 8. Providing our opinion on stormwater infiltration feasibility. 9. Providing recommendations for infiltration/bioretention system installation. 10. Providing general recommendations for site drainage and erosion control. 11. Documenting the results of our findings, conclusions, and recommendations in a written geotechnical report. 141kM4191L107111111[a]►1.1 Surface Conditions The property is square in shape and covers 0.26 acres in area. It is currently occupied by a single-family residence in the central to northwestern portion. The property is bordered by 10th Place North to the northwest and neighboring residences on all other sides. Topographically, the site is relatively level to gently sloping down to the northwest. Vegetation within the site consists of grass yard areas, landscaping plants, and sparse young to mature trees. We did not observe any surface water or seepage emitting from the site slopes within the site during our visit on February 15, 2024. NELSON GEOTECHNICAL ASSOCIATES, INC. Geotechnical Engineering Evaluation Bockretsion Residential Development Edmonds, Washington Subsurface Conditions NGA File No. 1497924 March 1, 2024 Page 3 Geology: The geologic units for this site are shown on Geologic Map of the Edmonds East and Part of the Edmonds West Quadrangles, Washington, by James P. Minard, (USGS, 1983). The site is mapped on the border of transitional beds (Qtb), recessional outwash (Qvr), Olympia gravel (Qog), and undivided till (Qtu). The transitional bed deposits are described as clay, silt, and fine to very fine sand. The recessional outwash is generally described as mostly stratified sand and gravel with minor silt and clay layers. The Olympia gravel is described as consisting of stratified, fluvial sand and gravel. The undivided till is generally described as a non -sorted mixture of clay, silt, pebbles, cobbles, and boulders all in variable amounts. Our explorations within the site generally encountered surficial topsoil and/or undocumented fill underlain by medium dense to dense, fine to coarse sand with varying amounts of gravel, silt, and roots, which we interpreted as native recessional outwash deposits at depth. Explorations: The subsurface conditions within the site were explored on February 15, 2024, with one hand auger and five trackhoe excavated test pits extending to depths in the range of 5.0 to 10.0 feet below the existing ground surface. One of the test pits was utilized for infiltration testing. The approximate locations of our explorations are shown on the Site Plan in Figure 2. A geologist from NGA was present during the explorations, examined the soils and geologic conditions encountered, obtained samples of the different soil types, and maintained logs of the explorations. The soils were visually classified in general accordance with the Unified Soil Classification System, presented in Figure 3. The logs of our explorations are attached to this report and are presented as Figures 4 and 5. We present a brief summary of the subsurface conditions in the following paragraph. For a detailed description of the subsurface conditions, the exploration logs should be reviewed. At the surface of all of our explorations, we generally encountered 0.5- to 1.5-feet of surficial topsoil/undocumented fill. Underlying the surficial topsoil, we encountered orange -brown, fine to medium sand with silt, roots, and iron -oxide weathering, which we interpreted as weathered recessional outwash deposits. Underlying the weathered recessional outwash, we encountered gray, fine to coarse sand with varying amounts of gravel and roots, which we interpreted as unweathered recessional outwash deposits. All of our explorations were completed within the unweathered recessional outwash deposits at depths in the range of 5.0- to 10.0-feet below the existing ground surface. NELSON GEOTECHNICAL ASSOCIATES, INC. Geotechnical Engineering Evaluation Bockretsion Residential Development Edmonds, Washington Hydrogeologic Conditions NGA File No. 1497924 March 1, 2024 Page 4 We did not encounter groundwater within our explorations. If groundwater is encountered during construction, we would interpret this water as perched water. Perched water occurs when surface water infiltrates. Perched water does not represent a regional groundwater "table" within the upper less pervious soil horizons. Perched water tends to vary spatially and is dependent upon the amount of rainfall. We would expect the amount of perched groundwater to decrease during drier times of the year and increase during wetter periods. SENSITIVE AREA EVALUATION Seismic Hazard We reviewed the 2018 International Building Code (IBC) for seismic site classification for this project. Since competent glacial soils are inferred to underlie the site at depth, the site conditions best fit the IBC description for Site Class D. Table 1 below provides seismic design parameters for the site that are in conformance with the 2018 IBC, which specifies a design earthquake having a two percent probability of occurrence in 50 years (return interval of 2,475 years), and the 2008 USGS seismic hazard maps. Table 1— 2018 IBC Seismic Design Parameters Site Class Spectral Acceleration Spectral Acceleration Site Coefficients Design Spectral at 0.2 sec. (g) at 1.0 sec. (g) Response S, S1 Parameters Fa Fv Sps Sol D 1.295 0.457 1.000 Null 0.863 Null The spectral response accelerations were obtained from the USGS Earthquake Hazards Program Interpolated Probabilistic Ground Motion website (2008 data) for the project latitude and longitude. Hazards associated with seismic activity include liquefaction potential and amplification of ground motion. Liquefaction is caused by a rise in pore pressures in a loose, fine sand deposit beneath the groundwater table. It is our opinion that the medium dense or better glacial deposits interpreted to underlie the site have a low potential for liquefaction or amplification of ground motion. NELSON GEOTECHNICAL ASSOCIATES, INC. Geotechnical Engineering Evaluation Bockretsion Residential Development Edmonds, Washington Erosion Hazard NGA File No. 1497924 March 1, 2024 Page 5 The criteria used for determination of the erosion hazard for affected areas include soil type, slope gradient, vegetation cover, and groundwater conditions. The erosion sensitivity is related to vegetative cover and the specific surface soil types, which are related to the underlying geologic soil units. The Soil Survey of Snohomish County Area, Washington, by the Natural Resources Conservation Service (NRCS), classifies the development portions of the site as Alderwood-Urban land complex, 2 to 8 percent slopes. The erosion hazard for these soils is listed as moderate. Based on our observations and the material encountered, we would interpret this site as having a low to moderate erosion hazard where the surficial soils are exposed. It is our opinion that the erosion hazard for site soils should be low in areas where the site is not disturbed. CONCLUSIONS AND RECOMMENDATIONS General It is our opinion that the planned development within the site is generally feasible from a geotechnical standpoint. Our explorations indicated that the site was generally underlain by competent native glacial till soils below a surficial layer of topsoil and undocumented fill. The glacial till soils encountered at depth should provide adequate support for foundation, slab, and pavement loads. We recommend that the new residence structures be founded on medium dense or better native bearing recessional outwash soils for bearing capacity and settlement considerations. These soils should generally be encountered approximately 0.5- to 1.5-feet below the existing ground surface based on our explorations. However, deeper areas of loose soil and/or undocumented fill could also exist within unexplored areas of the site. If undocumented fill is encountered in unexplored areas of the site, it should be removed and replaced with structural fill for foundation and pavement support. We recommend that NGA be retained to review proposed grading plans once they are developed and allowed to provide alternative foundation support recommendations as needed. We performed on -site infiltration testing based on the 2019 Department of Ecology Stormwater Manual for Western Washington. The onsite testing consisted of performing one small-scale PIT within Infiltration Test Pit One. Test procedures and results are detailed in the next sections. However, based on our observations, results of the onsite testing, and the sandy nature of the native recessional outwash deposits that underlie the site, it is our opinion that the on -site native soils encountered at depth are conducive for traditional stormwater infiltration systems. More detailed information on our infiltration tests and drainage recommendations can be found in the Stormwater Infiltration and Site Drainage subsections of this report. NELSON GEOTECHNICAL ASSOCIATES, INC. Geotechnical Engineering Evaluation Bockretsion Residential Development Edmonds, Washington NGA File No. 1497924 March 1, 2024 Page 6 The soils encountered on this site are considered moisture -sensitive and will disturb easily when wet. To lessen the potential impacts of construction on the slopes and to reduce cost overruns and delays, we recommend that construction take place during the drier summer months. If construction takes place during the rainy months, additional expenses and delays should be expected. Additional expenses could include the need for placing erosion control and temporary drainage measures to protect the slopes, the need for placing a blanket of rock spalls on exposed subgrades, and construction traffic areas prior to placing structural fill, and the need for importing all-weather material for structural fill. Erosion Control and Slope Protection Measures The erosion hazard for the on -site soils is considered to be moderate to severe but the actual hazard will be dependent on how the site is graded and how water is allowed to concentrate. Best Management Practices (BMPs) should be used to control erosion. Areas disturbed during construction should be protected from erosion. Erosion control measures may include diverting surface water away from the stripped or disturbed areas. Silt fences and/or straw bales should be erected to prevent muddy water from leaving the site or flowing over the slopes. Stockpiles should be covered with plastic sheeting during wet weather and stockpiled material should be placed near site slopes. Disturbed areas should be planted as soon as practical, and the vegetation should be maintained until it is established. The erosion potential for areas not stripped of vegetation should be low. Site Preparation and Grading After erosion control measures are implemented, site preparation should consist of stripping any loose soils and undocumented fill to expose medium dense or better native soil in foundation, slab -on -grade, and pavement areas. The stripped materials should be removed from the site or stockpiled for later use as landscaping fill. Based on our observations, we anticipate stripping depths of 0.5- to 1.5-feet within the proposed development areas. However, additional stripping may be required if areas of deeper undocumented fill and/or loose soil are encountered in unexplored areas of the site. If the ground surface, after site stripping, should appear to be loose, it should be compacted to a non - yielding condition. Areas observed to pump or weave during compaction should be over -excavated and replaced with properly compacted structural fill or rock spalls. If loose soils are encountered in any slab areas, the loose soils should be removed and replaced with rock spalls or granular structural fill. If significant surface water flow is encountered during construction, this flow should be diverted around areas to be developed, and the exposed subgrades should be maintained in a semi -dry condition. NELSON GEOTECHNICAL ASSOCIATES, INC. Geotechnical Engineering Evaluation NGA File No. 1497924 Bockretsion Residential Development March 1, 2024 Edmonds, Washington Page 7 This site is underlain by moisture -sensitive soils. Due to these conditions, special site stripping and grading techniques might be necessary, especially if grading is attempted in wet weather. These could include using large excavators equipped with wide tracks and a smooth bucket to complete site grading and promptly covering exposed subgrades with a layer of crushed rock for protection. If wet conditions are encountered or construction is attempted in wet weather, the subgrade should not be compacted as this could cause further subgrade disturbance. In wet conditions, it may be necessary to cover the exposed subgrade with a layer of crushed rock as soon as it is exposed to protect the moisture sensitive soils from disturbance by machine or foot traffic during construction. The prepared subgrade should be protected from construction traffic and surface water should be diverted around prepared subgrade. Shallow groundwater, if encountered, should be intercepted with cut-off drains and routed around the planned grading area, or the groundwater should be controlled with sump -pumps or dewatering systems. Failure to follow these recommendations could cause erosion and failures on the slopes, as well as result in inadequate subgrades. The site soils are considered to be moisture -sensitive and will disturb easily when wet. We recommend that construction take place during the drier summer months if possible. However, if construction takes place during the wet season, additional expenses and delays should be expected due to the wet conditions. Additional expenses could include the need for placing a blanket of rock spalls on exposed subgrades, construction traffic areas, and paved areas prior to placing structural fill. Wet weather grading will also require additional erosion control and site drainage measures. NGA should be retained to evaluate the suitability of all on -site and imported structural fill material during construction. Temporary and Permanent Slopes Temporary cut slope stability is a function of many factors, including the type and consistency of soils, depth of the cut, surcharge loads adjacent to the excavation, length of time a cut remains open, and the presence of surface or groundwater. It is exceedingly difficult under these variable conditions to estimate a stable, temporary, cut slope angle. Therefore, it should be the responsibility of the contractor to maintain safe slope configurations at all times as indicated in OSHA guidelines for cut slopes. The following information is provided solely for the benefit of the owner and other design consultants and should not be construed to imply that Nelson Geotechnical Associates, Inc. assumes responsibility for job site safety. Job site safety is the sole responsibility of the project contractor. NELSON GEOTECHNICAL ASSOCIATES, INC. Geotechnical Engineering Evaluation NGA File No. 1497924 Bockretsion Residential Development March 1, 2024 Edmonds, Washington Page 8 For planning purposes, we recommend that temporary cuts in the upper undocumented fill soils be no steeper than 2 Horizontal to 1 Vertical (2H:1V). Temporary cuts in the competent native recessional outwash soils encountered at depth should be no steeper than 1.5H:1V. If temporary cut excavations are not able to achieve the recommended inclinations, we recommend that the cuts be temporarily shored. If significant groundwater seepage or surface water flow were encountered, we would expect that flatter inclinations would be necessary. We recommend that cut slopes be protected from erosion. The slope protection measures may include covering cut slopes with plastic sheeting and diverting surface runoff away from the top of cut slopes. We do not recommend vertical slopes for cuts deeper than four feet if worker access is necessary. We recommend that cut slope heights and inclinations conform to appropriate OSHA/WISHA regulations. Permanent cut and fill slopes should be no steeper than 2H:1V. However, flatter inclinations may be required in areas where loose soils are encountered. Permanent slopes should be vegetated, and the vegetative cover maintained until established. Foundations Conventional shallow spread foundations should be placed on undisturbed medium dense or better native glacial till soils. Medium dense to dense soils should be encountered roughly 0.5- to 1.5-feet below the ground surface based on our explorations within the development area; however, deeper loose soils may be encountered in unexplored areas of the site. Where undocumented fill or less dense soils are encountered at footing bearing elevation, the subgrade should be over -excavated to expose suitable bearing soil. Footings should extend at least 18 inches below the lowest adjacent finished ground surface for frost protection and bearing capacity considerations. Foundations should be designed in accordance with the 2018 IBC. Footing widths should be based on the anticipated loads and allowable soil bearing pressure. Water should not be allowed to accumulate in footing trenches. All loose or disturbed soil should be removed from the foundation excavation prior to placing concrete. NELSON GEOTECHNICAL ASSOCIATES, INC. Geotechnical Engineering Evaluation Bockretsion Residential Development Edmonds, Washington NGA File No. 1497924 March 1, 2024 Page 9 For foundations constructed as outlined above, we recommend an allowable design bearing pressure of no more than 2,000 pounds per square foot (psf) be used for the design of footings founded on the medium dense or better native glacial soils or structural fill extending to the competent native material. The foundation bearing soil should be evaluated by a representative of NGA. We should be consulted if higher bearing pressures are needed. Current IBC guidelines should be used when considering increased allowable bearing pressure for short-term transitory wind or seismic loads. Potential foundation settlement using the recommended allowable bearing pressure is estimated to be less than 1-inch total and %-inch differential between adjacent footings or across a distance of about 20 feet, based on our experience with similar projects. Lateral loads may be resisted by friction on the base of the footing and passive resistance against the subsurface portions of the foundation. A coefficient of friction of 0.35 may be used to calculate the base friction and should be applied to the vertical dead load only. Passive resistance may be calculated as a triangular equivalent fluid pressure distribution. An equivalent fluid density of 200 pounds per cubic foot (pcf) should be used for passive resistance design for a level ground surface adjacent to the footing. This level surface should extend a distance equal to at least three times the footing depth. These recommended values incorporate safety factors of 1.5 and 2.0 applied to the estimated ultimate values for frictional and passive resistance, respectively. To achieve this value of passive resistance, the foundations should be poured "neat" against the native medium dense soils or compacted fill should be used as backfill against the front of the footing. We recommend that the upper one foot of soil be neglected when calculating the passive resistance. Structural Fill General: Fill placed beneath foundations, pavement, or other settlement -sensitive structures should be placed as structural fill. Structural fill, by definition, is placed in accordance with prescribed methods and standards, and is monitored by an experienced geotechnical professional or soils technician. Field monitoring procedures would include the performance of a representative number of in -place density tests to document the attainment of the desired degree of relative compaction. The area to receive the fill should be suitably prepared as described in the Site Preparation and Grading subsection prior to beginning fill placement. NELSON GEOTECHNICAL ASSOCIATES, INC. Geotechnical Engineering Evaluation Bockretsion Residential Development Edmonds, Washington NGA File No. 1497924 March 1, 2024 Page 10 Materials: Structural fill should consist of a good quality, granular soil, free of organics and other deleterious material, and be well graded to a maximum size of about three inches. All-weather fill should contain no more than five -percent fines (soil finer than U.S. No. 200 sieve, based on that fraction passing the U.S. 3/4-inch sieve). Some of the on -site soils may be suitable for use as structural fill, but this will depend on moisture content at the time of construction. We should be retained to evaluate all proposed structural fill material prior to placement. Fill Placement: Following subgrade preparation, placement of structural fill may proceed. All filling should be accomplished in uniform lifts up to eight inches thick. Each lift should be spread evenly and be thoroughly compacted prior to placement of subsequent lifts. All structural fill underlying building areas and pavement subgrade should be compacted to a minimum of 95 percent of its maximum dry density. Maximum dry density, in this report, refers to that density as determined by the ASTM D-1557 Compaction Test procedure. The moisture content of the soils to be compacted should be within about two percent of optimum so that a readily compactable condition exists. It may be necessary to over - excavate and remove wet soils in cases where drying to a compactable condition is not feasible. All compaction should be accomplished by equipment of a type and size sufficient to attain the desired degree of compaction and should be tested. Slab -on -Grade Slabs -on -grade should be supported on subgrade soils prepared as described in the Site Preparation and Grading subsection of this report. We recommend that all floor slabs be underlain by at least six inches of free -draining gravel with less than three percent by weight of the material passing Sieve #200 for use as a capillary break. A suitable vapor barrier, such as heavy plastic sheeting (6-mil minimum), should be placed over the capillary break material. An additional 2-inch-thick moist sand layer may be used to cover the vapor barrier. This sand layer may be used to protect the vapor barrier membrane and to aid in curing the concrete. Pavements Pavement subgrade preparation and structural filling where required, should be completed as recommended in the Site Preparation and Grading and Structural Fill subsections of this report. The pavement subgrade should be proof -rolled with a heavy, rubber -tired piece of equipment, to identify soft or yielding areas that require repair. The pavement section should be underlain by a minimum of six inches of clean granular pit run. We should be retained to observe the proof -rolling and recommend repairs prior to placement of the asphalt or hard surfaces. NELSON GEOTECHNICAL ASSOCIATES, INC. Geotechnical Engineering Evaluation Bockretsion Residential Development Edmonds, Washington NGA File No. 1497924 March 1, 2024 Page 11 Utilities We recommend that underground utilities be bedded with a minimum six inches of pea gravel prior to backfilling the trench with on -site or imported material. Trenches within settlement sensitive areas should be compacted to 95 percent of the modified proctor as described in the Structural Fill subsection of this report. Trenches located in non-structural areas should be compacted to a minimum 90 percent of the maximum dry density. Trench backfill compaction should be tested. Site Drainage Infiltration Testing General: The 2019 WSDOE Stormwater Management Manual for Western Washington was utilized to determine the long-term design infiltration rate of the site soils. According to this manual, on -site infiltration testing consisting of the Small -Scale Pilot Infiltration Test (PIT) was used to determine the long-term design infiltration rates. The infiltration pit measured approximately 4.0-feet long by 3.0-feet wide by 3.5-feet deep. Infiltration Test Pit 1 was filled up to a level 12 inches and this level was maintained for the soaking period for approximately 6 hours. After the 6-hour soaking period was completed, the water level was maintained at approximately 12-inches while the water flow rate into the hole was monitored using Great Plains Industries (GPI) TM 050 water flow meter. The flow rate for infiltration test pit one stabilized at 3.98 gallons per minute (approximately 238.8 gallons per hour) resulting in an infiltration rate of 31.9 inches per hour. The water was shut off after the steady-state period and the water level within the pit was monitored every 15 minutes for one hour. After thirty minutes, the water level in infiltration test pit one had dropped 12 inches. This resulted in an infiltration rate of 24 inches per hour. Based on the results of our onsite infiltration testing, it is our opinion that the granular recessional outwash soils encountered within the site are conducive for traditional stormwater infiltration. We have selected an overall measured field rate of 24 inches per hour obtained from the falling head portion of the test within Infiltration Pit 1 be utilized in determining the long-term design infiltration rate for the infiltration systems within the site. We referenced the 2019 WSDOE Stormwater Management Manual for Western Washington that applies correction factors to the field measured infiltration rate to generate a long-term design infiltration rate. Correction factors of 0.50, 0.65, and 0.80 were utilized in this equation for Ftesting, Fgeometry, Fplugging, respectively. Using these correction factors, we calculated a long-term design infiltration rate of 6.14 inches per hour to be utilized to design on -site infiltration systems, provided that the base of the system terminates within the native clean recessional outwash soils encountered at depth. NELSON GEOTECHNICAL ASSOCIATES, INC. Geotechnical Engineering Evaluation Bockretsion Residential Development Edmonds, Washington NGA File No. 1497924 March 1, 2024 Page 12 NGA should be retained to evaluate the soils exposed in the infiltration system excavations at the time of construction. This is imperative to ensure that soils exposed in the system can provide the design infiltration rate. The stormwater manual recommends a five-foot separation between the base of an infiltration system and any underlying bedrock, impermeable horizon, or groundwater. We did not encounter any groundwater to the depths explored throughout the site and as such, we do not anticipate groundwater to adversely impact the infiltration system if the base of the infiltration system is founded in the native recessional outwash deposits. Subsurface Drainage: If groundwater is encountered during construction, we recommend that the contractor slope the bottom of the excavation and collect the water into ditches and small sump pits where the water can be pumped out of the excavation and routed into a suitable outlet. We recommend that the residence down spouts and footing drains be tightlined to an appropriate discharge location. We recommend the use of footing drains around structures. Footing drains should be installed at least one foot below planned finished floor elevation. The drains should consist of a minimum 4-inch- diameter, rigid, slotted or perforated, PVC pipe surrounded by free -draining material wrapped in a filter fabric. We recommend that the free -draining material consist of an 18-inch-wide zone of clean (less than three -percent fines), granular material placed along the back of walls. Washed rock is an acceptable drain material, or drainage composite may be used instead. The free -draining material should extend up the wall to one foot below the finished surface. The top foot of soil should consist of low permeability soil placed over plastic sheeting or building paper to minimize the migration of surface water or silt into the footing drain. Footing drains should discharge into tightlines leading to an appropriate collection and discharge point with convenient cleanouts to prolong the useful life of the drains. Roof drains should not be connected to wall or footing drains. CONSTRUCTION MONITORING We recommend that we be retained to provide construction monitoring services to evaluate conditions encountered in the field with respect to anticipated conditions, to provide recommendations for design changes should the conditions differ from anticipated, and to evaluate whether construction activities comply with contract plans and specifications. NELSON GEOTECHNICAL ASSOCIATES, INC. Geotechnical Engineering Evaluation Bockretsion Residential Development Edmonds, Washington USE OF THIS REPORT NGA File No. 1497924 March 1, 2024 Page 13 NGA has prepared this report for Daniel Bockretsion and associated agents, for use in the planning and design of the development on this site only. The scope of our work does not include services related to construction safety precautions and our recommendations are not intended to direct the contractors' methods, techniques, sequences, or procedures, except as specifically described in our report for consideration in design. There are possible variations in subsurface conditions between the explorations and also with time. Our report, conclusions, and interpretations should not be construed as a warranty of subsurface conditions. A contingency for unanticipated conditions should be included in the budget and schedule. We recommend that we be retained to review the project plans after they have been developed to determine that recommendations in the report were incorporated into project plans. We recommend that NGA be retained to review final plans prior to construction. We also recommend that NGA be retained to provide monitoring and consultation services during construction to confirm that the conditions encountered are consistent with those indicated by the explorations, to provide recommendations for design changes should the conditions revealed differ from those anticipated, and to evaluate whether or not earthwork and foundation installation activities comply with contract plans and specifications. We should be contacted a minimum of one week prior to construction activities and could attend pre -construction meetings if requested. Within the limitations of scope, schedule, and budget, our services have been performed in accordance with generally accepted geotechnical engineering practices in effect in this area at the time this report was prepared. No other warranty, expressed or implied, is made. Our observations, findings, and opinions are a means to identify and reduce the inherent risks to the owner. ... NELSON GEOTECHNICAL ASSOCIATES, INC. Geotechnical Engineering Evaluation NGA File No. 1497924 Bockretsion Residential Development March 1, 2024 Edmonds, Washington Page 14 It has been a pleasure to provide service to you on this project. If you have any questions or require further information, please call. Sincerely, NELSON GEOTECHNICAL ASSOCIATES, INC. -:)p,� uv�- Daniel J. O'Dell Project Geologist 3.01.2024 Khaled M. Shawish, PE Principal DJO:FKS:KMS:dy Five Figures Attached NELSON GEOTECHNICAL ASSOCIATES, INC. VICINITY MAP Not to Scale overlook ParK Southwest County Park a PERRINVILLE Project Site a, a t Sa f CID Puget �`� s2a Lyn o o d 0 N C Edmonds College W THE BOWL OF EDMONDS y ° •• Edmonds Main St SEATTLE HEIGHTS 2�6t o 0 r~ 0 ° CD N 212th St SW N Q Edmonds r, - City Park ' °� WinCo Foods Z N 104 N 22uth St SW = - v N } o ou N Voodway 99 Ranch Market CZ U c Edmonds, WA Project Number Alh..IIELSOti GEOTECHIIICAL No. Date Revision By CK Bockretsion Residential ' 1497924 Redevelopment ASSOCIATES, Inc 1 2/26/24 Original ABT ono OX (Y Figure 1 J Vicinity Map Af°vllle—°e Wenatcheeuse °f°e 17311-135th Ave. NE, A-500 105 PaloSt. Wood-ille, WA 98072 Wenatchee, WA 98801 Q y www.nelsongeotech.com (425) 486-1669 / Fax. 481-2510 (509) 665-7696 / Fax 665-7692 U U Site Plan HA-1 TP-4 I I ' 1 i LEGEND — • — Property line INF-1 —�— Number and approximate I location of infiltration test pit TP-1 —�— Number and approximate location of test pit HA-1 —�— Number and approximate location of hand auger 0 15 30 Approximate Scale: 1 inch = 15 feet Reference: Site Plan based on field measurements, observations, and aerial parcel map review Project Number Bockretsion Residential h. nELson GEOTECHIIICOL No. Date Revision By I cK 1497924 Redevelopment ASSOCIATES, inc 1 2/26/24 Original ABT ono Site Plan WoodMAI� MC. Wanatchee ice Figure 2 17311-1351h Ave. NE, A-500 105 Palause St. Wcotllnville,WA 98072 Wenatchee, WA 98801 www.nelsangeolech.ca1 (425) 486-1669 / Fax: 481-2510 (509) 665-7696 / Fax 665-7692 UNIFIED SOIL CLASSIFICATION SYSTEM GROUP MAJOR DIVISIONS GROUP NAME SYMBOL CLEAN GW WELL -GRADED, FINE TO COARSE GRAVEL COARSE- GRAVEL GRAVEL GP POORLY -GRADED GRAVEL GRAINED MORE THAN 50 % GRAVEL GM SILTY GRAVEL OF COARSE FRACTION RETAINED ON SOILS NO.4 SIEVE WITH FINES GC CLAYEY GRAVEL SAND CLEAN SW WELL -GRADED SAND, FINE TO COARSE SAND SAND SP POORLY GRADED SAND MORE THAN 50 % RETAINED ON MORE THAN 50 % NO. 200 SIEVE OF COARSE FRACTION SAND SM SILTY SAND PASSES NO. 4 SIEVE WITH FINES SC CLAYEY SAND FINE - SILT AND CLAY ML SILT INORGANIC GRAINED LIQUID LIMIT CL CLAY LESS THAN 50 % SOILS ORGANIC OL ORGANIC SILT, ORGANIC CLAY SILT AND CLAY MH SILT OF HIGH PLASTICITY, ELASTIC SILT INORGANIC MORE THAN 50 % PASSES LIQUID LIMIT CH CLAY OF HIGH PLASTICITY, FAT CLAY NO. 200 SIEVE 50 % OR MORE ORGANIC OH ORGANIC CLAY, ORGANIC SILT HIGHLY ORGANIC SOILS PT PEAT NOTES: 1) Field classification is based on visual SOIL MOISTURE MODIFIERS: examination of soil in general accordance with ASTM D 2488-93. Dry - Absence of moisture, dusty, dry to the touch 2) Soil classification using laboratory tests is based on ASTM D 2488-93. Moist - Damp, but no visible water. 3) Descriptions of soil density or Wet - Visible free water or saturated, consistency are based on usually soil is obtained from interpretation of blowcount data, below water table visual appearance of soils, and/or test data. Project Number nELSOn GEOTEnninl_ No. Date Revision By cK Bockretsion Residential � 2/26/24 Original ABT ono 1497924 Redevelopment OSSOCIATES, inc, Figure 3 Soil Classification Chart ui ""135thA°e°""e Wa"a`°hee.S"e 17311-1351h Ave. NE, A-500 105 Palouse St. Woodinville, WA 98072 Wenatchee, WA 98801 www.nelsongeoiech.com (425) 486-1669 / Fax: 481-2510 (509) 665-7696 / Fax: 665-7692 LOG OF EXPLORATION DEPTH (FEET) USCS SOIL DESCRIPTION INFILTRATION TEST PIT ONE 0.0 - 1.5 TOPSOIL / FILL 1.5 - 2.0 SP-SM ORANGE -BROWN, FINE TO MEDIUM SAND WITH SILT, ROOTS, AND IRON -OXIDE WEATHERING (MEDIUM DENSE, MOIST) 2.0 - 3.5 SP GRAY, FINE TO MEDIUM SAND WITH TRACE GRAVEL AND TRACE ROOTS (MEDIUM DENSE TO DENSE, MOIST) SAMPLES WERE NOT COLLECTED GROUNDWATER SEEPAGE WAS NOT ENCOUNTERED TEST PIT CAVING WAS NOT ENCOUNTERED INFILTRATION TEST PIT WAS COMPLETED AT 3.5 FEET ON 2/15/24 0.0 - 1.5 TOPSOIL / FILL 1.5 - 2.0 SP-SM ORANGE -BROWN, FINE TO MEDIUM SAND WITH SILT, ROOTS, AND IRON -OXIDE WEATHERING (MEDIUM DENSE, MOIST) 2.0 - 6.0 SP GRAY, FINE TO MEDIUM SAND WITH TRACE GRAVEL AND TRACE ROOTS (MEDIUM DENSE TO DENSE, MOIST) 6.0 - 10.0 GRAY, FINE TO COARSE SAND WITH GRAVEL (MEDIUM DENSE TO DENSE, MOIST) SAMPLES WERE NOT COLLECTED GROUNDWATER SEEPAGE WAS NOT ENCOUNTERED TEST PIT CAVING WAS NOT ENCOUNTERED TEST PIT WAS COMPLETED AT 10.0 FEET ON 2/15/24 TEST PIT TWO 111<1m 11101;Y0111WAy11111 1.5 - 2.0 SP-SM ORANGE -BROWN, FINE TO MEDIUM SAND WITH SILT, ROOTS, AND IRON -OXIDE WEATHERING (MEDIUM DENSE, MOIST) 2.0 - 6.0 SP GRAY, FINE TO MEDIUM SAND WITH TRACE GRAVEL AND TRACE ROOTS (MEDIUM DENSE TO DENSE, MOIST) SAMPLE WAS COLLECTED AT 6.0 FEET GROUNDWATER SEEPAGE WAS NOT ENCOUNTERED TEST PIT CAVING WAS NOT ENCOUNTERED TEST PIT WAS COMPLETED AT 6.0 FEET ON 2/15/24 TEST PIT THREE 0.0 - 0.5 TOPSOIL / FILL 0.5 - 1.5 SP-SM ORANGE -BROWN, FINE TO MEDIUM SAND WITH SILT, ROOTS, AND IRON -OXIDE WEATHERING (MEDIUM DENSE, MOIST) 1.5 - 6.0 SP GRAY, FINE TO MEDIUM SAND WITH TRACE GRAVEL AND TRACE ROOTS (MEDIUM DENSE TO DENSE, MOIST) SAMPLES WERE NOT COLLECTED GROUNDWATER SEEPAGE WAS NOT ENCOUNTERED TEST PIT CAVING WAS NOT ENCOUNTERED TEST PIT WAS COMPLETED AT 6.0 FEET ON 2/15/24 ABT:DJO NELSON GEOTECHNICAL ASSOCIATES, INC. FILE NO 1497924 FIGURE 4 LOG OF EXPLORATION DEPTH (FEET) USCS SOIL DESCRIPTION TEST PIT FOUR 0.0 - 1.0 TOPSOIL / FILL 1.0 - 2.5 SP-SM ORANGE -BROWN, FINE TO MEDIUM SAND WITH SILT, ROOTS, AND IRON -OXIDE WEATHERING (MEDIUM DENSE, MOIST) 2.5 - 6.0 SP GRAY, FINE TO MEDIUM SAND WITH TRACE GRAVEL AND TRACE ROOTS (MEDIUM DENSE TO DENSE, MOIST) SAMPLE WAS COLLECTED AT 3.0 FEET GROUNDWATER SEEPAGE WAS NOT ENCOUNTERED TEST PIT CAVING WAS NOT ENCOUNTERED TEST PIT WAS COMPLETED AT 6.0 FEET ON 2/15/24 HAND AUGER ONE 0.0 - 1.5 TOPSOIL / FILL 1.5 - 3.5 SP-SM ORANGE -BROWN, FINE TO MEDIUM SAND WITH SILT, ROOTS, AND IRON -OXIDE WEATHERING (MEDIUM DENSE, MOIST) 3.5 - 5.0 SP GRAY, FINE TO MEDIUM SAND WITH TRACE GRAVEL AND TRACE ROOTS (MEDIUM DENSE TO DENSE, MOIST) SAMPLES WERE NOT COLLECTED GROUNDWATER SEEPAGE WAS NOT ENCOUNTERD HAND AUGER CAVING WAS NOT ENCOUNTERED HAND AUGER WAS COMPLETED AT 5.0 FEET ON 2/15/24 ABT:DJO NELSON GEOTECHNICAL ASSOCIATES, INC. FILE NO 1497924 FIGURE 5