Loading...
APPROVED ENG2024-0435 ROW PERMITDescription: ZIPLY - TRANSFER LINES AND REMOVE 1 BO POLE NJUNS 6164173 Address: 820 OLYMPIC AVE EDMONDS WA 98020-2960 ISSUED: 01/14/2025 EXPIRES: 07/13/2025 Permit Type: RIGHT OF WAY EUC I Permit Subtype: STANDARD I Parcel Number: 00548900002206 NAME TYPE NAME ADDRESS PHONE APPLICANT COLTEN HESSELMAN 4155 SW CEDAR HILLS BLVD, BEAVERTON OR 97205 (971)205-9470 CONTACT ZIPLY FIBER 4155 SW CEDAR HILLS BLVD, BEAVERTON OR 97205 (971)205-9470 CONTRACTOR ZIPLY FIBER 1800 41ST ST, EVERETT WA 98201 (425)949-0230 OWNER DANITA A & DAVID W SHNEIDMAN 17356 BEACH DR NE, LAKE FOREST PARK WA 98155 DESCRIPTION AMOUNT PAID CITY TECHNOLOGY FEE - PER PERMIT $45.00 $45.00 ENG - INSPECTIONS - 4.1.24 $264.00 $264.00 ROW - STANDARD - 4.1.24 $396.00 $396.00 REQUIREMENTS REQUIREMENT TYPE NOTES TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their posession. RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday - No Exceptions WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the work. INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM 24 HR NOTICE REQUIRED The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit. RELEASED BY: MAJ DATE: 01 /14/2025 Printed: Tuesday, January 14, 2025 3:23:33 PM 1 of 2 RIGHT OF WAY EUC PERMIT PERMIT NUMBE3 City of Edmonds ,.... 121 Sth Ave -. •.v / 425.771.0220 CONDITIONS CONDITION TYPE ALERT RESIDENTS ALERT AFFECTED RESIDENTS AND OR BUSINESSES PRIOR TO WORK START. It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in DAMAGE TO FRONTAGE City right of Ways or Easements to City Standards caused by or occurring during the permitted IMPROVEMENTS project. MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD ESC REQUIREMENTS REQUIREMENTS. Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the HOLD HARMLESS issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT. INSPECTIONS www.mybuildingpermit.com POTHOLING VERIFY CLEAR BORE CROSSINGS. RESTORE LANDSCAPE Restore landscape to like or better conditions Sound or noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on SOUND AND NOISE weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites and activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. All utilities shall be located prior to any excavation. New locates shall be called for if at time of UTILITY LOCATES excavation, original locates are no longer identifiable. INSPECTIONS INSPECTION TYPE DATE RESULT COMPLETE A-1 JOB START X-2 ENGINEERING FINAL** E-7 TRAFFIC CTRL Printed: Tuesday, January 14, 2025 3:23:33 PM 2 of 2 t"F EDAJ() INC. 1890 SECTION A RECEIVED NOV 19 2024 CITY OF EDMONDS DEVELOPMENT RIGHT OF WAY CONSTRUCTION SERVICES DEPARTMENT PERMIT APPLICATION Complete and submit this Application in accordance with the Submittal Requirements outlined in Right -of -Way permit Handout E6�. If any field is not applicable to your project, write "N/A" instead of leaving blank. All fields required. Incomplete Applications will be denied. Owner and Entity Holding Franchise (if applicable) Name of Company Ziply Fiber Northwest Franchise Ordinance No: Point of Contact Colten Hesselman Title Program Manager Address 135 Lake Street S, Suite 155 Kirkland, WA 98033 City Kirkland State WA Zip 98033 Phone 971-205-9470 Email colten.hesselman@ziply.com Contractor and Authorized Agent of Owner (see note below) Name of Company BEON Contractor Contacts During Construction Primary Name Agent Name Alex Vasilcenco Title Title Mobile Address 11716 SE 229th PI Email City Kent State WA I Zip 98031 Secondary Name Phone 253-355-3741 Title Email Alex@beonconnect.com Mobile City of Edmonds Business License No: 604691807 Email State License No: 604691807 ;Q Contractor verifies it is currently bonded X Contractor verifies it currently has general liability insurance NOTE: ECDC 18.6o.02o requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city engineer. ❑ Multifamily residential ❑ Commercial ❑ City project ❑ Single family residential subdivision ❑ Single family -other ❑ Industrial ❑ Demo and rebuild or from vacant land? ❑ Other, please specify: ❑ Utility Franchise Work associated with development (check one of the above boxes as well) ❑ Traffic Control Only (no associated development) City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021 ❑ Utility Franchise Work (no associated development) Include an overall narrative description of the proposed work. Be specific and detailed: Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc. Include whether this is construction, maintenance, or repair. Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for underground utilities, etc.) SNOPUD replaced pole. Ziply to complete their aerial transfer for 3 attachments at 820 Olympic Ave Edmonds WA 98020. RIGHT-OF-WAY CLOSURE AREA TOTAL DURATION (Number of Months) Sidewalk 72 hours + LF x LF SF Alley 72 hours + I LF x LF SF Parking 72 hours + I LF x LF SF SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTION C. 1. The work in the right of way is on or for the following type of facilities: ❑ telecommunications dcable ❑ power ❑ gas ❑ water ❑ sewer ❑ storm Details of Work to be Completed 1. Does the utility owner have existing overhead infrastructure in the area of work? Yes No 2. Will any equipment be added underground or above ground (e.g. pedestals, vaults, etc.)? If yes, describe: 3. Does the proposed work connect a lot or commercial development with utilities that serve more than one lot or commercial development? `� 4. Does the work involve rebuilding or relocating an existing aboveground utility system which connects a lot or commercial development to an existing underground common utility system? 5. j Does the work involve proposed additions to an aboveground utility system? If es: Are the additions for the purpose of serving new commercial development? Are the additions for the purpose of serving a single-family residential subdivision? 6. IDoes your project involve rebuilding or replacing utility equipment which currently serves more than one lot or commercial development? City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021 If yes, answer the following questions related to project area, i.e. the actual area in which the project is proposed: 6a. Does your project involve wires/cables/lines? If yes: How many are existing? 1 3 How many are to be added? 0 6b. Does your project involve poles? If yes: How many poles are existing in the project area? What is the height of the existing poles? 45 How many poles are to be removed? Are additional poles to be laced? 0 How many? I I What is the height of the additionalpoles? 6c. Are any poles to be modified/rebuilt/replaced? If yes: X How many? I I What is the height of the poles after? Describe the modification rebuild: SECTION C Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their possession. Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS. Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to any permit approval. Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials, officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever, foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the expiration, revocation, or termination of any resulting permit approval. Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable requirements of state and federal law. Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by owner to act on its behalf and have authority to bind the owner to this application. Fees. The Applicant is responsible for all permit fees. APPLICANT SIGNATURE: cio-(� DATE: 09/05/2024 APPLICANT PRINTED NAME: Colten Hesselman APPLICANT TITLE: Program Manager NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021 SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM PUBLIC UTILITY DISTRICT 140.1 OF SNOHOMISH COUNTY LOCATION 750 OLYMPIC AVE LYNNWOODAREA POLE NO. 428 NE1/4S 24 T 27 R 03 DATE 03/05/22 ORDER 100092625 REASON FOR WORK REPLACE BAD ORDER POLE FOR ENGINEER A. RIFE OPERATION 0030 PUD PRI-5 DRAFTER U.G. NO. SCALE 1" =100 APPROVED g, DATE PRINTED DATE WORK COMPLETED FOREMAN FEES REO'D AYES ■NO PRIMARY OVERHEAD 0 RESIDENTIAL O COMMERCIAL LEO NO. SECONDARY OVERHEAD BASIC FEE S t '=i METER/CONV. POLE S PRIMARY UNDERGROUND O RESIDENTIAL O COMMERCIAL BASIC FEE S LIEU NO. 'as 'ms SECONDARY UNDERGROUND BASIC FEE S '®f '.i UNDERGROUND PLAT BASIC FEE S q FT.0 '=s STREET LIGHTING q FT.@% 'ms WORK IN RIGHT OF WAY 0 PRIMARY 0 SECONDARY q FT.@% 'mS MISCELLANEOUS FEES VAULT S PERMIT S s s S z TOTAL DUE S DATE PAID RECEIPT NO. SERVICE ORDER NO. mirommol NESC VIOLATIONS ■ NO 0 YES (SEE NOTES) PERMITS (DATE GRANTED) 0 TREE TRIM 0 STATE 0 COUNTY ■ CITY EDMONDS 0 EASEMENTS 0 REOUIRED ■ NOT REOUIREO DATE RELEASED FOREIGN CONTACTS ■ JPN• 100092625 0 JOINT TRENCH ZIPLY & CATV 0 JOINT BORE ZIPLY & CATV POLE STENCILING FROM TO TAKE OFF POLE PRE-CONST. REOUIRMENTS 0 TREE TRIM 0 PUD LOCATOR 0 BACKHOE 0 FLAGGING ■ ONE CALL DATE No. STREET LIGHTING 0 YES ■ NO M&R I IAS-BUILT IGIS Phi IJOINT USE LOCATION MAP PAGE 454H- 0 EXISTING POLE 0 EXISTING POLE -TO BE REMOVED • NEW POLE )1( NEW POLE TO REPLACE EXISTING POLE DATE SUBSTATION MPL CIRCUIT NO. 12-346 PHASE 123 ENGR'S TEL. • 425-783-8559 ENGR'S CELL • ,F-425-239-8210J. LOC A-PLI-428 SET 35FT POLE 2FT S.OF EXISTING POLE SET POLE DEEP 6.5FT DEEP AND INSTALL POLE KEY FOR EXTRA STABILITY INSTALL *1 NEUT SPOOL 10101 TRANSFER 1/0 OVHD SEC SVC BUILD NEW 3" UG SEC RISER PER CS-1U705 FROM OVHD 1/0 TRIPLEX, INSTALL 45FT OF 350 TRIPLEX TO EXISTING PED STRIP POLE AND ABANDON POLE TO COMM. POLE SHALL BE REMOVED ONCE ZIPLY TRANSFERS LINES OWNER/CONTRACTOR IS RESPONSIBLE FOR EROSION CONTROL AND DRAINAGE OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY UTILITIES MAY REQUIRE A SEPERATE PERMIT. ENGINEERING DIVISION APPROVED AS NOTED %» WQ✓ j j,,44z 12/04/2024 vv SL-1 RECEIVED NOV 19 2024 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT cast SHEET OF SCHEDULE ALL INSPECTION 1 EXISTING EXISTING EXISTING EXISTING SHOULDER LANE LANE SHOULDER LANE OPEN LANE OPEN WORK AREA TO TRAFFIC TO TRAFFIC SEE NOTE 3 RECEIVED SECTION A -A > THROUGH MYBUILDINGPERMIT.COM RECOMMENDED SIGN SPACING = X (1) RURAL ROADS & URBAN ARTERIALS 35-40 MPH 350'± RURAL ROADS & URBAN ARTERIALS 25-30 MPH 200'± (2) RESIDENTAL & BUSINESS DISTRICTS URBAN STREETS 25 MPH OR LESS 100'± (2) (1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE LONGITUDINAL BUFFER SPACE = B SPEED (MPH) 1 20 25 30 35 40 B (feet) 115 155 200 256 305 Buffer space may be adjusted (i) based on field conditions. INTERCHANGE RAMPS, AT -GRADE INTERSECTIONS AND DRIVEWAYS. (2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. PROTECTNE VEHICLE ROLL AHEAD DISTANCE = R STRATEGICALLY POSITION WORK VEHICLE TO PROTECT WORK CREW. 40'- 80' RECOMMENDED. NOV 19 2024 TRAFFIC CONTROL INSPECTION SHALL BE CITY OF EDMONDS REQUIRED WHENEVER WORK ZONE IS SET UP DEVELOPMENT SERVICES DEPARTMENT N I� H N • • SEE NOTE 3 X/2 X/2 X/2 X/2 U3 B SEE NOTE 1 VARIES, SEE NO- 36" MIN 36" 36 "MIN MIN 36"MIN 48 R 30" �°D � 30,. 36"MIN MIN SI OTHER PEC W20.1 W21.5 W71.15MOD R4.11 IBIW) 120.301 (BINS USED WITH USED WWITH SHARED SHARED (OPTIONAL) BIKE -VEHICLE BIKE -VEHICLE LANE ONLY LANE ONLY SEE NOTE 10(A) SEE NOTE 10(A) SHOULDER CLOSURE TAPER LENGTH = U3 SHONLDER SPEED (MPH) 20 2$ 30 35 4WIDTH < 6' 40 40 40 60 60 6' L/3 (feet) 40 40 40 60 60 10' 40 40 60 90 90 NOTES: 1. IF FEASIBLE, AVOID PLACING SHOULDER CLOSURE TAPER WITHIN OR IMMEDIATELY FOLLOWING HORIZONTAL AND VERTICAL CREST CURVES. 4. SIGNS ARE BLACK ON ORANGE UNLESS OTHERWISE INDICATED. 2. DISTANCE INCREASES AS WORK AREA MOVES DOWNSTREAM. 5. PLAN IS APPLICABLE TO LANE CLOSURES OF 7 DAYS OR LESS. LEGEND: 3. 28" TRAFFIC CONES, 36" TRAFFIC CONES, 42" TALL CHANNELIZING DEVICES, 6. ADD W21-30 SERIES SIGNS (36"06" MIN, F HEIGHT) @ X PRIOR TO N TEMPORARY SIGN LOCATION (1'MIN HEIGHT) OR TRAFFIC SAFETY DRUMS ALLOWED ON TAPERS AND TANGENTS. FREQUENT CONSTRUCTION VEHICLE INGRESS/EGRESS INTO OPEN LANE(S). ■ CHANNELIZING DEVICE (SEE NOTE 3) SHOULDER CLOSURE (HIGHWAYS E a PROTECTIVE VEHICLE , 40 MPH OR LESS NOT TO SCALE MAXIMUM CHANNELIZATION DEVICE SPACING (feet) MPH TAPER TANGENT 35 - 40 30 60 20-30 20 40 (OPTIONAL) 36" TI 36" MIN DOUBLE 48" ROAD wORx AXEAD nao emCes 36" MIN 120.301 (SIM W20-1 X/z X/2 N 7. PEDESTRIAN ACCOMMODATIONS, WHERE FACILITY OPEN TO PEDESTRIANS: (A) KEEP ADJACENT SIDEWALK OR PATHWAY OPEN. (B) CLOSE ADJACENT SIDEWALK OR PATHWAY. PROVIDE PEDESTRIAN DETOUR, ALTERNATE ROUTE,OR FREE SHUTTLE (WORK TRUCK,VAN,OR BUS OK). (C)STOP WORK OPS.& ESCORT PEDESTRIANS THROUGH WORK AREA. (D) ENGINEER TO ACCEPT ANY ALTERNATIVE STRATEGIES. 8. BICYCLIST ACCOMMODATIONS, VMERE FACILITY OPEN TO BICYCLES: (A) SHARED BICYCLE -VEHICLE LANE. ADD Wl l-15 MOD & R4-11 SIGNS. (B) BICYCLES PROHIBITED R5-6 SIGN(S). PROVIDE SIGNED DETOUR OR ALTERNATIVE ROUTE. (C) BICYCLES PROHIBITED VIA R5-6 SIGN(S). PROVIDE FREE SHUTTLE (WORK TRUCK, VAN, OR BUS OK) + CONTACT INFORMATION/PHONE BOXILABORER. (D)STOP WORK OPS & ESCORT BICYCLISTS THROUGH SHOULDER CLOSURE. (E) ENGINEER TO ACCEPT ANY ALTERNATIVE STRATEGIES. 24" ,dk36" MIN 36" MIN 36" MIN ® 24" UCK$ TRUCKS WVING IGXWgY 36"MIN ENTERING XIGHWWY 36"MIN < 76"MIN (RIB.) RS-6 RIBIW PRIOR TO AND WITHIN W21-30A W21-30 W21-308 SHLDR CLOSURE . .�� ....�..� it, ;ia,�..�... ......�....-..o........... TIME 2:0402 PM �.a.. �o .........,,........,..a.....�.�.o............. �......�. ........ �.. °w'o° W.0R ...I.,...,..� °}"" FED.AID PROJ.NO. wre o".E AdMkk Washington State Department of Transportation , ,�. rux xer uo TC4D3 DATE 4/212024 WAS PLOTTED BY Un2F DESIGNED BY �oW xumeen ..JET s„ter° ENTERED BY CHECKED BY coxra�cr„ —"xo, TYPICAL TRAFFIC CONTROL PLANS PROJ. ENGR. ENGINEERING DIVISION APPROVED AS NOTED jdl 12/04/2024 co O C� m ti O V co O Z O Z RECEIVED NOV 19 2024 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT RECEIVED CITY OF EDMONDS Right -of -Way Application #1541339 - W0918188 / NOV 19 2024 MyBuildingPermit.corn CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT Applicant First Name Last Name Company Name Colten Hesselman Ziply Fiber Number Street Apartment or Suite Number E-mail Address 4155 SW Cedar Hills Blvd chh4038@nwestnetwork.com City State Zip Phone Number Extension Beaverton OR 97205 (971) 205-9470 Contractor Company Name Contractor Unknown Number Street Apartment or Suite Number City State Zip Phone Number Extension State License Number License Expiration Date UBI # E-mail Address Project Location Number Street Floor Number Suite or Room Number 820 OLYMPIC AVE City Zip Code County Parcel Number EDMONDS 98020 00548900002206 Associated Building Permit Number Tenant Name Additional Information (i.e. equipment location or special instructions)_ Work Location Property Owner First Name Last Name or Company Name Danita A & David W Shneidman Number Street Apartment or Suite Number 17356 BEACH DR NE City State Zip LAKE FOREST PARK WA 98155 Certification Statement - The applicant states: I certify that I am the owner of this property or the owner's authorized agent. If acting as an authorized agent, I further certify that I have full power and authority to file this application and to perform, on behalf of the owner, all acts required to enable the jurisdiction to process and review such application. I have furnished true and correct information. I will comply with all provisions of law and ordinance governing this type of application. If the scope of work requires a licensed contractor to perform the work, the information will be provided prior to permit issuance. Date Submitted: 9/5/2024 Submitted By: Colten Hesselman Page 1 of 2 i CITY OF EDMONDS MyBuildingPermit.com Right -of -Way Application #1541339 - W0918188 Project Contact Company Name: Ziply Fiber Name: Colten Hesselman Email: chh4038@nwestnetwork.com Address: 4155 SW Cedar Hills Blvd Phone #: (971) 205-9470 Beaverton OR 97205 Project Type Activity Type Scope of Work Utility Purveyor Utility Work No Disturbance of Surface Project Name: W0918188 Description of Work: SNO PUD has replaced one pole. Ziply to complete their aerial transfer of 3 attachments at 820 Olympic Ave NE Edmonds WA 98020. Project Details Project Information Job Number W0918188 Page 2 of 2