Loading...
Building PermitType: RESIDENTIAL BLDG Subtype: ALTERATION OR REMODEL I Status: ISSUED Parcel No: 00544600001300 Site Address: 20710 86TH PL W EDMONDS,WA 98026-6617 Subdivision: SP S-95-197, PLN 2011-0015, LLA AFN 200406155002, LLA Lot: 0 PLN20130050, 005446 Fire Sprinklers: Lot Area: 24423 Zoning: RS-8 Valuation: $350,000.00 Occupancy Type: R3 Construction Type: VB Code Edition: 2021 No. Stories: 2 # of Dwelling Units: 1 Scope of Work: LEWIS- REMODEL, DECK, PORCH ROOF. M INCL P SEP WA State Contractor L & I #: Applied: 11/6/2024 Issued:1/16/2025 Final: Expiration Date: 1/16/2027 Issued by: NED CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT JAMES MORAN 10604 E RIVERSIDE DR., (425)485-3877 JAMES@LZLCONSTRUCTION.COM BOTHELL WA 98011 10604 E RIVERSIDE DR., CONTACT LZL CONSTRUCTION, INC. (425)485-3877 brett@lzlconstruction.com BOTHELL WA 98011 CONTRACTOR OWNER OWNER JOSEPH P & JANET O LEWIS 20710 86TH PL W, EDMONDS (425)417-2751 WA 98026 FEE INFORMATION DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT# APPLIANCE VENT 001.000.345.83.000.00 $34.00 $34.00 1/16/25 R42718 BLD - RES - PERMIT - VALUATION 001.000.345.83.000.00 $2,600.00 $2,600.00 1/16/25 R42718 BASED BLD - RES - PLAN REVIEW 001.000.345.83.000.00 $2,210.00 $2,210.00 11/8/24 R41273 CITY TECHNOLOGY FEE - PER 001.000.321.99.100.00 $45.00 $45.00 11/8/24 R41273 PERMIT ENG - INSPECTIONS - 4.1.24 001.000.345.83.400.20 $132.00 $132.00 1/16/25 R42718 FAN CONNECTED TO A SINGLE 001.000.345.83.000.00 $34.00 $34.00 1/16/25 R42718 DUCT FURNACE OR FIREPLACE 001.000.345.83.000.00 $34.00 $34.00 1/16/25 R42718 GAS PIPING - NEW OR RELOCATED 001.000.345.83.000.00 $34.00 $34.00 1/16/25 R42718 MECHANICAL BASE PERMIT FEE 001.000.322.10.000.00 $57.00 $57.00 1/16/25 R42718 STATE BUILDING CODE SURCHARGE 001.000.237.150 $6.50 $6.50 1/16/25 R42718 RES TOTALS: $5,186.50 $5,186.50 CONDITION TYPE STATUS I ff NOTES Printed: Thursday, January 16, 2025 9:42:23 AM 1 of 3 'RESIDENTIAL BLDG PermitCity - • • • • EL 98020 1 � . www.edmondswa.gov• 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. CARBON MONOXIDE ALARMS SHALL BE INSTALLED OUTSIDE OF EACH SEPARATE SLEEPING AREA IN THE IMMEDIATE VICINITY OF THE BEDROOMS AND ON EACH LEVEL IN FOR CARBON MONOXIDE SYSTEMS NEW CONSTRUCTION AND IN EXISTING DWELLINGS WHEN ALTERATIONS, REPAIRS OR INFORMATION ADDITIONS REQUIRING A PERMIT OCCUR, OR WHEN ONE OR MORE SLEEPING ROOMS ARE ADDED OR CREATED. It is the owner's responsibility to repair/replace all damage of utilities or frontage DAMAGE TO FRONTAGE FOR improvements in City right of Ways or Easements to City Standards caused by or IMPROVEMENTS INFORMATION occurring during the permitted project. ELECTRICAL PERMIT FOR Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309. NFORMATION FOR MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD ESC REQUIREMENTS INFORMATION REQUIREMENTS. GAS PIPE TEST FOR Gas pipe test must be observed by City Building Inspector, affidavits shall not be accepted NFORMATION Sound or noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of FOR 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding SOUND AND NOISE INFORMATION Sundays and Federal Holidays. At all other times the noise originating from construction sites and activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. FOR All utilities shall be located prior to any excavation. New locates shall be called for if at UTILITY LOCATES INFORMATION time of excavation, original locates are no longer identifiable. INSPECTIONS - Schedule Online at https://inspection.mybuildingpermit.com INSPECTIONTYPE INSPECTOR COMPLETED RESULT NOTES B-1 SETBACKS B-2 FOOTINGS B-3 EXT WALL SHEATHING Printed: Thursday, January 16, 2025 9:42:23 AM 2 of 3 ' : '- 'AAM City of Edmonds PERMIT NUM w- 121 5th Ave N, Edmondsrmit 980201 � . www.edmondswa.gov B-3 GAS PIPING TEST B-3 MECH ROUGH IN B-3 ROOF SHEATHING B-3 UNDERFLR FRAMING B-4 FRAMING B-4 SHOWER PAN B-7 BUILDING OTHER INSP X-3 BUILDING FINAL" A-1 TESC AND MOBILIZE E-3 STRM TIGHTLINE X-2 ENGINEERING FINAL Printed: Thursday, January 16, 2025 9:42:23 AM 3 of 3