Loading...
BLD2025-0086_Supplementals_Plumbing_Fixture_Counts_1.21.2025_10.01.36_AM_4720345. OF tp,b +r OHO r Jurisdiction: Edmonds Project Name: PINE PARK Application ID: 1603562 Supplemental Name: Plumbing Fixture Counts Enter the # of plumbing fixtures being - installed, altered, repaired, added or relocated Water Heater - Specify GAS or ELECTRIC - QTY # electric Plumbing fixture on 1 trap or set of fixtures on 1 trap - Include sinks, toilets, tubs, showers, etc. - QTY # 11 Drains wiin footprint of building - Rainwater systems, roof deck drains, etc. - QTY # 0 Re -pipe - Drain, vent, or water piping for each fixture served - QTY # 0 Water service line - Replacement or repair - QTY # Water service line - New - QTY # 1 Water treating equipment (water softener) - QTY # Backflow protective device - 2" and smaller - QTY # Backflow protective device - Over 2" - QTY # Graywater or reclaimed water system - In addition to fixtures - QTY # Non -grease waste pre-treatment interceptor - Oil/water separator - QTY # Medical gas piping system - QTY # Grease trap - HGI inside building - QTY # Gravity grease interceptor - GGI - QTY # Gas piping outlets - QTY # 2 MyBuildingPermit.com