APPROVED ENG2024-0303 ROW PERMITOF WAY PERMIT
PERMIT ER
City •EdmondsRIGHT
Edmonds:i 1 1 1
www.edmondswa.gov i
Description: ROW DRIVEWAY REPLACEMENT AND REMOVAL OF 3RD DRIVEWAY
ISSUED: 01/27/2025
Address: 16216 N MEADOWDALE RD EDMONDS WA 98026-4928
EXPIRES: 01/22/2026
Permit Type: RIGHT OF WAY Permit Subtype: RESIDENTIAL Parcel Number: 00649500001000
NAME TYPE NAME ADDRESS PHONE
APPLICANT JONATHAN HERRERA 8423 MUKILTEO SPEEDWAY, MUKILTEO WA 98275 (425)626-1877
CONTACT JIREH ASPHALT AND CONCRETE 8423 MUKILTEO SPEEDWAY 101, MUKILTEO WA 98275 (425)626-1877
CONTRACTOR JIREH CONSTRUCTION SERVICES 10121 EVERGREEN WAY, EVERETT WA 98204 (425)268-3084
OWNER STEVEN HYAMS 10016 EDMONDS WAY C316, EDMONDS WA 98020 (425)967-3030
FEE INFORMATION
DESCRIPTION AMOUNT PAID
CITY TECHNOLOGY FEE - PER PERMIT
$45.00 $45.00
ENG - INSPECTIONS - 4.1.24
$396.00 $396.00
ROW - STANDARD - 4.1.24 $396.00 $396.00
REQUIREMENTS
REQUIREMENT TYPE NOTES
TRAFFIC CONTROL
Traffic control and public safety shall be in accordance with City regulations as required by the City
Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification
verifying completion of the required training in their posession.
RESTORATION
Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with
asphalt or City approved material prior to the end of the workday - No Exceptions
WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final
inspection and acceptance of the work.
INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM
24 HR NOTICE REQUIRED
The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of
any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its
departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney
fees by reason of granting this permit.
RELEASED BY: GRN DATE: 01/27/2025
Printed: Monday, January 27, 2025 5:56:30 PM 1 of 2
RIGHT OF WAY PERMIT
PERMIT NU �!B E
City of Edmonds
SID
www.edmondswa.gov • •
CONDITIONS
CONDITION TYPE
ALERT RESIDENTS
ALERT AFFECTED RESIDENTS AND OR BUSINESSES PRIOR TO WORK START.
It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in
DAMAGE TO FRONTAGE
City right of Ways or Easements to City Standards caused by or occurring during the permitted
IMPROVEMENTS
project.
MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD
ESC REQUIREMENTS
REQUIREMENTS.
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to
indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and
agents from any and all claims for damages of whatever nature, arising directly or indirectly from the
HOLD HARMLESS
issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any
requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance
provision.
SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT.
INSPECTIONS
www.mybuildingpermit.com
RESTORE LANDSCAPE
Restore landscape to like or better conditions
Sound or noise originating from temporary construction sites as a result of construction activity are
exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on
SOUND AND NOISE
weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all
other times the noise originating from construction sites and activities must comply with the noise
limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
All utilities shall be located prior to any excavation. New locates shall be called for if at time of
UTILITY LOCATES
excavation, original locates are no longer identifiable.
INSPECTIONS
INSPECTION TYPE
DATE
RESULT
COMPLETE
E-7 DWY APPROACH
E-7 HMA WALK
E-7 TRAFFIC CTRL
X-2 ENGINEERING FINAL**
E-4 FENCE
Printed: Monday, January 27, 2025 5:56:30 PM 2 of 2
RESUB
Lti�y of EpiyO�o�
ANC. 1 g90
SECTION A
RIGHT OF WAY CONSTRUCTION
PERMIT APPLICATION
Complete and submit this Application in accordance with the Submittal
Requirements outlined in Right -of -Way permit Handout E63.
JAN 23, 2025
CITY OF EDMONDS
DEVELOPMENT
SERVICES DEPARTMENT
If any field is not applicable to your project, write "N/A" instead of leaving blank.
All fields required. Incomplete Applications will be denied.
General•
Project Name Gayle and Steve Hyams
Site Address or if no site address use Property Address at NW corner of project area:16216 N Meadowdale Rd. Edmonds, WA, 98026
Associated Permits: BLD PLN ENG
• • • .• .• -
Name of Company Franchise Ordinance No:
Point of Contact
Title
Address
City
State
Zip
Phone
Email
Contractor and Authorized Agent of Owner (see note below)
Name ofCompanyJIREH ASPHALT & CONCRETE INC
Contractor Contacts During Construction
Primary Name Ricardo Lopez
Agent Name JD
Title Project Cordinator
Title Permit Coordinator & IT
Mobile 425-971-4378
Address 8243 Mukilteo Speedway #101
Email Ricardo@jirehwa.com
City Everett
State WA
Zip 98275
Secondary Name
Phone 425-268-3084
Title
EmailJD@jirehwa.com
Mobile
City of Edmonds Business License No: 603355719
Email
State License No: 603355719 - Contractor: JIREHCS861 N5
91 Contractor verifies it is currently bonded
V Contractor verifies it currently has general liability insurance
NOTE: ECDC 18.6o.02o requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city
engineer.
❑ Multifamily residential ❑ Commercial ❑ City project
'v6 Single family residential subdivision ❑ Single family -other ❑ Industrial
❑ Demo and rebuild or from vacant land?
❑ Other, please specify:
❑ Utility Franchise Work associated with development (check one of the above boxes as well)
❑ Traffic Control Only (no associated development)
City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021
❑ Utility Franchise Work (no associated development)
Project Description
Include an overall narrative description of the proposed work. Be specific and detailed:
Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc.
Include whether this is construction, maintenance, or repair.
Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for
underground utilities, etc.)
As shown in the site plan, we will remove 160 sgft of excess asphalt and replace it with river rock to meet the city's requirements. After this, the total asphalt driveway
area will be 1,990 sqft.
RIGHT-OF-WAY
CLOSURE
AREA
TOTAL
DURATION
(Number of Months)
Sidewalk 72 hours +
LF
JxJ
LF
SF
Alley 72 hours +
LF
JxJ
F
SF
Parking 72 hours +
LF
JxJ
LF
SF
SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTION C.
1. The work in the right of way is on or for the following type of facilities:
❑ telecommunications ❑ cable ❑ power ❑ gas
❑ water ❑ sewer ❑ storm
1.
CompletedDetails of Work to be
Does the utility owner have existin overhead infrastructure in the area of work?
•
2.
Will any equipment be added underground or above ground (e.g. pedestals, vaults, etc.)?
If yes, describe:
3.
Does the proposed work connect a lot or commercial development with utilities that serve more
than one lot or commercial development?
4.
Does the work involve rebuilding or relocating an existing aboveground utility system which
connects a lot or commercial development to an existing underground common utility system?
5.
Does the work involve proposed additions to an aboveground utility system? If es:
Are the additions for the purpose of serving new commercial development?
Are the additions for the purpose of serving a single-family residential subdivision?
Details of • to be Completed
®i
6. Does your project involve rebuilding or replacing utility equipment which currently serves more
than one lot or commercial development?
City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021
If yes, answer the following questions related to project area, i.e. the actual area in which the
project is proposed:
6a.
Does your project involve wires/cables/lines? If yes:
How many are existing? I I How many are to be added?
6b.
Does your project involve poles? If yes:
How many poles are existing in the project area?
What is the height of the existing poles?
How many poles are to be removed?
Are additional poles to be laced?
How many? I I What is the height of the additionalpoles?
6c.
Are any poles to be modified/rebuilt/replaced? If yes:
How many? What is the height of the poles after?
Describe the modification rebuild:
SECTION C
Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as
required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have
certification verifying completion of the required training in their possession.
Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be
patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS.
Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to
any permit approval.
Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials,
officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever,
foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or
omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose
acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and
specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any
respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the
expiration, revocation, or termination of any resulting permit approval.
Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and
requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to
the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal
Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable
requirements of state and federal law.
Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a
licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by
owner to act on its behalf and have authority to bind the owner to this application.
Fees. The Applicant is responsible for all permit fees.
APPLICANT SIGNATURE:
1 /23/2024
APPLICANT PRINTED NAME: JD
APPLICANT TITLE: Permit Coordinator & IT
NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE
City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021
a
r
sm
- r —
. ENGINEERING DIVISION
,7TEDMoog d
-- .
; ..• NO STORMWATER MANAGEMENT SYSTEM ` 'Rp-sus
REQUIRED AT THIS TIME. IF NEW AND/OR �+
REPLACED IMPERVIOUS SURFACE EQUALS 23, 20i
• ' "" 2000SQFT OR GREATER, A STORMWATER
MANAGMEMENT SYSTEM MAY BE REQUIRED
't PER CITY CODES AND STANDARDS
ry
COLD MIX ASPHALT
SHALL BE REMOVED AS
MARKED ON SITE BY
CITY ENGINEERING
INSPECTOR
FENCE OR PLANTINGS
SHALL BE PLACED IN
THIS AREA TO CLOSE
OFF THE UNPERMITTED
THIRD DRIVEWAY
\ APPROACH.
`ANY PLANTINGS SHALL
BE NO TALLER THAN 3' IN
/ MATURE HEIGHT.
Legend
1 Cone
N Faagger.
Staging zone
♦ W20-1
♦ W20-4
♦ W20-7a
® Work Area
MAXIMUM CHANNELIZATION
DEVICE SPACING (feet)
MPH
TAPER
TANGENT
50-75
40
80
35-45
30
60
20-3
220
40
SIGN SPACING = X (1)
FREEWAYS & EXPRESSWAYS 50-75 MPH 1500'+/-
RURAL HIGHWAYS 60-65 MPH 800'+/-
RURAL ROADS 45-55 MPH 500'+/-
RURAL ROADS & URBAN ARTERIALS 35-40 MPH 350'+/-
RURAL ROADS & URBAN ARTERIALS 25-30 MPH 200'+/-(2)
RESIDENTAL & BUSINESS DISTRICTS
URBAN STREETS 25 MPH OR LESS 100'+/-(2)
(1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE
INTERCHANGE RAMPS, AT -GRADE INTERSECTIONS AND DRIVEWAYS.
(2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TO FIT
ROADWAY CONDITIONS.
ALL SIGNS ARE 48" X 4&' BLACK ON ORANGE
UNLESS OTHERWISE DESIGNATED
MINIMUM LANE CLOSURE TAPER
LENGTH = L
LANE In rH
SPEED (MPH)I 201251
30
35
40
45
50
55
60
65
701
75
12
1 L (feet) 180
11401180127013301540160016801720180018401920
SHOULDER CLOSURE TAPER LENGTH = L13
SHOUWDTTHLD.M
SPEED (MPN)
20
25
30
35
140
145
1 50
155
60
65
1 70
75
6
U3 (feet)
1
40
40
40
60
160
190
112011201120
160
160
160
10
40
40
60
190
190
1150120012001200
240
240
280
FOR SHOULDERS LESS THAN 6% USE 3 DEVICES MINIMUM
TRAFFIC CONTROL INSPECTION SHALL BE
REQUIRED WHENEVER WORK ZONE IS SET UP
Notes:
1.Flaggers to be placed before any curves should they have lack of visibility from approaching traffic.
2.Spotter/flagger for center driveways
3. increase sign distance to accommodate curvature of the road.
4.if posted speed is under 45mph, it is advised to add the Be prepared to Stop sign between the
one lane road and flagger symbol for extra visibility of approaching work.
16100 N Meadowdale Rd
LONGITUDINAL BUFFER SPACE = B
SPEED (MPH)I
201251
301
351401451
501
551601651
70175
LENGTH (feet)
115
155
200
250
305
360
425
495
570
645
730
820
STATIONARY TRANSPORTABLE ATTENUATOR ROLL AHEAD DISTANCE = R
HOST VEHICLE WEIGHT
9,900 TO 22,000 lbs.
HOST VEHICLE WEIGHT
22,001+ Ibs.
UP TO 40 MPH
45-55 MPH 1
60+ MPH
UP TO 40 MPH
45-55 MPH
1 60+ MPH
100' 1
123' 1
172'
74'
1 100'
1 150'
PROTECTIVE VEHICLE ROLL AHEAD DISTANCE = R
NO SPECIFIED DISTANCE REQUIRED.
STRATEGICALLY POSITION WORK VEHICLE TO PROTECT WORK CREW.
16216 N Meadowdale Rd
Date: 6/4/2024 Author: Jessica Vizcarra-Calleros Project: Gayle Hyams- 16216 N. Meadowdale Rd, Edmonds, Wa 98026
TCP was made with Invarion Rapid Plan
We. TCS: Jessica Vizcarra-calleros TCS Card# 009940 (ATSSA)
exp 10/27/2027
Contact info: 253-754-2825 , Lynn@oktcs.net
16215 N Meadowdale Rd
16217 N Meadowdale Rd
I
ENGINEERING DIVISION
.,DTED
Owv 11 /27/202E
RECEIVED
Jun 17 2024
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
ROAD
WORK
1E 'IN ` AHEAD
�. X �{�x-I—x�
RECEIVED
Jun 17 2024
DEVELOPMENTCITY OF EDMNDS OERVCES CITY OF EDMONDS MyBuildingPermit.com
DEPARTMENT
Right -of -Way Application #1503712 - Gayle Hyams - ROW
Applicant
First Name Last Name Company Name
Jonathan Herrera Jireh Asphalt and Concrete
Number Street Apartment or Suite Number E-mail Address
8423 Mukilteo Speedway jona@jirehwa.com
City State Zip Phone Number Extension
Mukilteo WA 98275 (425) 626-1877
Contractor
Company Name
JIREH CONSTRUCTION SERVICES
Number Street Apartment or Suite Number
10121 EVERGREEN WAY
City State Zip Phone Number Extension
EVERETT WA 98204 (425) 268-3084
State License Number License Expiration Date UBI # E-mail Address
JIREHCS861 N5 9/14/2024 F;ni is.ri71 q jona@jirehwa.com
Project Location
Number Street Floor Number Suite or Room Number
16216 N MEADOWDALE RD
City Zip Code County Parcel Number
EDMONDS 98026 00649500001000
Associated Building Permit Number Tenant Name
Additional Information (i.e. equipment location or special instructions)_
Work Location
Property Owner
First Name Last Name or Company Name
Steven Hyams
Number Street Apartment or Suite Number
10016 EDMONDS WAY C316
City State Zip
EDMONDS WA 98020
Certification Statement - The applicant states:
I certify that I am the owner of this property or the owner's authorized agent. If acting as an authorized agent, I further certify that I have full power and
authority to file this application and to perform, on behalf of the owner, all acts required to enable the jurisdiction to process and review such application. I
have furnished true and correct information. I will comply with all provisions of law and ordinance governing this type of application. If the scope of work
requires a licensed contractor to perform the work, the information will be provided prior to permit issuance.
Date Submitted: 6/13/2024 Submitted By: Jonathan Herrera
Page 1 of 2
CITY OF EDMONDS MyBuildingPermit.com
Right -of -Way Application #1503712 - Gayle Hyams - ROW
Project Contact
Company Name: Jireh Asphalt and Concrete
Name: Jonathan Herrera Email: jona@jirehwa.com
Address: 8423 Mukilteo Speedway 101 Phone #: (425) 626-1877
Mukilteo WA 98275
Project Type Activity Type Scope of Work
Single Family Residential Modification Driveway Replacement
Project Gayle Hyams - ROW
Name:
Scope of Work: Asphalt Driveway Replacement Project Objective: Replace the existing concrete
driveway to enhance durability, aesthetics, and safety. The work includes removing the old
material, preparing the base, and installing new asphalt. Tasks: Asphalt and Root Removal:
Remove existing concrete driveway and any interfering roots. Dispose of all materials
Description responsibly. Debris Management: Clear away all debris and cover disposal fees. Base
of Work: Preparation: Lay a 2-3 inch thick gravel base and compact it to stabilize the foundation. Asphalt
Installation: Install 3 inches of class B asphalt over a 2406 square foot area. Ensure the asphalt is
evenly spread and compacted. Logistics: Duration: Complete within 2-3 days, weather permitting.
Access: Parking available, but may be restricted near work area. Hours: Work will occur during
hours that minimize disruption. Completion: Conduct a final inspection with the client to confirm
satisfaction. Address any final adjustments needed for quality assurance.
Project Details
Surface Improvements
Asphalt
Page 2 of 2