Loading...
APPROVED ENG2024-0303 ROW PERMITOF WAY PERMIT PERMIT ER City •EdmondsRIGHT Edmonds:i 1 1 1 www.edmondswa.gov i Description: ROW DRIVEWAY REPLACEMENT AND REMOVAL OF 3RD DRIVEWAY ISSUED: 01/27/2025 Address: 16216 N MEADOWDALE RD EDMONDS WA 98026-4928 EXPIRES: 01/22/2026 Permit Type: RIGHT OF WAY Permit Subtype: RESIDENTIAL Parcel Number: 00649500001000 NAME TYPE NAME ADDRESS PHONE APPLICANT JONATHAN HERRERA 8423 MUKILTEO SPEEDWAY, MUKILTEO WA 98275 (425)626-1877 CONTACT JIREH ASPHALT AND CONCRETE 8423 MUKILTEO SPEEDWAY 101, MUKILTEO WA 98275 (425)626-1877 CONTRACTOR JIREH CONSTRUCTION SERVICES 10121 EVERGREEN WAY, EVERETT WA 98204 (425)268-3084 OWNER STEVEN HYAMS 10016 EDMONDS WAY C316, EDMONDS WA 98020 (425)967-3030 FEE INFORMATION DESCRIPTION AMOUNT PAID CITY TECHNOLOGY FEE - PER PERMIT $45.00 $45.00 ENG - INSPECTIONS - 4.1.24 $396.00 $396.00 ROW - STANDARD - 4.1.24 $396.00 $396.00 REQUIREMENTS REQUIREMENT TYPE NOTES TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their posession. RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday - No Exceptions WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the work. INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM 24 HR NOTICE REQUIRED The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit. RELEASED BY: GRN DATE: 01/27/2025 Printed: Monday, January 27, 2025 5:56:30 PM 1 of 2 RIGHT OF WAY PERMIT PERMIT NU �!B E City of Edmonds SID www.edmondswa.gov • • CONDITIONS CONDITION TYPE ALERT RESIDENTS ALERT AFFECTED RESIDENTS AND OR BUSINESSES PRIOR TO WORK START. It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in DAMAGE TO FRONTAGE City right of Ways or Easements to City Standards caused by or occurring during the permitted IMPROVEMENTS project. MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD ESC REQUIREMENTS REQUIREMENTS. Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the HOLD HARMLESS issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT. INSPECTIONS www.mybuildingpermit.com RESTORE LANDSCAPE Restore landscape to like or better conditions Sound or noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on SOUND AND NOISE weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites and activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. All utilities shall be located prior to any excavation. New locates shall be called for if at time of UTILITY LOCATES excavation, original locates are no longer identifiable. INSPECTIONS INSPECTION TYPE DATE RESULT COMPLETE E-7 DWY APPROACH E-7 HMA WALK E-7 TRAFFIC CTRL X-2 ENGINEERING FINAL** E-4 FENCE Printed: Monday, January 27, 2025 5:56:30 PM 2 of 2 RESUB Lti�y of EpiyO�o� ANC. 1 g90 SECTION A RIGHT OF WAY CONSTRUCTION PERMIT APPLICATION Complete and submit this Application in accordance with the Submittal Requirements outlined in Right -of -Way permit Handout E63. JAN 23, 2025 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT If any field is not applicable to your project, write "N/A" instead of leaving blank. All fields required. Incomplete Applications will be denied. General• Project Name Gayle and Steve Hyams Site Address or if no site address use Property Address at NW corner of project area:16216 N Meadowdale Rd. Edmonds, WA, 98026 Associated Permits: BLD PLN ENG • • • .• .• - Name of Company Franchise Ordinance No: Point of Contact Title Address City State Zip Phone Email Contractor and Authorized Agent of Owner (see note below) Name ofCompanyJIREH ASPHALT & CONCRETE INC Contractor Contacts During Construction Primary Name Ricardo Lopez Agent Name JD Title Project Cordinator Title Permit Coordinator & IT Mobile 425-971-4378 Address 8243 Mukilteo Speedway #101 Email Ricardo@jirehwa.com City Everett State WA Zip 98275 Secondary Name Phone 425-268-3084 Title EmailJD@jirehwa.com Mobile City of Edmonds Business License No: 603355719 Email State License No: 603355719 - Contractor: JIREHCS861 N5 91 Contractor verifies it is currently bonded V Contractor verifies it currently has general liability insurance NOTE: ECDC 18.6o.02o requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city engineer. ❑ Multifamily residential ❑ Commercial ❑ City project 'v6 Single family residential subdivision ❑ Single family -other ❑ Industrial ❑ Demo and rebuild or from vacant land? ❑ Other, please specify: ❑ Utility Franchise Work associated with development (check one of the above boxes as well) ❑ Traffic Control Only (no associated development) City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021 ❑ Utility Franchise Work (no associated development) Project Description Include an overall narrative description of the proposed work. Be specific and detailed: Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc. Include whether this is construction, maintenance, or repair. Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for underground utilities, etc.) As shown in the site plan, we will remove 160 sgft of excess asphalt and replace it with river rock to meet the city's requirements. After this, the total asphalt driveway area will be 1,990 sqft. RIGHT-OF-WAY CLOSURE AREA TOTAL DURATION (Number of Months) Sidewalk 72 hours + LF JxJ LF SF Alley 72 hours + LF JxJ F SF Parking 72 hours + LF JxJ LF SF SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTION C. 1. The work in the right of way is on or for the following type of facilities: ❑ telecommunications ❑ cable ❑ power ❑ gas ❑ water ❑ sewer ❑ storm 1. CompletedDetails of Work to be Does the utility owner have existin overhead infrastructure in the area of work? • 2. Will any equipment be added underground or above ground (e.g. pedestals, vaults, etc.)? If yes, describe: 3. Does the proposed work connect a lot or commercial development with utilities that serve more than one lot or commercial development? 4. Does the work involve rebuilding or relocating an existing aboveground utility system which connects a lot or commercial development to an existing underground common utility system? 5. Does the work involve proposed additions to an aboveground utility system? If es: Are the additions for the purpose of serving new commercial development? Are the additions for the purpose of serving a single-family residential subdivision? Details of • to be Completed ®i 6. Does your project involve rebuilding or replacing utility equipment which currently serves more than one lot or commercial development? City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021 If yes, answer the following questions related to project area, i.e. the actual area in which the project is proposed: 6a. Does your project involve wires/cables/lines? If yes: How many are existing? I I How many are to be added? 6b. Does your project involve poles? If yes: How many poles are existing in the project area? What is the height of the existing poles? How many poles are to be removed? Are additional poles to be laced? How many? I I What is the height of the additionalpoles? 6c. Are any poles to be modified/rebuilt/replaced? If yes: How many? What is the height of the poles after? Describe the modification rebuild: SECTION C Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their possession. Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS. Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to any permit approval. Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials, officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever, foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the expiration, revocation, or termination of any resulting permit approval. Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable requirements of state and federal law. Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by owner to act on its behalf and have authority to bind the owner to this application. Fees. The Applicant is responsible for all permit fees. APPLICANT SIGNATURE: 1 /23/2024 APPLICANT PRINTED NAME: JD APPLICANT TITLE: Permit Coordinator & IT NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021 a r sm - r — . ENGINEERING DIVISION ,7TEDMoog d -- . ; ..• NO STORMWATER MANAGEMENT SYSTEM ` 'Rp-sus REQUIRED AT THIS TIME. IF NEW AND/OR �+ REPLACED IMPERVIOUS SURFACE EQUALS 23, 20i • ' "" 2000SQFT OR GREATER, A STORMWATER MANAGMEMENT SYSTEM MAY BE REQUIRED 't PER CITY CODES AND STANDARDS ry COLD MIX ASPHALT SHALL BE REMOVED AS MARKED ON SITE BY CITY ENGINEERING INSPECTOR FENCE OR PLANTINGS SHALL BE PLACED IN THIS AREA TO CLOSE OFF THE UNPERMITTED THIRD DRIVEWAY \ APPROACH. `ANY PLANTINGS SHALL BE NO TALLER THAN 3' IN / MATURE HEIGHT. Legend 1 Cone N Faagger. Staging zone ♦ W20-1 ♦ W20-4 ♦ W20-7a ® Work Area MAXIMUM CHANNELIZATION DEVICE SPACING (feet) MPH TAPER TANGENT 50-75 40 80 35-45 30 60 20-3 220 40 SIGN SPACING = X (1) FREEWAYS & EXPRESSWAYS 50-75 MPH 1500'+/- RURAL HIGHWAYS 60-65 MPH 800'+/- RURAL ROADS 45-55 MPH 500'+/- RURAL ROADS & URBAN ARTERIALS 35-40 MPH 350'+/- RURAL ROADS & URBAN ARTERIALS 25-30 MPH 200'+/-(2) RESIDENTAL & BUSINESS DISTRICTS URBAN STREETS 25 MPH OR LESS 100'+/-(2) (1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT -GRADE INTERSECTIONS AND DRIVEWAYS. (2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. ALL SIGNS ARE 48" X 4&' BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED MINIMUM LANE CLOSURE TAPER LENGTH = L LANE In rH SPEED (MPH)I 201251 30 35 40 45 50 55 60 65 701 75 12 1 L (feet) 180 11401180127013301540160016801720180018401920 SHOULDER CLOSURE TAPER LENGTH = L13 SHOUWDTTHLD.M SPEED (MPN) 20 25 30 35 140 145 1 50 155 60 65 1 70 75 6 U3 (feet) 1 40 40 40 60 160 190 112011201120 160 160 160 10 40 40 60 190 190 1150120012001200 240 240 280 FOR SHOULDERS LESS THAN 6% USE 3 DEVICES MINIMUM TRAFFIC CONTROL INSPECTION SHALL BE REQUIRED WHENEVER WORK ZONE IS SET UP Notes: 1.Flaggers to be placed before any curves should they have lack of visibility from approaching traffic. 2.Spotter/flagger for center driveways 3. increase sign distance to accommodate curvature of the road. 4.if posted speed is under 45mph, it is advised to add the Be prepared to Stop sign between the one lane road and flagger symbol for extra visibility of approaching work. 16100 N Meadowdale Rd LONGITUDINAL BUFFER SPACE = B SPEED (MPH)I 201251 301 351401451 501 551601651 70175 LENGTH (feet) 115 155 200 250 305 360 425 495 570 645 730 820 STATIONARY TRANSPORTABLE ATTENUATOR ROLL AHEAD DISTANCE = R HOST VEHICLE WEIGHT 9,900 TO 22,000 lbs. HOST VEHICLE WEIGHT 22,001+ Ibs. UP TO 40 MPH 45-55 MPH 1 60+ MPH UP TO 40 MPH 45-55 MPH 1 60+ MPH 100' 1 123' 1 172' 74' 1 100' 1 150' PROTECTIVE VEHICLE ROLL AHEAD DISTANCE = R NO SPECIFIED DISTANCE REQUIRED. STRATEGICALLY POSITION WORK VEHICLE TO PROTECT WORK CREW. 16216 N Meadowdale Rd Date: 6/4/2024 Author: Jessica Vizcarra-Calleros Project: Gayle Hyams- 16216 N. Meadowdale Rd, Edmonds, Wa 98026 TCP was made with Invarion Rapid Plan We. TCS: Jessica Vizcarra-calleros TCS Card# 009940 (ATSSA) exp 10/27/2027 Contact info: 253-754-2825 , Lynn@oktcs.net 16215 N Meadowdale Rd 16217 N Meadowdale Rd I ENGINEERING DIVISION .,DTED Owv 11 /27/202E RECEIVED Jun 17 2024 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT ROAD WORK 1E 'IN ` AHEAD �. X �{�x-I—x� RECEIVED Jun 17 2024 DEVELOPMENTCITY OF EDMNDS OERVCES CITY OF EDMONDS MyBuildingPermit.com DEPARTMENT Right -of -Way Application #1503712 - Gayle Hyams - ROW Applicant First Name Last Name Company Name Jonathan Herrera Jireh Asphalt and Concrete Number Street Apartment or Suite Number E-mail Address 8423 Mukilteo Speedway jona@jirehwa.com City State Zip Phone Number Extension Mukilteo WA 98275 (425) 626-1877 Contractor Company Name JIREH CONSTRUCTION SERVICES Number Street Apartment or Suite Number 10121 EVERGREEN WAY City State Zip Phone Number Extension EVERETT WA 98204 (425) 268-3084 State License Number License Expiration Date UBI # E-mail Address JIREHCS861 N5 9/14/2024 F;ni is.ri71 q jona@jirehwa.com Project Location Number Street Floor Number Suite or Room Number 16216 N MEADOWDALE RD City Zip Code County Parcel Number EDMONDS 98026 00649500001000 Associated Building Permit Number Tenant Name Additional Information (i.e. equipment location or special instructions)_ Work Location Property Owner First Name Last Name or Company Name Steven Hyams Number Street Apartment or Suite Number 10016 EDMONDS WAY C316 City State Zip EDMONDS WA 98020 Certification Statement - The applicant states: I certify that I am the owner of this property or the owner's authorized agent. If acting as an authorized agent, I further certify that I have full power and authority to file this application and to perform, on behalf of the owner, all acts required to enable the jurisdiction to process and review such application. I have furnished true and correct information. I will comply with all provisions of law and ordinance governing this type of application. If the scope of work requires a licensed contractor to perform the work, the information will be provided prior to permit issuance. Date Submitted: 6/13/2024 Submitted By: Jonathan Herrera Page 1 of 2 CITY OF EDMONDS MyBuildingPermit.com Right -of -Way Application #1503712 - Gayle Hyams - ROW Project Contact Company Name: Jireh Asphalt and Concrete Name: Jonathan Herrera Email: jona@jirehwa.com Address: 8423 Mukilteo Speedway 101 Phone #: (425) 626-1877 Mukilteo WA 98275 Project Type Activity Type Scope of Work Single Family Residential Modification Driveway Replacement Project Gayle Hyams - ROW Name: Scope of Work: Asphalt Driveway Replacement Project Objective: Replace the existing concrete driveway to enhance durability, aesthetics, and safety. The work includes removing the old material, preparing the base, and installing new asphalt. Tasks: Asphalt and Root Removal: Remove existing concrete driveway and any interfering roots. Dispose of all materials Description responsibly. Debris Management: Clear away all debris and cover disposal fees. Base of Work: Preparation: Lay a 2-3 inch thick gravel base and compact it to stabilize the foundation. Asphalt Installation: Install 3 inches of class B asphalt over a 2406 square foot area. Ensure the asphalt is evenly spread and compacted. Logistics: Duration: Complete within 2-3 days, weather permitting. Access: Parking available, but may be restricted near work area. Hours: Work will occur during hours that minimize disruption. Completion: Conduct a final inspection with the client to confirm satisfaction. Address any final adjustments needed for quality assurance. Project Details Surface Improvements Asphalt Page 2 of 2