Loading...
Building PermitType: COMMERCIAL BLDG Subtype: NEW TENANT IMPROVEMENT I Status: ISSUED Parcel No: 00580700002901 Site Address: 7320 216TH ST SW 100 EDMONDS,WA 98026-8006 Subdivision: 005807, BLA AFN 199909155005 Lot: 0 Fire Sprinklers: Yes Lot Area: Zoning: Valuation: $1,350,073.00 Occupancy Type: B Construction Type: IIA Code Edition: 2021 No. Stories: 3 # of Dwelling Units: 0 Scope of Work: SWEDISH PAVILLION- REMODEL PHARMACY TO CLINIC Applied: 11/8/2024 Issued:1/28/2025 Final: Expiration Date: 1/28/2027 Issued by: NED I WA State Contractor L & I #: COLVOCL832CZ I CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT AMANDA PROMISLOFF 21911 76TH AVE W SUITE 210, (425)778-1530 APROMISLOFF@TGBARCHITECTS.CO EDMONDS WA 98026 M CONTACT TGB ARCHITECTS 21911 76TH AVE W SUITE 210, (425)778-1530 apromisloff@tgbarchitects.com EDMONDS WA 98026 CONTRACTOR COLVOS CONSTRUCTION LLC 711 COURT C, TACOMA WA (253)844-4640 dpage@colvosconstruction.com 98402 PO BOX 92129, SOUTHLAKE TX OWNER STEVENS PAVILLION LLC 76092 •' • DESCRIPTION 7BLDCOM ACCOUNT AMOUNT PAID PAID DATE RECEIPT # - PERMIT - VALUATION 001.000.345.83.000.00 $8,864.80 $8,864.80 1/28/25 R43025 BASED BLD - COM - PLAN REVIEW 001.000.345.83.000.00 $7,535.08 $7,535.08 11/8/24 R41293 CITY TECHNOLOGY FEE - PER 001.000.321.99.100.00 $45.00 $45.00 11/8/24 R41293 PERMIT STATE BUILDING CODE SURCHARGE 001.000.237.150 $25.00 $25.00 1/28/25 R43025 COM TOTALS: $16,469.88 $16,469.88 7 CONDITION TYPE STATUS NOTES Printed: Tuesday, January 28, 2025 11:11:17 AM 1 of 2 •MERCIAL BLDG PermitCity • • • • - •:0iBLD2024-1478 www.edmondswa.gov 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. ELECTRICAL PERMIT FOR Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309. NFORMATION FIRE FINAL INSPECTION O Request final Fire Department Inspection online via mybuildingpermit.com. ORMATION Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its FOR officials, employees, and agents from any and all claims for damages of whatever nature, HOLD HARMLESS INFORMATION arising directly or indirectly from the issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. Final approval on a project or final occupancy approval must be granted by the Building OCCUPANCY FOR Official prior to use or occupancy of the building or structure. Check the job card for all INFORMATION required City inspections including final project approval and final occupancy inspections. Sound or noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of FOR 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding SOUND AND NOISE INFORMATION Sundays and Federal Holidays. At all other times the noise originating from construction sites and activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. INSPECTIONS - Schedule Online at https://inspection.mybuildingpermit.com INSPECTIONTYPE INSPECTOR COMPLETED RESULT NOTES X-1 FIRE FINAL X-3 BUILDING FINAL" A-1 BUILDING PRECON B-4 FRAMING Printed: Tuesday, January 28, 2025 11:11:17 AM 2 of 2