APPROVED ENG BLD2024-1307+Transportation_Impact_Form+10.3.2024_1.10.08_PM+4539880Approved by BLD2024-1307
APPENDIX A
1/2/25 Page 1 of 2
Transportation Impact Analysis
Worksheet RECEIVED
Oct �7 2024
DEVE-MENT SERVICES
PERMITTING & DEVELOPMENT
ENGINEERING
DIVISION
121 5th Avenue N
P: 425.771.0220
www.edmondswa.gov
Name of Proposed Project:
Owner/Applicant
Thuv Ho
Name
8012 Beverly Ln
Street/Mailing Address
Everett WA 98203
City
VTL Hair Salon T.I.
Applicant Contact Person:
Kent Shea
Name
PO Box 95727
Street/Mailing Address
Seattle WA 98145
State Zip City
State Zip
Telephone: (425) 772-0426 Telephone: (206) 953-9533
Traffic Engineer who prepared the Traffic Impact Analysis (if applicable):
N/A
Firm Name Contact Name
Telephone:
1. PROJECT DESCRIPTION
E-mail:
a. Location - Street address: 8311-A 212th St SW
Edmonds WA 98026
b. Specify existing land use: Offices
(Attach a vicinity map and site plan.)
629 Other Personal Services NEC
c. Specify proposed type and size of development: combine 3 offices into 1 hair salon,
total 483 SF of space (# of residential units and/or square footage of building)
d. Date construction will begin and be completed: Begin upon permit issuance and complete in 1 week
e. Define proposed access locations: frontage on 212th St SW
£ Define proposed sight distance at site egress locations:
HANDOUT UPDATED 05.09.2023
APPENDIX A
Page 2 of 2
2. MITIGATION RECOMMENDATIONS
State recommended measures and fees required to mitigate project specific traffic impacts.
Traffic impact fee shall be calculated from the attached Impact Fee Rate Tables and as identified
in ECDC 3.36.125, except as otherwise provided for independent fee calculations in ECDC
3.36.130. Check the applicable box below and calculate the fees as necessary:
❑ NO CHANGE
® CHANGE IN USE
Fee for prior use shall be based on fee established at the time the prior use was permitted. If
the previous use was permitted prior to the adoption of Ordinance 3516 (effective date:
09/12/04), the 2004 impact fee rate shall be used.
ITE Land Use Category
Per Unit Fee
Rate
New Use
710 - General Office
$ 10.89
Prior Use
710 - General Office
$ 10.89
Units in
square feet,
# of dwelling,
etc.
X 483 =
X 483
Use Fee
5,260
New Use Fee: $ 5,260 - Prior Use Fee: $ 5,260 = FEE DUE: $ 0 '
❑ NEW DEVELOPMENT
Per Unit Fee
ITE Land Use Category
Rate
New Use
$
❑ INDEPENDENT FEE CALCULATION
Units in
square feet,
# of dwelling,
vfb, etc.
X
Impact/Mitigation Fee: 1 $
Independent Review Fee: $296.00 (+ peer review fee) 1 $
FEE DUE
FEE DUE
INDEPENDENT FEE CALCULATION CONCLUDES & CITY
TRANSPORTATION ENGINEER AGREES THAT THE PROPOSED
USE FITS INTO GENERAL OFFICE OR HAIR SALON.
City of Edmonds, Engineering Division Approval Date
' No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative.
HANDOUT UPDATED 05.09.2023