BLD2024-1478+Supplementals_Professional_Stamp_Requirement+11.8.2024_4.07.27_PM+4610846Og FDAI
OM
MyBuildingPermit.com
Jurisdiction: Edmonds
Project Name: Swedish Edmonds Medical Pavilion Basement
Application 1D: 1575801
Supplemental Name: Professional Stamp Requirement
Drawings must be stamped by a Washington State licensed architect or engineer if the building is over 4,000sf. Please note that the entire
building is included in the 4,000sf requirement, not just the tenant space involved.