Loading...
REVIEWED BLD BLD2024-0235+Geotechnical_Report+3.12.2024_9.49.52_AM+4121402COBALT GE0SCIENCES February 27, 2024 Douglas and Amy Subcleff DsubcleffPgmail.com C/O Richard Okimoto raoarchooutlook.com RE: Plan Review Proposed Residence 88xx 189Th Place SW Edmonds, Washington RECEIVED Mar 13 2024 CITY OF EDMONDS DEVELOPMENT SERVICES Cobalt Geosciences, LLC DEPARTMENT P.O. Box 1792 North Bend, WA 98045 .........................I.....................4 REVIEWED BY CITY OF EDMONDS BUILDING DEPARTMENT:: ............................................... e In accordance with your authorization, Cobalt Geosciences, LLC has prepared this letter to discuss our plan review of the proposed project. In preparation of this letter, we have reviewed the civil plans by Effective Engineering, PLLC dated December 1, 2023 and November 22, 2023. The plans appear to include relevant information from our previous geotechnical report. Roof runoff will be routed into City infrastructure, which we recommend. The plans indicate the use of permeable pavements for flow control. Provided there is a subsurface interceptor drain constructed along the downslope side (west) of the paver locations, the risk to adjacent properties will be maintained at the current level. Alternatively, the underlying weathered glacial till could be graded at low magnitudes toward the central portion of the driveway/parking area so that water does not freely migrate to the west. No interceptor drain would be necessary if the underlying soils are graded slightly away from any adjacent slopes or other properties. We note that any cutoff drain must penetrate at least 12 inches into dense to very dense glacial till as confirmed by the geotechnical engineer during construction. The interceptor trench system should be at least 12 inches in width with a 4 inch diameter perforated PVC pipe at the base of the trench. We recommend use of 1-1/2 inch washed rock around and over the pipe as well as 2 to 3 inches below the pipe to allow for siltation. The rock should extend at least several inches above the base of the subgrade for permeable pavements. Mirafi MoN fabric should be placed over the rock prior to backfill placement up to the ground surface. Trench backfill over the rock should be compacted to 95 percent of the modified proctor in 12 inch thick lifts. We should verify aspects of construction, including soil bearing of foundation areas, foundation drainage placement, any fill and compaction, slab on grade, excavation stability, and pavement subgrades and interceptor trenching (if utilized). www.cobaltgeo.com (2o6) 331-1097 February 27, 2024 Page 2 of 2 Plan Review Sincerely, Cobalt Geosciences, LLC r H0Ny Pam w: jC S`F<•„ 54896 'IrCIS1 ER`�� �SS� iONA 2/27/2024 Phil Haberman, PE, LG, LEG Principal www.cobaltgeo.com (206) 331-1097