Loading...
APPROVED ENG RESUB1 BLD2024-1290+TRAFFIC IMPACT+12.17.2024_1.18.52_PM+4674493R E S U B V r-_ 1),1 APPENDIX A ,r'o�. BLD2024-1290 Page 1 of 2 Dec 18 2 CITY OF EDMO DEVELOPMENT DEPARTMMENTENT Transportation Impact Analysis PERMITTING & DEVELOPMENT ENGINEERING DIVISION 121 5th Avenue N P: 425.771.0220 www.edmondswa.gov Name of Proposed Project: Owner/Applicant Worksheet C(:)V-4 y2tJ oo(, cuyuc_�J Name � �1 903 [ Z c� clY Stre t/Mailing A dress o �LU City �f (�(� �j State zipb Telephone: Lu t 1 v D� Applicant Contact Person: fZ AU CA Name 2_y Z('c t,�W (ol11� Sal( Str t/M ,l n Address lA City State Zip Telephone:�- Traffic Engineer who prepared the Traffic Impact Analysis (if applicable): Firm Name Contact Name Telephone: E-mail: 1. PROJECT DESCRIPTION i a. Location - Street address: q� ` b. Specify existing land use: t) 1 c. Specify proposed type an size loffddevelo ennt�: 1� i�'J"� ,I V 5v J�#I �esiden ta�u"its d. Date construction will begin and be completed: e. Define proposed access locations: Yt1f f. Define pr posed si lit distance at site egryss k� tach a vicini map and site plan.) l_ LLAWAAL.CcuveA d/o • square footage of building) 21; HANDOUT UPDATED 05.09.2023 APPENDIX A Page 2 of 2 2. MITIGATION RECOMMENDATIONS State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact fee shall be calculated from the attached Impact Fee Rate Tables and as identified in ECDC 3.36.125, except as otherwise provided for independent fee calculations in ECDC 3.36.130. Check the applicable box below and calculate the fees as necessary: ❑ NO CHANGE CHANGE IN USE ee for prior use shall be based on fee established at the time the prior use was permitted. If the previous use was permitted prior to the adoption of Ordinance 3516 (effective date: 09/12/04), the 2004 impact fee rate shall be used. 1TE Land Use Category Per Unit Fee Rate New Use ADU $$3,124.57 Prior Use $ Units in square feet, Use Fee # of dwelling, etc. X = $ X = $ New Use Fee: $ - Prior Use Fee: $ = FEE DUE: $$3,124.57 NEW DEVELOPMENT 1TE Land Use Category Per Unit Fee Rate New Use $ '�] INDEPENDENT FEE CALCULATION Units in square feet, # of dwelling, vfn. etc. W:4 Impact/Mitigation Fee: I'$ Independent Review Fee: $296.00 (+ peer review fee) 1 $ ENGINEERING DIVISION APPROVED AS NOTED 12/23/2024 FEE DUE FEE DUE City of Edmonds, Engineering Division Approval Date ' No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative. HANDOUT UPDATED 05.09.2023