RVWD BLD BLD2024-1465+Structural_Analysis_or_Calculations+11.6.2024_10.40.18_AM+4604595BTL
RECEIVED
Nov 08 2024
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
BLD2024-1465
REVIEWED
BY
CITY OF EDMONDS
BUILDING DEPARTMENT
.............................................. c
19011 Wood-Sno Road NE, Suite 100
Woodinville, WA 98072-4436
Phone: (425) 814-8448
Fax: (425) 821-2120
Structural Calculations
For
Lewis Residence
20710 86th PL W
Edmonds, WA 98026
October 22, 2024
Prepared by
Brian Lampe
Kelsi Bonner
BTL 19011 Wood-Sno Road NE, Suite 100
Woodinville, WA 98072-4436
Phone: (425) 814-8448
ENGINEERING Fax: (425) 821-2120
STRUCTURAL CALCULATIONS SHEET INDEX
Lewis Residence
Item Page #
Criteria
• Design Criteria..............................................................................................................C1.1
Gravity
• Roof Framing
✓ Key Plans.......................................................................................................R1.1
✓ Beams............................................................................................................R2.1
• Upper Floor Framing
✓ Key Plans.......................................................................................................U1.1
✓ Beams............................................................................................................U2.1
• Main Floor Framing
✓ Key Plans....................................................................................................MF1.1
✓ Beams.........................................................................................................
MF2.1
Miscellaneous
• Post Design................................................................................................................. M1.1
• Footing Design............................................................................................................ M2.1
BTL
19011 Wood-Sno Road NE, Suite 100
Woodinville, WA 98072-4436
Phone: (425) 814-8448
ENGINEERING Fax: (425) 821-2120
Criteria
BF-FIL 19011 Wood-Sno Road NE, Suite 100
Woodinville, WA 98072-4436
Phone: 425-814-8448
ENGINEERING Fax: 425-821-2120
Project: Lewis Residence - Remodel
Project Number: 20710 86th PL W, Edmonds, WA
Code:
IBC 2021
Risk Category II
Earthquake/Wind:
Since there are no major portions of exterior walls being removed in the
remodel, the effect on the existing lateral design is negligible.
The existing
sheathing nailing and holdowns are acceptable by engineering judgment, so a
lateral analysis is not necessary.
Soil Bearing:
1500-psf Allowable Soil Bearing Pressure
Concrete:
2500-psi Concrete Strength
Higher strength may be used, but special inspection and testing reports not req'd
Nails:
Sheathing 8d common (2'/2" x 0.131")
Framing 12d box (3'/4" x 0.131 ")
Roof Framing:
Snow Load
Ground Snow, Pg
25 psf
Exposure factor, Ce
1.0
Thermal Factor, Ct
1.2
Flat Roof Snow, Pf (0.7 Ce Ct I Pg)
0 psf
Use Snow Load
25 psf
Attic (where accessible)
10 psf
Dead Load
Roofing - Composition Shingles
4.0 psf
Sheathing - 7/16 OSB
2.2 psf
Framing - 2x4 Rafters & 2x6 Ceiling Joists @ 16"oc
2.8 psf
Insulation - Batt.
1.0 psf
Ceiling - 5/8 GWB
2.8 psf
Misc.
2.2 psf
Total
15.0 psf
Deflection
L/360 Live Load, L/240 Total Load
Floor Framing:
Live Load Residential 40 psf
Decks 60 psf
Dead Load Finish Floor - Carpet/Vinyl 4.0 psf
Sheathing - 3/4 Plywood/Edge Gold 2.5 psf
Framing -2x12 @ 12"oc 4.4 psf
Ceiling - 5/8 GWB 2.8 psf
Misc. 1.3 psf
Total 15.0 psf
Deflection L/480 Live Load, L/240 Total Load
Wall Framing:
Dead Load Exterior 2x Stud Walls 10 psf
Interior 2x Stud Walls 8 psf
Date: 9/19/2024
Page: C1.1
BTL
19011 Wood-Sno Road NE, Suite 100
Woodinville, WA 98072-4436
Phone: (425) 814-8448
ENGINEERING Fax: (425) 821-2120
Gravity
Roof Framing
RB-13
-- -- -- ---- -- s� ---- Fr RB-05 (3)RB-06 RB-07 RB-08 RB-08 (3)RB-09
— --- --------- III
fl
—------- ---- — _ �I III I J
tO
(�I'�✓lII�IIIIt �p xL o6
IOkI . IIII -n-III (NIMII) RA2) G2 GIIxB E5J0
MINATTIC
4,A
L ROOF
26 1
LL --wR®AF4iEROSGA(N.AIFJ � -kb-03! E 5-
I
IIIlI rrWIIII �oII
I RFII
eBII
y2-�
I0II
b�
4eIn
$L8
RB-146-'
NI
J T—RFTER5 1xRJixROG
I I IRB_01165 FLUSH)
ROOF /�W "
- 0FRME NW WL f
FOM PATE TO BTM
OFrvFRRB-11
--------—NFL
=�
I I
F
__ , m O I'iI ®6OFGTeRS IpllI
O 11
� IIIIIII III
—12
I I pI � I I I I I I I I I I_ I I I I III I I V I I I I
-- —^Lu -- -- ---- -- m ®� sa}•xab}• � � I I;� I I �¢" I I I ry I C I I I I I I I Y I I I I I I I I I I LI I I JI I I I I I I �
M) 4 8 H (N) 4x HDR 1 4x HDR
RB-12,kL
RB-13 -
Roof Framing Key Plan R1.1
.l FO RT E W E B MEMBER REPORT
Roof, (N) Rafters
1 piece(s) 2 x 6 HF No.2 @ 16" OC
PASSED
Sloped Length I '<'
- +
0
12
4
0
6'
3❑
Drawing is Conceptual. All locations are measured from the outside face of left support (or left cantilever end). All dimensions are horizontal (typ.).
Design Results
Actual @ Location
Allowed
Result
LDF
Load: Combination (Pattern)
Member Reaction (Ibs)
603 @ 13' 1 1/4"
2215 (3.50")
Passed (27%)
1.0 D + 1.0 S (Adj Spans)
Shear (Ibs)
311 @ 12' 6 1/4"
949
Passed (33%)
1.15
1.0 D + 1.0 S (Adj Spans)
Moment (Ft-Ibs)
-585 @ 13' 1 1/4"
921
Passed (63%)
1.15
1.0 D + 1.0 S (Adj Spans)
Live Load Defl. (in)
0.241 @ 7' 2 9/16"
0.380
Passed (L/569)
1.0 D + 1.0 S (Alt Spans)
Total Load Defl. (in)
0.374 @ 72 1/2"
0.571
Passed (L/367)
1.0 D + 1.0 S (Alt Spans)
• Deflection criteria: LL (L/360) and TL (L/240).
• Overhang deflection criteria: LL (2L/360) and TL (2L/240).
• Upward deflection on left cantilever exceeds overhang deflection criteria.
• Allowed moment does not reflect the adjustment for the beam stability factor.
• A 15% increase in the moment capacity has been added to account for repetitive member usage.
• Applicable calculations are based on NDS.
Supports
Bearing Length
Loads to Supports (Ibs)
Accessories
Total
Available
Required
Dead
Snow
Total
1 - Beveled Plate - DF
3.50"
3.50"
1.50"
143
232
375
Blocking
2 - Beveled Plate - SPF
3.50"
3.50"
1.50"
229
374
603
None
3 - Hanger on 5 1/2" HF beam
1.50"
Hanger'
1.50"
30
74/-1
104/-1
See note'
• Blocking Panels are assumed to carry no loads applied directly above them and the full load is applied to the member being designed.
• At hanger supports, the Total Bearing dimension is equal to the width of the material that is supporting the hanger
• ' See Connector grid below for additional information and/or requirements.
Lateral Bracing
Bracing Intervals
Comments
Top Edge (Lu)
12' 2" o/c
Bottom Edge (Lu)
10' 4" o/c
-Maximum allowable bracing intervals based on applied load.
-Dimensions for lateral bracing intervals are measured along the length of the member for sloped conditions.
Member Length : 20' 1 7/16"
System : Roof
Member Type : Joist
Building Use : Residential
Building Code : IBC 2021
Design Methodology : ASD
Member Pitch : 3.5/12
Connector: Simpson Strong -Tie
Support
Model
Seat Length
Top Fasteners
Face Fasteners
Member Fasteners
Accessories
3 - Face Mount Hanger
LRU26Z
1.94"
N/A
4-10dxl.5
5-10d
• Refer to manufacturer notes and instructions for proper installation and use of all connectors.
Vertical Load
Location (Side)
Spacing
Dead
(0.90)
Snow
(1.15)
Comments
1 - Uniform (PSF)
0 to 19' 3 3/4"
16"
15.0
25.0
Default Load
Weyerhaeuser Notes
Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties
related to the software. Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is
responsible to assure that this calculation is compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at
Weyerhaeuser facilities are third -party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC-ES under evaluation reports ESR-1153 and ESR-1387
and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser product literature and installation details refer to www.weyerhaeuser.com/woodproducts/
document -library.
ForteWEB Software Operator
Job Notes
Kelsi Bonner
BTL Engineering
(931) 581-9272
kelsi.bonner@btleng.net
9/19/2024 10:56:58 PM UTC
FoIteWEB 0.8, Engine: V8.4.1.24, Data: V8.1.6.3
Vli: causer File Name: Lewis Residence
R2.1
BTL
ENGINEERING
RB-01
M = 19.80 k.ft
v = 3.30 k
L/ 360 =
0.80
(LL)
L/240 =
1.20
(TL)
EI,q'd =
1710.7
x1061b.in2
5-1/2 x 13-1/2 GLB
RB-02
M = 3.36 k.ft
v = 2.05 k
L/ 360 =
0.14
(LL)
L/240 =
0.21
(TL)
EI,q'd =
42.8
x1061b.in2
3-1/2 x 7-1/2 GLB
Project: Lewis Residence
Project Number:
Y=(1)f4
TRIMMER
P" ( )2x
POCKET
FLUSH BEAM
( )2x
STUD 6ROUP
FLUSH BEAM
( )2x
STUD GROUP
RUSH BEAM
POST
HbR
GRAW.BEAM
-POST
FOOTING
Client:
19011 Wood-Sno Road NE, Suite 100
Woodinville, WA 98072-4436
Phone:425-814-8448
Fax:425-821-2120
(2272) (15 + 10 psf) = 275 plf
ceiling
3300 # 3300 #
24'
11-77T—
TRIMMER
POCKET
FLUSH BEAM
( )2x
STUD 6ROUP
FLUSH BEAM
( )2x
STUD GROUP
FLII5FI BE,4M
POST
H&R
GRAM BEAM
—POST
FOOTIN&
RB-02
D(�2x
r7-2.
POCKET
TRIMMER
FLUSH BEAM
( )2x
FLUSH SEAM
( )2x
STUD GROUP
STUD GROUP
FUM BEAM &Q
BEAM
4x6
'R
POST
CRAM BEAM
POST
�OOTIN6
3300# (RB-01)
(2') (15 + 10 psf) = 50 plf
ceiling
1.75'�'
2050 # 1470 #
4.25'
Designed By: KTB Date:
Scale:
09/20/2024
Page: R2.2
DO►w
r )2x
POCKET
ER
r1)2x4
TRIMMER
FWSH BEAM
( )2x
STUD GROUP
FLUSH
( )2x
STUD 6ROUP
RUSH BEAM1
POST
+46R
GRAW.BEAM
POST
---FOOTIN6�
BTL
ENGINEERING
RB-03
M - 13.54 k.ft
v = 2.26 k
L/ 360 =
0.80
(LL)
L/240 =
1.20
(TL)
EI,q'd =
1169.5
x1061b.in2
3-1/2 x 13-1/2 GLB
RB-04
M = 10.40 k.ft
v = 2.60 k
L/ 360 =
0.53
(LL)
L/240 =
0.80
(TL)
El,q'd =
599.0
x1061b.in2
3-1/2 x 10-1/2 GLB
Project: Lewis Residence
Project Number:
YM
TRIMMER
l )2x
POCKET
FLUSH BEAM
r )2x
STUD 6ROUP
FLUSH BEAM
( )2x
STUD GROUP
R.U5H BEAM
BEAM
4x4
POST
H&R
GRAW.BEAM
-POST
FOOTING
Client:
V=(!�l
TRIMMER
)2x
POCKET
FLU5I1 BEAM
( )2x
STUD 6ROUP
FLUSH BEAM
( )2x
STUD GROUP
FLII5FI BE,4M
CAM
4x4
POST
H6R
GRAM BEAM
-POST
POOTIN6
19011 Wood-Sno Road NE, Suite 100
Woodinville, WA 98072-4436
Phone:425-814-8448
Fax:425-821-2120
(1572) (15 + 10 psf) = 188 plf
ceiling
2260 # 2260 #
24'
(2672) (15 + 10 psf) = 325 plf
ceiling
2600 # 2600 #
16'
Designed By: KTB Date:
Scale:
09/20/2024
Page: R2.3
D(�2x
r7-2.
POCKET
TRIMMER
FLUSH BEAM
( )2x
FLUSH SEAM
( )2x
STUD GROUP
STUD GROUP
FLUSH BEAM &Q
BEAM
H6R
4x4
POST
CRAM BEAM
POST
---T-OOTIN6
D(�2x
POCKET
r 7-2.
TRIMMER
FWSH BEAM
( )2x
STUD GROUP
FLUSH BEAM
r )2x
STUD 6ROUP
R115H BEAM
CpOIST
H&R
GRAW.BEAM
POST
---FOOTIN6�
BTL
ENGINEERING
RB-05
M - 1.64 k.ft
v = 1.25 k
L/ 360 =
0.18
(LL)
L/240 =
0.26
(TL)
EI,q'd =
32.5
x1061b.in2
4 x 6 min
RB-06
M = 1.02 k.ft
v = 1.26 k
L/ 360 =
0.11
(LL)
L/240 =
0.16
(TL)
EI,q'd =
12.0
x1061b.in2
4 x 6 min
Project: Lewis Residence
Project Number:
Dorw
O2x
POCKET
Ea
(1)2x4
TRIMMER
FLUSH eeAM
( )2x
STUD 6ROUP
MM BEAM
( )2x
STUD GROUP
FLusH BEAM
POST
H&R
GRAM BEAM
-POST
FOOTING
19011 Wood-Sno Road NE, Suite 100
Woodinville, WA 98072-4436
Phone:425-814-8448
Fax:425-821-2120
(1572 + 2') (15 + 25 + 10 psf) = 475 plf
roof
1250 # 1250 #
5.25'
roof (32 /2 + 2') (15 + 25 psf) + (1172) 10 psf = 775 plf
1260 # 1260 #
3.25'
HEADB2
(1)2x4
TRIMMER
Dorw
O2x
POCKET
FL W BEAM
( )2x
STUD 6ROUP
F FLUSH BEAM
( )2x
STUD GROUP
RUSH BEAM
POST
HbR
GRAW.BEAM
-POST
FOOTING
Client:
Daw
( )2x
POCKET
ER
(1)2x4
TRIMMER
FWSH BEAM
( )2x
STUD GROUP
FLusH
( )2x
STUD 6ROUP
RUSH BEAM1
POST
+46R
GRAW.BEAM
POST
---FOOTIN6�
Designed By: KTB
Scale:
Date: 09/20/2024
Page: R2.4
Dorw
l )2x
POCKET
ER
(1)2x4
TRIMMER
Fuses BEAM
( )2x
STUD GROUP
FLUSH
( )2x
STUD GROUP
RUSH BEAM
POST
+I6R
DRAWL BEAM
POST
---T-OOTIN6
BTL
ENGINEERING
RB-07
M - 6.59 k.ft
v = 3.20 k
L/ 360 =
0.28
(LL)
L/240 =
0.41
(TL)
EI,q'd =
205.6
x1061b.in2
okw/Cp=1.15
3-1/2 x 7-1/2 GLB
RB-08
M =
0.86 k.ft
v=
1.06 k
L/ 360 =
0.11 (LL)
L/240 =
0.16 (TL)
El,q'd =
10.6 x1061b.in2
4 x 6 min
Project: Lewis Residence
Project Number:
Dorw
O2x
POCKET
EI2
(2)2x4
TRIMMER
FLUSH BEAM
( )2x
STUD 6ROUP
MM BEAM
( )2x
STUD GROUP
FLusH BEAM
POST
H&R
ARAM BEAM
-POST
FOOTING
19011 Wood-Sno Road NE, Suite 100
Woodinville, WA 98072-4436
Phone:425-814-8448
Fax:425-821-2120
(32'/2 + 2') (15 + 25 psf) + (11'/2) 10 psf = 775 plf
roof
3200 # 3200 #
8.25'
(26'/2 + 2') (15 + 25 psf) + (1172) 10 psf = 655 plf
roof
1060 # 1060 #
3.25'
HEADB2
(1)2x4
TRIMMER
Dorw
O2x
POCKET
FLUSH BEAM
( )2x
STUD 6ROUP
F FLUSH BEAM
( )2x
STUD GROUP
RUSH BEAM
POST
HbR
GRAW.BEAM
-POST
FOOTING
Client:
Daw
( )2x
POCKET
ER
(1)2x4
TRIMMER
FWSH BEAM
( )2x
STUD GROUP
FLusH
( )2x
STUD 6ROUP
RUSH BEAM1
POST
+46R
GRAW.BEAM
POST
---FOOTIN6�
Designed By: KTB Date:
Scale:
09/20/2024
Page: R2.5
Dorw
l )2x
POCKET
ER
(2)2x4
TRIMMER
Fuses BEAM
( )2x
STUD GROUP
FLUSH
( )2x
STUD GROUP
RUSH BEAM
POST
+I6R
CRAWL M M
POST
---T-OOTIN6
BTL
ENGINEERING
RB-09
M - 0.86 k.ft
v = 1.06 k
L/ 360 =
0.11
(LL)
L/240 =
0.16
(TL)
EI,q'd =
10.1
x1061b.in2
4 x 6 min
RB-10
M =
0.17 k.ft
v =
0.21 k
L/ 360 =
0.11 (LL)
L/240 =
0.16 (TL)
EI,q'd =
2.1 x1061b.in2
4 x 6 min
Project: Lewis Residence
Project Number:
Dorw
O2x
POCKET
Ea
(1)2x4
TRIMMER
FLUSH eeAM
( )2x
STUD 6ROUP
MM BEAM
( )2x
STUD GROUP
FLusH BEAM
POST
H&R
GRAM BEAM
-POST
FOOTING
OTHER
19011 Wood-Sno Road NE, Suite 100
Woodinville, WA 98072-4436
Phone:425-814-8448
Fax:425-821-2120
(2672 + 2') (15 + 25 psf) + (1172) 10 psf = 655 plf
roof
1060 # 1060 #
3.25'
(272 + 2') (15 + 25 psf) + (2'/2) 10 psf = 130 plf
roof
210 # 210 #
3.25'
HEADB2
(1)2x4
TRIMMER
Dorw
O2x
POCKET
FLUSH BEAM
( )2x
STUD 6ROUP
F FLUSH BEAM
( )2x
STUD GROUP
RUSH BEAM
POST
HbR
GRAW.BEAM
-POST
FOOTING
Client:
Daw
( )2x
POCKET
ER
(1)2x4
TRIMMER
FWSH BEAM
( )2x
STUD GROUP
FLusH
( )2x
STUD 6ROUP
RUSH BEAM1
POST
+46R
GRAW.BEAM
POST
---FOOTIN6�
Designed By: KTB
Scale:
Date: 09/20/2024
Page: R2.6
Dorw
l )2x
POCKET
ER
(1)2x4
TRIMMER
Fuses BEAM
( )2x
STUD GROUP
FLUSH
( )2x
STUD GROUP
RUSH BEAM
POST
+I6R
DRAWL BEAM
POST
---T-OOTIN6
ii FORTE W E B MEMBER REPORT PASSED
Roof, RB-11
1 piece(s) 4 x 6 DF No.2
(E) HDR OK
6''
0
❑2
Drawing is Conceptual. All locations are measured from the outside face of left support (or left cantilever end). All dimensions are horizontal (typ.).
Design Results
Actual @ Location
Allowed
Result
LDF
Load: Combination (Pattern)
Member Reaction (Ibs)
857 @ 0
2126 (1.50")
Passed (40%)
1.0 D + 1.0 S (All Spans)
Shear (Ibs)
590 @ 7"
2657
Passed (22%)
1.15
1.0 D + 1.0 S (All Spans)
Moment (Ft-Ibs)
804 @ 1' 10 1/2"
1979
Passed (41%)
1.15
1.0 D + 1.0 S (All Spans)
Live Load Defl. (in)
0.016 @ 1' 10 1/2"
0.125
Passed (L/999+)
1.0 D + 1.0 S (All Spans)
Total Load Defl. (in)
0.026 @ 1' 10 1/2"
0.188
Passed (L/999+)
1.0 D + 1.0 S (All Spans)
• Deflection criteria: LL (L/360) and TL (L/240).
• Allowed moment does not reflect the adjustment for the beam stability factor.
• Applicable calculations are based on NDS.
Supports
Bearing Length
Loads to Supports (Ibs)
Accessories
Total
Available
Required
Dead
Snow
Total
1 - Stud wall - HF
1.50"
1.50"
1.50"
331
526
857
Blocking
2 - Stud wall - HF
1.50"
1.50"
1.50"
331
526
857
Blocking
• MOCKing vaneis are assumes to carry no ioaas appuea airecoy aoove inem ano ine ruu ioaa is appnea to ine memoer Deing oesignea.
Lateral Bracing
Bracing Intervals
Comments
Top Edge (Lu)
3' 9" o/c
Bottom Edge (Lu)
3' 9" o/c
-Maximum allowable bracing intervals based on applied load.
Dead
Snow
Vertical Loads
Location (Side)
Tributary
Width
(0.90)
(1.15)
Comments
0 - Self Weight (PLF)
0 to 3' 9"
N/A
4.9
1 - Uniform (PLF)
0 to 3' 9" (Front)
N/A
171.8
280.5
Linked from: (N)
Rafters, Support 2
• sae ioaas are assumea to not mauce cross -grain tension.
0
Member Length : 3' 9"
System : Roof
Member Type : Drop Beam
Building Use : Residential
Building Code : IBC 2021
Design Methodology : ASD
Member Pitch : 0/12
Weyerhaeuser Notes
Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties
related to the software. Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is
responsible to assure that this calculation is compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at
Weyerhaeuser facilities are third -party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC-ES under evaluation reports ESR-1153 and ESR-1387
and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser product literature and installation details refer to www.weyerhaeuser.com/woodproducts/
document -library.
The product application, input design loads, dimensions and support information have been provided by ForteWEB Software Operator
ForteWEB Software Operator
Job Notes
Kelsi Bonner
BTL Engineering
(931) 581-9272
kelsi.bonner@btleng.net
9/19/2024 11:22:11 PM UTC
ForteWEB 0.8, Engine: V8.4.1.24, Data: V8.1.6.3
wbyerhacuser File Name: Lewis Residence
R2.7
.1FORTEWEB
MEMBER REPORT
Roof, RB-12
1 piece(s) 4 x 10 DF No.2
PASSED
51
10'
Drawing is Conceptual. All locations are measured from the outside face of left support (or left cantilever end). All dimensions are horizontal (typ.).
Design Results
Actual @ Location
Allowed
Result
LDF
Load: Combination (Pattern)
Member Reaction (Ibs)
1532 @ 10' 5"
4961 (3.50")
Passed (31%)
1.0 D + 1.0 S (All Spans)
Shear (Ibs)
1224 @ 1' 3/4"
4468
Passed (27%)
1.15
1.0 D + 1.0 S (All Spans)
Moment (Ft-Ibs)
3801 @ 5' 3 1/2"
5166
Passed (74%)
1.15
1.0 D + 1.0 S (All Spans)
Live Load Defl. (in)
0.117 @ 5' 3 1/2"
0.342
Passed (L/999+)
1.0 D + 1.0 S (All Spans)
Total Load Defl. (in)
0.195 @ 5' 3 1/2"
0.512
Passed (L/632)
1.0 D + 1.0 S (All Spans)
• Deflection criteria: LL (L/360) and TL (L/240).
• Allowed moment does not reflect the adjustment for the beam stability factor.
• Applicable calculations are based on NDS.
Supports
Bearing Length
Loads to Supports (Ibs)
Accessories
Total
Available
Required
Dead
Snow
Total
1 - Column - DF
3.50"
3.50"
1.50"
611
921
1532
Blocking
2 - Stud wall - HF
3.50"
3.50"
1.50"
611
921
1532
Blocking
• MOCKing vaneis are assumes to carry no ioaas appnea airecoy aoove inem ano ine ruu ioaa is appnea to ine memoer Deing oesignea.
Lateral Bracing
Bracing Intervals
Comments
Top Edge (Lu)
10' 7" o/c
Bottom Edge (Lu)
10' 7" o/c
-Maximum allowable bracing intervals based on applied load.
Dead
Snow
Vertical Loads
Location (Side)
Tributary
Width
(0.90)
(1.15)
Comments
0 - Self Weight (PLF)
0 to 10' 7"
N/A
8.2
1 - Uniform (PLF)
0 to 10' 7" (Front)
N/A
107.3
174.0
Linked from: (N)
Rafters, Support 1
• sae ioaas are assumea to not mauce cross -grain tension.
0
Member Length : 10' 7"
System : Roof
Member Type : Drop Beam
Building Use : Residential
Building Code : IBC 2021
Design Methodology : ASD
Member Pitch : 0/12
Weyerhaeuser Notes
Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties
related to the software. Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is
responsible to assure that this calculation is compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at
Weyerhaeuser facilities are third -party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC-ES under evaluation reports ESR-1153 and ESR-1387
and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser product literature and installation details refer to www.weyerhaeuser.com/woodproducts/
document -library.
The product application, input design loads, dimensions and support information have been provided by ForteWEB Software Operator
ForteWEB Software Operator
Job Notes
Kelsi Bonner
BTL Engineering
(931) 581-9272
kelsi.bonner@btleng.net
9/19/2024 11:23:36 PM UTC
ForteWEB 0.8, Engine: V8.4.1.24, Data: V8.1.6.3
wbyerhacuser File Name: Lewis Residence
R2.8
BTL
ENGINEERING
RB-13
N1= 0.46 k.ft
v = 0.57 k
L/ 360 =
0.11 (LL)
L/240 =
0.16 (TL)
EI,q'd =
5.7 x1061b.in2
4 x 6 min
RB-14
M =
0.43 k.ft
v =
0.53 k
L/ 360 =
0.11 (LL)
L/240 =
0.16 (TL)
EI,q'd =
5.0 x1061b.in2
4 x 6 min
Project: Lewis Residence
Project Number:
P" OEM
( )2x
POCKET
ER
(1)2x4
TRIMMER
HAW BEAM
( )2x
STUD 6ROUP
FusH BEAM
( )2x
STUD GROUP
Fuses BEAM
POST
H&R
GRAM BEAM
-POST
FOOTING
19011 Wood-Sno Road NE, Suite 100
Woodinville, WA 98072-4436
Phone:425-814-8448
Fax:425-821-2120
(1072 + 2') (15 + 25 + 10 psf) = 350 plf
roof
570 # 570 #
3.25'
(2672) (15 + 10 psf) = 325 plf
ceiling
530 # 530 #
3.25'
EADB2
Y(1)2x4
TRIMMER
Dorw
O2x
POCKET
Fuses BEAM
( )2x
STUD 6ROUP
Fuses BEAM
( )2x
STUD GROUP
R U5H BEAM
POST
H6R
GRAW.BEAM
-POST
FOOTING
Client:
D(�2x
POCKET
(1)2x4
TRIMMER
Fuses BEAM
( )2x
STUD GROUP
Fuses BEAM
( )2x
STUD 6ROUP
RIEH BEAM
1
POST
,46R
GRAW.BEAM
POST
---FOOTIN6�
Designed By: KTB
Scale:
Date: 09/20/2024
Page: R2.9
Dorw
l )2x
POCKET
ER
(1)2x4
TRIMMER
M" DEW
( )2x
STUD GROUP
Fuses
( )2x
STUD GROUP
RAH BE
POST
+I6RAM
DRAWL BEhM
POST
�OOTIN6
BTL
19011 Wood-Sno Road NE, Suite 100
Woodinville, WA 98072-4436
Phone: (425) 814-8448
ENGINEERING Fax: (425) 821-2120
Gravity
Upper Floor Framing
(N) LI 5210
"ANGERS
I�—mil Ion
I� Q
II u IL
II II
I I III
lef EX15T. 2x12 JST. ® 12" O.G. N
II II
II II
II II
II II
II II
II II
I I I I
(E) U B-On MIN. (r) U B-02 MIN.
LL
Upper Floor Framing Key Plan U1.1
BTL
ENGINEERING
19011 Wood-Sno Road NE, Suite 100
Woodinville, WA 98072-4436
Phone: 425-814-8448
Fax: 425-821-2120
UB-01
(2072 +
2') (15 + 25 + 10 psf) = 600 plf
roof
M = 2.46 k.ft
(8') 10 psf = 80 plf
wall
-
-
V = 2.46 k
floor
(2072) (15 + 40 psf) = 550 plf
L/480 = 0.10 (LL)
2460 #
41 2460 #
L/240 = 0.20 (TL)
V=()
:0
7-2. f
El,q'd 51.5 x10 6 1b.in 2
TRIMMER
POOKET
POCKET
-7
TRIMMER
1 MAW MW
M" EEW
I r-L" 5EM I\
(2)2X4
)2X
(2)2x4
4�
57W 6ROW
'OLpp
57W 6ROW
Oup
t
RAH 5E-4M
H&R
H6R—
--070-5T
4 x 8
VCRA& WM
POST
CRAM MM
'M
P05T—
log
FOO'rlN&—
OTHER
OTHM
---T-OJOTI.N,&-
M k.ft
V
L/ (LL)
L/ (TL)
6 2
TRIMMER
POOKET
POCKET
TRIMMER
E1,q'd x1O 1b.in
E
I( )2X
)2X
)2x_
STUD 6Rap
STUD GROUP
5TW &ROUP
5TLO 6Rap
RAH 5MM
H&R
�4&R—
-�O- —ST
M:M::::
VL MW
rCRA&
PO_ _T
P T—
F0071N&—
L 107HM
---FOOTIN&-�)
J
— I
Project: Lewis Residence
Project Number:
Dam
TUD
POST
R� BEAM FW511 BEAM
Rases BEAM
POST
09/20/2024
Client:
Client:
� BEAM
FW511 BEAM
flJEFI BEAM
Designed By: KTB Date:
Scale: Page: U2.1
.l FO RT E W E B MEMBER REPORT PASSED
Upper, UB-02
2 piece(s) 2 x 8 HF No.2
(E) HDR OK
Overall Length 8' 3"
9„
C
E
Drawing is Conceptual. All locations are measured from the outside face of left support (or left cantilever end). All dimensions are horizontal (typ.).
Design Results
Actual @ Location
Allowed
Result
LDF
Load: Combination (Pattern)
Member Reaction (Ibs)
1454 @ 8' 1 1/2"
3645 (3.00")
Passed (40%)
1.0 D + 1.0 S (All Spans)
Shear (Ibs)
1105 @ T 4 3/4"
2501
Passed (44%)
1.15
1.0 D + 1.0 S (All Spans)
Moment (Ft-Ibs)
2551 @ 4' 3 15/16"
2569
Passed (99%)
1.15
1.0 D + 1.0 S (All Spans)
Live Load Defl. (in)
0.109 @ 4' 2 1/4"
0.200
Passed (L/882)
1.0 D + 1.0 S (All Spans)
Total Load Defl. (in)
0.237 @ 4' 2"
0.400
Passed (L/406)
1.0 D + 1.0 S (All Spans)
• Deflection criteria: LL (L/480) and TL (L/240).
• Allowed moment does not reflect the adjustment for the beam stability factor.
• Applicable calculations are based on NDS.
Supports
Bearing Length
Loads to Supports (Ibs)
Accessories
Total
Available
Required
Dead
Floor Live
Snow
Total
1 - Stud wall - HF
3.00"
3.00"
1.50"
666
165
504
1335
Blocking
2 - Stud wall - HF
3.00"
3.00"
1.50"
751
165
702
1618
Blocking
• MOCKing vaneis are assumes co carry no ioaas appuea airecoy aoove inem ano ine ruu ioaa is appnea io cne memoer Deing oesignea.
Lateral Bracing
Bracing Intervals
Comments
Top Edge (Lu)
1' 2" o/c
Bottom Edge (Lu)
8' 3" o/c
-Maximum allowable bracing intervals based on applied load.
Vertical Loads
Location (Side)
Tributary
Width
Dead
(0.90)
Floor Live
(1.00)
Snow
(1.15)
Comments
0 - Self Weight (PLF)
0 to 8' 3"
N/A
5.5
1 - Uniform (PSF)
0 to 8' 3" (Front)
1'
15.0
40.0
floor
2 - Uniform (PSF)
0 to 8' 3" (Front)
8'
10.0
-
wall
3 -Tapered (PSF)
0 to 8' 3" (Front)
2' 9" to 6' 9"
15.0
25.0
roof
4 - Tapered (PSF)
0 to 8' 3" (Front)
9" to 4' 9"
10.0
attic
• aioe ioaas are assumea io not mauce cross -gram cension.
0
Member Length : 8' 3"
System : Floor
Member Type : Drop Beam
Building Use : Residential
Building Code : IBC 2021
Design Methodology : ASD
Weyerhaeuser Notes
Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties
related to the software. Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is
responsible to assure that this calculation is compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at
Weyerhaeuser facilities are third -party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC-ES under evaluation reports ESR-1153 and ESR-1387
and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser product literature and installation details refer to www.weyerhaeuser.com/woodproducts/
document -library.
The product application, input design loads, dimensions and support information have been provided by ForteWEB Software Operator
ForteWEB Software Operator
Job Notes
Kelsi Bonner
BTL Engineering
(931) 581-9272
kelsi.bonner@btleng.net
9/19/2024 11:38:18 PM UTC
ForteWEB 0.8, Engine: V8.4.1.24, Data: V8.1.6.3
Vbyerhaeuscr File Name: Lewis Residence
U2.2
BTL
19011 Wood-Sno Road NE, Suite 100
Woodinville, WA 98072-4436
Phone: (425) 814-8448
ENGINEERING Fax: (425) 821-2120
Gravity
Main Floor Framing
-------------
FACE OF FRAF. o,JG.
M) 3xia
STRINGERS
16" O.C.
e
(N) LSCZ HANGER TYP.
(N)3x 10 Hd
Ml w310 �fQ�
'- fFJ GONG. SLABI
i
EXI5TINS PATIO
13"x13"x13" THK. (J
& GONG. FOOTING 3x1O P.T.
EXISTING DECKP844Z POST 5TRM6ER5 �.(O
BASE
M B-03
U;y'8 HANGER TYP.
�� �°
�ce
ib" O.G. N.I.F.)
Co
Co
G
F
MB-02
�O
°x
'IC'
-__-_-_-_-_-__-_
(E) 3x8 JST
ALIGN
® ib" O.G.
N.I.F.) - - L
WALL ABOVE
M) 3x4 WALL
n
-- (FJ FOOTING
NFILL OPENING
F
W/ 3x8 JST. ®
16"O.G.
L
WALL ABOVE
°
LLLLLL JJJ�
(E)BEAM N.I.F./ _-_-_
_--
Main Floor Framing Key Plan
V I L
- 3x10 P.T. S® IN6ER
5
Lx L
%0,.-,11 \o,1,
.T. JST. ® �- I
THK OO
�I EA. NWY a P644 (11`�J
� AT BASE TYP. V
M)4x4 POST TYP._-
ALIGN W/ - M) 15"X18'Ra" THIN 1
WALL GONG. FTG. W/ (3)
ABODE u BARS EA. WAY 6
PS44 POST BASE
M) 18"x34"
MIN. A.,GESS
�] (N) LU35 HANGER TYP.
V. '1 (FJ BEAM (-LF) ---------------------
- (E) FOUNDATION I
MF1.1
.l FO RT E W E B MEMBER REPORT
Main, (N) Deck Joists
1 piece(s) 2 x 8 HF No.2 @ 16" OC PT
PASSED
0 0
Drawing is Conceptual. All locations are measured from the outside face of left support (or left cantilever end). All dimensions are horizontal (typ.).
Design Results
Actual @ Location
Allowed
Result
LDF
Load: Combination (Pattern)
Member Reaction (Ibs)
248 @ 5' 2"
911 (1.50")
Passed (27%)
1.0 D + 1.0 L (All Spans)
Shear (Ibs)
187 @ 4' 6 3/4"
1088
Passed (17%)
1.00
1.0 D + 1.0 L (All Spans)
Moment (Ft-Ibs)
307 @ 2' 8 1/4"
1284
Passed (24%)
1.00
1.0 D + 1.0 L (All Spans)
Live Load Defl. (in)
0.018 @ 2' 8 1/4"
0.124
Passed (L/999+)
1.0 D + 1.0 L (All Spans)
Total Load Defl. (in)
0.022 @ 2' 8 1/4"
0.248
Passed (L/999+)
1.0 D + 1.0 L (All Spans)
TJ-Pro"" Rating
N/A
N/A
N/A
N/A
• Deflection criteria: LL (L/480) and TL (L/240).
• Allowed moment does not reflect the adjustment for the beam stability factor.
• A 15% increase in the moment capacity has been added to account for repetitive member usage.
• Applicable calculations are based on NDS.
• No composite action between deck and joist was considered in analysis.
ok w/ Ci = 0.80
Supports
Bearing Length
Loads to Supports (Ibs)
Accessories
Total
Available
Required
Dead
Floor Live
Total
1 - Plate on concrete - HF
3.50"
3.50"
1.50"
54
215
269
Blocking
2 - Hanger on 7 1/4" HF beam
1.50"
Hanger'
1.50"
52
208
260
See note'
• Blocking Panels are assumed to carry no loads applied directly above them and the full load is applied to the member being designed.
• At hanger supports, the Total Bearing dimension is equal to the width of the material that is supporting the hanger
• ' See Connector grid below for additional information and/or requirements.
Lateral Bracing
Bracing Intervals
Comments
Top Edge (Lu)
5' 2" o/c
Bottom Edge (Lu)
5' 2" o/c
-Maximum allowable bracing intervals based on applied load.
Member Length : 5' 2"
System : Floor
Member Type : Joist
Building Use : Residential
Building Code : IBC 2021
Design Methodology : ASD
Connector: Simpson Strong -Tie
Support
Model
Seat Length
Top Fasteners
Face Fasteners
Member Fasteners
Accessories
2 - Face Mount Hanger
LU26
1.50"
N/A
6-10dx1.5
4-10dx1.5
• Refer to manufacturer notes and instructions for proper installation and use of all connectors.
Vertical Load
Location (Side)
Spacing
Dead
(0.90)
Floor Live
(1.00)
Comments
1 - Uniform (PSF)
0 to 5' 3 1/2"
16"
15.0
60.0
Default Load
Weyerhaeuser Notes
Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties
related to the software. Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is
responsible to assure that this calculation is compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at
Weyerhaeuser facilities are third -party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC-ES under evaluation reports ESR-1153 and ESR-1387
and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser product literature and installation details refer to www.weyerhaeuser.com/woodproducts/
document -library.
The product application, input design loads, dimensions and support information have been provided by ForteWEB Software Operator
ForteWEB Software Operator
Job Notes
Kelsi Bonner
BTL Engineering
(931) 581-9272
kelsi.bonner@btleng.net
9/20/2024 12:21:58 AM UTC
ForteWEB 0.8, Engine: V8.4.1.24, Data: V8.1.6.3
Wli:yafiaeuser File Name: Lewis Residence
MF2.1
ii FORTE W E B MEMBER REPORT PASSED
Main, (E) Floor Joists - BRG ABV
2 piece(s) 2 x 8 HF No.2 @ 16" OC
(E) Joists OK
Overall Length: 8' 9 1;2"
C
r
0
Drawing is Conceptual. All locations are measured from the outside face of left support (or left cantilever end). All dimensions are horizontal (typ.).
Design Results
Actual @ Location
Allowed
Result
LDF
Load: Combination (Pattern)
Member Reaction (Ibs)
733 @ 8' 7"
4253 (3.50")
Passed (17%)
1.0 D + 1.0 L (All Spans)
Shear (Ibs)
667 @ 7' 10 3/4"
2175
Passed (31%)
1.00
1.0 D + 1.0 L (All Spans)
Moment (Ft-Ibs)
1177 @ 5' 10 1/2"
2569
Passed (46%)
1.00
1.0 D + 1.0 L (All Spans)
Live Load Defl. (in)
0.065 @ 4' 6 3/16"
0.209
Passed (L/999+)
1.0 D + 1.0 L (All Spans)
Total Load Defl. (in)
0.118 @ 4' 7 1/4"
0.419
Passed (L/850)
1.0 D + 1.0 L (All Spans)
TJ-Pro"" Rating
N/A
N/A
N/A
N/A
• Deflection criteria: LL (L/480) and TL (L/240).
• Allowed moment does not reflect the adjustment for the beam stability factor.
• A 15% increase in the moment capacity has been added to account for repetitive member usage.
• Applicable calculations are based on NDS.
• No composite action between deck and joist was considered in analysis.
Supports
Bearing Length
Loads to Supports (Ibs)
Accessories
Total
Available
Required
Dead
Floor Live
Total
1 - Beam - HF
3.50"
3.50"
1.50"
160
271
431
Blocking
2 - Beam - HF
3.50"
3.50"
1.50"
361
372
733
Blocking
• Blocking Panels are assumed to carry no loads applied directly above them and the tull load is applied to the member being designed.
Lateral Bracing
Bracing Intervals
Comments
Top Edge (Lu)
8' 10" o/c
Bottom Edge (Lu)
8' 10" o/c
-Maximum allowable bracing intervals based on applied load.
Vertical Loads
Location (Side)
Spacing
Dead
(0.90)
Floor Live
(1.00)
Comments
1 - Uniform (PSF)
0 to 8' 9 1/2"
16"
15.0
40.0
floor
2 - Point (PLF)
6' 10"
16"
64.0
-
wall
3 - Point (PLF)
6' 10"
16"
195.0
130.0
ceiling
0
Member Length : 8' 9 1/2"
System : Floor
Member Type : Joist
Building Use : Residential
Building Code : IBC 2021
Design Methodology : ASD
Weyerhaeuser Notes
Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties
related to the software. Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is
responsible to assure that this calculation is compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at
Weyerhaeuser facilities are third -party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC-ES under evaluation reports ESR-1153 and ESR-1387
and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser product literature and installation details refer to www.weyerhaeuser.com/woodproducts/
document -library.
The product application, input design loads, dimensions and support information have been provided by ForteWEB Software Operator
ForteWEB Software Operator
Job Notes
Kelsi Bonner
BTL Engineering
(931) 581-9272
kelsi.bonner@btleng.net
9/20/2024 1:00:56 AM UTC
ForteWEB v3.8, Engine: V8.4.1.24, Data: V8.1.6.3
Vbyerhacuser File Name: Lewis Residence
MF2.2
BTL
ENGINEERING
M B-01
M = 0.55 k.ft
v = 0.55 k
L/ 480 =
0.10
(LL)
L/240 =
0.20
(TL)
EI,q'd =
11.5
x1061b.in2
2x10
M B-02
M = 2.22 k.ft
v = 1.01 k
L/ 480 =
0.26
(LL)
L/240 =
0.53
(TL)
EI,q'd =
122.8
x1061b.in2
(2)2x8
Project: Lewis Residence
Project Number:
11-77T—
TRIMMER
POCKET
FLUSH BEAM
( )2x
STUD 6ROUP
FLUSH BEAM
( )2x
STUD GROUP
CAM
POST
RUSH BEAM
T
V
19011 Wood-Sno Road NE, Suite 100
Woodinville, WA 98072-4436
Phone:425-814-8448
Fax:425-821-2120
�2x
POCKET
r )2x
-f
TRIMMER
FLUSH BEAM
( )2x
STUD 6R151UP
FLUSH SEAM
( )2x
STUD 6ROUP
RUSH BEAM
POST
+I6R
GRAYVL BEAM
Posy_
550# (MB-01)
(2') (15 + 40 psf) = 110 plf
floor
2.33'
1010 #
10.5'
HEADB2
r )2x
TRIMMER
Do►w
()2x
POCKET
FLUSH BEAM
( )2x
STUD 6ROUP
FLUSH BEAM
( )2x
STUD GROUP
RUSH BEAM
POST
HbR
CRAW. BEAM
-POST
IN6
Client:
D(�2x
POCKET
r )2x
-f
TRIMMER
FLUSH BEAM
( )2x
STUD GROUP
FLASH BEAM
r )2x
STUD 6ROUP
RUSH BEAM1
POST
+46R
OTHER
GRAW.BEAM
POST
Designed By: KTB Date: 09/20/2024
Scale: Page: MF2.3
BTL
ENGINEERING
M B-03
M = 1.50 k.ft
v = 0.75 k
L/ 480 =
0.20
(LL)
L/240 =
0.40
(TL)
EI,eq'd =
69.3
x1061b.in2
okw/C,=0.80
PT(2)2x8
M B-04
M = 0.92 k.ft
v = 0.98 k
L/ 480 =
0.13
(LL)
L/240 =
0.25
(TL)
EI,eq'd =
25.8
x1061b.in2
PT(2)2x8
Project: Lewis Residence
Project Number:
1r-7O!!!--
TRIMMER
DOY`Al BEAM
( )2x
POOKET
FllJ5H BEAM
( )2x
STUD GROUP
rUSH BEAM
( )2x
STUD GROUP
FWSH BEAM
POST
H&R
CRAWL BEAM
2nM—'J
_POST
OOTIM6
19011 Wood-Sno Road NE, Suite 100
Woodinville, WA 98072-4436
Phone: 425-814-8448
Fax:425-821-2120
DOY`Al BEAM
r J2x
POOKET
HEADER
( )2x
TRIMMER
rUZH BEAM
( )2x
STUD GROUP
FLll54BEAM
( )2x
STUD GROUP
FLUSH BEAM
POST
HGR
Onim
CRAWL BEAM
POST_
OOTI
750# (MB-03)
(2') (15 + 60 psf) = 150 plf
floor
L 4 lk
530 # 980 #
5'
r-(
TRIMMER
( )2x
POOKET
FL)5H BEAM
( )2x
STUD GROUP
FLUSH BBAM
( )2x
STUD GROUP
FWSH BEAM
POST
H6R
tORAM-BEAMPOST6OTHM
Client:
DOY`Al BEAM
r )2x
POOKET
HEADER
( )2x
TRIMMER
FLUSH BEAM
( )2x
STUD GROUP
FLU54BEAM
( )2x
STUD GROUP
FUJ9H BEAM
BEAM
POST
MGR
OTHER
CRAWL BEAM
POST_
OOTI
Designed By: KTB
Scale:
Date: 09/20/2024
Pagc: MF2.4
BTL
19011 Wood-Sno Road NE, Suite 100
Woodinville, WA 98072-4436
Phone: (425) 814-8448
ENGINEERING Fax: (425) 821-2120
Miscellaneous
][?or-r]L
ENGINEERING
2018 NDS
3.7-SOLID COLUMNS and 15.3-BUILT-UP COLUMNS
Solid Column
Fc =
800 psi
Visually graded lumber (Dimensional)
CD =
1.00
No Fire Rating
cm =
1.00
Hem -Fir Stud
Ci =
1.00
CF =
1.00
Fc ' = Fc * CF
Fc*= Fc CD CM Ct CF
Fc*= 800 psi
CP = 0.416 Cp =Kf
Fc' = 333 psi
19011 Wood-Sno Road NE, Suite 100
Woodinville, WA 98072-4436
Phone: 425-814-8448
Emig =
440 ksi
Emirs =
440 ksi
1=
9.0 ft
d =
3 1/2 in
Ke =
1.0
1e =
108.0 in
le/d =
30.9
2 1
1+IF,E 1+1F�E J F�F,
F, F,
2c 2c c
J J
FEE = 380
c = 0.8
Kf = 1.0
STUD
HF Plate Crushing
(1)
2x4
1746
2126
(2)
2x4
3492
4253
(3)
2x4
5237
6379
(4)
2x4
6983
8505
(5)
2x4
8729
10631
0.822 E rrin'
F,' _ f�Id
2 d)
DF Plate Crushine
3281
6563
9844
13125
16406
Date: 4/18/2024
Page: M 1.1
BTL
ENGINEERING
Project: Continuous Strip Footing
14" wide x 8" thick
Footing width, B = 14 in
Footing Thickness, t = 8 in
Stem Wall width, C = 8 in
Stem Wall Height = 24 in
19011 Wood-Sno Road NE, Suite 100
Woodinville, WA 98072-4436
Phone: 425-814-8448
Fax: 425-821-2120
IBC Section 13.3.2: One-way shallow foundations
Normalweight W
f'� = 2500 psi
Uncoated W
fy = 40000 psi
Longintudinal Reinforcement:
(2) #4
-.
Bar Diameter =
0.500 in
Bar Area =
0.20 in
As =
0.40 in
Cover: 3 in
Stem Wall Reinforcement:
#4 w @ 24
"oc Hook Dowels
Bar Diameter =
0.500 in
Bar Area =
0.20 in
As =
0.10 in
Cover: 3 in
bw =
12 in (per ft)
d =
4.75 in
Footing + Stem Wall Weight - Weight
of Displaced Soil =
231 plf
One-way shear, no shear reinforcement
[22.5.5.11 V, = 2.1 f, b,,t,d = 5700 # per foot length
[22.5.10.11 Vu <_ q5V,
rB—C— 1 �VC
Vu = Rubw l\ 2 d/I _> Ru = B — C
51300 psfb,, ( 2 — d)
Max Uniform Load on km_ = 59850 plf [Ultim te]
37406 plf [Service]
Strip footing
.'A
0_
Moment:
[22.2.1.11 M,, = AS fy (d — a/2) = 1.557 k-ft per foot length _
Mu OM,, z Asf
Rubw(B —C a= y
2 ) 2.PMn 0.85fcb—
Mu 2 � 9u ((B — C)z
au = 44N' ps?
Max Uniform Load on Stem = 52322 plf [Ultimate]
32701 plf [Service]
Development of Reinforcement
[25.4.2.31 ld = 3 fy 'PtOeOs 1
db =
N/A
C40 b tr
( ))
a f� db
T
Allowable Soil Bearing Pressure
1500 psf
2000 psf
Max Uniform Load, Soil
1519 plf
2102 plf
Max Uniform Load, Shear
37406 plf
37406 plf
Max Uniform Load, Moment
32701 plf
32701 plf
Max Uniform Load (Service)
1519 plf
2102 plf
Max Uniform Load (Ultimate)
2430 plf
3364 plf
Max Point Load (Service)
12151 #
16818 #
Max Point Load (Ultimate)
19442 #
26908 #
0.75
0.90
0.16 in
2500 psf
3000 psf
3500 psf
4000 psf
2686 plf
3269 plf
3852 plf
4436 plf
37406 plf
37406 plf
37406 plf
37406 plf
32701 plf
32701 plf
32701 plf
32701 plf
2686 plf
3269 plf
3852 plf
4436 plf
4297 plf
5230 plf
6164 plf
7097 plf
21484 #
26151 #
30818 #
35484 #
34375 #
41842 #
49308 #
56775 #
Date: 9 / 19 /2024
Page: M2.1
Brr1L
ENGINEERING
Project: Typical Footing
Footing: 15" x 15" x 8" thick
Footing B = 1.25 ft
t=8in
Reinforcement R = (2) #4
As, = 0.40 in
d = 4.25 in Cover: 3 in
Column C i = 3.50 in C2 = 3.50 in
Materials f = 2500 psi Normalweight .1 = 1.00
fy = 40000 psi Uncoated 1.00
Net Footing Weight
PFTG = 0.04 k
Soil Pressure:
PASD = gaB2 — PFTG =
One-way shear: 0 = 0.75
Vc=2A1 f,Bd= 6.38k
Vu <_ oVc oVc = 4.78 k
(B —Cz— 0Vc
vu=quB z d � qu e—c
B( 2 z—d)
qu = 30600 psf or
19011 Wood-Sno Road NE, Suite 100
Woodinville, WA 98072-4436
Phone: 425-814-8448
Fax: 425-821-2120
Isolated rooting
(B —Cl— ) pVc
Vu —quB 2 d � qu— B—C
B( 2 1—d)
30600 psf Pu = quB2 = 47813 #
Two-way shear: 0 = 0.75
[22.6.5.2(a)] vc = U c = 200 psi a
[22.6.5.2(b)] vc = (2 + 4 Q) Al fc = 300 psi 6 = 1.00
a,, = 40
[22.6.5.2(c)] vc = (2 + e d) Al fc = 374 psi b ° 31C'+d)+2(Cz+d)
Vu < OVc OVc = ovcbod = 19.76 k
Vu = qu[B2 — (Cl + d)(C2 + d)] —> qu = 0VC
[Bz — (Cl + d)(C2 + d)]
qu = 17254 psf Pu = quB2 = 26959 #
Moment: 0 = 0.90
M,,, = Asfy(d — a/2) = 5.3 k-ft
a=Asfyl(0.85f,B) = 0.50 in
Mu S OM. OM,,, = 4.8 k-ft
—z
quB ( B Cz 2 ) _ 20JM,�
Mu 2 qu B((B — C2)/2)2
qu = 33441 psf or
Development of Reinforcement:
3 fy 4tV2VS
quB (B—z
Cl 2 ) 20M,,
M. 2 �qu=
B((B — C,)/2)2
33441 psf Pu = quB2 = 52252 #
� f- C Kt, Id 40 b + K db =
3 in
...3 in
available
OK
db
Adjusted
Soil Bearing Pressure
1500 psf
2000 psf
2500 psf
3000 psf
3500 psf
4000 psf
Max Load (lbs), Soil
2302
3083
3865
4646
5427
6208
Max Load (lbs), One -Way Shear
29883
29883
29883
29883
29883
29883
Max Load (lbs), Two -Way Shear
16849
16849
16849
16849
16849
16849
Max Load (lbs), Moment
32657
32657
32657
32657
32657
32657
Max Load(ASD)
2302
3083
3865
4646
5427
6208
Max Load (Factored)
3683
4933
6183
7433
8683
9933
Date: 9 / 19 /2024
Page: M2.2
Brr1L
ENGINEERING
Project: Typical Footing
Footing: 18" x 18" x 8" thick
Footing B = 1.50 ft
t=8in
Reinforcement R = (2) #4
As, = 0.40 in
d = 4.25 in Cover: 3 in
Column C i = 3.50 in C2 = 3.50 in
Materials f = 2500 psi Normalweight L .1 = 1.00
fy = 40000 psi Uncoated IN = 1.00
Net Footing Weight
PFTG = 0.06 k
Soil Pressure:
PASD = gaB2 — PFTG =
One-way shear: 0 = 0.75
Vc=2A f,Bd= 7.65k
Vu <_ oVc oVc = 5.74 k
(B —Cz— ) 0Vc
2
Vu=quB d � qu B—C
B( 2 z—d)
qu = 15300 psf or
19011 Wood-Sno Road NE, Suite 100
Woodinville, WA 98072-4436
Phone: 425-814-8448
Fax: 425-821-2120
Isolated rooting
(B —Cl— ) pVc
Vu —quB 2 d � qu— B—C
B( 2 1—d)
15300 psf Pu = quB2 = 34425 #
Two-way shear: 0 = 0.75
[22.6.5.2(a)] vc = U c = 200 psi a
[22.6.5.2(b)] vc = (2 + 4 it 6 = 1.00
Q) fc = 300 psi a,, = 40
[22.6.5.2(c)] vc = (2 + e d) fc = 374 psi b ° 31C'+d)+2(Cz+d)
Vu < OVc OVc = ovcbod = 19.76 k
Vu = qu[B2 — (Cl + d)(C2 + d)] —> qu = 0VC
[Bz — (Cl + d)(C2 + d)]
qu = 10782 psf Pu = quB2 = 24260 #
Moment: 0 = 0.90
M,,, = Asfy(d — a/2) = 5.4 k-ft
a=Asfyl(0.85f,B) = 0.42 in
Mu S OM. OM,,, = 4.8 k-ft
—z
quB ( B Cz 2 ) _ 20JM,�
Mu 2 qu B((B — C2)/2)z
qu = 17712 psf or
Development of Reinforcement:
3 fy 4tV2VS
quB (B—z
Cl 2 ) 20M,,
MU = 2 �qu=
B((B — C,)/2)2
17712 psf Pu = quB2 = 39853 #
� f- C Kt, Id 40 b + K db =
4 in
...4 in available
OK
db
Adjusted
Soil Bearing Pressure
1500 psf
2000 psf
2500 psf
3000 psf
3500 psf
4000 psf
Max Load (lbs), Soil
3315
4440
5565
6690
7815
8940
Max Load (lbs), One -Way Shear
21516
21516
21516
21516
21516
21516
Max Load (lbs), Two -Way Shear
15162
15162
15162
15162
15162
15162
Max Load (lbs), Moment
24908
24908
24908
24908
24908
24908
Max Load(ASD)
3315
4440
5565
6690
7815
8940
Max Load (Factored)
5304
7104
8904
10704
12504
14304
Date: 9 / 19 /2024
Page: M2.3
Brr1L
ENGINEERING
Project: Typical Footing
Footing: 24" x 24" x 8" thick
Footing B = 2.00 ft
t=8in
Reinforcement R = (2) #4
As, = 0.40 in
d = 4.25 in Cover: 3 in
Column C i = 3.50 in C2 = 3.50 in
Materials f = 2500 psi Normalweight L .1 = 1.00
fy = 40000 psi Uncoated IN = 1.00
Net Footing Weight
PFTG = 0.11 k
Soil Pressure:
PASD = gaB2 — PFTG =
19011 Wood-Sno Road NE, Suite 100
Woodinville, WA 98072-4436
Phone: 425-814-8448
Fax: 425-821-2120
Isolated AoodtV
One-way shear:
0 = 0.75
Vc=2A f,Bd=
10.20k
Vu <_ 0Vc 0Vc
= 7.65 k
Vu qB (B —Cz—
—u2 d
1 OVc
gu— B(B —Cz —d)
l
�B —Cl
Vu —quB 2
— 1 _ 0Vc
d qu B(B ZCi —d)
qu
2
= 7650 psf or
7650 psf Pu =
quB2 = 30600 #
Two-way shear:
0 = 0.75
[22.6.5.2(a)] vc =
4A f� =
200 psi a
[22.6.5.2(b)] vc =
4
(2 + it fc =
300 psi
8 = 1.00
Q)
a X = 40
[22.6.5.2(c)] vc =
(2 + d) fc =
374 psi
b ° 31C'+d)+2(Cz+d)
e
V. < OVc
OVc = ovcbod =
19.76 k
V. = quLB2 — (Cl
+ d)(Cz + d)] —� qu =
0Vc
LBa — (Cl + d)(Ca + d)]
qu
= 5516 psf
Pu =
quB2 = 22063 #
Moment: 0 = 0.90
M,,, = Asfy(d — a/2) = 5.5 k-ft
a=Asfyl(0.85f,B) = 0.31 in
Mu S OM. OM,,, = 4.9 k-ft
—z
quB ( B Cz 2 ) _ 20JMn
Mu 2 qu B((B — C2)/2)2
qu = 6732 psf or
Development of Reinforcement:
3 fy 4tV2VS
quB (B—Cl z
2 ) 20Mu
M. 2 ,qu=
B((B — C,)/2)2
6732 psf Pu = quB2 = 26929 #
Id 40 Af- C Kt, b + K db =
7 in
...7 in
available
OK
db
Adjusted
Soil Bearing Pressure
1500 psf
2000 psf
2500 psf
3000 psf
3500 psf
4000 psf
Max Load (lbs), Soil
5893
7893
9893
11893
13893
15893
Max Load (lbs), One -Way Shear
19125
19125
19125
19125
19125
19125
Max Load (lbs), Two -Way Shear
13789
13789
13789
13789
13789
13789
Max Load (lbs), Moment
16830
16830
16830
16830
16830
16830
Max Load(ASD)
5893
7893
9893
11893
12710
12710
Max Load (Factored)
9429
12629
15829
19029
20337
20337
Date: 9 / 19 /2024
Page: M2.4