APPROVED ENG RESUB 1-BLD2022-1329+Traffic Control Plan+9.20.2023_9.37.40_AM+3793487SIGN SPACING
= X
FREEWAYS & EXPRESSWAYS
55 /70 MPH
1500'1
RURAL HIGHWAYS
50 /65 MPH
8001±
RURAL ROADS
45 / 55 MPH
500'±
RURAL ROADS & URBAN ARTERIALS
35 /40 MPH
350'±
RURAL ROADS & URBAN ARTERIALS
RESIDENTAL & BUSINESS DISTRICTS
25 / 30 MPH
200'± (2)
URBAN STREETS
25 MPH OR LESS
100'± (2)
(1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE
RAMPS, AT -GRADE INTERSECTIONS AND DRIVEWAYS.
(2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TO FIT
ROADWAY CONDITIONS.
TABLE (1)
CHANNELIZATION DEVICE
SPACING feet
MPH
TAPER
TANGENT
50/70
40
80
35/45
30
60
25/30
20
40
MINIMUM LANE CLOSURE TAPER LENGTH = L (feet)
LANE
Posted Speed (mph)
WIDTH
(feet)
25
30
35
40
45
50
55
60
65
70
10
105
150
205
270
450
500
550
-
-
-
11
115
165
225
295
495
550
605
660
-
-
12
125
180
245
320
540
600
660
720
780
840
LEGEND
WORK AREA DISPLAYED 72 HRS IN
PROJECT FOOTPRINT ADVANCE OF CLOSURE
L._._.I � PARKING
■ ■ ■ ■ ■ 28" REFL. CONE ERaMO
TOW AWAY AREA
41 SIGN LOCATION
CONTINUATION LINE
EXISTING TRAFFIC FLOW
NO PARK BARRICADE
ROAD
WORK
AHEAD
\ W20-1
** MANDATORY
NOTIFY ALL AFFECTED OCCUPANTS AT LEAST 10 BUSINESS DAYS PRIOR
TO START OF WORK. COORDINATE ACCESS, DELIVERY, AND GARBAGE
PICK-UP NEEDS WITH AFFECTED OCCUPANTS.
GENERAL NOTES:
1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD.
2. NOTIFY ALL LOCAL EMERGENCY SERVICES OF CLOSURE TIMES
AND DATES (OPTIONAL).
3. ALERT COMMUNITY TRANSIT CONSTRUCTION 5 DAYS IN ADVANCE
OF CLOSURE (MANDATORY) 425-348-7191
4. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY
CONDITIONS.
5. ALL SIGNS MIN. 48" X 48" UNLESS OTHERWISE SPECIFIED.
6. CHANNELIZATION DEVICES ARE 28" REFL. CONES (see TABLE (1) for
spacing distances).
7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT -GRADE
INTERSECTIONS AND/OR DRIVEWAYS.
36" x 24"
SIDEWALK
CLOSED
R9-9
ROAD
WORK
AHEAD
\ W20-1
POSTED
SPEED
LIMIT
f
TRAFFIC CONTROL PLAN
EDMONDS, WA N
W_!�_E
S
NOT TO SCALE
Z Typical Parking Lane/Sidewalk Lane Closure
LU
� 24" x 18" O Parking lane +sidewalk closed on south side of
SIDEWALKCLOSED Daley St between 3rd Ave N & alley (heading east)
=EA ► O Pedestrians shall cross street to bypass work area.
�RR9H11E O Community Transit stop on 3rd Ave N maintained.
O Bike lane not present.
` ! O REASON: Frontage improvement construction.
ROAD
36" x 24" WORK
AHEAD
CROSSWALK W 20-1
CLOSED
NO ENCROACHMENT ON THIS
R9-3XC TRAVELED LANE IS PERMITTED
22' MIN. TRAVEL
WIDTH MAINTAINED
AT ALL TIMES
r *-r -Z -_- .e+411:4-fs -_- r
Project Location:
310 Daley St
•�• Edmonds, WA 98020
COMMUN�ITITRANSIT�•�•
STOP UNAFFECTED �•
24" x 18" �•�
SIDEWALK CLOSED
AHEAD
4—
CROSS HERE
R9-11
BLD2022-1325 - 308 DALEY - LOT B
BLD2022-1326 - 310 DALEY - LOT C
BLD2022-1327 - 312 DALEY - LOT D
BLD2022-1329 - 306 DALEY - LOT A
POSTED
SPEED
LIMIT
14
SPEED
LIMIT
25
Stella Maris Acadamy
410 4th Ave N
Edmonds, WA 98020
PARKING LANE I
� TRAFFIC FLOW ON DALEY ST � �—
_1111111UNAFFECTED �
j PARKING LANE I
/ 36" x 24"
SIDEWALK
CLOSED
* * 36" x 24"
R9-9
ALLEY
CLOSED
DALEY ST
24" x 18"
DEWALK CLOSE
AHEAD
CROSS HERE
R9-11
ENGINEERING DIVISION
APPROVED
08/13/2024
Engineering Inspector may
require revisions if needed.
ADVISORY
FI-21
South County FS #17
275 6th Ave N
Edmonds, WA 98020
IN VICINITY OF WORK AREA
BUT UNAFFECTED BY CLOSURE
ADDL. NOTES:
RESUB
Sep 21 2023
CITY OF EDMONDS
DEVE—MENTSERVICES
DEPARTMENT
Know ais below.
811 before you dig.
0
C
o
c0
w Do
0: w W)
wM O V) Q i
aU a N w 0
m
w o
w �
E o Cl)
G P Q O N
Cn U W N
wyaOJ'D wG
F
z 0 w 0 a N
0.0 -0 a W
ww �aoW
z
W
O
z
W
ry
U
CM W =
ONE. DO(Id
Lo°o zo
a� >a CD
v = w
i>7 M
Z w~- a O to
O •- M o
0U wU a N