Loading...
ENG2023-0173+Additional_File_Submittal+8.17.2023_12.15.02_PM+3732004Additional File Submittal Permit Number: ENG2023-0173 Project Name: 310 Daley Water Availability Submission Date & Time: 8/17/2023 12:14:58 PM Reason for Submittal: Change in Original Project Brief Description of Changes: A utility availability study is now needed to confirm the water pressure available to the site. This information is needed for fire ppression design. Name of Jurisdiction Contact(s): JoAnne Zulauf Uploaded Files: 2023-08-15 WaterAvailabilityApplication - AJB Signed.pdf(Utility eCitvGov Alliance, P.O. Box 90012, Bellevue, Washington 98009-9012