APPROVED ENG RESUB 1-BLD2022-1325+Transportation_Impact_Form+UNIT B-9.20.2023_9.37.40_AM+3793483BLD2022-1325
APPENDIX A
Page I of 2
Transportation Impact Analysis
Worksheet
PERMITTING & DEVELOPMENT
ENGINEERING
DIVISION
121 5th Avenue N
P: 425.771.0220
Name of Proposed Project
Owner/Applicant
HBRE Investments
Name
1951 3rd Avenue W
Street/Mailing Address
Seattle WA 98119
City
Telephone: 206.380.9989
State zip
RESUB
Sep 21 2023
CITY OF EDMONDS
SERVICES
1ENT
Applicant Contact Person:
Jacob Young
Name
10 Dravus Street
Street/Mailing Address
Seattle WA 98109
City State zip
Telephone: 206.535.7908
Traffic Engineer who prepared the Traffic Impact Analysis (if applicable):
N/A N/A
Firm Name Contact Name
Telephone: N/A
1. PROJECT DESCRIPTION
E-mail: N/A
a. Location - Street address: 310 Daley Street
(Attach a vicinity map and site plan.)
b. Specify existing land use: Duplex to be demolished
c. Specify proposed type and size of development: (1) Residential Townhouse containing
(1) dwelling unit (# of residential units and/or square footage of building)
d. Date construction will begin and be completed: Summer 2023 - Summer 2024
e. Define proposed access locations: All access from existing alley to east of site
HANDOUT UPDATED 03.24.2021
APPENDIX A
Page 2 of 2
f. Define proposed sight distance at site egress locations: Approx. 10 ft (unobstructed)
provided at the intersection of the alley and Daley Street. This is to remain.
2. MITIGATION RECOMMENDATIONS
State recommended measures and fees required to mitigate project specific traffic impacts.
Traffic impact fee shall be calculated from the attached Impact Fee Rate Tables and as identified
in ECDC 18.82.120, except as otherwise provided for independent fee calculations in ECDC
18.82.130.
X CHANGE IN USE
Fee for prior use shall be based on fee established at the time the prior use was permitted. If
the previous use was permitted prior to the adoption of Ordinance 3516 (effective date:
09/12/04), the 2004 ECDC 18.82.120 impact fee shall be used.
ITE Land Use Category
New Use 1 (1) Townhouse (230)
Prior Use (1) Duplex Unit (210)
Units in
Per Unit
square feet,
Fee Rate
# of dwelling,
of , etc.
X 1 =
$ 6249.14
$ 6249.14
X 1 =
Fee
inn I a�n— $ 0 1
New Use Fee: $ ��. , - Prior Use Fee: $ l 0A a. �n , T
$3318.13 $ 840.72 $ 2477.41
❑ NEW DEVELOPMENT
ITE Land Use Category
New Use 1 1 $
❑ NO CHANGE
Units in
Per Unit square feet,
Fee Rate # of dwelling,
vfD. etc.
❑ INDEPENDENT FEE CALCULATION
In
MITIGATION FEE RECOMMENDATION:
$
INDEPENDENT FEE CALCULATION: $240.00 (+ consultant fee)
$
TOTAL TRANSPORTATION IMPACT FEE
$
ENGINEERING DIVISION
APPROVED AS NOTED
City of Edmonds, Engineering Division Approval 9/11 /2024
' No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative.
$3318.13
$ 840.72
HANDOUT UPDATED 03.24.2021