Loading...
APPROVED ENG RESUB 1-BLD2022-1326+Transportation_Impact_Form+9.20.2023_9.37.40_AM+3793486BLD2022-1326 APPENDIX A Page 1 of 2 Transportation Impact Analysis RESUB Sep 21 2023 Worksheet EDMONDS RVI DEVELOPMENTSERVICES DEPARTMENT PERMITTING & DEVELOPMENT ENGINEERING DIVISION 121 5th Avenue N P: 425.771.0220 Name of Proposed Project Owner/Applicant HBRE Investments Name 1951 3rd Avenue W Street/Mailing Address Seattle WA 98119 City Telephone: 206.380.9989 State zip Applicant Contact Person: Jacob Young Name 10 Dravus Street Street/Mailing Address Seattle WA 98109 City State zip Telephone: 206.535.7908 Traffic Engineer who prepared the Traffic Impact Analysis (if applicable): N/A N/A Firm Name Contact Name Telephone: N/A 1. PROJECT DESCRIPTION E-mail: N/A a. Location - Street address: 310 Daley Street (Attach a vicinity map and site plan.) b. Specify existing land use: N/A. Credit for existing duplex applied to Units A and B. c. Specify proposed type and size of development: (1) Residential Townhouse containing (1) dwelling unit (# of residential units and/or square footage of building) d. Date construction will begin and be completed: Summer 2023 - Summer 2024 e. Define proposed access locations: All access from existing alley to east of site HANDOUT UPDATED 03.24.2021 APPENDIX A Page 2 of 2 f. Define proposed sight distance at site egress locations: Approx. 10 ft (unobstructed) provided at the intersection of the alley and Daley Street. This is to remain. 2. MITIGATION RECOMMENDATIONS State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact fee shall be calculated from the attached Impact Fee Rate Tables and as identified in ECDC 18.82.120, except as otherwise provided for independent fee calculations in ECDC 18.82.130. X CHANGE IN USE Fee for prior use shall be based on fee established at the time the prior use was pe�ed. the previous use was permitted prior to the adoption of Ordinance 351 fective date: 09/12/04), the 2004 ECDC 18.82.120 impact fee shall be used. ITE Land Use Category Per Unit Fee e New Use (1) Townhouse $ 6249.14 X Prior Use $ X Use Fee: $ 6249.14 X NEW DEVELOPMENT /IInits in square feet, # of dwelling, of , etc. 1 = - Prior Use Fee: $ 0 1 = 1 $ 6249.14 ITE Land Use Category New Use I CONDO (230) ❑ NO CHANGE Per Unit Fee Rate $ 3318.131 X ❑ INDEPENDENT FEE CALCULATION Units in square feet, # of dwelling, vfp, etc. 1 UNIT MITIGATION FEE RECOMMENDATION: $ INDEPENDENT FEE CALCULATION: $240.00 (+ consultant fee) $ TOTAL TRANSPORTATION IMPACT FEE $ ENGINEERING DIVISION APPROVED AS NOTED City of Edmonds, Engineering Division Approval 9/11/2024 ' No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative. HANDOUT UPDATED 03.24.2021