Loading...
APPROVED ENG RESUB 1-BLD2022-1327+Transportation_Impact_Form+9.20.2023_9.37.40_AM+3793475BLD2022-1327 APPENDIX A Page 1 of 2 Transportation Impact Analysis RESUB Wo rks h eet Sep 21 2023 CITY OFE DEVELOPMENTS RVI CES DEPARTMENT PERMITTING & DEVELOPMENT ENGINEERING DIVISION 121 5th Avenue N P: 425.771.0220 Name of Proposed Project Owner/Applicant HBRE Investments Name 1951 3rd Avenue W Street/Mailing Address Seattle WA 98119 City Telephone: 206.380.9989 State zip Applicant Contact Person: Jacob Young Name 10 Dravus Street Street/Mailing Address Seattle WA 98109 City State zip Telephone: 206.535.7908 Traffic Engineer who prepared the Traffic Impact Analysis (if applicable): N/A N/A Firm Name Contact Name Telephone: N/A 1. PROJECT DESCRIPTION E-mail: N/A a. Location - Street address: 310 Daley Street (Attach a vicinity map and site plan.) b. Specify existing land use: N/A. Credit for existing duplex applied to Units A and B. c. Specify proposed type and size of development: (1) Residential Townhouse containing (1) dwelling unit (# of residential units and/or square footage of building) d. Date construction will begin and be completed: Summer 2023 - Summer 2024 e. Define proposed access locations: All access from existing alley to east of site HANDOUT UPDATED 03.24.2021 APPENDIX A Page 2 of 2 f. Define proposed sight distance at site egress locations: Approx. 10 ft (unobstructed) provided at the intersection of the alley and Daley Street. This is to remain. 2. MITIGATION RECOMMENDATIONS State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact fee shall be calculated from the attached Impact Fee Rate Tables and as identified in ECDC 18.82.120, except as otherwise provided for independent fee calculations in ECDC 18.82.130. X CHANGE IN USE Fee for prior use shall be based on fee established at the time the prior use was permi f the previous use was permitted prior to the adoption of Ordinance 3516 ctive date: 09/12/04), the 2004 ECDC 18.82.120 impact fee shall be used. ITE Land Use Category New Use I Single Famjy- -10) Prior Use New Use Fee: $ 6249.14 X NEW DEVELOPMENT nits in Per Uni square feet, ate # of dwelling, vfp, etc. $ 6249.14 I X 1 1 $ IX - Prior Use Fee: $ 0 = $ 6249.14 ITE Land Use Category Per Unit Fee Rate New Use I CONDO (230) 1 $ 3318.13 1 X ❑ NO CHANGE ❑ INDEPENDENT FEE CALCULATION Units in square feet, # of dwelling, vfp, etc. 1 UNIT MITIGATION FEE RECOMMENDATION: $ INDEPENDENT FEE CALCULATION: $240.00 (+ consultant fee) $ TOTAL TRANSPORTATION IMPACT FEE $ ENGINEERING DIVISION APPROVED AS NOTED City of Edmonds, Engineering Division Approval 9/11/2024 ' No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative. HANDOUT UPDATED 03.24.2021