APPROVED ENG2024-0574 ROW PERMITRIGHT OF WAY EUC PERMIT
PERMIT NUMBE
City of • •
:0
www.edmondswa.gov i
Description: PUD - REPLACE ONE POLE AND STREETLIGHT ISSUED: 02/03/2025
Address: 8034 185TH ST SW EDMONDS WA 98026-5840
EXPIRES: 08/02/2025
Permit Type: RIGHT OF WAY EUC Permit Subtype: STANDARD Parcel Number: 00469200000400
Isle]'
NAME TYPE NAME ADDRESS PHONE
APPLICANT MOE MATTHEWS PO BOX 1107, EVERETT WA 98206 (425)783-5681
CONTACT SNOHOMISH COUNTY PUD PO BOX 1107, EVERETT WA 98206 (425)670-3214
CONTRACTOR SNOHOMISH COUNTY PUD PO BOX 1107, EVERETT WA 98206 (425)783-4353
OWNER ANNGELIQUE A & ANDERS BOWEN 8034 185TH ST SW, EDMONDS WA 98026
FEE INFORMATION
DESCRIPTION AMOUNT PAID
CITY TECHNOLOGY FEE - PER PERMIT
$45.00 $45.00
ENG - INSPECTIONS - 4.1.24
$132.00 $132.00
ROW - STANDARD - 4.1.24 $396.00 $396.00
REQUIREMENTS
REQUIREMENT TYPE NOTES
TRAFFIC CONTROL
Traffic control and public safety shall be in accordance with City regulations as required by the City
Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification
verifying completion of the required training in their posession.
RESTORATION
Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with
asphalt or City approved material prior to the end of the workday - No Exceptions
WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final
inspection and acceptance of the work.
INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM
24 HR NOTICE REQUIRED
The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of
any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its
departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney
fees by reason of granting this permit.
RELEASED BY: MAJ DATE: 02/03/2025
Printed: Monday, February 03, 2025 3:21:16 PM 1 of 2
RIGHT OF WAY EUC PERMIT
PERMIT NUM11BE
City of Edmonds
....121
Sth Ave N, Edmonds WA •:0
www.edmondswa.gov • •
CONDITIONS
CONDITION TYPE
ALERT RESIDENTS
ALERT AFFECTED RESIDENTS AND OR BUSINESSES PRIOR TO WORK START.
It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in
DAMAGE TO FRONTAGE
City right of Ways or Easements to City Standards caused by or occurring during the permitted
IMPROVEMENTS
project.
MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD
ESC REQUIREMENTS
REQUIREMENTS.
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to
indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and
agents from any and all claims for damages of whatever nature, arising directly or indirectly from the
HOLD HARMLESS
issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any
requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance
provision.
SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT.
INSPECTIONS
www.mybuildingpermit.com
POTHOLING
VERIFY CLEAR BORE CROSSINGS.
RESTORE LANDSCAPE
Restore landscape to like or better conditions
Sound or noise originating from temporary construction sites as a result of construction activity are
exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on
SOUND AND NOISE
weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all
other times the noise originating from construction sites and activities must comply with the noise
limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
All utilities shall be located prior to any excavation. New locates shall be called for if at time of
UTILITY LOCATES
excavation, original locates are no longer identifiable.
INSPECTIONS
INSPECTION TYPE DATE
RESULT
COMPLETE
A-1 JOB START
X-2 ENGINEERING FINAL**
Printed: Monday, February 03, 2025 3:21:16 PM 2 of 2
of EpMOz
RECEIVED
RIGHT OF WAY CONSTRUCTION DEC 30 2024
PERMIT APPLICATION
Complete and submit this Application in accordance with the Submittal CITY OF EDMONDS
p pp DEVELOPMENT
'Vc. i aa° Requirements outlined in Right -of -Way permit Handout E6�. SERVICES DEPARTMENT
If any field is not applicable to your project, write "N/A' instead of leaving blank.
All fields required. Incomplete Applications will be denied.
SECTION A
General •
Project Name BO Pole Replacement - PLI 8890 (WO# 100141569) 8034 185th St SW
Site Address or if no site address use Property Address at NW corner of project area:
--- - ------ -- ---
Associated Permits: BLD PLN ENG
Owner and Entity Holding
Name of Company SNOHOMISH COUNTY PUD NO.1 Franchise Ordinance No: N/A
Point of Contact KENNETH LUU
Title ENGINEERING TECH II
Address PO BOX 1107
City EVERETT
State WA
Zip 98206
Phone 425-670-3214
Email PERMITS@SNOPUD.COM
Contractor and Authorized Agent of Owner
Name of Company SAME AS ABOVE
(see note below)
Contractor Contacts During Construction
Primary Name SAME AS ABOVE
Agent Name
Title
Title
Mobile
Address
Email
City State
Zip
Secondary Name
Phone
Title
Email
Mobile
City of Edmonds Business License No: N/A
Email
State License No: 3 1 3-005-74 1
Contractor verifies it is currently bonded
® Contractor verifies it currently has general liability insurance
NOTE: ECDC 18.6o. o2o requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city
engineer.
❑ Multifamily residential ❑ Commercial ❑ City project
❑ Single family residential subdivision ❑ Single family -other ❑ Industrial
❑ Demo and rebuild or from vacant land?
❑ Other, please specify:
• Utility Franchise Work associated with development (check one of the above boxes as welt
❑ Traffic Control Only (no associated development)
❑ Utility Franchise Work (no associated development)
City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021
Include an overall narrative description of the proposed work. Be specific and detailed:
Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc.
Include whether this is construction, maintenance, or repair.
Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for
underground utilities, etc.)
Replace pole at NE corner of 8034 185th St SW. Transfer primary, neutral, service wires, and streetlight onto new pole. 50' section of eastbound lane of 8034 185th St SW to be
closed for 4 hours between the hours of 8:OOAM - 4:00PM Tree trimming needed_ Ground disturbance in soft surface only.
RIGHT-OF-WAY
CLOSURE
AREA
TOTAL
DURATION
(Number of Months)
Sidewalk '72hours +
LF
I x
LF
SF
N/A
Alley'72 hours +
LF
Ix
I LF
SF
N/A
Parking 72 hours +
LF
I x
I LF
SF
N/A
SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTION C.
1. The work in the right of way is on or for the following type of facilities:
❑ telecommunications ❑ cable in power ❑ gas
❑ water ❑ sewer ❑ storm
Details of Work to be Completed
1. Does the utility owner have existing overhead infrastructure in the area of work?
Yes
X
No
2. Will any equipment be added underground or above ground (e.. pedestals, vaults, etc.)?
X
If yes, describe: 1 nnhn
3.
Does the proposed work connect a lot or commercial development with utilities that serve more
than one lot or commercial development?
X
4.
Does the work involve rebuilding or relocating an existing aboveground utility system which
connects a lot or commercial development to an existing underground common utility stem?
X
5.
Does the work involve proposed additions to an aboveground utility stem? If es:
X
Are the additions for the purpose of serving new commercial development?
Are the additions for the purpose of serving a single-family residential subdivision?
Details
of Work to be Completed
Yes
No
6.
Does your project involve rebuilding or replacing utility equipment which currently serves more
than one lot or commercial development?
If yes, answer the following questions related to project area, i.e. the actual area in which the
X
project is proposed:
6a.
Does your project involve wires/cables/lines? If yes:
X
How many are existing? 1 1 1 How many are to be added? 1 0
City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021
6b.
Does your project involve poles? If yes:
X
How many poles are existing in the project area? 1
What is the height of the existing poles? 45'
How many poles are to be removed? 1
Are additional poles to be laced? No
How many? I I What is the height of the additionalpoles?
6c.
Are any poles to be modified/rebuilt/replaced? If yes:
X
How many? What is the height of the poles after? 45'
Describe the modification rebuild: Pole replacement adjacent to existing location
SECTION C
Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as
required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have
certification verifying completion of the required training in their possession.
Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be
patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS.
Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to
any permit approval.
Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials,
officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever,
foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or
omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose
acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and
specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any
respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the
expiration, revocation, or termination of any resulting permit approval.
Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and
requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to
the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal
Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable
requirements of state and federal law.
Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a
licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by
owner to act on its behalf and have authority to bind the owner to this application.
Fees. The Applicant is responsible for all permit fees.
APPLICANT SIGNATURE: Kenneth Luu Da 20;;323,6N33-08°W DATE: 12/27/2024
APPLICANT PRINTED NAME: Kenneth Luu
APPLICANT TITLE: Engineering Tech 2
NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE
City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021
SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM
SNOHOMMIISHnCOUNTY
PUBLIC UTILITY DISTRICT NO I
LOCATION 8034 185TH ST SW, EDMONDS, WA 98026 AREA LYNNWOOD
POLE NO. 8890 NE1/4S 18 T 27 R 4 DATE 12/4/2024 ORDER 100141569
REASON FOR WORK PUD MAINTENANCE ENGINEER K. LUU OPERATION 0030
80 POLE - PL1 8890 DRAFTER UGND NO.
SCALE 1'= 30'
APPROVED
DATE PRINTED
FOREMAN RECORDS
NESC VIOLATIONS
FOREMAN
■ NO ❑ YES (SEE NOTES)
PERMITS
DATE WORK COMPLETED
❑ RESTORATION REQUIRED
■ CITY
❑ ADDITIONAL WORK REQUIRED
❑ SNO COUNTY (TCP)
NOTES (i.e. REDLINE INFO):
❑ SNO COUNTY (BLANKET)
❑ SNO COUNTY (MAJOR)
❑ OTHER:
❑ NO PERMIT REQUIRED
❑ RESTORATION REQUIRED
❑ MULTIPLE JOB PHASES (i.e. OH, UG)
FEES REQ'D ❑ YES ■ No
EASEMENTS ❑ REQUIRED
E# ■ NOT REQUIRED
PRIMARY OVERHEAD
❑ RESIDENTIAL
REQUEST NO.
❑ COMMERCIAL
LEO#
DATE APPROVED
@ $ -$
FOREIGN CONTACTS
■ JPN#
PRIMARY UNDERGROUND
❑ RESIDENTIAL
❑ JOINT TRENCH ZIPLY & CATV
❑ COMMERCIAL
❑ JOINT BORE ZIPLY & CATV
BASIC FEE S
❑
LEU#
POLE STENCILING
@ $ /,_$
FROM TO
TAKE OFF POLE
MISCELLANEOUS FEES
VAULT 8
PRE-CONST. REQUIRMENTS
PERMIT S
❑ BACKHOE ❑ FLAGGING
$
■ ONE CALL DATE 01/14/25
No. 24523430
s
S_
FIBER
❑ YES ■ NO
TOTAL DUE E NIA
DATE PAID N/A
STREET LIGHTING
RECEIPT NO.
■ YES ❑ NO
ENGINEER KENNETH LUU
M&R IN
AS -BUILT
PHONE 425-670-3214
GIS
M&R OUT
CELLULAR 425-870-9753
GIS QC
JOINT USE
OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING
ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY
UTILITIES MAY REQUIRE A SEPERATE PERMIT.
I P-(-p-Nn_
O EXISTING POLE
X EXISTING POLE -TO BE REMOVED
• NEW POLE
NEW POLE TO REPLACE EXISTING POLE
DATE
SUBSTATION PRV
CIRCUIT No. 12-93 PHASE 1
TRANSFER OF UTILITIES, REMOVAL OF POLE AND FINAL RESTORATION TO BE CONSISTENT
WITH APPLICABLE POLE ATTACHMENT AGREEMENT(S) AND JOINT OWNERSHIP POLE AGREEMENT.
RECEIVED
SET 45' CL2 POLE 5' SE AT DEPTH OF 6.5' (PW2045) DEC 30 2024
FRAME POLE AS 7.2KV 1PH VERT DE PER 12V109
OF
INSTL NEW 3/8'' DG & 8' AHR, L= 8' E (GO113, A0101) CDEVELODMONDS
DEVELOPMENT
INSTL NEW 4' SL ARM (L0501); RMV EXISTING SL ARM SERVICES DEPARTMENT
XFR EXISTING OH PRI, NEUT, OH SVCS, XFMR 15-451123, & STLT# 131974
STRIP & TOP POLE TO COMMS (45', CL2, 1967)
--18 5TH ST SVV 4
- -- ' 8030
- —— -- --
OWNER/CONTRACTOR IS RESPONSIBLE FOR
EROSION CONTROL AND DRAINAGE
Applicant shall repair/replace all
damage to utilities or frontage
improvements in City right-of-way
per city standards that is caused or
occurs during the permitted project.
ENGINEERING DIVISION
APPROVED AS NOTED
P1/ LVLJ,,,,44z 01/28/2025
VV
221913
J 15-3661
-130835 A
3
I
15-4511 Z
SL-131974-
4 THE NEW POLE SHALL BE
PLACED A MINIMUM OF 5 FEET
FROM THE BACK OF CURB
i
8034
SHEET 1 OF 1
185TH
E:ilIiIll
O
ST SW 0
lie 100,
16
fOR
RE
iFi
0 •
PL 1 8890
GENERAL NOTES:
1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD.
2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND
DATES (OPTIONAL).
3. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD
N CONDITIONS.
NORTH 4. PROTECTIVE VEHICLE RECOMMENDED -MAY BE A WORK TRUCK.
5. ALL SIGNS MINIMUM 48" X 48", UNLESS OTHERWISE SPECIFIED.
6. CHANNELIZATION DEVICES ARE 28" REFLECTIVE CONES. SEE TABLE 1
FOR SPACING DISTANCES.
7. ALL SPACING MAY BE ADJUSTED TO ACCOMODATE AT -GRADE
INTERSECTIONS AND/OR DRIVEWAYS.
SIGN SPACING = X
FREEWAYS & EXPRESSWAYS
55-70 MPH
1500'±
RURAL HIGHWAYS
60-65 MPH
800'±
RURAL ROADS
45-55 MPH
500'±
RURAL ROADS & URBAN ARTERIALS
35-40 MPH
350'±
RURAL ROADS & URBAN ARTERIALS
RESIDENTIAL & BUSINESS DISTRICTS
25-30 MPH
200'± (2)
URBAN STREETS
I 25 MPH OR LESS
100'± (2)
(1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE
RAMPS, AT -GRADE INTERSECTIONS AND DRIVEWAYS.
(2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TO FIT
ROADWAY CONDITIONS.
LEGEND:
TABLE 1
O
CHANNELIZING DEVICE
CHANNELIZATION DEVICE
r
FLAGGING STATION
8034
SPACING (FEET)
s
PORTABLE SIGN AND SUPPORT
MPH
TAPER
TANGENT
50-65
10 TO 20
80
�®
WORK VEHICLE WITH FLASHING
LIGHT
35-45
10 TO 20
60
25-30
10 TO 20
40
WORK AREA
ENGINEERING DIVISION
APPROVED AS NOTED
jdl 01 /28/2025
vv
RECEIVED
DEC 30 2024
CITY OF EDMONDS
DEVELOPMENT
SERVICES DEPARTMENT
RECEIVED
CITY OF EDMONDS
Right -of -Way Application #1595061 - 100141569
DEC 30 2024
MyBuildingPermit.com
CITY OF EDMONDS
DEVELOPMENT
SERVICES DEPARTMENT
Applicant
First Name Last Name Company Name
Moe Matthews Snohomish County PUD
Number Street Apartment or Suite Number E-mail Address
PO Box 1107 permits@snopud.com
City State Zip Phone Number Extension
Everett WA 98206 (425) 783-5681
Contractor
Company Name
Owner
Number Street Apartment or Suite Number
City State Zip Phone Number Extension
State License Number License Expiration Date UBI # E-mail Address
Project Location
Number Street Floor Number Suite or Room Number
8034 185TH ST SW
City Zip Code County Parcel Number
EDMONDS 98026 00469200000400
Associated Building Permit Number Tenant Name
Additional Information (i.e. equipment location or special instructions)_
Work Location
Property Owner
First Name Last Name or Company Name
Anngelique A & Anderson Ryan Bowen
Number Street Apartment or Suite Number
8034 185TH ST SW
City State Zip
EDMONDS WA 98026
Certification Statement - The applicant states:
I certify that I am the owner of this property or the owner's authorized agent. If acting as an authorized agent, I further certify that I have full power and
authority to file this application and to perform, on behalf of the owner, all acts required to enable the jurisdiction to process and review such application. I
have furnished true and correct information. I will comply with all provisions of law and ordinance governing this type of application. If the scope of work
requires a licensed contractor to perform the work, the information will be provided prior to permit issuance.
Date Submitted: 12/30/2024 Submitted By: Moe Matthews
Page 1 of 2
CITY OF EDMONDS MyBuildingPermit.com
Right -of -Way Application #1595061 - 100141569
Project Contact
Company Name: Snohomish County PUD
Name: Kenneth Luu Email: permits@snopud.com
Address: PO Box 1107 Phone #: (425) 670-3214
Everett WA 98206
Project Type Activity Type Scope of Work
Utility Purveyor Utility Work Disturbance of Surface
Project Name: 100141569
Description of Replace a pole at NE corner of 8034 185th ST. Transfer primary, neutral, service wires and
Work: streetlight to new pole. 50' section of eastbound lane of 8034 185th ST SW to be closed for
4 hours. Tree trimming to be performed and ground disturbance is soft surface only.
Project Details
Project Information
Job Number
100141569
Page 2 of 2