APPROVED ENG2025-0012 ROW PERMITRIGHT OF WAY EUC PERMIT
PERMIT NUMBER
City of Edmonds
- N, Edmonds WA 98020 ENG2025-001
www -. •. i
-4
Description: OVWSD-RESTORATION AFTER EMERGENCY WATER MAIN REPAIR
ISSUED: 02/03/2025
Address: 9117 238TH ST SW EDMONDS WA 98026-8903
EXPIRES: 08/02/2025
Permit Type: RIGHT OF WAY EUC Permit Subtype: STANDARD Parcel Number: 00456500000600
NAME TYPE NAME ADDRESS PHONE
APPLICANT
MARTY HENNINGER
8128 228TH ST SW, EDMONDS WA 98026
(425)774-7769
CONTACT
OLYMPIC VIEW WATER AND SEWER
8128 228TH ST SW, EDMONDS WA 98026
(425)774-7769
DISTRICT
CONTRACTOR
OLYMPIC VIEW WATER & SEWER
8128 228TH ST SW, EDMONDS WA 98026
(425)670-1856
DISTRICT
OWNER MICHAEL & KATELYN LINDSTROM 9117 238TH ST SW, EDMONDS WA 98026
FEE INFORMATION
DESCRIPTION AMOUNT PAID
CITY TECHNOLOGY FEE - PER PERMIT $49.00 $49.00
ENG - INSPECTIONS - 1.1.25 $274.00 $274.00
ROW - STANDARD - 1.1.25 $411.00 $411.00
REQUIREMENTS
REQUIREMENT TYPE NOTES
TRAFFIC CONTROL
Traffic control and public safety shall be in accordance with City regulations as required by the City
Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification
verifying completion of the required training in their posession.
RESTORATION
Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with
asphalt or City approved material prior to the end of the workday - No Exceptions
WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final
inspection and acceptance of the work.
INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM
24 HR NOTICE REQUIRED
The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of
any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its
departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney
fees by reason of granting this permit.
RELEASED BY: MAJ DATE: 02/03/2025
Printed: Monday, February 03, 2025 3:54:31 PM 1 of 2
RIGHT OF WAY EUC PERMIT
PERMIT NUM11BE
City of Edmonds
www.edmondswa.gov • •
CONDITIONS
CONDITION TYPE
ALERT RESIDENTS
ALERT AFFECTED RESIDENTS AND OR BUSINESSES PRIOR TO WORK START.
It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in
DAMAGE TO FRONTAGE
City right of Ways or Easements to City Standards caused by or occurring during the permitted
IMPROVEMENTS
project.
MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD
ESC REQUIREMENTS
REQUIREMENTS.
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to
indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and
agents from any and all claims for damages of whatever nature, arising directly or indirectly from the
HOLD HARMLESS
issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any
requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance
provision.
SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT.
INSPECTIONS
www.mybuildingpermit.com
POTHOLING
VERIFY CLEAR BORE CROSSINGS.
RESTORE LANDSCAPE
Restore landscape to like or better conditions
Sound or noise originating from temporary construction sites as a result of construction activity are
exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on
SOUND AND NOISE
weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all
other times the noise originating from construction sites and activities must comply with the noise
limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
All utilities shall be located prior to any excavation. New locates shall be called for if at time of
UTILITY LOCATES
excavation, original locates are no longer identifiable.
INSPECTIONS
INSPECTION TYPE
DATE
RESULT
COMPLETE
A-1 JOB START
X-2 ENGINEERING FINAL**
E-7 RESTOR LIMITS
Printed: Monday, February 03, 2025 3:54:31 PM 2 of 2
pF EDtjo
RIGHT OF WAY CONSTRUCTION
PERMIT APPLICATION
Complete and submit this Application in accordance with the Submittal
Z�V'
l
INC. Is) ° Requirements outlined in Right-of-Wadpermit Handout, .tld3a
S301na3S 1N3WdOl3n34
If any field is not applicable to your project, write "N/A�� nsteaa of leaving blank.
All fields required. Incomplete Applications �nffPg &MR.
a3AI303N
SECTION A
General
Project Name Emergency water main repair
site Address or if no site address use Property Address at NW corner of project area: 9 it PI and 238th St SW
Associated Permits: BLD PLN ENG
•applicable)
NameofCompany Olympic View Water and Sewer District FranchiseOrdinance No:
Point of Contact Marty Henninger
'hfie Lead Utility Worker
Address 8128 228th St SW
city Edmonds State Wa zip 98026
Phone (425)&&4-7769
Email marty@ovwater.com
Contractor and Authorized Agent of • o•below)
Name of Company Olympic View Water and Sewer District
Primary Name
Agent Name Marty Henninger
Title
Title Lead Utility Worker
Mobile
Address8128 228th St SW
Email
city Edmonds IState Wa. Zip 98026
Secondary Name
Phone(425)774-7769
Title
Email marty@ovwater.com
Mobile .
City of Edmonds Business License No:
Email
State License No:
❑ Contractor verifies it is currently bonded
Contractor verifies it currently has general liability insurance
NOTE: ECDC 18.6o. o2o requires that the Application be signed by a licensed and bonded conb-actor unless otherwise approved by the city
engineer.
Type of Development — Check ALL that apply
❑ Multifamily residential ❑ Commercial ❑ City project
❑ Single family residential subdivision
❑ Demo and rebuild or from vacant land?
❑ Other, please specify:
❑ Single family -other ❑ Industrial
❑ Utility Franchise Work associated with development (check one of the above boxes as well
❑ Traffic Control Only (no associated development)
o(Utility Franchise Work (no associated development)
City of Edmonds ROW construction permit Application --Page i of 3 Updated 3/25/2021
Include an overall narrative description of the proposed work. Be specific and detailed:
Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc.
Include whether this is construction, maintenance, or repair.
Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for
underground utilities, etc.)
This was an emergency water main repair. repair has been completed. All work was hydro excavated.
RIGHT-OF-WAY
CLOSURE
AREA
TOTAL
DURATION
(Number of Months)
Sidewalk 72 hours +
LF
x
LF
SF
Alley 72 hours +
LF
x
LF
SF
Parking 72 hours +
LF
x
LF
SF
SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTIONC.
Type of Utility Facilities
1. The work in the right of way is on or for the following type of facilities:
❑ telecommunications ❑ cable ❑ power ❑ gas
ix water ❑ sewer ❑ storm
Details • be Completed
1. Does the utility owner have existing overhead infrastructure in the area of work?
Yes
No
X
2.
Will any equipment be added underground or above ground (e.. pedestals, vaults etc.)?
X
If yes, describe:
7
3.
Does the proposed work connect a lot or commercial development with utilities that serve more
than one lot or commercial development?
X
4.
Does the work involve rebuilding or relocating an existing aboveground utility system which
connects a lot or commercial development to an existingunderground common utilitystem?
X
5.
Does the work involve proposed additions to an above round utility system? If es:
X
Are the additions for the purpose of serving new commercial development?
X
Are the additions for the purpose of serving a single-family residential subdivision?
X
Details
of • to be Completed
Does your project involve rebuilding or replacing utility equipment which currently serves more
Yes
No
6.
than one lot or commercial development?
If yes, answer the following questions related to project area, i.e. the actual area in which the
x
roject is proposed:
6a.
Does your project involve wires/cables/lines? If yes:
x
How many are existing? I N/A I How many are to be added?
City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021
6b.
Does your project involve poles? If yes:
X
How many poles are existing in the project area?
What is the height of the existing poles?
How many poles are to be removed?
Are additional poles to be laced?
How many? I I What is the hei ht of the additionalpoles?
6c.
Are any poles to be modified/rebuilt/replaced? If yes:
X
How many? I I What is the height of the poles after?
Describe the modification rebuild:
SECTION C
Traffic Control and Public Safety. Traffic
accordance with City regulations as
required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have
certification verifying completion of the required training in their possession.
Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be
patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS.
Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to
any permit approval.
Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials,
officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever,
foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or
omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose
acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and
specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any
respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the
expiration, revocation, or termination of any resulting permit approval.
Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and
requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to
the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal
Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable
requirements of state and federal law.
Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a
licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by
owner to act on its behalf and have authority to bind the owner to this application.
Fees. The Applicant is responsible p for all ermit � es. r
APPLICANT SIGNATURE: DATE: k U3 I ZO
APPLICANT PRINTED NAME: MakyHeWinger
APPLICANT TITLE: Lead Utility Worker
NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE
City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021
RECEIVED
Jan 13 2025
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM
- FLUSH iHYUKANI I I
0) INTO SIEWER MH 9115 1 9107
1 0 T
?3029 2359205 4—V31 29216H
DI CP
350' 6" Cl
24028-1962
0052-1990
[6-7mr]
)0 236TH ST
R VAULT
RESTORATION LIMITS TO BE DETERMINED
BY CITY ENGINEERING INSPECTOR
OWNER/CONTRACTOR IS RESPONSIBLE FOR
EROSION CONTROL AND DRAINAGE
0
0
n
N
W
CY)
Co
C14
Utility patches shall be combined and full width or half
width overlay will be required depending on the extent
of disturbance. Where utility patches fall entirely within
one travel lane, the overlay shall extend to the
centerline of roadway. Where utility patches extend into
both travel lanes then a full width overlay is required.
OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING
ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY
UTILITIES MAY REQUIRE A SEPERATE PERMIT.
Applicant shall repair/replace all
damage to utilities or frontage
improvements in City right-of-way
per city standards that is caused or
occurs during the permitted project.
ENGINEERING DIVISION
APPROVED AS NOTED
1/31/2025
E
87 DI
C4- V42 FJi
10- Cl
D4-V8
D4-1
9025
T E
00—
C5-119 ALL IN 2" --�' 7�" 10
PVC CASING I I
E f 9120 9118 1 9114 1 9
C14
0
L 901-
Cq
89)
130, IC\,2 1
k' 2j�11
19 1 9108 90
C5-V28
9011
901E
2 3 6
<"
IM :f 23627 9102 901(
LL- 9016
0 0)
LU 0
LO FLUSH INTO SEWER jMH
Co
0 23-iI94
CD
CN 1 28702
37( 23705
E3
2
P BOP�4
<
M
23719--
29716 23720
23
2�
CID—
iL IJ!
I CUD
0
1 F�26 9117 23728
(7 9(
'0
LO 1
on I )AIL
238T
INLET 66 PSI
2" 130 IN VAULT
FOR 3/4- LFM Lr
OPEN AT 66/58 PS11
6" PRvAFM / de
TWO WAY FLOW
AT 66 PSI
/D5-V1
/ C5-115
2403513-1984 10" DI
C5-V33--*',-
IdU coo D5-V17
9228N N c4 9216 NO
IJ
ct
SEE DETAIL A
LrM t
DI .... .... .... :D5 Y6
-5-V7
I- ...-L8"DI 2004-
-.T-
0 65-- 21 D5-20 W
9116 9106 C
9130
D5-V5
NC
0
I L
C
i 1ARV 1 9112
VACANT
—A
L
23824 2&
r
2&
900
VACANT
T
05
00
0 9011
oil
C14
9015
D5-V 16
NC
9
9125 017
-05-V30 9
LO
240TH!. ST��
i 'W -'-ARC)CC
mrq --rqIt- -b-- — 4—
C5-V31 8- DI D7 1 8
C5-V32
�"0 902-2 9016
VACANT T9014
MINIMUM LANE CLOSURE TAPER LENGTH = L (feet)
LANE
WIDTH
Ow
Posted Speed (mph)
25
30
35
40
45
50
55
60
65
70
10
105
150
205
2M
450
S90
550
11
115
165
225
1 295
1 495
SSO
605
660
-
-
12
T25
160
24s
320
540
600
660
70
1 780
$0
MINIMUM SHOULDER TAPER LENGTH = U3 (feet)
SHOULDER
WIDTH
(I4afl
Posted Speed (mph)
25
30
35
40
45
SD
55
6D
65
70
S
40
40
60
9D
120
130
1 150
1 160
1 170
190
1D
40
60
90
90
150
170
1 190
1 200
1 220
240
USE A MINIMUM 3 DEVICES TAPER FOR SHOULDER LESS THEN C.
SIGN SPACING = X (1)
FREEWAYS 6 EXPRESSWAYS 55 !70 MPH
15ari
RURAL HIGHWAYS 6D !65 MPH
Bari
RURAL ROADS 45 155 MPH
Sari
RURAL ROADS I URBAN ARTERIALS 35140 MPH
35D2
RURAL ROADS d URBAN ARTERIALS 25 /30 MPH
RESIDENTIAL L BUSINESS DISTRICTS
2ODi (2)
URBAN STREETS 25 MPH OR LESS
100'i
(T)ALL SPACING MAY BE ADJUSTED TO ACCOMMODA7E INTERCHANGE
RAMPS,AT-GRADE INTERSECTIONS AND DRIVEWAYS.
0TWS SPACING MAY BE REDUCED IN URBAN AREAS TO FIT
ROADWAY CONDITIONS.
CHANNELIZATION DEVICE
SPACING feet
MPH
TAPER
TANDEM
50?D
49
W
35M5
>D
fi0
2SY30
I 2D
40
BUFFER DATA
LONGIMDINAL BUFFER SPACE = B
SPEED (MPH)
I 25
30
35
40
45
50
55
Ii0
65
70
LENGTH (ket)
1 155 1
200
I 25D I
305
I 360
4S
495
1 570
1 645
I 7M
TRANSPORTABLE ATTENUATOR ROLL AHEAD DISTANCE = R
HOST VEHICLE WEIGHT
9MD TO 22000 bl,
HOST VEHICLE WEIGHT
> 22.00D Da
< 6 MPH
4555 MPN
> 55 MPH
< 45 MPH
4555 MPH
> 55 UIPH
100
123'
17Y
71V
tar
1-
la to
z
FCMS
'
O
®
® ®� 6f
® ~— IaGM'
®®®
® WORK aREa
® tANE AHED
CLOSURE
®®0 N
q p
q
SEE
2D SEC ZD SEC
V
N
NOTE 4
FIELD LOCATE 1 MILE i INN
L
B R
tOPi ADVANCE OF LANE CLOSURE SIGHING.
X X
X
ROAD
WORK
e
/
AHEAD
ar
w20-1
>ad-z(L)
6B'
48,
NOTES
RIGHT LANE
1. SEE SPECIAL PRCM61ONS FOR WORK HOUR RESTRICTIONS.
CLOSED
2 EXTEND DEVICE TAPER AT L13 ACROSS SHOULDER.
LEGEND
AHEAD
48'
3. DEVICES SHALL NOT ENCROACH INTO THE ADJACENT LANE
R
TT]NPORARY SIGN LOCATION
K20SR
4. USE TRANSVERSE DEVICES IN CLOSED LANE EVERY IOW(FT)
m
TRAFFIC SAFETY DRUM
(RECOMMENDED).
DDD
SEQUENTIAL ARROW SIGN
SINGLE -LANE
CLOSURE FOR MULTI -LANE
ROADWAYS 20 SPACING FOR THE DOWNSTRFJU6 TAPER SHALL BE
®
TRANSPORTABLE ATTENUATOR
PCMS
PORTABLE CHANGEABLE MESSAGE SIGN
NOT TO SCALE
6. ALL SIGNS ARE BLACK ON ORANGE
FlLE NAN£
S1TA-I R PL $4SMdandaV.IYn
nN Lk_ work M R4Wra
TC+1 Buller
D.D
eda
reoeMTGSd
Washington Silts
Depa7imelTt of Transportation
plot
^" v
TC3
nNN; 3-nt3+ AB
-'
W
FEDATD PROJ.NO.
DATE trims
PLOTT® 1r, llddeB
er
.�
DESIGNED BY
•-wr-
ENT RE13 BY
HECK
�� m
TRAFFIC CONTROL PLAN
REGIONAL ADM.
REVISION
DATE
BY
ENGINEERING DIVISION
APPROVED AS NOTED
dill LVI,, 1.44z 01/31/2025
vv
RECEIVED
Jan 13 2025
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
RECEIVED
Jan 13 2025
CITY DEVELOPMENT
ETSERVI CITY OF EDMONDS MyBuildingPermit.com
DEVELOPMENT SERVICES
DEPARTMENT
Right -of -Way Application #1600339 - Water main repair
Applicant
First Name Last Name Company Name
Marty Henninger Olympic View Water and Sewer District
Number Street Apartment or Suite Number E-mail Address
8128 228th St SW marty@ovwater.com
City State Zip Phone Number Extension
Edmonds WA 98026 (425) 774-7769
Contractor
Company Name
Contractor Unknown
Number Street Apartment or Suite Number
City State Zip Phone Number Extension
State License Number License Expiration Date UBI # E-mail Address
Project Location
Number Street Floor Number Suite or Room Number
City Zip Code County Parcel Number
Associated Building Permit Number Tenant Name
Additional Information (i.e. equipment location or special instructions)_
Work Location
91 st PI W & 238th St SW
Property Owner
First Name Last Name or Company Name
Number Street Apartment or Suite Number
City State Zip
Certification Statement - The applicant states:
I certify that I am the owner of this property or the owner's authorized agent. If acting as an authorized agent, I further certify that I have full power and
authority to file this application and to perform, on behalf of the owner, all acts required to enable the jurisdiction to process and review such application. I
have furnished true and correct information. I will comply with all provisions of law and ordinance governing this type of application. If the scope of work
requires a licensed contractor to perform the work, the information will be provided prior to permit issuance.
Date Submitted: 1/13/2025 Submitted By: Marty Henninger
Page 1 of 2
CITY OF EDMONDS MyBuildingPermit.com
Right -of -Way Application #1600339 - Water main repair
Project Contact
Company Name: Olympic View Water and Sewer
District
Name: Marty Henninger Email: marty@ovwater.com
Address: 8128 228th St SW Phone #: (425) 774-7769
Edmonds WA 98026
Project Type Activity Type Scope of Work
Utility Purveyor Utility Work Disturbance of Surface
Project Name: Water main repair
Description of Work: This was an emergency water main repair. Repair has been completed. All
excavation was hydro excavated.
Project Details
Project Information
Job Number
18
Page 2 of 2