Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
APPROVED ENG2025-0010 ROW PERMIT
RIGHT OF WAY EUC PERMIT PERMIT NUME City of • • . J• •:i 1 11 LM www.edmondswa.gov i Description: ZIPLY - REMOVE 1 BO POLE ISSUED: 02/10/2025 Address: 19206 86TH AVE W EDMONDS WA 98026-6108 EXPIRES: 08/09/2025 rmit Type: RIGHT OF WAY EUC Permit Subtype: STANDARD Parcel Number: 27041800305700 I 11-14111 a i NAME TYPE NAME ADDRESS PHONE APPLICANT KENNETH THOMAS 135 LAKE STREET S SUITE 155, KIRKLAND WA 98033 (509)720-7765 CONTACT ZIPLY FIBER 135 LAKE STREET S SUITE 155, KIRKLAND WA 98033 (509)720-7765 CONTRACTOR BEON CONNECT INC 11716 SE 229TH PL, KENT WA 98031 (253)355-3741 OWNER POWERS MICHAEL & CATHERINE 18427 88TH AVE W, EDMONDS WA 98026-5708 FEE INFORMATION DESCRIPTION AMOUNT PAID CITY TECHNOLOGY FEE - PER PERMIT $49.00 $49.00 ENG - INSPECTIONS-1.1.25 $137.00 $137.00 ROW - STANDARD - 1.1.25 $411.00 $411.00 REQUIREMENTS REQUIREMENT TYPE NOTES TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their posession. RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday - No Exceptions WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the work. INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM 24 HR NOTICE REQUIRED The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit. RELEASED BY: MAJ DATE: 02/10/2025 Printed: Monday, February 10, 2025 12:17:50 PM 1 of 2 RIGHT OF WAY EUC PERMIT PERMIT NUMBE3 City of Edmonds ,...Ave N, Edmonds WA 9:01 11 1 www.edmondswa.gov • • CONDITIONS CONDITION TYPE ALERT RESIDENTS ALERT AFFECTED RESIDENTS AND OR BUSINESSES PRIOR TO WORK START. It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in DAMAGE TO FRONTAGE City right of Ways or Easements to City Standards caused by or occurring during the permitted IMPROVEMENTS project. MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD ESC REQUIREMENTS REQUIREMENTS. Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the HOLD HARMLESS issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT. INSPECTIONS www.mybuildingpermit.com POTHOLING VERIFY CLEAR BORE CROSSINGS. RESTORE LANDSCAPE Restore landscape to like or better conditions Sound or noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on SOUND AND NOISE weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites and activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. All utilities shall be located prior to any excavation. New locates shall be called for if at time of UTILITY LOCATES excavation, original locates are no longer identifiable. INSPECTIONS INSPECTION TYPE DATE RESULT COMPLETE A-1 JOB START X-2 ENGINEERING FINAL** Printed: Monday, February 10, 2025 12:17:50 PM 2 of 2 RECEIVED Lti�y of ED%�O� ANC. 1 g90 SECTION A RIGHT OF WAY CONSTRUCTION PERMIT APPLICATION Complete and submit this Application in accordance with the Submittal Requirements outlined in Right -of -Way permit Handout E63. Jan 21 2025 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT If any field is not applicable to your project, write "N/A" instead of leaving blank. All fields required. Incomplete Applications will be denied. General• Project Name W0950435 Site Address or if no site address use Property Address at NW corner of project area: 19206 86th Ave W, Edmonds, WA 98026 Associated Permits: BLD N/A PLN N/A ENG N/A Owner and Entity Holdingapplicable) Name of Company Northwest Fiber, LLC, dba Ziply Fiber Franchise Ordinance No: Point of Contact Kenneth Thomas TitleJoint Use Program Manager Address 135 Lake Street S,Suite 155 Kirkland, WA 98033 City Kirkland State WA Zip 98033 Phone 509-720-7765 Email kenneth.thomas@ziply.com Contractor and Authorized Agent of • Name of Company geon Connect • - below) C• • • During Construction Primary Name Agent Name Alex Vasilcenco Title Title Mobile Address 11716 SE 229th PI Email City Kent I State WA Zip 98031 Secondary Name Phone 253-355-3741 Title Email Alex@beonconnect.com Mobile City of Edmonds Business License No: 604691807 Email State License No: BEONCC1799LT 0 Contractor verifies it is currently bonded Contractor verifies it currently has general liability insurance NOTE: ECDC 18.6o.02o requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city engineer. ❑ Multifamily residential ❑ Commercial ❑ City project ❑ Single family residential subdivision ❑ Single family -other ❑ Industrial ❑ Demo and rebuild or from vacant land? ❑ Other, please specify: ❑ Utility Franchise Work associated with development (check one of the above boxes as well) ❑ Traffic Control Only (no associated development) City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021 Utility Franchise Work (no associated development) Include an overall narrative description of the proposed work. Be specific and detailed: Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc. Include whether this is construction, maintenance, or repair. Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for underground utilities, etc.) SNOPUD Replaced 1 Pole. Ziply needs to transfer our existing aerial equipment from the old Pole to the new one and remove the old pole. Pole contains Risers that will need to be relocated 5' to the new pole. That will be open trench at 36" Depth. The Old pole will be removed and gravel will be backfilled/compacted. LOCATED @ 47.825020,-122.349622 RIGHT-OF-WAY CLOSURE AREA TOTAL DURATION (Number of Months) Sidewalk 72 hours + LF JxJ LF SF Alley 72 hours + LF JxJ LF SF Parking 72 hours + LF JxJ LF SF SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTION C. 1. The work in the right of way is on or for the following type of facilities: A telecommunications ❑ cable ❑ power ❑ gas ❑ water ❑ sewer ❑ storm Details 1. Does the utility owner have existin overhead infrastructure in the area of work? Yes 2. Will any equipment be added underground or above ground (e.g. pedestals, vaults, etc.)? No If yes, describe: 3. Does the proposed work connect a lot or commercial development with utilities that serve more than one lot or commercial development? N/A 4. Does the work involve rebuilding or relocating an existing aboveground utility system which connects a lot or commercial development to an existing underground common utility system? N/A 5. Does the work involve proposed additions to an aboveground utility system? If es: N/A Are the additions for the purpose of serving new commercial development? N/A Are the additions for the purpose of serving a single-family residential subdivision? N/A Details of Work to be Completed ®i 6. Does your project involve rebuilding or replacing utility equipment which currently serves more than one lot or commercial development? rn 0 City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021 If yes, answer the following questions related to project area, i.e. the actual area in which the project is proposed: N/A 6a. Does your project involve wires/cables/lines? If yes: N/A How many are existing? I N/A How many are to be added? I N/A 6b. Does your project involve poles? If yes: yes How many poles are existing in the project area? 1 What is the height of the existing poles? 45 How many poles are to be removed? 1 Are additional poles to be laced? N/A How many? I N/A I What is the height of the additionalpoles? N/A 6c. Are any poles to be modified/rebuilt/replaced? If yes: How many? 11 1 What is the height of the poles after? 45 Describe the modification rebuild: 1 POLE FROM THE 1960S Was Replaced by SNOPUD SECTION C Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their possession. Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS. Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to any permit approval. Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials, officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever, foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the expiration, revocation, or termination of any resulting permit approval. Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable requirements of state and federal law. Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by owner to act on its behalf and have authority to bind the owner to this application. Fees. The Applicant is responsible for all permit fees. APPLICANT SIGNATURE: Z!!��2ztw-, DATE: 01/10/2025 APPLICANT PRINTED NAME: Kenneth Thomas APPLICANT TITLE: Joint Use Program Manager NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021 SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM CONTACTS PERMIT LEAD: W 09 5043 5 KENNETH THOMAS PHONE ONE NUMBER: 509-720-7765 EMAIL: kenneth.thomas@ziply.com PROGRAM MANAGER: NE Corner of Address: 19206 86th Ave W, Edmonds, WA 98026 NAME: MICHAEL MILLER EMAIL: michael.miller@ziply.com VICINITY ^ SCOPE OF WORK TIMLY OTHY NAME::TTIMOTHY HESSELMAN EMAIL: timothy.hesselman@ziply.com AERIAL CONSTRUCTION UNDERGROUND CONSTRUCTION Brackett's THE BOWL Landing OF EDMONDS TRANSFER FROM OLD POWER POLE(S) TO HAND DIGNAC TRUCK TRENCH 3' PAGE INDEX Shoreline _F, Edmonds -Kfngstc�"s, Sanctuary... NEW POLE(S). FROM OLD POLE TO MOVE EXISTING PAGE ID DESCRIPTION KinSstcnFery `-T r � <� RISER TO NEW POLE. c drrxnc' C COVER p Edmonds Dayton St Main St BUILDING CONSTRUCTION SITE CONSTRUCTION Anthony's ©S���nds N NOTES HomePort Edmonds ,z arsh Walnut St P PLAN Marina Edm a' Beach Park Park � Bcwdo;� wallwa City CS CONSTRUCTION STANDARD PERMITS EASEMENTS ES Erosion and sedimentation control plan toa PINE PARK 1 CITY NEIGHBORHOOD 3. v 2201h St SW JURISDICTION STAMP HERE a' OVERVIEW ^ GENERAL INFO POLE(S) REPLACED, ZIPLY TO TRANSFER EXISTING EQUIPMENT TO NEW POLE(S) AND REMOVE OLD POLE(S). " " �,r,r����A' - C COVER ,;asr._,;,,,,..r�rar,�•, •a sJ Y t •f , ,, �-� { U.Fa1J.Jll'.A.S C•U •. �: o REVISIONS REVISION: REV DATE: OWNER/CONTRACTOR IS RESPONSIBLE FOR 1/10/25 INITIAL SUBMITTAL - d•, .: EROSION CONTROL AND DRAINAGE R1 . . :. WE _ • for I R2 R3 ''' - ,,,{ • ,� �" >0 : Prepared for: KENNETH THOMAS W0950435 -� y NE Corner of Address: 19206 86th Ave W, Edmonds, t AF t - 1� + {2( ►1 fiberWA 98026 YA 12fit ,' OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY UTILITIES MAY REQUIRE A SEPERATE PERMIT. Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per city standards that is caused or occurs during the permitted project. ENGINEERING DIVISION APPROVED AS NOTED jdl "J,,.,44z 01 /31 /2025 VV RECEIVED Jan 21 2025 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT Legend r y -� '? f.lr s,• _.. POWER POLE LOCATION THAT ZIPLY x� }- <: v _ ,' .'4'� NEEDS TO TRANSFER THEIR ij b EQUIPMENT FROM OLD POLETONEWONEAND i, ` i t r �• �' �+•afi,. REMOVE OLD POLE. „ Task identifier (If not A present on map then all 4- poles are utilizing task 1.) £EY3�0 �3 Fdv7 � £fFib f9Q �C.7 £03�7 ©0 F�7 9 9fk3oJ r - i , y PLAN P1 viEw REVISIONS REV DATE: REVISION: ,�•�,�- :f - may. 1/10/25 INITIAL SUBMITTAL RI +c_n 't ✓. --�' PLSS = TRSQ: T27N R04E 18 NESW` ' - Rz KENNETHTHOMAS W0950435 DETAILS NE Corner of Address: 19206 86th Ave W, Edmonds, WA 98026 1 Delash Spans so the Slack can be used for riser CD enough Storage from the fiber/Telco located O moves here 2 Spans E to complete the riser move. z i ply, OPOLE REPLACED, ZIPLY TO TRANSFER EXISTING EQUIPMENTTO NEW POLE AND REMOVE OLD POLE fi be r POLE(S) REPLACED, ZIPLY TO TRANSFER EXISTING EQUIPMENT TO NEW POLE(S). RECEIVED Jan 21 2025 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT r City of Edmonds EDMONDS GIS SHOWS NO CONFLICT WITH EXISTING UG UTILITIES 984_W� Mer®Mr_A AI.ry_Sph— ofEd...ds DETAILS OPOLE(S) REPLACED, ZIPLYTO TRANSFER EXISTING EQUIPMENTTO NEW POLE(S) AND REMOVE OLD POLE(S). 3 FT OF TRENCHING REQUIRED TO MOVE EXISTING RISER. r� l 3 v -Fa Legend torn —Banns Starr Mach d.. � MBMIo� • en F-Ift.s cPlwrc • .dliW-- cr..k. P.duty U...offDs, rs. tone Di- 0 St• 9., LID Hyd-n s « ECErman® 6 Pw Vw— p CPEH C—E. BI•woffs ■ lrlN.c PIYir■s ,., yEffaP 1: 379 IENE Legend POWER POLE LOCATION THAT ZIPLY NEEDSTO TRANSFER THEIR EQUIPMENT FROM OLD POLE TO NEW ONE AND REMOVE OLD POLE. Trenching via hand dig or Vaccum truck. OTask identifier (If not present on map then all poles are utilizing task 1.) P2 I PLAN VIEW REVISIONS REV I DATE: I REVISION: KENNETH THOMAS W0950435 NE Corner of Address: 19206 86th Ave W. Edmonds. WA 98026 zipby POLE(S) REPLACED, ZI PLY TO TRANSFER EXISTING EQUIPMENTTO NEW POLE(S). RECEIVED Jan 21 2025 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT City of Edmonds EDMONDS GIS SHOWS NO CONFLICT WITH EXISTING UG UTILITIES A New Pole 7 I j Old Pole _' ■ mn_wa, nn.r®mr_aa.m.rv_sah— f ed—d. DETAILS Legend POWER POLE �4 LOCATION THAT ZIPLY NEEDSTO TRANSFER THEIR EQUIPMENT FROM OLD POLE TO NEW ONE AND Legend REMOVE OLD POLE. term a..h s.da. 0— TER Storm M.nhd.. akr.airc�e. cdv.rt' .drev amr. F.dll I ...... N..,I — arm Dkd 0 Stermwt.r VD Xydmta Valv.as p v[d Z.. ® k�aaak. F.k I*UILIvnvvt o�E.aP Al- 1: 379 PLSS = TRSQ: T27N R03E 26 NENE OPOLE(S) REPLACED, ZIPLYTO TRANSFER EXISTING EQUIPMENT TO NEW POLE(S) AND REMOVE OLD POLE(S). 3 FT OF TRENCHING REQUIRED TO MOVE EXISTING RISER. Trenching via hand dig or Vaccum truck. OTask identifier (If not present on map then all poles are utilizing task 1.) P3 I PLAN VIEW REVISIONS REV DATE: REVISION: KENNETH THOMAS W0950435 NE Corner of Address: 19206 86th Ave W. Edmonds. WA 98026 zipby POLE(S) REPLACED, ZIPLYTO TRANSFER EXISTING EQUIPMENTTO NEW POLE(S). RECEIVED Jan 21 2025 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT Dm Z OM 0 Z U 0 Z < w O— m� Iv Z 0 Iv Cn Ct N v m ` rn mn m0� /� [ A M° �Zm rn � R ZXz _ <N O < a m rn v SIGN SPACING = X (1) RURAL ROADS & URBAN ARTERIALS 35-40 MPH 350'+/- RURAL ROADS & URBAN ARTERIALS 25-30 MPH 200'+l- (2) RESIDENTAL & BUSINESS DISTRICTS URBAN STREETS 25 MPH OR LESS 100'+/- (2) (1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT -GRADE INTERSECTIONS AND DRIVEWAYS. (2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. ALL SIGNS ARE 48" X 48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED ROAD C WORK AHEAD W20-1 SHOULDER CLOSURE TAPER LENGTH = L/3 fe W1DTHSHOULDER IDTH (feet) p SPEED (MPH) 20 25 30 35 40 6 L/3 (feet) 40 40 40 60 60 10 40 40 60 90 1 90 FOR SHOULDERS LESS THAN 6', USE 3 DEVICES MINIMUM MAXIMUM CHANNELIZATION DEVICE SPACING (feet) MPH TAPER TANGENT 35-40 30 60 20-30 20 40 X X L/3 LEGEND b SIGN LOCATION 0 0 o CHANNELIZING DEVICES PROTECTIVE VEHICLE -RECOMMENDED LONGITUDINAL BUFFER SPACE = B SPEED (MPH) 20 25 30 35 40 LENGTH (feet) 115 155 200 250 305 PROTECTIVE VEHICLE ROLL AHEAD DISTANCE = R NO SPECIFIED DISTANCE REQUIRED. STRATEGICALLY POSITION WORK VEHICLE TO PROTECT WORK CREW. STATIONARY TRANSPORTABLE ATTENUATOR ROLL AHEAD DISTANCE = R HOST VEHICLE WEIGHT R 9,900 TO 22,000 Ibs. 100' 22,001+ Ibs. 74' 0 EI B R �60' No Parks to be placed at least 48 hours in advance to cover the cone zone NOTES 1. Address pedestrian control through or around the work area. 2. When used, device spacing for the downstream taper should be 20' O.C. Pedestrians will be accommodated through the work zone TYPICAL SHOULDER CLOSURE - LOW SPEED (40 MPH OR LESS) TC P 9 S a rt UNDERGROUND TYPICALS 3' HMA (CL }-) (MATCH —\ PANEL WIDTH PER PLAN EX. IF GREATER) 12- 12' EX ASPHALT SURFACE MIN, , LMIN. �11 11 * HMA (CL }" OR 1) - 6' MIN. COMPACT MINERAL AGGREGATE TYPE 2 • I � 3• Mill C061PACTFD Rf+CKFILL t- ---� 6" SAND COVER • I 8' 6" SAND BEDDING — • 12' 24' TYPICAL ASPHALT TRENCH DETAIL SCALE:NTS --1 6'-24" `-- EXISTING SURFACE - NATIVE MATFRIAI 36' _ VJARNING TAPF (12- ABOVE CONDUIT) 1z- BACKFILL - COMPACTED EARTH ,§ 905C (4") r a- _ — PROPOSED CONDUIT (36- MIN DEPTH) T— 4' BEDDING - COMPACTED EARTH C 90% (a') TYPICAL TRENCH IN SOIL DETAIL SCALE:NTS 3' HMA (CL }-) (MATCH EX. IF GREATER) EX CONCRETE TYPICAL CONCRETE TRENCH DETAIL 48' 12191 REPLACE EX CURB PER STD PI AN 41 OC J COMPACT MINERAL 2EGATE TYPE 2 'ACTED BACKFILL NO COVFR ND BEDDING BODY SPECIFICATIONS SPECIFICATION PROOFLOAD PRODUCTS Cover Weight (Splilll • ) 76 Ibs [34 kg] AMERICAS STANDARDS Pa Weight 274lbs [124kg] Assem6ledWeight 426lbs [193kg] ANSIISCTE 77 TIER 22 33,7501bf(150kN) Q SCALE:NTS VAULT DETAIL CS CONSTRUCTION STANDARD REVISIONS REV DATE: REVISION: 1/10/25 INITIAL SUBMITTAL R1 R2 KENNETH THOMAS W0950435 NE Corner of Address: 19206 86th Ave W, Edmonds, WA 98026 Company Logo Here RECEIVED Jan 21 2025 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT TYPICAL DETAIL — A POLE ARRANGEMENT FOR AERIAL TO BURIED CABLE 4' FIBER AERIAL TYPICALS TYPICAL DETAIL — B POLE ARRANGEMENT FOR REPEATER OR HANDHOLE LOCATION CABLE LASHING J 11-17 X � 1.2•• WIRE CLAMP I I I AN STAINLESS STEEL LASHER CABLE SUPPORT AN/ 1/2' SPACER CAL/IION TAG J FIBER OPTIC CABLE BUCK IN COLOR CABLE CLAMP � POLE TOP NEW CABLE U- GROUND LEVEL GROUND LEVEL STEEL CONDUIT TO 42" R•rHAND. �t^ STEEL BEND (38" RA TYPICAL DETAIL — D USE APPROPRIATE PVC TO STEEL COUPLER TYPICAL DETAIL — G 3- JOINING 045 LASHING WIRE REMOVE ANY SLACK IN THE LASHING FORM THE LASHING WIRE AROUND THE WIRE BY MAINTAINING A PULL ON THE STRAND AND PLACE IT BELOW THE STUD ARE AND TAPPING THE STRAND AND BETWEEN THE SECOND WASHER SHARPLY. THEN FORM THE 'MITE OVER AND STUD SHOULDER. THE SKID AND TOM THE NUT. CUT THE FREE END OF TIE LASHING WIRE OFF 3/4" BEYOND THE END OF THE CLAMP. FORMING WIRE OVER SKID OF CLAMP FORMING LASHING WIRE AROUND STRAND (X^MIN. OF 20 TIMES THE CABLE DA) ME POLE TOP NEW MDT. V TONOUIT QUARTER ON POLE EXPOSED O TRAM —WAY. CONDUITS WITH DUCT PLUGS AND SIMPLEX PLUGS TYPICAL DETAIL — E SUSPENSION STRAND — PULL AWAY FROM POLE — 5 FEET OR MORE POLE TOP CABLE SUSPENSION BOLT CURISUSPENSION 5/8" WASHE CORNER CLAMP TYPICAL DETAIL — H LASHING WIRE GRIP AND CLAMP C LASHING WIRE GRIP r AUZD ON STRAND D CABLE LASHING CLAMP TYPICAL DETAIL — C TYPICAL CABLE & HARDWARE INSTALLATION (6.6M STRAND \ 10M STRAND) GROUND WIRE CLAMP GABLE LAMING WIRE CLAMP /.BM OR 10M STRAND STAINLESS STEEL WSk"` CABLE SUPPORT AND 1/2" SP CAUTION TAG FIBER OPTIC CABLE ORANGE IN COLOR POLE /B INSULATED COPPER WIRE AND 10'K3/4" COPPER C GROUND LENS GROUND ROD GROUND EVERY I/4 MILE AT STRAND TO SHEATH BOND LOCATION TYPICAL DETAIL — F CAB 2 GUY HOOK TO CABLE SPACER NUT i— GUY 1ST LASHING WIRE C LASHING SHOULDER 2ND LASHING WIRE WIRE GRIP CLAMPM NUT TERMINATING NUT THREADED STUD 1ST WASHER GROOVED PLATES 2ND WASHER NOTE: LASHING WIRE SHOULD FOLLOW LAY OF STRAND WIRES UNDER TYPICAL ARRANGEMENT OF CABLE LASHER AND CABLE GUIDE TYPICAL DETAIL — I SUSPENSION STRAND — PULL TOWARD POLE — LESS THAN 5 FEET CURVED WASHER CABLE SUSPENSION BOLT e 2 GUY NOOK B^ SPACER NUT1 I CABLE SUSPENSION CLAMP GUY room KI/W wws below. Call before you dig. CS2 CONSTRUCTION STANDARD REVISIONS REV DATE: REVISION: 1/10/25 INITIAL SUBMITTAL R1 R2 R3 KENNETH THOMAS CURVED WASHER 5/1"cABLE SUSPENSION W0950435 BOLT NE Corner of Address: 19206 86th Ave W, Edmonds, WA 98026 Z'ply fiber ;ECEIVED Jan 21 2025 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT Filter for Storm Drain E S 1 EROSION AND SEDIMENTATION CONTROL PLAN REVISIONS REV DATE: REVISION: 1/10/25 INITIAL SUBMITTAL R1 R2 R3 KENNETH THOMAS W0950435 NE Corner of Address: 19206 86th Ave W, Edmonds, WA 98026 z 1 piy fiber RECEIVED Jan 21 2025 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT 3" - 5" (75-125mm) 8" - 10" Dia. _ (200-250mm) 1" x 1"Stake . (25 x 25mm) - - Spacing de on soil type slope steep Straw Waddle g` - 4 -_ -ap- Sediment, organic matter, and native seeds are capture behind the rolls_ Overlap adjacent rolls 12" behind one another E EROSION AND SEDIMENTATION CONTROL PLAN REVISIONS REV DATE: REVISION: 1/10/25 INITIAL SUBMITTAL R1 R2 R3 KENNETH THOMAS W0950435 NE Corner of Address: 19206 86th Ave W, Edmonds, WA 98026 Z 1 pY fiber RECEIVED Jan 21 2025 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT IS, City of Edmonds Site Plan For Catch Basins & Straw Wattles .. AN \r ' 22_Aer... Legend L Location for Catch R -- Basin Filter. Location for Straw Wattles. RECEIVED Jan 21 2025 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT RECEIVED Jan 21 2025 DEVELOPMENT MEN° S°R° CES CITY OF EDMONDS MyBuildingPermit.com DEPARTMENT Right -of -Way Application #1599816 - W0950435 Applicant First Name Last Name Company Name Kenneth Thomas Ziply Fiber Number Street Apartment or Suite Number E-mail Address 135 Lake Street S Suite 155 kenneth.thomas@ziply.com City State Zip Phone Number Extension Kirkland WA 98033 (509) 720-7765 Contractor Company Name BEON CONNECT INC Number Street Apartment or Suite Number 11716 SE 229TH PL City State Zip Phone Number Extension KENT WA 98031 (253) 355-3741 State License Number License Expiration Date UBI # E-mail Address BEONCC1799LT 6/30/2025 FB4B91 RB7 Alex@beonconnect.com Project Location Number Street Floor Number Suite or Room Number City Zip Code County Parcel Number Associated Building Permit Number Tenant Name Additional Information (i.e. equipment location or special instructions)_ Work Location N of 19206 86th ave w Property Owner First Name Last Name or Company Name Number Street Apartment or Suite Number City State Zip Certification Statement - The applicant states: I certify that I am the owner of this property or the owner's authorized agent. If acting as an authorized agent, I further certify that I have full power and authority to file this application and to perform, on behalf of the owner, all acts required to enable the jurisdiction to process and review such application. I have furnished true and correct information. I will comply with all provisions of law and ordinance governing this type of application. If the scope of work requires a licensed contractor to perform the work, the information will be provided prior to permit issuance. Date Submitted: 1/10/2025 Submitted By: Kenneth Thomas Page 1 of 2 i CITY OF EDMONDS MyBuildingPermit.com Right -of -Way Application #1599816 - W0950435 Project Contact Company Name: Ziply Fiber Name: Kenneth Thomas Email: kenneth.thomas@ziply.com Address: 135 155 Lake Street S Suite Phone #: (509) 720-7765 Kirkland WA 98033 Project Type Utility Purveyor Activity Type Utility Work Scope of Work Disturbance of Surface Project Name: W0950435 SNOPUD Replaced 1 Pole. Ziply needs to transfer our existing aerial equipment from the old Description of Pole to the new one and remove the old pole. Pole contains Risers that will need to be Work: relocated 5' to the new pole. That will be open trench at 36" Depth. The Old pole will be removed and gravel will be backfilled/compacted. LOCATED @ 47.825020,-122.349622 Project Details Project Information Job Number W0950435 Page 2 of 2