Loading...
ENG2022-0536 CANODCity of Edmonds Critical Area Notice of Decision Applicant: /� (.� Property Owner: ! Critical Area File #: �Z a Z _ ,-- Permit Number: XV6-- ,-)fl Site Location: j Q Q( �U S Parcel Number: Z-7 0 r Project Description:prct (n 4ro ❑ Conditional Waiver. No critical area report is required for the project described above. 1. There will be no alteration of a Critical Area or its required buffer. 2. The proposal is an allowed activity pursuant to ECDC 23.40.220, 23.50.020, and/or 23.80.040. 3. The proposal is exempt pursuant to ECDC 23.40.230. ❑ Erosion Hazard. Project is within erosion hazard area. Applicant must prepare an erosion and sediment control plan in compliance with ECDC 18.30, Critical Area Report Required. The proposed project is within a critical area and/or a critical area buffer and a critical area report is required. A critical area report has been submitted and evaluated for co pliance with the following criteria pursuant to ECDC 23.40.160: 1. The proposal minimizes the impact on critical areas in accordance with ECDC 23.40.120, Mitigation sequencing; 2. The proposal does not pose an unreasonable threat to the public health, safety, or welfare on or off the development proposal site; 3. The proposal is consistent with the general purposes of this title and the public interest; 4. Any alterations permitted to the critical area are mitigated in accordance with ECDC 23.40.110, Mitigation requirements. 5. The proposal protects the critical area functions and values consistent with the best available science and results in no net loss of critical functions and values; and 6. The proposal is consistent with other applicable regulations and standards. ❑ Unfavorable Critical Area Decision. The proposed project is not exempt or does not adequately mitigate its impacts on critical areas and/or does not comply with the criteria in ECDC 23.40.160 and the provisions of the City of Edmonds critical area regulations. See attached findings of noncompliance. pf-If Critical Area Decision. The proposed project as described above and as shown on the attached site plan meets or is exempt from the criteria in ECDC 23.40.160, Review Criteria, and complies with the applicable provisions of the City of Edmonds critical area regulations. Any subsequent changes to the proposal shall void this decision pending re -review of the proposal. ❑ Conditions. Critical Area specific condition(s) have been applied to the permit number referenced above. See referenced permit number for specific condition(s). Notice on Title. Critical area notice on title recorded under AFN � 2 %o (t� Z S-� Approved with updated geotech 2- letter 11/1/24, lr M. Clugston Reviewer Signature Date Appeals: Any decision to approve, condition, or deny a development proposal or other activity based on the requirements of critical area regulations may be appealed according to, and as part of, the appeal procedure, if any, for the permit or approval involved. Revised 1112912016 RESU B panGEC) Oct 252024 INCORPORATED CITY OF EDMONDS Jeotechnical & Earthquake DEVELOPMENT SERVICES Engineering Consultants DEPARTMENT October 25, 2024 File No. 02-063 Ms. Elana Shippen 18101 Sunset Way, Edmonds, WA 98026 Subject: Impact Review of Drainage Improvements Plan Review Comments #4 10/3/2024 Permit Number ENG2022-0536 18101 Sunset Way Edmonds, Washington Dear Elana: As requested, this letter presents our assessment of the proposed drainage improvements at your house at 18101 Sunset Way in Edmonds, prepared by CG Engineering. This letter is in response to the City of Edmonds Plan Review #4, dated October 3, 2024. Item 17: Review #4 10/3/2024 — Comment kept for refence. Provide an update letter as directed. Ref. Review #3 4/30/2024 and Review #2 12/28/2023. Both stating that updated letters from the Geotechnical Engineer approving the updated proposed TESC, stormwater management system and/or ground disturbance. We have reviewed the updated plans dated October 25, 2024, and, in our opinion, the proposed TESC measures will adequately protect against the release of soil material from the construction site. We have also reviewed the proposed stormwater management system and, in our opinion, if constructed in accordance with design plans, the system will protect critical areas against uncontrolled release of stormwater or ground disturbance. Item 1 under the section titled "Specific Comments" requires a letter from the Geotechnical Engineer addressing the impacts of this specific proposed system to the subject site, as previous reports addressed systems with different configurations. We have reviewed the current proposed configuration regarding potential impacts of the drainage improvements on the Landslide Hazard and Erosion Hazard area identified on your property by the City of Edmonds in their Critical Area Determination (CRA2022-0115) letter dated August 17, 2022. We have 3414 NE 55 h Street Seattle, WA 98105 (206)262-0370 Proposal for Geotechnical Engineering Services 18101 Sunset Way, Seattle, WA October 25, 2024 reviewed CG Engineering's Detention and Drainage plan which shows a 36 inch CMP detention vault, 31 feet in length, located 8 feet off of and parallel to the lower level patio, and drainage collection lines for roof and driveway drainage. The outfall from the detention vault will consist of 58 feet of 6-inch PVC drain line routed to a catch basin located along the eastern property in a 5-foot utility easement, per plan map. Based on the site plans, the closest facility approach to the steep slope hazard area is at the west end of the retention vault, which is a minimum of 20 feet from the top of the steep slope area. Accordingly, the proposed improvements do not fall within the hazard area or the 10-foot buffer area per 23.80.020.13 of the Edmonds Municipal Code. Based on our boring PG-3, drilled in the area of the planned improvements, the underlying soils are dense and stable, and the impact of the construction excavations will be minimal. In our opinion, as long as the improvements are located as shown on CG's plans, the risk of impact to the Landslide and Erosion Hazard area is low. Sincerely, Stephen H. Evans, L.E.G. Senior Engineering Geologist W. Paul Grant, P.E. Principal Geotechnical Engineer 02-063 18101 Sunset Way Drainage Improvements Review 2024-rev 1.doc 2 PanGEI RESUB Aug 16 2024 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT : --- ---------+ Reviewed by City of Edmonds Planning Division ; l--------------' August 13, 2024 File No. 02-063 Ms. Elana Shippen 18101 Sunset Way Edmonds, WA 98026 Subject: Geotechnical Engineering & Critical Areas Report Drainage Improvements 18101 Sunset Way Edmonds, Washington Dear Elana, PmGE0 P O R A T E D Geotechnical & Earthquake Engineering Consultants As requested, PanGEO Inc. completed a geotechnical engineering and critical areas report to assess the impacts of the planned drainage improvement project at your residence at 18101 Sunset Way on identified potential geological hazardous areas, in accordance with EDCD 23.80.050. Our study was performed as authorized on May 8, 2024. Our scope of work included reviewing our previous reports for your property, City of Edmonds Correction Notices, and the civil engineering plans developed by CG Engineering, from which we developed the conclusions and recommendations presented in this report. SITE AND PROJECT DESCRIPTION Your property is located between Sunset Way and Olympic View Drive in Edmonds, Washington (see Figures 1 and 2). Your one-story house, which has a daylight basement, was constructed in 1973 on your 0.27-acre parcel. The property is roughly trapezoidal in shape, oriented with the main axis southwest to northeast (see Figure 2). The site slopes gently down from Sunset Way to a relatively level backyard area, then slopes steeply down to Olympic View Drive about 30' below. The northern property boundary is located mid -slope. 3213 Eastlake Avenue East Suite B Seattle, WA 98102-7127 (206)262-0370 www.pangeoinc.com Elana and Matthew Shippen Drainage Improvements - 18101 Sunset Way, Edmunds, WA August 13, 2024 Based on our review of CG Engineering civil engineering plans , dated 12/06/2023, we understand that you intend to renovate the existing drainage system at the site, including all roof, footing and pavement drains. Previously, all drains discharged into the backyard area, some into drainage pipes with uncertain discharge points, some into pipes that were known to be obstructed. Renovation plans call for all drains to be collected into a detention system located approximately 8 feet north of the existing patio slab. The outflow from the 36-inch diameter N- 12 detention pipe will run east through a 6-inch diameter PVC pipe to an existing catch basin situated on a City of Edmonds storm drain easement that is located along the east property boundary. GEOLOGICALLY HAZARDOUS AREAS The bank along the north side of the property above Olympic View Drive has been identified as a Geologically Hazardous Area, which has been mapped as a landslide hazard and erosion hazard area by the City of Edmonds. The limits of the landslide hazard area, with buffer, is shown on the revised project survey plans, dated 08/12/2024. There does not appear to be any other hazards with potential to be affected by the project, mapped within 200 feet of the project area. SUBSURFACE EXPLORATIONS Various geotechnical investigations have been conducted for your parcel, including PanGeo's 2018 subsurface investigation that included 3 borings (PG-1 to PG-3) which were drilled at the locations shown on Figure 2. Two of these borings were drilled using a hand portable, 4-inch diameter hollow stem auger Acker drilling equipment owned and operated by CN Drilling of Shoreline, Washington on March 30, 2018. The borings were advanced to depths of 21.5 and 21.0 feet below the existing ground surface, respectively. As the Acker borings encountered difficult drilling conditions and could not reach the desired depth, a third boring (PG-3) was drilled on May 24, 2018, using a small track mount RTC 60 drill operated by Boretec, Inc., of Valleyford, Washington. This boring was advanced to a depth of 35 feet below surface. An engineering geologist from our firm was present during drilling to field classify and log the materials recovered from the borings. Soil sampling was conducted in the borings in accordance with Standard Penetration Test (SPT) split spoon sampling procedures which consist of driving a 2-inch diameter split steel sampler into the soil beyond the auger bit a distance of 18 inches, 02-063-18101 Sunset Way Drainage 2024.08.12 - wpg .doc2 PanGEO Elana and Matthew Shippen Drainage Improvements - 18101 Sunset Way, Edmunds, WA August 13, 2024 using a 140-pound safety hammer falling 30 inches. The hammer was operated using a rope and cathead pulley mechanism. The number of blows for each 6-inch penetration of the sampler was recorded. The total number of blows for the last 12 inches of penetration is called the N-value, which is a relative indicator of the density of granular soils and the consistency of cohesive soils. Summary logs of the borings are presented in Appendix A. The soils encountered in the borings were described and field classified in general accordance with the symbols and terms outlined in Figure A-1, followed by the summary logs in Figures A-2 to A-4. SUBSURFACE CONDITIONS SOILS The Geologic Map of the Edmonds East and part of the Edmonds West Quadrangles (Minard, 1983) shows the surficial geologic units in the area of the site to consist of Vashon Till (Qvt), Vashon Advanced Outwash (Qva), Transitional Beds (Qtb), and Olympia Gravels (Qog). Till (Qvt) is characterized as a compact, heterogeneous mix of silt, sand, gravel, clay, cobbles and boulders, and is very dense where undisturbed. The advanced outwash (Qva) is described as dense to very dense where undisturbed, well -sorted sand and gravel with silt beds and lenses. The Transitional beds (Qtb, also called Lawton Clay) are described as very stiff to hard, laminated to massive, silt and clayey silt. Minard (1983) uses the term "transitional beds" as it includes non -glacial strata at the base of the unit. The Olympia Gravel (pre -Fraser glaciation) strata consist of very dense, stratified sand and gravel, that may be locally weakly oxidized. The site borings did not encounter glacial till, though in PG-3 we did find a thin surficial layer of loose, red -brown silty sand that is likely a residual melt -out till material. The borings advanced at the site generally encountered fill or colluvium, underlain by a loose to dense, fine-grained soil that we interpreted as Transitional Bed strata, overlying medium dense to very dense sand and gravel which we interpret as Olympia Beds. The following provides our interpretations of the soil conditions underlying your property. The subsurface units are graphically depicted in Figure 3 and the location of the profile is shown on Figure 2. 02-063-18101 Sunset Way Drainage 2024.08.12 - wpg .doc3 PanGEO Elana and Matthew Shippen Drainage Improvements - 18101 Sunset Way, Edmunds, WA August 13, 2024 Fill / Colluvium Deposits: The borings encountered disturbed material at the top of the slope, which we interpret as fill from the basement excavation. The fill encountered in borings PG-1 and PG-2 contained layers of loose silt and fine to medium sand. The soil is characterized by a mixed texture, which contains some organics and occasional angular soil clasts. The fill also included medium dense, very dark gray to black, silty gravel with sand which appeared like degraded asphalt, but lacking petroleum odors or other apparent organic material. While the origin of this material is unknown, it is likely derived from the excavation for the daylight basement. The fill extends to a depth of approximately 4 feet near the top of the slope. Transitional Beds: The in -situ native soil consists of medium dense to dense, gray brown, clayey silt with occasional gravel. The transitional bed extends roughly 14 feet below the surface at the top of the slope. Olympia Beds: The deepest unit penetrated consisted of medium dense to very dense, fine to coarse sand with gravelly beds. The unit varies from laminated to medium bedded and contains a trace to some silt in the form of a matrix. The unit shows finer grained and coarser grained bedding and is moderately weathered. Based on the weathering and the grain size distribution, we interpret this unit as Olympia Beds. GROUNDWATER Groundwater was not encountered during drilling, but some thin layers of soil encountered in the test borings indicated the potential for seasonal perched lenses of water. A standpipe piezometer was installed in boring PG-3 where a well screen was placed between depths of 20 and 35 feet. The piezometer was sounded on July 5, 2018, and was found to be dry. Water levels may be expected to vary seasonally and will be highest in March or April. Previous experience with the site and our reconnaissance along the base of the bank above Olympic View Drive has indicated that groundwater seeps are generally absent along Olympic View Drive. GEOTECHNICAL EVALUATION OF THE PLANNED PROJECT To help assess the potential impacts of the planned project on the landslide and erosion hazard area, we have developed a profile of the interpreted soil conditions showing the relationship 02-063-18101 Sunset Way Drainage 2024.08.12 - wpg .doc4 PanGEO Elana and Matthew Shippen Drainage Improvements - 18101 Sunset Way, Edmunds, WA August 13, 2024 between the drainage project and the slope (see Figure 3). As can be seen in the profile, the planned retention pipe will be located in the native, medium dense to dense, Transitional Bed silts, and not within the fill located at the top of the slope. Based on the known landslides along the bank above Olympic View Drive, including the slide on the subject property in 2016, the slides are of the shallow colluvial style. As such, when they occur, slides do not cut deeply into the top of the slopes, but are generally limited to the surficial soils, especially if the surficial soils are comprised of loose fill. In our opinion the core of the slope is globally stable under current conditions. In our opinion, a set -back of 15 feet from the top of the geologically hazardous area is adequate to protect the new detention facility from potential future instability on the slope. Based on our understanding of subsurface conditions and the proposed drainage improvement project, we believe that the proposed construction will have no adverse impacts on the geologically hazardous area, either on the subject property or on adjacent properties, and will not decrease the stability of the landslide and erosion hazard areas. In addition, in our opinion, based on the set -back of at least 18 feet from the top of the steep slope, the permanent condition, including when the detention pipe is full of water, will not adversely impact the slope, or decrease the stability of the slope. In our opinion the installation of the 6-inch diameter discharge pipe will also not adversely impact the slope. In fact, as the planned drainage improvements will control previously uncontrolled stormwater discharge, and as such, will serve as a mitigation measure to improve the stability of the landslide/erosion hazard area. Construction Considerations - To limit the volume of material excavated, we suggest that the excavation be cut vertically with trench boxes to support the excavation walls. Excavated material that is planned to be reused as fill should be stockpiled upslope of the excavation, at least 20 feet from the excavation, away from the slope and within the sediment containment area. If open cuts are used, they should be sloped no steeper than 1H:IV. As can be seen on the profile (Figure 3), even open cuts are used, the cuts remain outside the anticipated areas underlain by fill, and will not impinge on the 15-foot set -back. All excess excavated material should be exported from the site. CLOSURE We have prepared this report for your use in renovating the stormwater drainage facilities for your house. Recommendations contained in this report are based on a review of the civil engineering plans, a review of the City of Edmonds codes as applied to your project in response to plan review comments contained in the review letter dated March 28, 2024, a review of 02-063-18101 Sunset Way Drainage 2024.08.12 - wpg .doc5 PanGEO Elana and Matthew Shippen Drainage Improvements - 18101 Sunset Way, Edmunds, WA August 13, 2024 pertinent subsurface information and our past experience with your site, and our understanding of the project. The study was performed using a mutually agreed -upon scope of work. Variations in soil conditions may exist at locations away from the explorations and the actual conditions underlying the site may vary. The nature and extent of soil variations may not be evident until construction occurs. If any soil conditions are encountered at the site that are different from those described in this report, we should be notified immediately to review the applicability of our recommendations. Additionally, we should also be notified to review the applicability of our recommendations if there are any changes in the project scope. The scope of our work does not include services related to construction safety precautions. Our recommendations are not intended to direct the contractors' methods, techniques, sequences or procedures, except as specifically described in our report for consideration in design. Additionally, the scope of our work specifically excludes the assessment of environmental characteristics, particularly those involving hazardous substances. This report has been prepared for planning and design purposes for specific application to the proposed project in accordance with the generally accepted standards of local practice at the time this report was written. No warranty, express or implied, is made. This report may be used only by the client and for the purposes stated, within a reasonable time from its issuance. Land use, site conditions (both off and on -site), or other factors including advances in our understanding of applied science, may change over time and could materially affect our findings. Therefore, this report should not be relied upon after 24 months from its issuance. PanGEO should be notified if the project is delayed by more than 24 months from the date of this report so that we may review the applicability of our conclusions considering the time lapse. Any party other than the client who wishes to use this report shall notify PanGEO of such intended use and for permission to copy this report. Based on the intended use of the report, PanGEO may require that additional work be performed and that an updated report be reissued. Noncompliance with any of these requirements will release PanGEO from any liability resulting from the use this report. 02-063-18101 Sunset Way Drainage 2024.08.12 - wpg .doc6 PanGEO Elana and Matthew Shippen Drainage Improvements - 18101 Sunset Way, Edmunds, WA August 13, 2024 We appreciate the opportunity to be of service. Sincerely, PanGEO, Inc. low 11 001 �� Stephen H. Evans, L.E.G. W. Paul Grant, P.E. Senior Engineering Geologist Principal Geotechnical Engineer Enclosures: Figure 1 Vicinity Map Figure 2 Site and Exploration Plan Figure 3 Generalized Subsurface Profile — Section A -A' Appendix A — Boring Logs References Minard, J.P., 1983, Geologic map of the Edmonds East and Part of the Edmonds West Quadrangles, Washington, U.S.G.S. Miscellaneous Field Studies Map MF-1541 02-063-18101 Sunset Way Drainage 2024.08.12 - wpg .doc7 PanGEO 02-063 Fig 1 Vicinity.ppt 5/23/2024(11:41 AM) SHE � 3 .. 172NE ST SW Project Location --- — w w _ 180TH ST SW _ > S I' City of EdmndS O rn Map not to Scale Base Map from Snohomish County SCOPI 196TH S SW 4 ; 2Q0 204iii-5lu m !TH ST SW City of Lynnwood _ 3 iH W a 164TH ST .1 Y Sw AND 162 r_ AB. 182 r "may 1 AA1e 181 '! > AATe 181 00, Q 00 ry E� IE IN(S,E)-206.45 IE OUT(W)-206.35 i i EER HAS VERIFIED OL YMPI C VIEW DR. NG ROOF/FOOTING ----- - EP SLOPE. COPE THESE ��� TYPE II CB OOFDRAINS INTO - - - - - - RIM:243.36 _ 4DTHE FOOTING --------- - - IE IN (S) 6" PVC: 241.86 2 3 FROM THE �` /--�_ -`„-�-----------IEOUT(NE)6"PVC:238.86 _ _—IE(W)36'N12=238.86 C3. C3. _- - ------------ - - - __ el DETENTION / / / / _ - -_ -_ \- C3. 31L` _ _ - F-36"N12 %/ / _' ~\ \� \7 /y� - - �� 30' EASEMENT AFN 196o 27041800202100 / / 4 �- AFN 20:8755 DETENTION ACCESS, A r'G-1 � )2Cy CONTRACTOR TO NO NOT FOR MAN ENTRY % PG-3 AREA \� NEIGHBOR OF WORK 14T)EC \ EASEMENT FOR STOF SE EXISTING YARD DRAIN f03 SF 12 C1, I CONTRACTION 4R GATE AND PROVIDE A "fin? 2nnn CONCRETE SLAB AT END ��4 ST NO REBAR W/CAP FROM GM - EXISTING PARKING AREA // Q' LINE / IE 12*RCP(N)-23506 DRAINAGE AND TIE INTO /?4¢- --- CONTRACTOR TO VERIFY DETENTION SYSTEM �• / E 12CY #WEFT & R%V EXIST ROOF DRAINS - i SOIL AMENDMENT Et,- / OF PhC / I 4 A/' �/ / 2' REBAR i ' CONDITION OF CB Al T CORNER // 1/ 0/ / C3.Q i EXISTING STORM AN BE VERIFIED BY CONI INSTALLATION. ADJU STORM DRAIN PIPE A / I MAINTAIN REQUIRE[ 58 LF - 6" PVC @ 0.5 EXISTTRENCH / ��� 0.1' OF CURRENT MAX SLOPI DRAIN / �. LINE 1. 1E v // \ � \ 48-FOOTING DRAIN yV f ' \ \y I // \ - 9 LF - 6" PVC ROOF [ 6-� -- - TO COLLECT EXISTINa %A\:� • �1 // / \ // DRAINAGE SYSTEM F Ilk EXISTING ROOF AND %/�/�• / '\ // FOOTING DRAIN TO FOUND 1/2- REBAR ADJUST IF NEEDED i1 _ *. ./ NO GAP, AT CORNER IE 12-RCP(N E,5)=247.86 SSAIH RW=251.66 IE IN(E)7244.76 �+\ _� FOUND 112' RESAR IE OUT(NE)=244.66 h GIP. ILLEGIBL& / \ 0.2'(N) OF CORNER IE 12VCP-150.W / v Approximate Scale LEGEND: 1":30' PG Location of Borings 3 AND DRAINAGE PLAN ^E® Drainage Improvements p (`7' 18101 Sunset Way SITE AND EXPLORATION PLAN Edmonds, Washington I N C O R P O R A IT D Project No. Figure No. 02-063 2 A Proposed Top of Landslide/ 250 36" Detention Tank Erosion Hazard Area House per Civil Drawings, invert el. 238.19' i 15' Buffer PG-3 ``` PG-2 Loose Red -Br 1 H:1 V Excavation 240 silty SAND ,' — - Loose SILT 5 Transitional Beds \ & sA"° _ _ _ ,' sm boulder 50/4 MD to Dense D GRAV clayey SILT, w/ silt�sa d 32 FILL _ .� sand/grav beds _ � 5 Loose to MD Dense, brn gray, SILT, NP to Slt P �` Occ tr sand 8 f to c SAND 31 230 with gravel Olympia Beds � 15 O Dense, gray NP-Slt P 32 2i SILT, tr sand 62 Dense to VD f to c SAND 71 some g & silt 220 52 a) VD, It brn, C f to m SAND �..� tr silt 41 C (6 > 50/5 a) 210 Note: Piezometer screened 20 - 35' dry on July 5, 2018 50/6 200- r 190- o 0 180-J Graphics Legend: BH-1 Topographic Surface Groundwater Seep Groundwater Level z$ SP N-value _ so Soil Unit �f $$ Boundries 31 ——— --_42————— 31 M 0 10 20 h V J Notes: = 1. Site topography based on survey data provided by Newport West LLC. 2. Elevations based on NAVD 88. D J V J 30 40 50 60 70 Distance (ft.) Olympic View Drive 80 90 100 110 120 130 A' r— 250 - 240 - 230 220 a) a) C C O - 210-2 - 200 - 190 - 180 APPENDIX A BORING LOGS Project: Landslide Remediation Surface Elevation: Job Number: 02-063 Top of Casing Elev.: Location: 18101 Sunset Way, Edmonds, WA Drilling Method: HSA Coordinates: Northing: , Easting: Sampling Method: SPT $ CL 0 O Z C1 Co Q C (n m L a) O o E MATERIAL DESCRIPTION N-Value A PL Moisture ILL ROD Recovery ®EJ 0 50 100 0 3 Loose, brown SILT: moist, some fine sand, non -plastic to slightly S-1 3 plastic, mottled, occasional angular soil clasts, mixed. (Fill / 4 Colluvium). ......... ......... ......... ......... 1 Trace to some fine sand, slightly plastic, no dilatancy, occasional ........ ........ ........ ......... ......... ......... S-2X 1 charcoal, gravel. 3 5 2 Medium stiff, gray and brown, clayey SILT: moist, low plastic, slow to S-3X 5 no dilatancy, homogeneous, laminated. (Transitional Beds). 5 Medium dense, brown gray SILT with fine sand: moist, non -plastic 5 homogeneous, rusty veins and mottles, laminated. (Transitional S-4 6 Beds). 6 10 5 Medium dense to dense, brown gray, interbedded, fine to medium SAND and SILT: moist, generally non -plastic silt, fine bedded to S-5 9 laminated, beds 4 to 6 inches, rusty bands along contacts. 9 (Transitional Beds). One low plastic, silt lean CLAY interbed. 6 Rusty bands. S-6 14 15 15 S-7 10 20 29 Dense to very dense, light brown to rusty brown, fine to coarse SAND: moist, trace to some silt, trace fine, tabular gravel, finer / coarser layering, slightly rusty bands and laminae, moderately weathered, laminated. (Olympia Gravel). 20 27 Becoming very moist, beds 4 to 6 inches, silt interbed at 21.3 feet. S-8 37 32 Bottom of Boring. 25 ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... Completion Depth: 21.5ft Remarks: No groundwater encountered during drilling. Date Borehole Started: 3/30/18 Date Borehole Completed: 3/30/18 Logged By: S. Evans Drilling Company: CN Drilling FbnGEO LOG OF TEST BORING PG-1 I N C O R P G R A T E D Figure A-2 The stratification lines represent approximate boundaries. The transition may be gradual. Sheet 1 Of Project: Landslide Remediation Surface Elevation: Job Number: 02-063 Top of Casing Elev.: Location: 18101 Sunset Way, Edmonds, WA Drilling Method: HSA Coordinates: Northing: , Easting: Sampling Method: SPT $ CL 0 O Z C1 Co Q C (n m L a) O o E MATERIAL DESCRIPTION N-Value A PL Moisture LL ROD Recovery ®EJ 0 50 100 0 Loose, brown to brown gray, inter -layered SILT and fine to medium S-1 2 SAND: moist, non -plastic to slightly plastic, occasional gravel, mixed 3 texture. (Fill). S-2 9 12 11 Medium dense, dark gray, silty GRAVEL with sand: moist, occasional brown layer, gravel sub -rounded, tabular to prismatic, homogeneous, layered. (Fill). 0 o ......... ......... 5 2 Loose, light brown gray SILT: moist to very moist, non -plastic, homogeneous, laminated, with rusty swirls. (Transitional Beds). S-3 2 3 ......... ......... ......... ......... ......... ......... ......... ......... 2 Becoming light green gray, non -plastic to slightly plastic, rusty bands, ......... ......... ......... ......... ......... ......... S-4 4 finely fractured at 8.5 feet, micaceous. 4 . . . . . . . . . . 10 5 Gray and rusty brown, trace fine sand, slightly plastic with slow to rapid ...... ......... S-5 6 dilatancy, rusty fractures and bands, some sharp bedding contacts. 9 ......... ... ..... ... ..... ......... ......... ......... 4 Light green gray SILT occasional sandy laminae. ......... ......... ......... ......... ......... ......... 15 S-6 11 15 14 .... .... ......... a e e Medium dense to very dense, brown gray, fine to coarse SAND: moist, some gravel and silt, massive to indistinctly laminated and bedded, moderately weathered with rusty staining. (Olympia Gravel). Fine to coarse SAND with gravel, gravel sub -angular and blocky to S-7 32 tabular, massive. 30 20 S-8X 16 26 Rusty brown, fine to coarse SAND, scattered gravel, slightly to moderately weathered, laminated to massive. 26 Bottom of Boring. 25 ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... Completion Depth: 21.Oft Remarks: No groundwater encountered during drilling. Date Borehole Started: 3/30/18 Date Borehole Completed: 3/30/18 Logged By: S. Evans Drilling Company: CN Drilling FbnGEO LOG OF TEST BORING PG-2 I N C O R P G R A T E D Figure A-3 The stratification lines represent approximate boundaries. The transition may be gradual. Sheet 1 Of Project: Landslide Remediation Job Number: 02-063 Location: 18101 Sunset Way, Edmonds, WA Coordinates: Northing: , Easting: o (D C F i N Q Q (n L E C M ^ V, M L J O 0 `[I 15 20 25 Surface Elevation: Top of Casing Elev.: Drilling Method: Sampling Method: MATERIAL DESCRIPTION HSA SPT N-Value A PL Moisture LL a0i 1 I E ® RQD Recovery ® c 0 50 100 Loose, red brown, silty, fine SAND with gravel: moist. (Ablation Till). Medium dense to dense, gray, clayey SILT with fine sand: moist, gravelly and sandy interbeds. (Transitional Beds). S-1 Z 50/4 Small boulder, blow counts at 5 feet unreliable. > 1 > > Dense, speckled brown gray, fine to coarse SAND with gravel: slightly moist, some silt, layered, moderately weathered, gravel sub -rounded and blocky, some coarse S-2 X4 19 grained granitic gravels. (Olympia Gravels). 12 < Sample tube at 15 wet, sample moist, likely perched water around 13 feet. ----------------- J `------- . . . ......... . . : ......... S-3 $ 15 17 Dense, brown gray SILT: moist, non -plastic to slightly plastic, occasional rusty pockets, trace fine sand and sandy laminae, scattered gravel, laminated with dips to 10°. (Olympia Gravels). ......... ....... . ....... . ......... ......... ......... ......... ......... ......... ......... Very dense, light brown, fine to medium SAND: moist, fine ......... ......... ......... ......... to coarse interbeds, homogeneous,trace to some non -plastic silt, slightly weathered. (Olympia Gravels). 13 S-4 26 MEN 45 20 Brown, fine to medium SAND, wet gray bed at top, S-5 26 1 laminatedpossible perched water layer at 20 feet. Completion Depth: 36.0ft Remarks: No significant groundwater encountered during drilling. Two thin perched water Date Borehole Started: 5/24/18 lenses observed. Date Borehole Completed: 5/24/18 Logged By: S. Evans Drilling Company: CN Drilling C_1T7® LOG OF TEST BORING PG-3 I N C O R P O R A T E D Figure A-4 The stratification lines represent approximate boundaries. The transition may be gradual. Sheet 1 of 2 Project: Landslide Remediation Surface Elevation: Job Number: 02-063 Top of Casing Elev.: Location: 18101 Sunset Way, Edmonds, WA Drilling Method: HSA Coordinates: Northing: , Easting: Sampling Method: SPT N-Value A O Z o PL Moisture ILL Q ~ E MATERIAL DESCRIPTION CL 0 Co � El Recovery ® c m O 0 50 100 Very dense, light brown, fine to medium SAND: moist, fine to coarse interbeds, homogeneous,trace to some non -plastic silt, slightly weathered. (Olympia Gravels). (Continued) 30 31 Light brown sand with gray bed at top above a thin silt bed, S-6 47 slightly weathered, graded bedding with 6 inch beds. 50/5 35 S-7 36 Light brown, fine to medium SAND, homogeneous, moist, 50/6 trace to some silt. Bottom of Boring. 40 ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... 45 ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... 50 ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... Completion Depth: 36.Oft Remarks: No significant groundwater encountered during drilling. Two thin perched water Date Borehole Started: 5/24/18 lenses observed. Date Borehole Completed: 5/24/18 Logged By: S. Evans Drilling Company: CN Drilling LOG OF TEST BORING PG-3 PmGE@) I N C O R P G R A T E D Figure A-4 The stratification lines represent approximate boundaries. The transition may be gradual. Sheet 2 Of 2