Loading...
APPROVED ENG2022-0536 STORMWATER PERMIT•• PERMIT STORMWATER PERMIT NUMBER City of Edmonds www.edmondswa.gov425.771.0220 Description: SHIPPEN STORMWATER CONNECTION TO CITY SYSTEM ISSUED: 12/27/2024 Address: 18101 SUNSET WAY EDMONDS WA 98026-5331 EXPIRES: 12/27/2025 rmit Type: STORMWATER Permit Subtype: Parcel Number: 27041800202000 i NAME TYPE NAME ADDRESS PHONE APPLICANT JIM COOLBAUGH 6009 212TH ST SW, LYNNWOOD WA 98036 (425)778-2557 CONTACT BODINE CONSTRUCTION SERVICES, 6009 212TH ST SW, LYNNWOOD WA 98036 (425)778-2557 INC. CONTRACTOR BODINE CONSTR CO INC 6009 212TH ST SW, LYNNWOOD WA 98036 (425)321-4847 OWNER MATTHEW & ELANA SHIPPEN 18101 SUNSET WAY, EDMONDS WA 98026 FEE INFORMATION DESCRIPTION AMOUNT PAID CITY TECHNOLOGY FEE CHARGED PER PERMIT $40.00 $40.00 ENG - HOURLY REVIEW - 3.1.23 $252.00 $252.00 ENG - INSPECTIONS - 3.1.23 $882.00 $882.00 ENG - PEER REVIEW DEPOSIT $130.00 $130.00 ENG - PEER REVIEW DEPOSIT $2,000.00 $2,000.00 STORMWATER ENGINEER - REVIEW $296.00 $296.00 STORMWATER PERMIT FEE $330.00 $330.00 REQUIREMENTS REQUIREMENT TYPE NOTES TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their posession. RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday - No Exceptions WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the work. INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM 24 HR NOTICE REQUIRED The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit. Printed: Friday, December 27, 2024 11:21:31 AM 1 of 3 RELEASED BY: MAJ DATE: 12/27/2024 Printed: Friday, December 27, 2024 11:21:31 AM 2 of 3 . • • PERMIT PERMIT NUMBE3 City of Edmonds aw.121 Sth Ave N, Edmonds98020 • www.edmondswa.gov425.771.0220 CONDITIONS CONDITION TYPE It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in DAMAGE TO FRONTAGE City right of Ways or Easements to City Standards caused by or occurring during the permitted IMPROVEMENTS project. MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD ESC REQUIREMENTS REQUIREMENTS. INSP PRIOR TO BACKFILL Call for all required inspections. All work shall be inspected prior to backfill. SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT. INSPECTIONS www.mybuildingpermit.com Electronic civil asbuilt shall be submitted to the City prior to final project acceptance. Asbuilt shall be PROJECT CIVIL ASBUILT submitted to Engineeringpermits@edmondswa.gov. RESTORE LANDSCAPE Restore landscape to like or better conditions Sound or noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on SOUND AND NOISE weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites and activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. A Special Inspection agreement is required for this project. It is the owner/contractors responsibility SPECIAL INSPECTIONS to ensure inspections take place and that reports are provided to the Engineering Division on a weekly ENGINEERING basis at Engineeringpermits@edmondswa.gov. STORM COVENANT A stormwater covenant shall be approved for recording prior to project final approval. All utilities shall be located prior to any excavation. New locates shall be called for if at time of UTILITY LOCATES excavation, original locates are no longer identifiable. IL INSPECTION TYPE DATE RESULT NOTES ir COMPLETE X-2 ENGINEERING FINAL" A-1 TESC AND MOBILIZE E-3 STRM CONVEYANCE E-3 STRM COVENANT E-3 STRM FOOTING DRAIN E-3 STRM MGMT FACILITY E-3 STRM TIGHTLINE E-7 STORM CB E-9 COMPOST AMEND E-9 PROJECT ASBUILTS A-1 ENGINEERING PRECON E-5 ENG SPECIAL INSPECTION Printed: Friday, December 27, 2024 11:21:31 AM 3 of 3