Loading...
Notice of Final Decision PLN2023-0071CITY OF EDMONDS 121 5th Avenue North, Edmonds WA 98020 Phone: 425.771.0220 • Fax: 425.771.0221 • Web: www.edmondswa.gov PLANNING & DEVELOPMENT DEPARTMENT • PLANNING DIVISION `ne. I STJ To: Parties of Record From: Tristan Sewell, Planner Date: December 17, 2024 Subject: Notice of Final Decision for the Design Review for Edmonds 222 Townhouses (File # PLN2023-0071) —Approved with Conditions This letter serves as the Notice of Final Decision for the Architectural Design Board's review of the 222 Edmonds Townhouses project at 222 3'd Ave. S, as required by Sections 20.06.130 and 20.02.007 of the Edmonds Community Development Code (ECDC). Per ECDC 20.02.007, no conflicts of interest for the decision makers were uncovered at disclosure and the project received a SEPA Determination of Non -significance (DNS), which was not appealed. After the required public hearing for the Type III -A permit, Board Member Schmitz made the following motion, which was seconded by Board Member Stine: THE ARCHITECTURAL DESIGN BOARD ADOPTS THE FINDINGS, CONCLUSIONS AND ANALYSIS OF THE STAFF REPORT AND FINDS THAT, AS CONDITIONED, THE CASCARA TOWNHOUSE PROPOSAL IN FILE PLN2023-0071 IS CONSISTENT WITH THE COMPREHENSIVE PLAN, DESIGN CRITERIA OF ECDC 20.11.030, AND ZONING REGULATIONS AND THEREFORE APPROVES THE DESIGN OF THE PROJECT WITH THE FOLLOWING CONDITIONS: 1. The site plans submitted in application for the subsequent building permit(s) shall demonstrate compliance with Chapter 17.115 — Electric Vehicle Charging Infrastructure, Chapter 17.120 — Bicycle Parking Facilities, and Title 18 — Public Works Requirements. 2. All plantings must meet the sizing requirements found in Section 20.13.015 ECDC — Plant Schedule. A performance and maintenance bond will be required per ECDC 20.13.040. 3. Significant trees that are removed must be replaced in accordance with ECDC 23.10.080. 4. With the exception of the east frontage on V Ave (Bldg. 1), a minimum of 2 architectural bldg. elements. Provide additional definition and break up the fagade to harmonize with the site. 5. The pedestrian path north of Building 2 shall be continued to the driveway with either a hardscape pathway or a mobility -friendly treatment like gravel, pavers, or other landscape feature only on the north face of Bldg. 2. 6. If Engineering requires communal waste collection, the required screening must harmonize with the approved architectural design. The motion was approved 5-0. Affected property owners may request a change in property tax valuation notwithstanding any program of revaluation The Architectural Design Board's decision is not administratively appealable. The decision may be appealed within 21 days of the date of this decision by commencing a land use petition in Snohomish County superior court, consistent with Chapter 36.70C RCW.