Building PermitType: RESIDENTIAL BLDG Subtype: ACCESSORY STRUCTURE RES I Status: ISSUED
Parcel No: 27032400220900 Site Address: 529 9TH AVE N EDMONDS,WA 98020-3038
Subdivision: SP S-07-76, 007565, SIP 5-26-81, SIP S-16-89 Lot: 0
Fire Sprinklers: No Lot Area: 22,216 Zoning: RS-12
Valuation: $51,854.40 Occupancy Type: R3 Construction Type: VB
Code Edition: 2021 No. Stories: 1 # of Dwelling Units: 0
Scope of Work: COBB- DETACHED GARAGE
Applied: 8/26/2024
Issued:3/10/2025
Final:
Expiration Date: 3/10/2027
Issued by: NED
I WA State Contractor L & I #: PARAMCG869LK I
CONTACTS
NAME TYPE NAME
ADDRESS I
PHONE
EMAIL
APPLICANT
JEFF AND DEBBIE COBB
529 9TH AVE N, EDMONDS WA
(360)631-6766
COBBS88@MSN.COM
98020
CONTACT
JEFF AND DEBBIE COBB
529 9TH AVE N, EDMONDS WA
(360)631-6766
cobbs88@msn.com
98020
11700 MUKILTEO SPEEDWAY
CONTRACTOR
PARAMOUNT CONST GROUP
201/1234, MUKILTEO WA 98275
(206)799-6467
LLC
OWNER
JEFFREY M & DEBBIE L COBB
529 9TH AVE N, EDMONDS WA
(425)422-3216
98020
FEE
INFORMATION
DESCRIPTION
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
BLD - RES - PERMIT - VALUATION
001.000.345.83.000.00
$764.00
$764.00
3/10/25
R44065
BASED
BLD - RES - PLAN REVIEW
001.000.345.83.000.00
$649.40
$649.40
8/27/24
R39621
CITY TECHNOLOGY FEE - PER
001.000.321.99.100.00
$45.00
$45.00
8/27/24
R39621
PERMIT
ENG - INSPECTIONS - 4.1.24
001.000.345.83.400.00
$264.00
$264.00
3/10/25
R44065
STATE BUILDING CODE SURCHARGE
001.000.237.150
$6.50
$6.50
3/10/25
R44065
RES
TOTALS: $1,728.90
$1,728.90
• 1 •
CONDITION TYPE STATUS
71
NOTES
Printed: Monday, March 10, 2025 4:02:08 PM 1 of 3
'RESIDENTIAL
BLDG PermitCity
• • • • -
EL
98020 1
. •.
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision.
2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or
other administrative deviation from adopted codes ordinances or policies must be
specifically requested in writing and be called out and identified. Processing fees for such
requests shall be established by Council and shall be paid upon submittal and are
nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted
by the Building Official prior to use or occupancy of the building or structure. Check the
job card for all required City inspections including final project approval and final
occupancy inspections.
5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW.
Property owners who hire an unlicensed plumber may assume the risks and potential
monetary liability for work performed by unlicensed plumbing contractors. For more
information contact L&I Department of Licensing at 1-800-647-0982.
ELECTRICAL PERMIT
FOR
Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309.
NFORMATION
LOT LINES STAKED
O
Lot line stakes must be in place at the time of foundation setback inspection.
ORMATION
Maximum Height 25 feet. The agent or contractor shall set up the equipment; establish
the datum point and the point of average grade. Call for inspections to verify. These
MAXIMUM HEIGHT
FOR
items must be consistent with the approved plan. If the proposed height of a building is
INFORMATION
within 12 inches of the maximum height permitted for the zone an elevation survey is
required.
SPECIAL INSPECTION REPORTS
FOR I
Submit all special inspection reports to the City Building Official on a weekly basis.
NFORMATION
INSPECTIONS
- Schedule Online
at https://inspection.mybuildingpermit.com
INSPECTIONTYPE INSPECTOR
COMPLETED
RESULT
NOTES
A-1 BUILDING PRECON
B-2 FOOTINGS
B-2 FOUNDATION WALL
B-3 EXT WALL SHEATHING
B-3 ROOF SHEATHING
B-4 FRAMING
B-7 BUILDING OTHER INSP
X-3 BUILDING FINAL"
B-1 SETBACKS
A-1 TESC AND MOBILIZE
Printed: Monday, March 10, 2025 4:02:08 PM 2 of 3
Printed: Monday, March 10, 2025 4:02:08 PM 3 of 3