Loading...
Building PermitType: PLUMBING Subtype: COMMERCIAL PLUMBING I Status: ISSUED Parcel No: 00396200001000 Site Address: 300 21ND AVE N 2C EDMONDS,WA 98020-3152 Subdivision: 004344, 005922, 003962, 004342 Lot: 0 Fire Sprinklers: Lot Area: Zoning: Valuation: $0.00 Occupancy Type: Construction Type: Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Scope of Work: PLUMBING-4 FIXTURES WA State Contractor L & I #: REDIFPL761BJ Applied: 3/6/2025 Issued:3/12/2025 Final: Expiration Date: 3/12/2027 Issued by: BAC CONTACTS NAME TYPE NAME ADDRESS Y PHONE EMAIL APPLICANT KIRIL ARZAMASAU 1726 147TH PL SW, LYNWOOD (425)350-7951 REDIFLOPLUMBING@GMAIL.COM WA 98087 CONTACT RERI-FLO PLUMBING 1726 147TH PL SW, LYNWOOD (425)350-7951 redifloplumbing@gmail.com WA 98087 CONTRACTOR REDI-FLO PLUMBING LLC 1726 147TH PL SW, LYNNWOOD (425)350-7951 redifloplumbing@gmail.com WA 98087 300 2ND AVE N 2C, EDMONDS OWNER DAVID JAY & FRANCEY F LEVY WA 98020 •' • DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # CITY TECHNOLOGY FEE -PER 001.000.321.99.100.00 $49.00 $49.00 3/12/25 R44080 PERMIT DRAINS WITHIN FOOTPRINT OF 001.000.345.83.000.00 $36.00 $36.00 3/12/25 R44080 BUILDING EACH PLUMBING FIXTURE ON ONE 001.000.345.83.000.00 $36.00 $36.00 3/12/25 R44080 TRAP PLUMBING BASE FEE 001.000.322.10.000.00 $62.00 $62.00 3/12/25 R44080 TOTALS: $183.00 $183.00 7 CONDITION TYPE STATUS !91W NOTES Printed: Wednesday, March 12, 2025 10:36:08 AM 1 of 2 PLUMBING Permit - City of • • • 9:020 1 1 • www.edmondswa.gov • 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. INSPECTIONT'.. INSPECTOR COMPLETED RESULT NOTES B-3 PLUMB ROUGH IN X-0 PLUMBING FINAL** VERIFY SCOPE OF WORK -PLUMBING PERMIT ONLY Printed: Wednesday, March 12, 2025 10:36:08 AM 2 of 2