Loading...
APPROVED FIR STM ENG RESUB3 BLD2023-0640+Civil_Plan+5.23.2024_3.43.23_PM+4279509c� 0 W W W 0 u 0 / z Q n W z 0 i W W z Q 0 / c� z W W z CD z W / N N 0 N / N N 0 N / 0 C� N 0 N \ N Ln x N PUBLIC SEWER EASEMENT PER AFN FOUND REDO 1W 8306230289 N 89`54'04" E (RAD) LS/4074 ON LINE - -,_. - - -r I00.9< - - PARCEL NUMBER: 00513100002410 EX NATIVE GROWTH PROTECTION EASEMENT PER AFN 200010235001 1. ALL MATERIALS AND WORK SHOWN ON THESE PLANS SHALL CONFORM TO THE CITY OF EDMONDS STANDARD PLANS AND DETAILS, THE FOLLOWING SPECIFICATIONS AND CODES, AND ALL OTHER APPLICABLE LOCAL MUNICIPAL, STATE, AND FEDERAL CODES, RULES AND REGULATIONS: - CURRENT INTERNATIONAL BUILDING CODE (IBC) - 2023 WSDOT/APWA STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION - 2019 WASHINGTON STATE DEPARTMENT OF ECOLOGY STORMWATER MANAGEMENT MANUAL 2. STANDARD PLAN AND TYPE NUMBERS INDICATED ON THESE DRAWINGS REFER TO CITY OF EDMONDS STANDARD DETAILS, UNLESS NOTED OTHERWISE 3. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOBSITE WHENEVER CONSTRUCTION IS IN PROGRESS. 4. DEVIATIONS FROM THESE PLANS MUST BE APPROVED BY THE ENGINEER OF RECORD AND THE LOCAL GOVERNING AUTHORITY. 5. CONTRACTOR SHALL RECORD ALL APPROVED DEVIATIONS FROM THESE PLANS ON A SET OF "AS -BUILT" DRAWINGS AND SHALL SUMMARIZE ALL AS -BUILT CONDITIONS ON ONE SET OF REPRODUCIBLE DRAWINGS FOR SUBMITTAL TO THE OWNER PRIOR PROJECT COMPLETION AND ACCEPTANCE. A SET OF AS -BUILT DRAWINGS SHALL BE SUBMITTED TO THE CITY OF EDMONDS PRIOR TO FINAL APPROVAL OF THE BUILDING OCCUPANCY/FINAL PROJECT APPROVAL. 6. ELEVATIONS SHOWN ARE IN FEET. SEE SURVEY FOR BENCHMARK INFORMATION. 7. THE LOCATIONS OF EXISTING UTILITIES AND SITE FEATURES SHOWN HEREON HAVE BEEN FURNISHED BY OTHERS BY FIELD SURVEY OR OBTAINED FROM AVAILABLE RECORDS AND SHOULD THEREFORE BE CONSIDERED APPROXIMATE ONLY AND NOT NECESSARILY COMPLETE. IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO INDEPENDENTLY VERIFY THE ACCURACY OF ALL UTILITY LOCATIONS SHOWN AND TO FURTHER DISCOVER AND PROTECT ANY OTHER UTILITIES NOT SHOWN HEREON WHICH MAY BE AFFECTED BY THE IMPLEMENTATION OF THIS PLAN. CONTRACTOR SHALL VERIFY LOCATION, DEPTH, SIZE, TYPE AND CONDITION OF EXISTING UTILITY LINES AT CONNECTION OR CROSSING POINTS BEFORE TRENCHING FOR NEW UTILITIES. ENGINEER ASSUMES NO RESPONSIBILITY FOR THE COMPLETENESS OR ACCURACY OF THE EXISTING UTILITIES AND SITE FEATURES PRESENTED ON THESE DRAWINGS. ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF CONFLICTS THAT ARISE. 8. CONTRACTOR SHALL LOCATE AND PROTECT ALL UTILITIES DURING CONSTRUCTION AND SHALL CONTACT THE UNDERGROUND UTILITIES LOCATION SERVICE (1-800-424-5555) AT LEAST 48 HOURS PRIOR TO CONSTRUCTION. 9. CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS AT THE PROJECT SITE BEFORE STARTING WORK AND SHALL NOTIFY OWNER'S REPRESENTATIVE OF ANY DISCREPANCIES. 10. PIPE LENGTHS WHERE SHOWN ARE APPROXIMATE AND MAY CHANGE DUE TO FIELD CONDITIONS. 11. CONTRACTOR SHALL OBTAIN A COPY OF THE GEOTECHNICAL REPORT (WHERE APPLICABLE) AND SHALL THOROUGHLY FAMILIARIZE HIMSELF WITH THE CONTENTS THEREOF. ALL SITE WORK SHALL BE PERFORMED IN STRICT COMPLIANCE WITH THE RECOMMENDATIONS OF THIS REPORT. 12. STRUCTURAL FILL MATERIAL AND PLACEMENT SHALL CONFORM TO THE RECOMMENDATIONS OF THE PROJECT GEOTECHNICAL REPORT. 13. SUBGRADE SOILS IN ALL AREAS WHERE RAIN GARDENS, INFILTRATION OR PERVIOUS PAVEMENT IS TO BE PLACED SHALL BE DELINEATED AND PROTECTED AT ALL TIMES FROM COMPACTIVE ACTIVITIES (i.e. HEAVY EQUIPMENT, STOCKPILING). 14. MANHOLES, CATCH BASINS, UTILITIES AND PAVEMENT SHALL BEAR ON MEDIUM DENSE TO VERY DENSE NATIVE SOIL OR COMPACTED STRUCTURAL FILL. IF SOIL IS DISTURBED, SOFT, LOOSE, WET OR IF ORGANIC MATERIAL IS PRESENT AT SUBGRADE PROPOSED BUIDING EX 15' INGRESS AND EGRESS EASEMENT PER AFN 200010235001 KOH RESIDENCE 15604 75TH PL W, EDMONDS, WA 98026 FOUND RERAR/CAP LS/18898 0.18'N k 0.49'N' OF PROP. CC' S 87°38'29" E 9 ' 20.02 4ms ELEVATION, REMOVE AND REPLACE WITH COMPACTED STRUCTURAL FILL PER GEOTECHNICAL REPORT. 15. SEE SURVEY AND ARCHITECTURAL DRAWINGS FOR DIMENSIONS AND LOCATIONS OF BUILDINGS, LANDSCAPED AREAS AND OTHER PROPOSED OR EXISTING SITE FEATURES. 16. SEE ARCHITECTURAL DRAWINGS FOR PERIMETER FOUNDATION DRAINS. FOUNDATION DRAINS SHALL BE INDEPENDENT OF OTHER SITE DRAIN LINES AND SHALL BE TIGHTLINED TO THE STORM DRAIN SYSTEM WHERE INDICATED ON THE PLANS. 17. ALL REQUIRED STORMWATER FACILITIES MUST BE CONSTRUCTED AND IN OPERATION PRIOR TO INSTALLATION OF ANY PAVEMENT UNLESS OTHERWISE APPROVED BY THE ENGINEER. 18. ALL ROOF DRAINS, PERIMETER FOUNDATION DRAINS, CATCH BASINS AND OTHER EXTERNAL DRAINS SHALL BE CONNECTED TO THE STORM DRAINAGE SYSTEM, UNLESS NOTED OTHERWISE. 19. ALL FOOTING DRAINS SERVING THE BUILDING AND WALLS SHALL CONNECT TO THE DRAINAGE SYSTEM AT THE DOWNSTREAM END 20. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS REQUIRED FOR INSTALLATION OF ALL SITE IMPROVEMENTS INDICATED ON THESE DRAWINGS. 21. A SEPARATE IRRIGATION PERMIT MUST BE OBTAINED FROM THE CITY PUBLIC WORKS DEPARTMENT. PRIOR TO FINAL CONSTRUCTION ACCEPTANCE, PROVIDE TO THE CITY WATER QUALITY TECHNICIAN, A COPY OF THE BACKFLOW TEST REPORT. TEST REPORTS CAN BE FAXED TO 425-744-6057 OR EMAILED TO JEFF.KOBLYK@EDM ONDSWA. GOV. BACKFLOW TESTING SHALL BE COMPLETED BY THE OWNER ANNUALLY THEREAFTER. 22. AS A MINIMUM REQUIREMENT, ALL DISTURBED AREAS ON AND OFF SITE SHALL BE RETURNED TO THE EQUIVALENT OF THEIR PRECONSTRUCTION CONDITION IN ACCORDANCE WITH APPROPRIATE REQUIREMENTS AND STANDARDS. 23. ALL DISTURBED SOIL AREAS SHALL BE COMPOST AMENDED AND SEEDED OR STABILIZED BY OTHER ACCEPTABLE METHODS FOR THE PREVENTION OF ONSITE EROSION AFTER THE COMPLETION OF CONSTRUCTION. SEE EROSION CONTROL PLANS FOR SPECIFIC GRADING AND EROSION CONTROL REQUIREMENTS. 24. THE CONTRACTOR SHALL KEEP OFF -SITE STREETS CLEAN AT ALL TIMES BY SWEEPING. WASHING OF THESE STREETS WILL NOT BE ALLOWED WITHOUT PRIOR APPROVAL. 25. THIS PROJECT IS NOT A BALANCED EARTHWORK PROJECT. BOTH EXPORT AND IMPORT OF SOIL AND ROCK MATERIALS ARE REQUIRED. 26. SLOPE OF FINISHED GRADE SHALL BE CONSTANT BETWEEN FINISHED CONTOURS OR SPOT ELEVATIONS SHOWN. 27. FINISHED GRADE SHALL SLOPE AWAY FROM BUILDING WALLS AT MINIMUM 5% SLOPE FOR A MINIMUM DISTANCE OF 10 FEET. 28. CONTRACTOR SHALL BE RESPONSIBLE FOR AND SHALL INSTALL AND MAINTAIN SHORING AND BRACING AS NECESSARY TO PROTECT WORKERS, EXISTING BUILDINGS, STREETS, WALKWAYS, UTILITIES AND OTHER EXISTING AND PROPOSED IMPROVEMENTS AND EXCAVATIONS AGAINST LOSS OF GROUND OR CAVING EMBANKMENTS. CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR REMOVAL OF SHORING AND BRACING, AS REQUIRED. 29. CONTRACTOR SHALL OBTAIN APPROVAL FROM THE CITY AND FOLLOW CITY PROCEDURES FOR ALL WATER SERVICE INTERRUPTIONS, HYDRANT SHUTOFFS, STREET CLOSURES OR OTHER ACCESS RESTRICTIONS. CONTRACTOR SHALL NOT RELOCATE OR ELIMINATE ANY HYDRANTS WITHOUT FIRST OBTAINING WRITTEN APPROVAL FROM THE FIRE MARSHAL. 30. COORDINATE AND ARRANGE FOR ALL UTILITY CONNECTIONS, UTILITY RELOCATIONS AND/OR SERVICE INTERRUPTIONS WITH THE AFFECTED OWNERS AND APPROPRIATE UTILITY COMPANIES. CONNECTIONS TO EXISTING UTILITIES SHALL BE MADE ONLY WITH ADVANCE WRITTEN APPROVAL OF THE AUTHORITIES GOVERNING SAID UTILITIES. 31. ALL UTILITIES SHALL BE PLACED UNDERGROUND. C 0 o -G ❑ GM FT l M ASPHALT SURFACE BUILDING LINE CENTERLINE CABLE/TELCOM LINE (UNDERGROUND) CONIFER TREE DECIDUOUS TREE ELECTRIC LINE (UNDERGROUND) FENCE LINE (CHAIN LINK) GAS LINE GAS METER GRAVEL SURFACE MAILBOX (RESIDENTIAL) MANHOLE (AS NOTED) MAJOR CONTOUR LINE MINOR CONTOUR LINE MONITORING WELL/BORE MONUMENT IN CASE LSPECIAL IN REBAR (AS NOTED) SEWER LINE LSPECTIO LANCHORS SIGN BNSF STEEP SLOPE STORM DRAIN LINE SUBJECT PARCEL PROPERTY LINE WATER LINE WATER METER WALL (AS NOTED) DEFERRED SUBMITTAL: BNSF STORM OUTFALL APPROVAL ** NO WORK ON STORM SYSTEM SHALL OCCUR PRIOR TO BNSF APPROVAL** N 20 10 0 20 40 SCALE IN FEET 11t=20' 32. EXISTING UTILITY LINES IN SERVICE WHICH ARE DAMAGED DUE-T6 CONSTRITCTION - - - - WORK SHALL BE REPAIRED AT CONTRACTOR'S EXPENSE AND INSPECTED AND ACCEPTED BY CITY OF EDMONDS AND OWNER'S REPRESENTATIVE PRIOR TO BACKFILLING. 33. NEW UTILITY LOCATIONS ARE GENERALLY SHOWN BY DIMENSION, WHERE NO DIMENSIONS ARE INDICATED, LOCATIONS MAY BE SCALED FROM DRAWINGS. FIELD ADJUSTMENTS SHALL BE APPROVED BY OWNER'S REPRESENTATIVE AND CITY. 34. FIELD STAKE ALL UTILITY STUBS AT THE PROPERTY LINE. 35. TRENCH BACKFILL OF UTILITIES LOCATED WITHIN THE CITY RIGHT-OF-WAY SHALL BE COMPACTED TO 957, COMPACTION TEST REPORTS SHALL BE PROVIDED TO THE CITY PRIOR TO PAVING. 36. WHERE NEW PIPE CLEARS AN EXISTING OR NEW UTILITY BY 6" OR LESS, PLACE ETHAFOAM 200 AS A CUSHION BETWEEN THE UTILITIES. 37. SEE MECHANICAL DRAWINGS (WHERE APPLICABLE) FOR CONTINUATION OF SITE UTILITIES WITHIN THE BUILDING. 38. SEE ELECTRICAL DRAWINGS (WHERE APPLICABLE) FOR EXTERIOR ELECTRICAL WORK. 39. SEE LANDSCAPE DRAWINGS (WHERE APPLICABLE) FOR SITE IRRIGATION SYSTEM. 40. PIPE MATERIAL AND SIGNAGE SUBMITTALS SHALL BE PROVIDED TO CITY ENGINEERING DIVISION FOR APPROVAL PRIOR TO INSTALLATION. 41. THE SUBJECT PROJECT SITE IS LOCATED WITHIN THE EARTH SUBSIDENCE LANDSLIDE HAZARD AREA. IN ACCORDANCE WITH ECDC 19.10.080, "REQUESTS FOR EARLY SITE ACCESS IN ADVANCE OF BUILDING PERMIT APPROVAL OR IN THE TIME PERIOD BETWEEN OCTOBER 1ST AND APRIL 30TH FOR ANY PURPOSE SHALL BE SUBMITTED TO THE BUILDING OFFICIAL ACCOMPANIED BY WRITTEN CONCURRENCE OF THE OWNER/APPLICANT'S GEOTECHNICAL ENGINEER OF RECORD." UTILITY PURVEYORS: NATURAL GAS: PUGET SOUND ENERGY CUSTOMER STORMWATER: CONSTRUCTION SERVICES CITY OF EDMONDS, PUBLIC WORKS & UTILITIES 3130 S 38TH ST CITY HALL - 1ST FLOOR 121 5TH AVE N TACOM A, WA 98409 EDMONDS, WA 98020 PH: (253) 476-6421 PH: (425) 771-0241 POWER: '4wau .! some �; t � r r �.. /N111! M/ 1!M 9 fMICC SHEET INDEX: C1.0 COVER SHEET AND NOTES C2.0 TESC PLAN C2.1 TESC DETAILS C3.0 GRADING AND UTILITY PLAN C3.1 GRADING AND UTILITY DETAILS C3.2 ADDITIONAL DETAILS AND PROFILES C4.0 BNSF OUTFALL EXHIBIT PLAN - FOR REFERENCE C4.1 BNSF OUTFALL EXHIBIT DETAILS - FOR REFERENCE PROJECT CONTACTS OWNER: YVETTE SYLVI A AN N XAVI ER MICHAEL KOH BENG CHYE 12 JALAN SETIAKASIH 1, DAMNSARA HEIGHTS 54090 KUALA LUMPUR, MALAYSIA michael.yvette@gmail.com PH: (616) 634-1293 ENGINEER: BUSH ROED & HITCHINGS 15400 SE 30TH PL STE 100 BELLEVUE, WA 98007 CONTACT: JAY DECKER, P.E. jayd@brhinc.com PH: (206) 323-4144 SURVEYOR: GROUNDMARK LAND SURVEYING, PLLC 2712 E FIR ST SEATTLE, WA 98122 sean@groundmarkls.net PH: (206) 580-3801 ARCHITECT: MOTIONSPACE ARCHITECTURE + DESGIN PLLC 3104 WESTERN AVE #107 SEATTLE, WA 98121 CONTACT: NAZIM NICE BLD2023-0640 nazim@motion-space.com PH: (206) 204-0490 WATER: SNOHOMISH COUNTY PUBLIC REFER ALSO TO: CITY OF EDMONDS, PUBLIC WORKS & UTILITIES UTILITY DISTRICT RIGHT-OF-WAY PERMIT: ENG2023-0558 CITY HALL - 1ST FLOOR 121 5TH AVE N 2320 CALIFORNIA ST SEWER PERMIT: ENG2023-0557 EDMONDS, WA 98020 EVERETT, WA 98201 WATER METER: ENG2023-0556 PH: (425) 771-0241 PH: (425) 783-1000 ENCROACHMENT PERMIT: ENG2024-0039 SANITARY SEWER: PHONE AND CABLE: CITY OF EDMONDS, PUBLIC WORKS & UTILITIES ZIPLY FIBER CITY HALL - 1ST FLOOR 121 5TH AVE N PH: 1 (866) 699-4759 EDMONDS, WA 98020 PH: (425) 771-0241 COMCAST PH: (800) 934-6489 COMPLIES WITH APPLICABLE CITY STORMWATER CODE 1 06/17/2024 1 HMO STORM DRAINAGE REPORT PREPARED BY BUSH, ROED & HITCHINGS, DATED MARCH 14, 2024 SEWER GRINDER PUMP CALCS (E-ONE), DATED MARCH 12, 2024 APPROVED FOR CONSTRUCTION CITY OF EDMONDS ENGINEERING DIVISION DAZE: APPROVED AS NOTED �v/ 6/15/2024 BY: CITY ENGINEERING DIMSM I 3 � Q Z M o O CV LO O CGS. I NC Al � a i0 %`i o � `HSIR . v! UL.L W 'qCo� z W It00 z Iq O 0 Ncoz 0 z (DoCE z W 00m = J T � U O 00 06 000 T �//�� V / W C 06 p[ o Q 0 W W Tu)E co 0 0 > o�U LJ C- W:- (f)>� 0JLu � J T W .� m Q tk( I M1 Z 0 U)L Z> O Ld Ld Z 0 Q Z 0 0 O N 0 z () Ld W o U z oz W z Q 0 U) U) 0 W W 0 = CE W (n = 0 W 0 co 0 KESUB 5/23/2024 ° CITY OF EDMONDS DEVELOPMENT dr ed by DP JDD scale date AS SHOWN 05/23/2 job no. 2022117 sheet \ / I . 0 of 3 A1.2 77 Driveway - NS1 1 /8" = 1'-0" NOTE: NO POTENTIALLY LARGE SHRUBS OR TREES SHALL BE PLACED ALONG THE FORCE MAIN ALIGNMENT. SEWER LINES, CONDUITS AND PUMP STATION SHALL NOT BE INSTALLED DIRECTLY UNDER LARGE TREES OR SHRUBS. 110 O 1 '0 �06 NOA' .0 - 10Z - 0" -100'-0"� - 98, - 0" -96'-0" ; - 94' - 0" 1 GATE 89.48 w a \Pill 1 0 - 86' - 0„ \ - 87.90 z 86.22 — PC ,. 83.23 LL O o_ O - 1 TP 81.05 T/O LOWER LEVEL SLAB FF TP = 76'-0"� I -74'-0" F 1 160 SHOWING CONCRETE WALL EXTENDING 6" ABV DRIVEWAY, TYPICAL III — 94.40 �. � + Level 1 Subfloor III III III III III I\ LINE OF EARTH ON LOW �r l I -H III III III SIDE OF WALL, - 92' - 4 1/2" F-- E�l � �d I F-1 FJ F�� ---1 �J E�� F�� � E� - III III 91.02 C FILTER FENCE — (LIMIT OF---- CLEARING) CHAIN LINK -- ---FENCING (CONFIRM W/ OWNER) CONCRETE CURB AT DRIVEWAY EDGE 96'-0"� FF 94" 0 92' - 0" - I 9p' - 88' i ----- 86' - FF ' � 84- 0" PM - .� RETAINING WALL REQUIRED : AT NEW DRIVEWAY 82' - 0" (CONTINUES UP TO PROVIDE CURB AT DRIVEWAY) 80, 20' --0" PM 78' - 0" 131,1111) 76' - 0„ TP 1.02; I � TP � NOTE: PER GEOTECHNICAL I I ENGINEER, TEMPORARY VERTICAL CUTS OF UP TO 48" OK, AND 2H : 1V THEREAFTER / i FF / - 74 0„ CC j ��I -PM EDGE OF LANDSLIDE -HAZARD AREA PER SURVEY, TYP C_C PC TP J'? , } = EXTENT OF PC' _ PCr- TEMPORARY AC PM _- -- — EXCAVATION 0„ I 68' - 1 - GRINDER EJECTOR " PUMP PER EDMONDS FF DETAIL #E62 '. NOTE: REQUIRED REPLACEMENT OF INVASIVE PLANT SPECIES IN THIS AREA, 10 � SEE MITIGATION DRAWINGS rP L ON "0 CC P(' \91.02 \92.1 !.19, W20-1 per table l of MUTCD ROAD WORK AHEAD Subject Parcel: 15604 75th PI W WIDE ROAD w/ 20 H SPEED LIMIT END ROADWORK G20-2 per table 6F-4 of MUTCD o Paving width N of project for 75th PI W: 15' Location of new driveway. Street to remain open during construction (see grading plan at left for C) CD .- extent of work o Distance for Urban: Slow per MUTCD o Table l Paving width S of project for 75th PI W: 21' +/- 158th St SW Traffic Control Plan �E CLOSURE WEST R DRIVEWAY WORK qE CLOSURE WEST R PAVEMENT STORATION qE CLOSURE EAST R PAVEMENT STORATION \CE ANNELIZATION VICES TO -OW ACCESS TO IVEWAY ANNELIZATION VICE FOR THIS EED / SIZE OF AD CAN BE Q 4FFIC CONE PER ;DOT M 54-44.09 ;: Haul Route 19bth St SW Meadowdale Beach Park NOTE: For work in ROW- - avoid peak hours, especially when construction impacts a busy intersection (along State Route) or within close proximity of a school - hours must comply with City of Edmonds Construction Hours: (M - F: 7am - 6pm); (Sat: 1 Oam - 6pm); (No work on Sunday or Holiday) NOTE: no disruption to pedestrian route or non -motorized facilities proposed. No parking restrictions proposed. NOTE: Hauling to and from site shall be along 75th /76th and 196th St SW. Single trucks only shall be used (no trailers). alderwood Manor DotheIl West 11 Cre TH A' — LL C U J J d C U) N (D U 0) U O O3104 Western Avenue Suite 107 Seattle WA 98121 206.204.0490 www.motion-space.com REGISTERED ARCHITECT Q o *STATE AZIM NICE F WASHINGTON N C) 0 O W E U -0 C � � W LO C: C) p co UJ No. Date Revision Description 1 1112012023 RC1 3 311412024 RC2 JOB # MS2021-42 DATE 05/19/2023 Site + Grading Al .2 0 z Q U W N 0 z Q w z 0 i w w z Q n 0 / z ry W W z CD z W / N N 0 N / N N 0 N / 0 N 0 N N Ln X N CONSTRUCTION SEQUENCE: 1. SCHEDULE A PRE —CONSTRUCTION MEETING THROUGH MyBuildingPermit.com WITH EMAIL engineeringpermits0edmondswa.gov 2 DAYS IN ADVANCE OF DATE REQUESTED. 2. REVIEW TEMPORARY EROSION AND SEDIMENT CONTROL NOTES 3. CALL FOR UTILITY LOCATES. 4. INSTALL TESC MEASURES AND MAINTAIN DUST CONTROL WHILE PREVENTING DISTURBANCE OF ANY AREAS OF VEGETATION OUTSIDE THE CONSTRUCTION ZONE. 5. HAVE EROSION CONTROL MEASURES INSPECTED BY CITY OF EDMONDS ENGINEERING INSPECTOR. ALL TEMPORARY SEDIMENTATION AND EROSION CONTROL MEASURES MUST BE IN PLACE AND INSPECTED PRIOR TO ANY CONSTRUCTION OR SITE CLEARING. EROSION AND SEDIMENTATION CONTROL PRACTICES AND/OR DEVICES SHALL BE MAINTAINED UNTIL PERMANENT VEGETATION IS ESTABLISHED. 6. ROUGH GRADE SITE AS REQUIRED TO INSTALL DRAINAGE FEATURES. 7. CLEAR, GRUB & ROUGH GRADE SITE. COMPOST AMEND AND REVEGETATE DISTURBED AREAS NOT SUBJECT TO ADDITIONAL SURFACE DISTURBANCE IMMEDIATELY AFTER ROUGH GRADING. OTHER EXPOSED AREAS SHALL BE STABILIZED PER EROSION CONTROL NOTES BELOW 8. INSTALL PROPOSED BUILDING, UTILITIES, AND BNSF DRAINAGE PIPE OUTFALL. 9. STABILIZE AND COMPOST AMEND ALL EXPOSED SOILS PRIOR TO REVEGETATION OF ENTIRE SITE PER CITY OF EDMONDS STANDARD DETAIL SD-642. 10. ESTABLISH LANDSCAPING AND PERMANENT VEGETATION. ALL TEMPORARY EROSION CONTROL MEASURES SHALL BE REMOVED UPON FINAL SITE STABILIZATION AND APPROVAL BY CITY INSPECTOR. EROSION CONTROL NOTES: APPROVAL OF THIS EROSION/SEDIMENTATION CONTROL (ESC) PLAN DOES NOT CONSTITUTE AN APPROVAL OF DRAINAGE DESIGN. THE IMPLEMENTATION OF THIS ESC PLAN AND THE CONSTRUCTION, MAINTENANCE, REPLACEMENT, AND UPGRADING OF THESE ESC BMPS IS THE RESPONSIBILITY OF THE APPLICANT UNTIL ALL CONSTRUCTION IS COMPLETED AND APPROVED AND VEGETATION/LANDSCAPING IS ESTABLISHED. CLEARLY FLAG THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THIS PLAN IN THE FIELD PRIOR TO CONSTRUCTION. DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE FLAGGED CLEARING LIMITS SHALL BE PERMITTED. THE FLAGGING SHALL BE MAINTAINED BY THE APPLICANT FOR THE DURATION OF CONSTRUCTION. CONSTRUCT THE ESC BMPS SHOWN ON THIS PLAN IN CONJUNCTION WITH ALL CLEARING AND GRADING ACTIVITIES, AND IN SUCH A MANNER AS TO ENSURE THAT SEDIMENT AND SEDIMENT LADEN WATER DO NOT ENTER THE DRAINAGE SYSTEM, ROADWAYS, OR VIOLATE APPLICABLE WATER STANDARDS. THE ESC BMPS SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS. DURING THE CONSTRUCTION PERIOD, UPGRADE THESE ESC BMPS AS NEEDED FOR UNEXPECTED STORM EVENTS AND TO ENSURE THAT SEDIMENT AND SEDIMENT —LADEN WATER DO NOT LEAVE THE SITE. THE APPLICANT SHALL INSPECT THE ESC BMPS DAILY AND MAINTAIN THEM AS NECESSARY TO ENSURE THEIR CONTINUED FUNCTIONING. INSPECT AND MAINTAIN THE ESC BMPS ON INACTIVE SITES A MINIMUM OF ONCE A MONTH OR WITHIN THE 48 HOURS FOLLOWING A MAJOR STORM EVENT (I.E. A 24—HOUR STORM EVENT WITH A 10—YR OR GREATER RECURRENCE INTERVAL). AT NO TIME SHALL THE SEDIMENT EXCEED 60—PERCENT OF THE SUMP DEPTH OR HAVE LESS THAN 6—INCHES OF CLEARANCE FROM THE SEDIMENT SURFACE TO THE INVERT OF THE LOWEST PIPE. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT LADEN WATER INTO THE DOWNSTREAM SYSTEM. INSTALL STABILIZED CONSTRUCTION ENTRANCES AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL MEASURES MAY BE REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN FOR THE DURATION OF THE PROJECT. ALL DISTURBED AREAS TO BE COMPOST AMENDED PER 2019 SWMMWW BMP T.5.13. INSTALL AND MAINTAIN ALL TESC ACCORDING TO APPROVED PLANS, CITY OF EDMONDS STANDARD DETAILS, AND ALL OTHER MEASURES THAT MAY BE REQUIRED DURING CONSTRUCTION. FILTER SOCKS AND INLET PROTECTION TO BE ADDED TO ANY CATCH BASINS DOWNSTREAM. PERMANENT SLOPES SHOULD BE COVERED WITH EROSION CONTROL MATTING AND VEGETATED. BMP C123: DESIGN AND INSTALLATION SPECIFICATIONS • PLASTIC SLOPE COVER MUST BE INSTALLED AS FOLLOWS: 1. RUN PLASTIC UP AND DOWN THE SLOPE, NOT ACROSS THE SLOPE. 2. PLASTIC MAY BE INSTALLED PERPENDICULAR TO A SLOPE IF THE SLOPE LENGTH IS LESS THAN 10 FEET. 3. PROVIDE A MINIMUM OF 8—INCH OVERLAP AT THE SEAMS. 4. ON LONG OR WIDE SLOPES, OR SLOPES SUBJECT TO WIND, TAPE ALL SEAMS. 5. PLACE PLASTIC INTO A SMALL (12—INCH WIDE BY 6—INCH DEEP) SLOT TRENCH AT THE TOP OF THE SLOPE AND BACKFILL WITH SOIL TO KEEP WATER FROM FLOWING UNDERNEATH. 6. PLACE SAND FILLED BURLAP OR GEOTEXTTLE BAGS EVERY 3 TO 6 FEET ALONG SEAMS AND TIE THEM TOGETHER WITH TWINE TO HOLD THEM IN PLACE. 7. INSPECT PLASTIC FOR RIPS, TEARS, AND OPEN SEAMS REGULARLY AND REPAIR IMMEDIATELY. THIS PREVENTS HIGH VELOCITY RUNOFF FROM CONTACTING BARE SOIL, WHICH CAUSES EXTREME EROSION. 8. SANDBAGS MAY BE LOWERED INTO PLACE TIED TO ROPES. HOWEVER, ALL SANDBAGS MUST BE STAKED IN PLACE. • PLASTIC SHEETING SHALL HAVE A MINIMUM THICKNESS OF 6 MIL. • IF EROSION AT THE TOE OF A SLOPE IS LIKELY, A GRAVEL BERM, RIPRAP, OR OTHER SUITABLE PROTECTION SHALL BE INSTALLED AT THE TOE OF THE SLOPE IN ORDER TO REDUCE THE VELOCITY OF RUNOFF. MAINTENANCE STANDARDS • TORN SHEETS MUST BE REPLACED AND OPEN SEAMS REPAIRED. • COMPLETELY REMOVE AND REPLACE THE PLASTIC IF IT BEGINS TO DETERIORATE DUE TO ULTRAVIOLET RADIATION. • COMPLETELY REMOVE PLASTIC WHEN NO LONGER NEEDED. • DISPOSE OF OLD TIRES USED TO WEIGHT DOWN PLASTIC SHEETING APPROPRIATELY. 70 W4 I 50' z r _OT 1 LIMIT OF DISTURBA C �N BL�►I 1 LIMI S T FENCE R EDMONDS ) ER-900 1POSED CB BE iTECTED Aw rn np f E� C NIN(LOWAATIONLL PER R T LOG DENSE BRUSH) 3" 2s X—X 'I I X x — I � I� " N O GO �6 BLOCK 24 8 8 8 mm 6' CHERR P OPERTY LIME (TYP) N /CAP o X X =— _ ' X—X—X—x—X—x—X� Iro m I NI ESM I I I I I L N� X X�I d E , I I I I I EASEMENT P I � � I I BORE HOLE � I aw I I APP LOC. PER W/ NO CODER 1 BRUSH) I x I L al, )T 2 I \ X } \ \ I GONG. mw 14• AP \ \ INTERCEPT B. } SWALE I 4' OUARR SPALLS \ I 1 \ \ \ \ \ \ J\\ \ k I 'ROPERTYED I APLE` I I \ \ \ 5 CHECK DAIS (TYP) —X x—x—x—x—� \ X X X X—X X—XJ I \ I I M " I N 8737195. (195.1 R1) % I I I Ay E D OIL WITH BMP DECK I I T —1 SEE SHE T C.2 ATER I I I I I � C N TRUCTION ND N . 1 R VE ETATE I I I I I I I I I I I 20 10 0 20 40 SCALE IN FEET 1 "=20' R' PTO PLACE NT OR WHERE .18' d: .4R. I x PR P.C R. I .0' n lx ' x � 3 &� a COVER STOCKPILE WITH PLASTIC COVERING WITHIN 2" OURS 20'10 VV 1, oo$o U � W y N 5'p_p UaU 1 STABILIZED CONSTRUCTION 2 � IM@ ENTRANCE PER EDMONDS MBSTD ER-901 C2.1 OB \ �I CB RIM-96.21' } II �z`�J � f 8 INLET I 3 � PROTECTION PER EDMONDS C2•� STD ER-902 SDMH RIM=93.:. ,,,m=X.k I IE DIR X' TYPE=X.X I Approved D F M CMr' s gust South County Fire Date: 06/18/2024 PVC N I.E=97.50' 6 PVC E I.E.=97.00' B' PVC S I.E.-96.90' BLD2023-0640 APPROVED FOR CONSTRUCTION CITY OF EDMONDS ENGINEERING DIVISION WE: APPROVED AS NOTED �/i%y1%"6/15/2024 BY: CITY ENGINEERING DIVISION 0�� CV 3 1-10 0) Q Z M O CV o �G5. I Nc O 0 `HS0 ■ _ U W q0o� zW — z �o° N�z c0 0 — c� z (DoCE z W 0Mm = J �I� T � U O 06 o 00 T LL C 06 p[ 0 C) 0 r� /1 1 W W I (0 O 0 > o�U cr `� w C- w�f > LU o -1 � 0 J zT- �W/�, Q T W .� J z U� Z> 0 Ld w Z 0 Q Z 0 0 N O z W Q �U oz W 0 0 = U) Q U) O z W o VJ IZ I UO W co RESUB o 5/23/2024 ° CITY OF EDMONDS DEVELOPMENT dr'dW1" U.r-- — ' "CFi��lied by DP JDD scale date AS SHOWN 05/23/2 job no. 2022117 sheet �-/ L . U of 0 z Q n C) w N 0 / U) z Q I w W Cn z 0 cn w w cn z Q n I 0 c� z ry w w z z W / N N 0 N N N 0 N / 0 ro C� N 0 N N Ln X N 2" x 2" WOOD/STEEL FILTER FABRIC SECURED TO 2" x 2' 14 GA WIRE FABRIC EQUAL NATIVE BACKFILL MATERIAL 8" 0 I N FILTER FABRIC MATERIAL IN CONTINOUS ROLLS USE STAPLES OR WIRE RINGS TO ATTACH FABRIC TO WIRE 2" x 2" WOOD/STEEL POSTS -\ I I I CE FPORT FIRE MESH ILTER FABRIC I `BURY BOTTOM OF FILTER MATERIAL 8" TO 12" NOTES: 1. CONTRACTOR/DEVELOPER SHALL MAINTAIN AND ENSURE PROPER EROSION CONTROL THROUGHOUT PROJECT. CITY INSPECTION REQUIRED ON 2. SILT FENCE TO BE PLACED DOWNSLOPE OF CONSTRUCTION ALL EROSION CONTROL METHODS ACTIVITY. BEFORE OTHER WORK CAN BEGIN `Sl. 189\' SILT FENCE NOT TO SCALE REVISION DATE CITY OF EDMONDS FILTER FABRIC FENCE JANUARY 2018 FILTRATION SYSTEMS PUBLIC WORKS STANDARD DEPARTMENT DETAIL APPROVED BY: R. ENGLISH E R - 9 00 Surface area determined at top of weir 1' Min. � 3.5' - 5' c'1 + 1.5' Min. 4' Min. Overflow 1' Min 1' Min. _LS 4 TH IN DE FULL WIDTH GRESS/EGRESS DETAIL NOTES: THE MINIMUM LENGTH SHALL BE EXTENDED AS NECESSARY TO ENSURE MATERIAL IS NOT TRACKED OFF SITE O AND/OR INTO THE PUBLIC RIGHT-OF-WAY. O ATB DRIVEWAY RAMP AND/OR SITE ACCESS ROAD 15' WIDE MIN. SEE TABLE BELOW FOR REQUIRED LENGTH. NOTES: 1. SURFACE WATER - ALL SURFACE WATER FLOWING OR DIVERTED TOWARD CONSTRUCTION ENTRANCES SHALL BE PIPED ACROSS THE ENTRANCE. IF PIPING IS IMPRACTICAL, A MOUNTABLE BERM WITH 5:1 SLOPES WILL BE PERMITTED. 2. MAINTENANCE - THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT OFF SITE AND/OR ONTO PUBLIC RIGHT-OF-WAY. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL QUARRY SPALLS AS CONDITIONS DEMAND AND REPAIR AND/OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. ALL SEDIMENT SPILLED, DROPPED, WASHED OR TRACKED OFF SITE AND/OR ONTO PUBLIC RIGHT-OF-WAY MUST BE REMOVED IMMEDIATELY. 3. WHEELS SHALL BE CLEANED TO REMOVE SEDIMENT PRIOR TO LEAVING THE SITE. WHEN WASHING IS USED, IT SHALL BE DONE ON AN AREA STABILIZED WITH QUARRY SPALLS AND WHICH DRAINS INTO AN APPROVED SEDIMENT TRAPPING DEVICE. 4. INSPECTION AND NEEDED MAINTENANCE SHALL BE PROVIDED AFTER EACH RAIN. PROJECT SIZE MIN LENGTH OF (FEET) QUARRY SPALLS* < 1/4 ACRE 30 < 1 ACRE 50 < 3 ACRE 100 > 3 ACRE 100 *PROVIDE ATB OR ASPHALT TRANSITION WHERE FRONTAGE ROAD IS AN ARTERIAL. LENGTH TO BE DETERMINED BY CITY INSPECTOR. CITY INSPECTION REQUIRED ON ALL EROSION CONTROL METHODS BEFORE OTHER WORK CAN BEGIN REVISION DATE CITY OF EDMONDS STABILIZED CONSTRUCTION JANUARY 2018 FENTRANCE T PUBLIC WORKS STANDARD DEPARTMENT DETAIL FS l 1890 APPROVED BY: R. ENGLISH E R - 9 01 STABILIZED CONSTRUCTION ENTRANCE NOT TO SCALE View Looking Upstream Note: Key stone into channel banks and extend it beyond the abutments a minimum of 18" (0.5m) to prevent flow around dam. Section A -A A 18„ 12" (0.5m) (150mm) 24" (0.6m) CITY OF EDMONDS PUBLIC WORKS DEPARTMENT `Sl. 189. INLET PROTECTION NOT TO SCALE CATCH BASIN FILTER SOCK WITH OVER FLOW HOLES (TYP) :IN NOTES: 1. CONTRACTOR/DEVELOPER SHALL MAINTAIN THIS APPLICATION AT ALL TIMES DURING CONSTRUCTION PERIOD. 2. ANY SEDIMENT IN CATCH BASIN INSERT SHALL BE REMOVED WHEN INSERT IS ONE-THIRD FULL. 3. CITY INSPECTION REQUIRED ON ALL EROSION CONTROL METHODS BEFORE OTHER WORK CAN BEGIN. TEMPORARY SEDIMENT TRAP FOR CATCH BASINS APPROVED BY: R. ENGLISH REVISION DATE JANUARY 2018 STANDARD DETAIL ER-902 cV 3 1 � Q Z M o O N LO O . W UL.L W 'qao� Z W ILO t z O 0 VJ NcoZ V C`') M — c� z (Dorr Z W 0 0m = J T U> � U 0 00 06 O � T W C dS p[ � o C)0 C a W W 0 0 > oC) co a LU .. WD.- U) > r= 0 J V) J LU 4— M W Q z 0 z -> 0 UJ w z 0 z 0 0 0 N0ZIz Washed gravel 8' (2.4m) Discharge to Note: Trap may be formed by berm or by Geotextile stabilized Q W conveyance, W U partial or complete excavation. 2" - 4" Rock outlet, or level Rip Rap spreader Spacing Between Check Dams o W � Q z 'L' = the distance such that points Q V ) 'A' and 'B' are of equal elevation. vl I I Y Point 'A' Point'B' Q i NOT TO SCALE Cross Section of Sediment Trap Revised June 2016 DEPARTMENT OF ECOLOGYPlease see http://www.ecy.wa.gov/copyright.html for copyright notice including permissions, State of Washington limitation of liability, and disclaimer. SEDIMENT TRAP NOT TO SCALE DEPARTMENT OF ECOLOGY State of Washington CHECK DAMS NOT TO SCALE Rock Check Dam NOT TO SCALE Revised June 2016 Please see http://www.ecy.wa.govlcopyright.html for copyright notice including permissions, limitation of liability, and disclaimer. BLD2023-0640 APPROVED FOR CONSTRUCTION CITY OF EDMONDS ENGINEERING DIVISION DATE: APPROVED AS NOTED 5/2024 BY: CITY ENGINEERING DIVISION �O W � co RESUB o 5/23/2024 ° CITY OF EDMONDS DEVELOPMENT drdWh-bS(-- "CF 6'CWdd by DP JDD scale date AS SHOWN 05/23/2 job no. 2022117 sheet \ / L . I of U 0 z Q J a_ w 0 Q z Q 0 0 z Q U z 0 a U ro 0 / to z Q J a_ w Cn z 0 to I- w w z Q J tZ 0 / U z w w z z w N N 0 N N N 0 N 0 U N 0 N N X 4 N ► r ► , ► ► / y ,/ ► 1 1 j I i , �. x`��`� �` d„A L x� 1 2 I 1 �o f / 1 , ► 1 I / I 1► ► � I I \ \ \ \ I \ \ \ \1 H RFk1 1 I I X I / l 1 ► I I 1 / I I I , , , ► , I I \` \ �` 1 I '' I I I 1 1 I 1 % 2 1 I I 1 , I ► ► 1rel , I I ti ``�� \ \ \ \ t ► ► , 1 I 1 1 ► I 1 I 1 I I �. ► ► 1 1 1 I I 16LFr' 47S / i l ' i I I' I'' i i ► ti`�' i I I I 1 03 `` � 2 � \ \ 1 1 , I t, 1 1 1 l ► ► 1 � I I I ' ' i I 3 1 ' I 1 ► / ..\ 1 „ L 1 I I 1 2 t , I I ► 1 1 ► ► ► 1 ► I , I, 1 \ , I , ► / ��� 1 6 HtRR 1 1 I 9 ► I I , I I I I I ' I 1 1 , , 1 ► 1 1 , , 1 1 1 ► 1 / 1 I I , 1 \ (off' , I ► f l �� i o 0% x / 1 I I 11 I I 1 I I LL1 1 1 1 , , ► 1 1 , ► 1 i 1 , I , , , ► 40' j I , 1 \ \ X , , I , 1 , i` 1 1 ' I 1 , I I I 1 ► I , , 1 1 1 >V Z X I I 1 1 1 1 ► ► 1 I ► 1 1 1 1 ► 1 ► 1 I \ I 1 ► • 1 1 1 I 41 SD 0 ►° , I I II I I 1 , ► , ► ► ► ; , ; MW ; ; \� ► ► / ' I I I \ l I I 1 I I I ' 1 I I I 1 ► ► ► 1 11 ► ► \ II I \ l\ f � Ii' I I I ; ; \ \ \ ► � 2 lO�` I I ►1 l i ► 1 ►` I ► 1 ► I I I . \ \ \ 1 17 .35m \ \ \ I ► p,� ` ► i ` \ `, t ' / I I 1 I I , \ \ \ 'w w 11 1 1 1 1 I II I 1, 1 I I I I , I 1 I 1 I 1 1 , ► <7r ► 1 ► ► \ �PEIp Y LINE (1YP) 1 \ \ \ \ 1 1 x I .09 W= I I, 1 \ \ \ sN z zI I I ► , 1 1 BO 92.49 4 I \ _ 1 1 - I -�--� I I I I 1 , 1 ► 1 1 1 ` ► \ X I I I 1 ► `\ ► 1 I SSC I 1 ► W _J I , I I I i i I -�L / ►` 1 l\ \ i �, I I (92.29) I _; \ \\ ; \ X U G I� HER I / 1 ► ► I 1 1 I , I t M-921I W wg• .vj .v 1 �W w\ ►,k w w w w ,.v 1 (8 .37) S 91.50� I -85 0 1 \ % I � � h ' x `C x `C x x x x `C x xx x x x xx x N--,,�' SEWER FORCE LINE FOR PROPERTY TO .� >- NORTH TO BE FIELD LOCATED PER Y ENGINEER OF RECORD AND ENGINEERING >- INSPECTOR. A DIFFERENT CONFIGURATION >- MAY BE INSTALLED WITH CONSIDERATION / / i - \ \ 1 , In I T" �/- ►- ► r�-► _ , \ \ 1 I TO FUTURE NEEDS OF NORTH PROPERTY I I I I ' I I I I I 1 I ' w w\ I .v .� v► 1``� A x! ^/ W p I ! \\ \ \, ^�; , , ,� SFR. SEWER EASEMENT TO CITY I I 1 I , , I I I I 1 1 1 .v . .v .v ► .v � xwr �C ► . ,. ,. ,. � - I I 11, I 1 I 1 I » i LSCAP \B'� I ! I ,- t a1 5LF 4 SD @ 13.1% i _ TOW=92.18 TOW 0 ' t i i ' 1 �'� '! i ► FOLLOWSD LOCATION OF FORCE LINE WALL 14ND VE 1�i I I , 1 1 1 I I I I ► I TO -9 .1 I I 1 I I I I I, I I 1, 1 I I 1 I, I 1 ► W .v . w l W wl w wi w tx .v w% .v n I BOW=92.25 , i I 1 I ` / (� �. ! ;- U / WHEREVER INSTALLED. v 3 - I I 1 d / I I I I I I I 1' ' I' 1 I 1 ' 1 I 1 , ' I I ► ► 1 i ► X 6.1 LF 4» 3 .6% I ► ' 1 1 I I 1 1 I `. ►! -C I I �, w , 1 w �►2 '\ w w » •v c v --- -- -- I TOW=92.18 93.14 ! I , I , .� �� x I i' I >>> I I I � 1 .v .,, �. w' .v' w 1 .v � ' .v w� A", SDCO.•� , I I �, I I I I » I 1 , I I, , I 1 1 1 j I I � ► ► �. j r , -- --- -- -- -� » : I I I ` � I I I 1 ► 1 o I I 1/ I 1 I 1 M L I I I I I 1 I I I w : ' w lY w l w I' ,, RIM=75.36 y 1 » 1 4 SDCO r' I ,, , I' ° i 1 u 0► z ♦/ I I I I , I , I ! I 1 I 1 1' I 1 ► T I 4 PERF PVC DS I °> I �I 914 I I I I I �\o `► I , , 1 I , , ' / ' ► 75.61 89.71 I I I- I IE=74.03 RIM=92.32 + � BX EDGE 11 FOOTING DRAIN TYP g - ' 1'7 ' 1 ' I' ' ► h ' / o w Iw ► 81.53 ( ) 92.37 I IE=90.99 1. I , 1 2 X I cu I 1 I I 1112" MAF� LF�1 1 , , I 1 w ► .v. w, .� Ca.v w , .y ► ► , I 1 F , t O I 1, I , I I , / ► / I / jW I sl `► IE=79.72 ; 93. �9 i 1 ti I, �j I I 1 1 , I I , ' I , I I , I I , /•v .v .v 1 w , w w f v/ w 1 w rLb , v 1 •v >� DS pS 92.37 I �: ► , I ► 1 11 , t ti� NT - • I ! I I I I I I 11 I I I I I , 1 1 I I I, I .v/ / 1 w 1 .v, I .v w ► w ► c► , `v I i ICJ► (�► 19 2.32 _ ►►, ► t �' y » rr---r a 9� '. iIN .3.�1Y �. ►I `I \\ / ` ' Iy , I� I ROOF DRAIN N • 20LF 4 SD . CaD 2.0% 8'1.8b I I; 1 ,►► Llb 11 RiD I I w w w '� w, w w► w • , a I 3:09 I, I► t �. l i 1 1 1 \ \ I 1 1 1 1 I 1 1 �� ►�I 2 TIGHTLINE . , 1 i 1 1 1 R A I , I I I /� �� i� y who w ! • Ia 92.37 �, 1.. _ i _ �i i I ET, 0 1 �� , ►' --------------------� , , IIt. ► 1 l � titi \ 1 1 I I 1 I I I 11 , I I I 1!! N y W, i , , I� I I - , BO150, 1 ` TYPE I CB » 81.35 » 3.5 LXO.5 WX1 D 1 .......... 1 I I 1 ► I 1 1� �'�'- . \ / I ° 29-f 4 SD 92.07 1 C� I ► ► , t : a , I , • � � I � I , , I , , 1 , , 1 , ► _ ►� 12LF 4 SD ®2.0% 4 TRENCH DRAIN v w w I v w 1` ► O RIM-77.26 � I • I �°. o .. ....TOW- :88� � ACM � I o i ► ► ` ' � I I N' 4 � 2.0% CV � T O. � ' � � r `* 1 � ' I • \ I I 1 I , , I , I � I » I TOP OF 1�. . . �• , EASE � IE=73.38 4 N,E,W ,.� wl v' I a 7 92,6 �- I ' �x �,� t '► I ...... x . SSE E B E �1 ................ » I ...L__ TRENCH=92.33 .1. I `'` _G ���.:�:��_��:�:�:�:�: i IE=75.69 (4 S) I w I `� �S LO ......-...... , ti -..... (+ I I '1,,1 1 d IE=91 .33 CV - 1 FN I i \ ........ ..... / 1 d 78.56 �. .. .. I! A ftO a \ `l- ,► �3 CONNECT FOOTING ° ° co rn. .�. �. �'. `�1 ^ I I I �► - 1 i i i I I I I nsi' A L I I I I I 1 I p� i I , ; DRAINS HERE 1 i., I.,. `I a k I 1 r\ tie _ 1 \C3. 2 .......... . 16 LXO.5 WX1 D 1 (y -93.0 - ► 1 �- 1 .. 1 , i \ INSTALL AVB PER STD 2°' ► I , 1 I 1, , I, I I I, 1 I I 1 a , PIPE ANCHOR 17 .41 S T NCH IN w ... , I, I' I I I I RE DRA �'I" �, 1 P I ti� I I I ;-`t' I I I,, I i� y w W, 1 PER DETAIL 1 y 1° d a 1. , I I 2 �b- ► ; 1 1 \ ' ' WA-165 AND HOSE BIB ON 1 ` ' j I ' �I , I I I I , I , , ' I ' ►`o / I 1 I. S 80,d79 ° . TOP OF 4V �. ;93.62 I 1 1 1 2 II I I I I I `�C \ o I 1 , I I I d I III I I wx �� �► WI ON SHEET C4.1 - -- - - DS 1 , ► w tip' I ::: ,,, ► PRIVATE PROPERTY SIDE OF ' ► \ ♦ ` I , 1 J8 N}A L X , , , �.�, , I , I I 1 / ► I , �I » TRENCH=92.07 _ �c ` 1 \ \ ►� y� ti , I w ' 1 ` 1 1 I, I I , I , I I I I I I �► 125E 4 SD _;\ ►, 1� I - I I 1. I i METER FOR TEMP I \ �\ \ ► , 1 , � , I , ► � 1 _ IE=91.07 MW. _ � ► , I \ I '� � I I � - � _ - I:::: titi ► I 1 I \ I 1 1 I I I { w 1 I 92.07 . , \ , ` ` ` ► �3) ► CONNECTION DURING �• \ + \ \ , Inj I 1 I 1 I , t- �• , 1 '? W W W / vx w w W W W , 81.48 ■ , \ , $ 1 ` ► 1 \ \ \ , 'b I I I 1 I I o- �o / , II 92.01 ■ - 1 . X. r�. ' , ; , ► ; ► i 1 bj ap ?, �: 1 CONSTRUCTION X I 1 ► , , \ I I '� , I I , l0 I , I ► I I ■ _ , ► v \ . �....... I X, , \ I 1 , , Rti w vx , w w 1 w w ,w w , .v .v I I I » . R't \ z �..... . ''- I ► 1 ' I 1 I I c,, I , , I I 1OLF 4 SD @ 5.9% ' 93.5 0, .. 9�. \ , �A o►Q » ► I I I W► RE a + 1 , cn x 1 , 01 °�► i�► - ` i NEW 1-1/2" DIAMETER ► I ; ' , ' I III !i!!! i � ►� 1 ► 1 � ' ►► ' 11i ' 1I1 , II I , 1 ,' I� 1 11 , II I 1 1 , II' II' I ,,' i l 61Yl , �4 � I, I I ` I �.v �'.vl' ���w y w I\ w ` w w w, ► i► ww w ,1 �.v`�' .v.vl w ..v�.v w w 'I, Ii�II o . •N ` ..0� � 1I I *j� ��' t► , ti ASTM F877 RE 4 SDCO O -I T_ POLYETHYLEN E WATE R O RIM=93.01�0 1 H IX � M PIPING BUILDING .b�*kl SSIN 81.37 • WITH TRACER WIRE 120+ 81.49 92.4.I wSD S \ \ \ ♦ w , v w, W W► W W w W ^w w • 81.25 a 92.54 r. \ 1 ► , `2 J\ 9,�.w , � / � .1 ! \ I [[ I I I I ' ► \ 5 FOR EMA N ti 1 ! 1 \ 1 1 ' I { ► I I I 1 I I I ' 1 �, \ \ ; w , w . , w w / , w .i, /►� w \ �1 1 � .D.� • . • . • • . .��. \ » � 1 \ , ► , I ` , I 1 I , I ' I \ \ ♦ I �► -�-1 14LF 4»SD ° , \ \ - s - I � ► '� I \ ♦ \ \ \ w '� v/ w w I. _gyp----- i's "� ` ` \ \ ♦ 1 >� ► STRUCTURAL , •1 N 81.42 ; �..:.: ;.� \ I $ \ I-MOL, IPE 6-x S'1 ♦ ' ► ' 'tJ .:. \ ` AC€R WIRk' `�OR x COLUMNS (TYP) I\ \ `11 ORTH NEIGHBPR,S - - \ ♦ \ � � 8. \ \ \ w w ► .v w w w / w / w w w , D S 94.08 � � \` ♦ \` \ \ \ \ \` \ ♦ \ W y IW iW W ` 1 `t.15.. N1 _ 1,� \ o C �i • 1 cn I I �� • •� •� �� 1 FIRST FLOOR , , • 00 92.54 ; ° ; .. CONM _ I .0 I , , , I I , , I ► 1 ► \ • k,\ \ \ \ ' 1 ABOVE TYP ` •1 \ sci �� 0 0 0 ?I i 1 1 1 � � l] ♦ \ \ � \ ( ) oo ► � � » O� i � . `T SE'� f�UFI LE OIN \C I �` nl I II 1 1 i I i ' 1 I 1 i i i i i i ` '♦ W ► » I w ,` �� 4 SDCO ® I\ 53LF 4 SD 0 2.0% �r y � 1 ■IDS ' 94.17 � ...... I I I 1 » N �, , �. ♦ \ 1 �1 RIM=81.91 92.38 I 94. \ \ o �� m z\,,, I I I dN I D U \ , \ .� .- ♦.� \ jv ► , 1 •1 �- - �. `. \ \ ti`�' \ ti �� a c> \ 1 , SPECIAL , ! 1 1 1 I , 1 \ \ w ` �� w �\ w DECK ABOVE k .� �___- _- , IE=80.10 cn , , , I 92.1 0% I \ \ \ °�. �, uJ t� INSPECTIONS , i ' StA' I i i , ; \ 1 ` 11 LXO.5 WX1 D I °' �20% �` is - - -X�� ,'� o I o A- o I 1 Ill 9 ( I , ' , \ , \ ` ► w \ (TYP) , 11 I a REQUIRED FOR PIPE I I I , \ , , , \ 1 1 ` \, I . _ _ II �� IL TRENCH DRAIN T'� =9 d ` d ANCHORS AND ; i E 4;5 i 1 \ , 1 \ \ \ �► v \`\ ` .a ; --, II » •.... , \ �_ N ;N 1 1 i E N C� ` �' ` \ t ROOF DRAIN i �1 TOP OF_ I 17LF SD �� ..:.:� CCE '4� 11�I P `�= o \ I , OUTFACE TO BNSF \ , \ ` ` ` ` ` I II I o , ■ \ 1 ` I , 1 1 , \ ,� ► ` \ \ ► \ �\ �� TIGHTLINE I I TRENCH-92.45 (�? 15. ■ �, IAFN 20 20I$ - \ TR N / W\\ `X \ \\ I I; IE=91.43 �� ■. .,. NEGINS NID5CC) 34 � � '1 I 1 1 I 1 I w' w - � \ 1 �H 5 F'�1 �S f♦�E `�.� : w`\ `` ; A , A, I N �. ..... �` \ » J ► I 1 I 1 \ \ \ \ 1 \ ► \ \ ♦ \ I I I c9 ', PROPER \ 2 PVC SCH ► I , 1 I I I i 1 ► I ► \ \ \ \ Q►I( G� `�$ \ \ + \ \ •v ► •v \ •v � w \ w ; � � .��. � �, .� � ,�, , ,�, I D S I ® � BOW- .39 ■ ... I ... \ \ ,� 1 I I I 141' AFILE ► \ , \ \` 1� 161 LF 1.25» FORCEMAIN ` '--__-__= o �. �.:. ADD �T� N .� __4A-POWER- M� �\ r ► 1 ` S SE A� T� A \ \ \ ` w w \; �\ I I ..... F CE Al 1 CONDUIT AN \ \� I I \ \ \ \ \ \ ` \ \ 1 In RE INING LL , . ,... . \ \ \ \ 1 1 IPS POLY HI-MOL PIPE 1 I ■. k• x. \ 1 , \ 1� 1 I I 1 i r , I \ \ \ \ \ \ , ► \ \ \ \ \ I d- . 00 G DRAI 1 ! 1 �� I I 1 ► \ \ \ \ ` ► , \ \ ► \ \ 1 \ \ \ �, \i w \ •v w \w ♦.v w I - ■ AID POWER (10 ` I �O- O 1 , I , 1 1 1 ► \ \ \ ► \ \ \ \ 1 \ \ \ \ \ \ WITH TRACER WIRE ----- ILA » 3 1 3 I 7� \ 2 ti I �� ! ' I \ \ \ 1 \ \ \ ► \ \ ► w\ w _ - ------ - 88.00 , J SDCO .� .. 96 Q ` \ ► $ \ I I 2 I , , ► , ► , , \ + \ \ \ ` \ \ 14.0% SEE PROFILE I I __J , . ■ \ \ 1 \ \ I �' 1 I ► 4 A \ \ \ ` 1 \ \ \ ►\ \ w I 85.57 \ \ \ \ I ► , I ; ' ' ' \ \ ` , \ 1 \ \ ► \ ON C3.2 I 90.41 ; �.L RI =90.33 ,.:. \ \ ,'PE LiE 11 b ; \ \ \ \ ww �� D IE- .55 i ; ...... \ i i I I I i C E Ci 1 j \ \ \ ► \\ \\ \\ ►► w w •>r w w \` » �` ( ) \ \ � ► \ � \ ADDITIONAL 1.25 I , I 1 I 1 I I 1 ► 1 ` ` \ ` 1 \ \ FORCEMAIN - CAP AT «, 1 ' \ ► , ; \ ► 1 \ EACH END `� » p , I , I I I ' 1 I 1 ► 1 ; \ \ , , 1 \ \ + \ ` \ w w .�\ w \ w w w 4 SD Gt0 `90� SJt i �i ' I , + II I 1 1 �, 1 ► 1 ' 1 \ ` 1 \ ` ` 1 ` RIM=85.65 AG_kI 84.31 0 `�2 4I 1 I ► \ �_OW=9 .20 '�.1t...........AS LI Q �� i ► ' i TI \ ;.�\.��.���`2.,` W=96. 5 AI P U ' ; 1 1 I \ 0 SL�PE \ \ 0 I I , \ , \ \ \ \ \ wt w w 1 I I E, I I VT ► I ►\\`txL1X E� i ' ► 1 \ ` 1 t`w `w I 0 1 I ► � ' ► 1 1 ` � \ ` ` ��G 1 I I 1 , ; , , I 1 , 1 1 ' l ; \ \ ; ` ; \ , , w t w w , v„J-DWA .v .v , .v .v •, , , \ `, `.` ���s `` .x. 1 .� I I 4,1 I 1 1 ► 1 ► 1 , 1 1 1 1 \ \ \ , 1 \ t n � w \ w \ w w w` `\ � ♦ \ `.\ I 1 1 ► / \ , \ 1 \ \ , wt �0 Ow \ .� `r ` ` ` I 1, 1 I , 1 1 I , \ ► \ \ Et HE1 4 01 M{ �� 1 1 1 1 I 1 \+ w w w `� O (83�. �....... I ' ► ' ' ' 1 ► / \ \ + \ \ \ \ 1 `� ♦ \ \ \ ♦ `� R�`T,p►I Nd� LL`� ; ... CI do I , / , T I } Q 1 ► I 1 f 1 ► (-�\ .v t w w \w `\�► v w♦ ✓ ��` J`.� \ `0 R� ` � �` _____-- , , 1► ► 1 I , , 1 r 170E If 4,P I SIQE DJ � R \ \ � � \ w ; � � � \ � � � � � � `9 � ,------ ` �� I � ` : X ........ o - 1 , ' i ' ' i I i ' ' ► i AST 3'03 SD 5 IIVI i \ t w w\ ` � `. S�E IlJ ' I ,.. \ 1 ► I I ► ' ' I I ► I RES 14tIN (JOINT B�j \ .� t w w \v \ .�, .� -�.� . ., `, ICAT� N ` II II II r ' T \ t \ \ trj ♦ \ .� ♦ �Q g 99.9'8 (100.30) '� \ w w ► , ► / ' ► ► , , 1 f ► I » » \ v L w v \ v wt w .v yv v \ .v♦ \ �� ♦ . O \ \ I I 1 j i i ' ► ► 1 1 i ' i i I C RVA- 0 R ►EQ `A�) Jpl \ \ t , \ ` ♦ \ ` �` �` I do - - - 1 ► , , ' ► ► I ' \ .v t w `v w \ w \ w 4 Y------- ; . z W (n ► ► / ! ► 1 ► ' 1 RATED,' F R 5 T �iE pS \ ` ► \ \ ACCESS EptSE R .. .. ,p% \ �, 1 I 1 1 1. 0, I ► , , , , , , 1 1 ► 1 ' 1 1 1 ► , I ► 1 w , w .v iv w p� w w w ,.v ♦w `. _ ■ rn > > I I ► ► ► ► ' 1 1 J 1 IW 2.115 F i C f N ► \ w w ` ` �• ` �`� ��4P1- �`� \ :` \ ■..= °fo . 9.2 ° o u I 1 ► , 1 + , I ► , 1 1 ► A PRbX SLOP = 2. % ► 1 \ w t w .Iv w w I w W y, W W ♦ `� BEGINS AND . . ► L h , ► ► ► , =- - I ' 1 I 1 I ► I \ \ .� . ` 6 SSC I 1 l I 1 I I , 1 I ► �' a-�1_ t I 1 : ` • rIRv6€ '�,�N� , �, \ I 1 1 , 1 \ 1 I 1 I 1 ► I 1 I ► .v I .v .v 1 v w °l' �.v v % � � `. `. ` 2 0 \ \ 4 I 1 1 ► ► ` 1 I I , 1 I I 1 1 ► ► I to `� �� `�_ `� . ` \ ■ \ of ' ► 1 ► ` I 1 I ' ► ' 1 ► ► ► 0' `J x - • • `.(� 41 w� I 1 ► I I 1 1 1 1 , 1 I ► I I , I ► 1 1\ '3 , , \ 1 �� \ .1 ! _ I 1 I \ ► 1 I ► 1 �- I , � • I ► \ \ \ I 1 1 I , 1 I I I I I ; h I X I Iraq 1 ` 1 1 OP X (98.62) �2 ` \ i i i 1 1 i i i ' i i i ► 1 ► �`� LINE E TYP ,� ♦ '� ,� SSCtO 1 ► ► `. 1J � X \ 1 ,� ( ) ------- � � M� 99 31 , 201 F 6» % i i i `i i !; ! j 1 1 1 1 ' 1 I I I -� d h \ 1 ► ` I I I 1 I I 1 I 1 I �_ 1 i i \ \ ``. \ 1 ♦ x' Y ► » ►» ► 1 .0% tk of `� ao _ ♦ 1 It=94. 7; ( S� , ► x 1 n 111i`Nu I 15.00' ACCESS R ��6 S$C¢ ► , - G 1 2 N w ``� 100:....:...:....:....:1..:....+....... EASEMENT..::.......:....:t..:..:...:....:VARIES� I fIM=$9�2 ; I 1 1 ANSI�ON W L , �� °� .. _.... _........ ' '� I = .7121(�» M; » S i iIx » i x 'q'° `°, zz Z o\ :..•,� / 21 1 , I , , 0 6 CURB - ----� •� 0 > o•o RETAINING2:.......... �'� ' I I i , i CONFIXM NO - - " x • ��. ::°�o PROPOSED GRADE ,O i ► I ► i i I Ix U TI LI ' 2 N C WALL :.IMPERVIOUS AREA CHART:cn :�°.:: 6 CURB PROJECT SITE CATEGORY: CATEGORY 2 �% ; ►' { , ' ' ► �, (0, 1 1, , 1 ►I I CONFLICTS P O 95:....:...:....:.1..:....=...:....:....:....:._..................................... DISCHARGE LOCATION: BNSF ROW ' I 1 ► ► ' ' I , Ex GRADE / I 1, 1 , I 1 I I TO I M \ I :....... PROPOSED 2» N w _ ::::::::.I : SCH 40 CONDUIT 10 5 0 10 20 z p................................... ......;.......................................I..:..:...:....:....:....:............. PROPOSED ......... GAS LINE SCALE IN FEET I : _ .... ......:::I : I. "1U0'. DEDICATION ..........I..:....... 1 "=10' 1.25" SEWER :: :::I : _ :::: :::::::::I :: ::: OS T GRAVITY PIPE FORCE LINE i 1 i ; ICONSTRUCTIO T��° RANSITN T IOO °I° I I I MENT SHALL NOT OCCUR , I I I i I °'�, _ � I AT 90 DEGREE � I ' I I I I , II ♦ � I I BENDS. i I i I i l I `♦ °o I I Lu _ . ; . . . . ... . .I FORCE MAIN .... _ .... ; .........................................: I..... i.................................... ►o' , I I F- I 3' ► C�- , NOTE: PROPOSED UTILITIES SHOWN ARE IN PARALLEL - -i - i i i i i v i 1 ACCESS ROAD WALL AND UTILITY CROSSING A� { I SCALE: 1" = 10'H, 1"=5'V TYPE OF AREA SQUARE FOOTAGE STORMWATER FACILITY COMP LAWN AND 11,782 N„� INSTALL NEW 1» METER IN EMPTY METER BOX PER EDMONDS STANDARDS NEW 1" SERVICE WILL NEED TO BE INSTALLED FROM MAIN TO BOX BY CITY. RESTORATION IS THE RESPONSIBILITY OF THE CONTRACTOR. 1 RESTORE C3.1 PAVEMENT PER EDMONDS STD GU-410 (�) - ASPHALT ACCESS ROAD 4» HMA OVER 2' GRANULAR STRUCTURAL FILL OR CRUSHED ROCK PER GEOTECH RECOMMENDATION - CLEAN SAWCUT AT EXISTING EDGE OF PAVEMENT AT 75TH PL W AND APPLY AR4000 SEALER AT JOINT SIDE SEWER STUB IE=94.3f APPROVED FOR CONSTRUCTION CITY OF EDMONDS ENGINEERING DIVISION DAZE: APPROVED AS NOTED �/ 6/15/2024 8'1r: a7Y aHsaN . VJ U °C W z �o� W �00 ? BLOC) W D0 z J U U � 0 0 = o � dS � 0 00 coC W W T_> E O > U CY)Wc D n::)L 0w 0 J � z `o rW� m J 04 mQ s� z O O w w Of z 0 F Q z 0 o' 0 0 U N O z �I Z a_ Lu �0 �z J LLJ 0 � O o W o Q CE � U = z0 0 � Q U) (RESUB z 2 5/23/2024 ° CITY OF EDMONDS DEVELOPMENT dr UEHi ed by DP JDD scale date ASSH OWN 05/23/2 job no. 2022117 3 0 of sheet ♦-/ . FINAL JOINT SHALL BE A NEAT SAW CUT STRAIGHT LINE. ALL EXPOSED VERTICAL HMA CLASS 1/2" EDGES SHALL BE TACKED NEATLY PER PG 58H-22 WSDOT STANDARD SPECIFICATIONS 5-04.3(4) (SEE NOTES 4 & 5) 1' APPROVED TACK OR APPROVED EQUAL AND SEALED PER WSDOT STD 5-04.3(4)A. 1' SLOPE EXCAVATION TO AVOID UNDERMINING EXISTING PAVEMENT. EXISTING HMA..... :....:..:......:..:::::....::::.:...:....'.-,:_..:'..,.....,.::,..,:._.,::-,:,-:.,.....::,...:,......:::.;::.::::,':.:•� EXISTING BEDDING MATERIAL (1-1/4" MINUS) CRUSHED SURFACE BASE COURSE (SEE NOTE 3) IMPORT BACKFILL SHALL BE COMPACTED TO 95% MAXIMUM DENSITY (SEE NOTE 2) TRENCH WIDTH NOTES: 1. SEE CITY OF EDMONDS MODIFICATIONS TO DIVISION 9 OF THE CURRENT WSDOT STANDARD SPECIFICATIONS FOR BACKFILLING REQUIREMENTS. 2. SUBMIT PROCTOR AND DENSITY TESTS FROM CERTIFIED TESTING COMPANIES DOCUMENTING THAT THE BACKFILL MEETS A MINIMUM OF 95% DENSITY PER ASTM D 1557. 3. CSBC DEPTH SHALL BE A MINIMUM OF 6", AND SHALL BE INSTALLED IN MULTIPLE EQUAL THICKNESS LIFTS NOT EXCEEDING 6". 4. ROADWAY HMA DEPTH SHALL BE A MINIMUM OF 4" FOR RESIDENTIAL ROADS AND 6" FOR COLLECTORS/ARTERIALS. 5. ALLEY HMA DEPTH SHALL BE A MINIMUM OF 2" THICK. UNLESS APPROVED BY THE ENGINEER, ANY DEPTH GREATER THAN 2" SHALL MATCH EXISTING. 6. UNLESS APPROVED BY THE ENGINEER, THE HMA SHALL BE INSTALLED IN MULTIPLE EQUAL THICKNESS LIFTS NOT EXCEEDING 2". 7. FINAL PAVEMENT JOINTS SHALL BE NEATLY SAW CUT AND UNIFORMILY SEALED WITH WSDOT STANDARD SPECIFICATIONS 5-04.3(4)A APPROVED JOINT SEALANT OR APPROVED EQUAL. ' REVISION DATE CITY OF EDMONDS TYPICAL HMA AND APRIL 2021 UTILITY PATCH PUBLIC WORKS STANDARD DEPARTMENT DETAIL APPROVED BY: R. ENGLISH G U - 41 0 TYPICAL HMA AND UTILITY PATCH NOT TO SCALE w z'Jw J > w Z_ O Z a wQw 0 1 � X U a Qom 10' /- (IF STUB FOR FUTURE DEVELOPMENT) SEWER STUB SHALL BE LOCATED 10' INSIDE PROPERTY LINE & STAKED. PLACE 2"x4" TIMBER AT END OF SIDE SEWER STUB AND CUT TO LENGTH TO ENSURE 3 FEET EXTENDS ABOVE GRADE. PAINT TOP 18 INCHES WHITE. IN 3 INCH HIGH LETTERS, STENCIL THE NUMBER OF EVEN FEET FROM GROUND ELEVATION TO THE SEWER STUB INVERT. 8 GAUGE WIRE TO BE DOUBLE WRAPPED AROUND PIPE AND 2 x 4 STAKE AT OR ABOVE FINISHED GRADE. w z J af a `LOCKING CLEANOUT COVER / PER COE STD DTL SS-200 a 6" LATERAL SEWER SLOPE - 2% MIN TO 50% MAX 22.5' OR 45' BEND 6" TEST TEE 6" WYE/6" ROMAC SADDLE SEE NOTES 1 AND 2 POSSIBLE SEWER MAIN LOCATION 22.5' OR 45' BEND 6" TEST TEE 6" TEE POSSIBLE I SEWER MAIN LOCATION NOTES: 1. WHEN TAPPING INTO EXISTING MAIN A ROMAC STYLE CB SADDLE SHALL BE USED. PLACEMENT OF TEE SHALL DEPEND ON DEPTH OF SEWER MAIN. AS A MINIMUM, THE TEE SHALL BE PLACED AT A 45 DEGREE ANGLE FROM PIPE SPRINGLINE. 2. IF CONNECTING EXISTING PRIVATE SIDE SEWER TO NEW CITY LATERAL, A CONCRETE/PVC STRONGBACK FERNCO RC SERIES OR ROMAC COUPLING SHALL BE USED AND SECURED PER MFR'S INSTRUCTIONS. 3. BORING OF SERVICES WITHIN RIGHT OF WAY IS NOT ALLOWED. 4. SEWER PIPE SHALL BE SDR-35 AND JOINTS SHALL BE GASKETED. 5. IF STUB FOR FUTURE DEVELOPMENT, USE RUBBER JOINT BISCUIT PLUG OR OTHER APPROVED WATERTIGHT PLUG. CITY OF EDMONDS NEW LATERAL NEW FOR EXISTING PUBLIC WORKS SEWER MAIN PIPE DEPARTMENT APPROVED BY: R. ENGLISH SEWER LATERAL NOT TO SCALE REVISION DATE FEBRUARY 2023 STANDARD DETAIL SS-202 SEE COE STD DTL GU-410 { oz v� 0m BEDDING MATERIAL (1-1/4" MINUS) 6" MIN ,� / ,� / / ,� CRUSHED SURFACE BASE COURSE (SEE NOTE 2 BELOW) Ld w n EL 6" MIN FOUNDATION (IF REQUIRED) SEE NOTE 4 nIN 8" MIN NOTE NOTES: 1. MAXIMUM WIDTH OF TRENCH AT TOP OF PIPE • 18" OR LESS FOR 6" AND SMALLER DIAMETER PIPE • 24" FOR 8" DIAMETER PIPE • 36" FOR 12" DIAMETER PIPE • O.D. PLUS 18" FOR PIPE LARGER THAN 12" NOMINAL DIAMETER 2. REFER TO DIVISION 9 OF WSDOT STANDARD SPECIFICATIONS FOR MATERIAL GRADATION AND ADDITIONAL INFORMATION. 3. TRENCH BACKFILL SHALL MEET A MINIMUM COMPACTION OF 95% DENSITY PER ASTM D 1557. 4. IF UNSTABLE MATERIAL IS ENCOUNTERED BELOW PIPE ZONE, CONTRACTOR SHALL REMOVE AND REPLACE AS REQUIRED BY CITY ENGINEER. 181 - REVISION DATE CITY OF EDMONDS APRIL 2021 TYPICAL TRENCH SECTION PUBLIC WORKS STANDARD DEPARTMENT DETAIL APPROVED BY: R. ENGLISH G U - 400 TYPICAL TRENCH SECTION NOT TO SCALE DWELLING PROPERTY OWNER PUBLIC RIGHT-OF-WAY w RED FLASHING ALARM, z VISIBLE FROM ROW PER HANDOUT E-61 AND E-62 w ROADWAY a PUMP CONTROL FINISHED O PANEL GRADE a SIDE SEWER r 5' MIN BACKFLOW PREVENTER PER COE STD DTL SS-220 GRAVITY FLOW FROM DWELLING 3' MIN COVER CLEANOUT SEE COE STD DTL SS-200 TYPICAL J SIDE SEWER TRACER WIRE SEE DETAIL "A" FOR CONNECTION IN THIS AREA FORCE MAIN 2" IPS POLY HI-MOL PIPE GRAVITY SEWER MAIN (200 PSI) GRINDER PUMP ASSEMBLY PER COE STD DTL PROPERTY OWNER PUBLIC RIGHT-OF-WAY SS-241 OR SS-242 NOTES: 1. WRAP AND TAPE 12 GAUGE TRACER WIRE EVERY 10' TO THE FORCE MAIN. 2. THE LOCATION OF THE STUB SERVICE TERMINATION SHALL BE MARKED BY THE CONTRACTOR WITH A 2"x4" TIMBER EXTENDED VERTICALLY FROM THE PLUG END TO GLUED - A MINIMUM OF 3 FEET ABOVE THE GROUND SURFACE. IN ADDITION: 2" FORCE MAIN • A 12-GAUGE GALVANIZED WIRE SHALL BE ATTACHED TO THE TIMBER FROM END TO END ENSURING THAT NEITHER THE WIRE NOR THE 2"x4" TIMBER SHALL BE 2" BRASS MIP x IPS w z J w a 0 a 6" SDR 35 PIPE ATTACHED TO THE SEWER PIPE OR PLUG. COMPRESSION FITTING 6" SD 35 SPIGOT • THE EXPOSED PORTION OF THE 2"x4" TIMBER SHALL WITH STAINLESS (W/ 6" GASKET) BE PRE -PAINTED TRAFFIC WHITE WITH THE WORDS STEEL INSERT x 4" SCH 40 HUB "GRINDER PUMP SEWER CONNECTION" STENCILED ON 4"x2" SCH 80 SLIP WITH BLACK PAINT. x THREAD BUSHING • THE END OF THE 2"x4" TIMBER SHALL BE PRE -MARKED IN PERMANENT INK WITH THE LENGTH DETAIL OF THE TIMBER INSTALLED. CITY INSPECTION REQUIRED �- PRIOR TO BACKFILL REVISION DATE a CITY OF EDMONDS GRINDER PUMP SERVICE SEPTEMBER 2023 CONNECTION TO PUBLIC WORKS GRAVITY SEWER MAIN STANDARD DEPARTMENT DETAIL FS t . 189�3 APPROVED BY: R. ENGLISH S S - 2 1 0 GRINDER PUMP SERVICE NOT TO SCALE SEE APPLICABLE STANDARD DETAILS FRAME AND GRATE PIPE ALLOWANCES PIPE MATERIAL MAXIMUM INSIDE DIAMETER REINFORCED OR 12" PLAIN CONCRETE ALL METAL PIPE 15" SOLID WALL PVC 15" (WSDOT STD SPEC 9-05.12.(1)) PROFILE WALL PVC 15" (WSDOT STD SPEC 9-05.12(2)) 5 2p 4 2 S 5 \2", 4", 6", OR 12" ?i NOTES: RISER SECTION 1. CATCH BASINS SHALL BE CONSTRUCTED IN ACCORDANCE WITH WSDOT STANDARD SPECIFICATION 9-05.50(3). 2. AS AN ACCEPTABLE ALTERNATIVE TO REBAR, WELDED WIRE 4y FABRIC HAVING A MIN. AREA OF 0.12 SQUARE INCHES PER > M/,y FOOT MAY BE USED. WELDED WIRE FABRIC SHALL COMPLY ?2, TO ASTM A497 (AASHTO M 221). WIRE FABRIC SHALL NOT 26 BE PLACED IN KNOCKOUTS. e 3. APPLY NON -SHRINK GROUT TO INSIDE AND OUTSIDE OF ALL JOINTS, RINGS, RISERS AND FRAMES. 4. ROUND KNOCKOUTS MAY BE ON ALL 4 SIDES, WITH MAX / DIAMETER OF 20". KNOCKOUTS MAY BE EITHER ROUND OR "D" SHAPE. a . 5. THE MAX DEPTH FROM THE FINISHED GRADE TO THE PIPE INVERT IS 5'-0 6. THE TAPER ON THE SIDES OF THE PRECAST BASE SECTION AND RISER SECTION SHALL NOT EXCEED 1/2"/FT. 7. CATCH BASIN FRAME AND GRATE SHALL BE IN ACCORDANCE WITH STANDARD SPECIFICATIONS. MATING SURFACES SHALL BE FINISHED TO ASSURE NON -ROCKING FIT WITH ANY COVER POSITION. (MEASUREMENT AT THE TOP OF THE BASE) 8. VERTICAL EDGE OF RISER SHALL NOT BE MORE THAN 2" PRECAST BASE SECTION FROM VERTICAL EDGE OF CATCH BASIN WALL. `St. 18y- TYPE I CB NOT TO SCALE CITY OF EDMONDS PUBLIC WORKS DEPARTMENT CATCH BASIN TYPE 1 APPROVED BY: R. ENGLISH GRIPPER PLUG SEE COE STD DTL SS-200 COLLAR 4" ABS/PVC INSERT PIPE* FLAPPER/ASSEMBLY FLAPPER 6" ABS/PVC FEMALE ADAPTER 6" ABS/PVC RISER PIPE* VALVE BODY FLOW CLEANOUT SEE COE STD DTL SS-200 6" SIDE SEWER WITHIN 2'-4' OF BUILDING 2' FLOW I 6" TO 4" REDUCER 4" SIDE SEWER REVISION DATE SEPTEMBER 2023 STANDARD DETAIL SD-303 STREET -SIDE HOUSE -SIDE * BOTH RISER PIPE AND INSERT PIPE CAN BE EXTENDED -CONTACT MANUFACTURER. NOTES: 1. THREADED PLUG, FEMALE ADAPTER, INSERT PIPE, AND RISER PIPE MAY BE SUPPLIED BY OTHERS. 2. BACKFLOW PREVENTER SHALL BE LOCATED FROM HOUSE BETWEEN 2' TO 4'. 3. BACKFLOW PREVENTER VALVE SHALL BE A CLEAN CHECK, INC. MODEL: EBV-P401 OR EQUIVALENT. CITY OF EDMONDS SIDE SEWER BACKFLOW PREVENTER PUBLIC WORKS DEPARTMENT `St. 1B9� SEWER BACKFLOW PREVENTER NOT TO SCALE APPROVED BY: R. ENGLISH REVISION DATE JANUARY 2018 STANDARD D ETAI L SS-21 1 NOTES: 1. WATER DURING CONSTRUCTION WILL BE PROVIDED BY NEW 1" WATER METER INSTALLED IN EMPTY METER BOX. 2. UNDERGROUND WIRING REQUIREMENTS OF ECDC 18.05 SHALL BE FOLLOWED. ALL UTILITY SERVICES SHALL BE INSTALLED UNDERGROUND. 3. DRIVEWAY SLOPES SHALL NOT EXCEED 14% PER ECDC 18.80.060. 4. MINIMUM 3' HORIZONTAL SEPARATION AND 1' VERTICAL SEPARATION BETWEEN DRY UTILITIES AND SEWER, WATER, AND STORM, AND 5' FROM ANY CITY MAIN LINES. 5. FINAL RESTORATION WITHIN THE RIGHT-OF-WAY SHALL BE COMPLETED BY THE CONTRACTOR, NOT THE CITY OF EDMONDS. 6. EXISTING FAILING FRONTAGE IMPROVEMENTS SHALL BE REMOVED AND REPLACED AS DETERMINED BY THE CITY ENGINEERING INSPECTOR. 7. BNSF INSPECTION REQUIRED FOR BNSF OUTFALL. CITY OF EDMONDS WILL NOT BE RESPOPNSIBLE TO INSPECT THE OUTFALL PIPE, ANCHORS, AND DISCHARGE TO BNSF ROW. 8. INSTALL CONTROL PANEL ON EAST SIDE OF HOUSE FACING STREET. ELECTRICAL CONTRACTOR TO LOCATE WHERE IT FITS BEST. SEE SHEET A3.0. 9. HOSE BIB TO BE INSTALLED WITHIN 15' OF GRINDER PUMP SUMP. SEE SHEET A2.0. 10. SEWER CLEANOUTS SHALL HAVE A 12" CAST IRON LAMPHOLE COVER WITH J" HEX BOLTS AND A PICK HOLE AND CONCRETE PAD PER CITY OF EDMONDS STANDARD DETAIL SS-200. 11. FOR BNSF OUTFALL, GEOTECHNICAL INSPECTION OF EXCAVATIONS AND SUBGRADE CONDITIONS AT CONCRETE PIPE ANCHOR. 12. FOR BNSF OUTFALL, GEOTECHNICAL INSPECTION OF PIPE SURFACE ANCHORS TO VERIFY THE PIPE IS ADEQUATELY RESTRAINED. 13. IF UTILITY PATCHES ARE WITHIN 20' OF EACH OTHER, COMBINE PATCHES INTO A SINGLE PATCH. 14. FORCE LINE CONNECTION TO GRAVITY CONNECTION PER EDMONDS STD SS-210. CONNECTION SHALL NOT BE AT A 90' BEND. BLD2023-0640 APPROVED FOR CONSTRUCTION CITY OF EDMONDS ENGINEERING DIVISION DATE: APPROVED AS NOTED �1/7I,_'2 4"6/15/2024 BY: CITY ENGINEERING DIVISION 3 1-10 � Q O CV LO O m) UL.L W qCo� z W It00 z 00 VJ - NCLOz Co O - c� z �11 0CE z ui00m J 2 T U> v � 1- O O 0)T Lu C 06 p� o C) 0 C LLI W 1: (0 o 0> 0 0 LLI E LU : - (f)>� _ 0 -1 0 J z T_ �W/•�� T W .� m Q U� 0 z 0 N N z -> O ui 0) w z 0 Q z 0 o' 0 O O N O z Q Ld ui oU �z W J_ Q = U) U) 0 o ui 0 z � Q cD 0 z � Q Q 0 ESUB 5/23/2024 ° CITY OF EDMONDS DEVELOPMENT dr ed by DP JDD scale date AS SHOWN 05/23/2 job no. 2022117 sheet C3.1 of cD 0 z Q J w w c� Q z_ Q ry 0 0 z Q c� z 0 Q c� r� 0 z Q w z 0 w w cn z Q n I 0 / c� z ry w w z 0 z W / N N 0 N / N N 0 N / 0 0 N 0 N N Ln X N STAINLESS STEEL VALVE EXTENSION HANDLE SIMPLEX PIPE TRACER WIRE 24" BASIN COVER JUNCTION BOXifFASTENED TO WALL STRUCT PLASTIC STRUCT PLASTICSST FASTENERS 1 1/2" CONDUIT �2" FINISHED GRADE FLANGE Z EY CONDUIT SEAL — iv (REQ'D BY OTHERS) 100 ELECTRICAL ;' RAIL MOUNTING FLANGE CONDUIT LIFro UT CHAIN ANIT—SIPHON VALVE, PVC (IF REQ'D) AIR VENT CONNECT TO DWELLING TOP HOLDDOWN PLUMBING VENTILATION INLET FITTING, TYP RISER PIPE (FIELD INSTALLED) GRAVITY FLOW 4" INLET FROM DWELLING 2" HI—MOL POLY FORCE MAIN 2" BRASS MIP x IPS COMPRESSION FITTING WITH STAINLESS STEEL FIBERGLASS OR HIGH STIFFENER DENSITY POLYETHYLENE BASIN HIGH WATER "ALARM" LEVEL SHALL BE A MIN OF 6" BELOW GUIDE PLATE INVERT OF 4" SEWER INLET PUMP "ON" LEVEL N n RAILS PUMP "OFF" DISCHARGE PIPE LEVEL d.. SWING CHECK VALVE e & DISCONNECT ASSY GRINDER PUMP d ° DISCHARGE CASE d c ANTI —FLOATATION PLATE °I OR FLANGE CONCRETE ANTI —FLOTATION BASE NOTES: 1. REFER TO CITY HANDOUT E62 FOR ADDITIONAL DESIGN AND PERMIT REQUIREMENTS. 2. ASSEMBLIES SHOULD NOT BE PLACED IN AREAS SUBJECT TO VEHICULAR TRAFFIC. IF LOCATED IN TRAFFIC AREAS, THE LID SHALL BE TRAFFIC RATED AND SHALL BE INSTALLED FLUSH IN ASPHALT OR CONCRETE. CITY INSPECTION REQUIRED PRIOR TO BACKFILL \ 24" SIMPLEX GRINDER REVISION DATE OCTOBER 2021 CITY OF EDMONDS PUMP WITH REMOTE STANDARD PUBLIC WORKS MOUNTED CONTROL PANEL DEPARTMENT DETAIL S S — 2 4 1 APPROVED BY: R. ENGLISH GRINDER PUMP NOT TO SCALE 100 95 85 75 RESIDENCE w Z J w IL 0 CLEANOUT (L WITH 45' BEND AND CAP CLEANOUT (MAX) (TYP) NOT TO EXCEED 100' BETWEEN CLEANOUTS CLEANOUT (WYE WITH CAP AND CLEANOUT COVER) AND CONCRETE LEVELING COLLAR 2"t r-FINISHED GRADE Z a w F z w w uJ � 0 12" LOCKING COVER ofSEE NOTE 3 a w o END OF PIPER GRIPPER PLUG F EQUAL) ❑ E 27061 OR APPROVED a U WATER TIGHT CAP LEVELING COLLAR❑ SEE NOTE Al. 45' RISER 12" PVC SLEEVE 45' 6" RISER \\YY, Y 6" WYE AND 6" CITY STUB 4" OR 6" SIDE SEWER 45' BEND GENERAL CLEANOUT DETAIL 4" OR 6" SIDE SEWER CLEANOUT DETAIL 12" LOCKING COVER AT PROPERTY LINE/CITY EASEMENT 3 SEE NOTE 3 Z 4 NOTES: LLJ W w LEVELING COLLAR j d 0 w SEE NOTE 4 1. SEWER PIPE SHALL BE SDR-35 AND JOINTS SHALL BE ii d ASPHALT SURFACE GASKETED. 2. PIPE SLOPE TO BE 295 MIN AND UP TO 50% MAX. 12" t 3. SEWER CLEANOUT TO BE 12" CAST IRON CLEANOUT COVER WITH 1/2" HEX BOLTS AND A PICK HOLE. EAST JORDAN ONG 12" PVC r IRON WORKS PRODUCT #00366102 OR APPROVED EQUAL. 6" RISERIPE GRIPPER4.LEVELING COLLAR SHALL BE CONSTRUCTED AS FOLLOWS: ERNE 270261 IN ROADWAYS PER COE STD DWG GU-424 VED EQUAL) • IN SIDEWALK/LANDSCAPED AREAS, EITHER 24"x24"x6" TYPICAL CLEANOUT DEEP CONCRETE COLLAR OR 24" DIAMETER x 6" DEEP UNDER ASPHALT OR CONCRETE CONCRETE COLLAR ❑ �❑ REVISION DATE CITY OF EDMONDS SEWER CLEANOUT DETAILS FEBRUARY 2023 PUBLIC WORKS STANDARD DEPARTMENT DETAIL Fst, 18g� APPROVED BY: R. ENGLISH SS-200 SEWER CLEANOUT NOT TO SCALE 0+50 1+00 FORCEMAIN PROFILE - ONSITE CONNECTION SCALE: 1 "=10H, 1 "=5'V STREAM 6" MIN 5' MAX GROUND/FLOOR NOTES: 1. APPROVED PRESSURE VACUUM BREAKER ASSEMBLY MUST BE INSTALLED VERTICALLY, 6" MIN ABOVE THE HIGHEST POINT OF USE AND ALL DOWN STREAM PIPING 2. 6" MIN ABOVE FLOOD LEVEL FOR GENERAL PLUMBING 3. DESIGNED FOR BACK SIPHONAGE ONLY, NOT FOR BACK PRESSURE 4. THOROUGHLY FLUSH LINES PRIOR TO INSTALLATION OF BACKFLOW PREVENTER 5. IF AVB IS INSTALLED INDOORS, CONSIDERATION MUST BE GIVEN TO WATER LEAKAGE IF THE BACKFLOW PREVENTER FAILS (EXCESSIVE WATER SPILLAGE) 6. DO NOT INSTALL IN AN AREA SUBJECT TO FLOODING 7. MUST BE PROTECTED FROM FREEZING CONDITIONS B. THE BACKFLOW ASSEMBLY SHALL BE A STATE APPROVED MODEL 9. A PLUMBING PERMIT IS REQUIRED— OBTAIN PERMIT FROM CITY OF EDMONDS DEVELOPMENT SERVICES 10. NO DOWNSTREAM VALVES ARE ALLOWED 11. THIS DEVICE DOES NOT REQUIRE TESTING BY A BACKFLOW ASSEMBLY TESTER (ABOVE GROUND INSTALLATION ONLY) REVISION DATE ATMOSPHERIC/ANTI—SIPHON JANUARY 2018 CITY OF EDMONDS VACUUM BREAKER ASSEMBLY 7 PUBLIC WORKS (AVB) 2" AND SMALLER STANDARD DEPARTMENT DETAIL St. 1590 F APPROVED BY: R. ENGLISH WA— 165 ATMOSPHERIC VACUUM BREAKER NOT TO SCALE 1+50 100 95 85 75 70 1+68 FIELD JOINT REQUIRED FOR MODELS DH151-129 / DR151-129 B DH151-160 / DR151-160 POWER/ALARM CABLE 6 CONDUCTOR W/GNO NEMA 6P (EQD) QUICK DISCONNECT ASSY. (304 S.S.) — S.S. CAST BALL VALVE DISCHARGE 1 1/4' FPT 1 1/4' DISCHARGE LINE (304 S.S.) 43.9 in 1115 mm CHECK VALVE (NORYL) ANTI -SIPHON VALVE (NORYLJ POLYETHYLENE TANK 1/2' NOMINAL WALL THICKNESS 150 GALLON CAPACITY ❑ SEMI -POSITIVE DISPLACEMENT TYPE PUMP DIRFCTI Y DRIVFN BY A 1 HP MOTOR OPTIONS :❑ DH 151 LEVELRCONTRO�S) [:1DR 151 LEVELIRELESS CONTROLS) GASKETED LID, HOPE STRAIN RELIEF CORD CONNECTOR /E/ONE EQUALIZER DUAL WALL, CORRUGATED HOPE ACCESSWAY INTERNAL WELL VENT 2.0DIAMETER s INLET, GROMMET TO ACCEPT 4.50' O.D. PVC PIPE (STANDARD). DUST COVER SUPPLIED FOR SHIPMENT (NOT SUITABLE FOR BURIAL) ALARM 38.4 in t 975 mm 29 in ON II 737 mm OFF ` 116 gal 439 L I 214 17 in 534 mm 432 mm 84 gal 266 50g l 318 IL 0 38.8 in- mm CONCRETE BALLAST MAY BE REQUIRED SEE INSTALLATION INSTRUCTIONS FOR DETAILS NOTE: DIMENSIONS ARE FOR REFERENCE ONL EONE GRINDER PUMP NOT TO SCALE BMP T5-13: V� DPO et NSF Op SOIL RETENTION RETAIN, IN AN UNDISTURBED STATE, THE DUFF LAYER AND NATIVE TOPSOIL TO THE MAXIMUM EXTENT PRACTICABLE. IN ANY AREAS REQUIRING GRADING, REMOVE AND STOCKPILE THE DUFF LAYER AND TOPSOIL ON SITE IN A DESIGNATED, CONTROLLED AREA, NOT ADJACENT TO PUBLIC RESOURCES AND CRITICAL AREAS, TO BE REAPPLIED TO OTHER PORTIONS OF THE SITE WHERE FEASIBLE. SOIL QUALITY ALL AREAS SUBJECT TO CLEARING AND GRADING THAT HAVE NOT BEEN COVERED BY IMPERVIOUS SURFACE, INCORPORATED INTO A DRAINAGE FACILITY OR ENGINEERED AS STRUCTURAL FILL OR SLOPE SHALL, AT PROJECT COMPLETION, DEMONSTRATE THE FOLLOWING: 1. A TOPSOIL LAYER WITH A MINIMUM ORGANIC MATTER CONTENT OF 10% DRY WEIGHT IN PLANTING BEDS, AND 5% ORGANIC MATTER CONTENT IN TURF AREAS, AND A PH FROM 6.0 TO 8.0 OR MATCHING THE PH OF THE UNDISTURBED SOIL. THE TOPSOIL LAYER SHALL HAVE A MINIMUM DEPTH OF EIGHT INCHES EXCEPT WHERE TREE ROOTS LIMIT THE DEPTH OF INCORPORATION OF AMENDMENTS NEEDED TO MEET THE CRITERIA. SUBSOILS BELOW THE TOPSOIL LAYER SHOULD BE SCARIFIED AT LEAST 4 INCHES WITH SOME INCORPORATION OF THE UPPER MATERIAL TO AVOID STRATIFIED LAYERS, WHERE FEASIBLE. 2. MULCH PLANTING BEDS WITH 2 INCHES OF ORGANIC MATERIAL. 3. USE COMPOST AND OTHER MATERIALS THAT MEET THE FOLLOWING ORGANIC CONTENT REQUIREMENTS: A. THE ORGANIC CONTENT FOR 'PRE —APPROVED" AMENDMENT RATES CAN BE MET ONLY USING COMPOST MEETING THE COMPOST SPECIFICATION FOR BMP T7.30: BIORETENTION, WITH THE EXCEPTION THAT THE COMPOST MAY HAVE UP TO 35% BIOSOLIDS OR MANURE. THE COMPOST MUST ALSO HAVE AN ORGANIC MATTER CONTENT OF 40% TO 65%, AND A CARBON TO NITROGEN RATIO BELOW 25:1. THE CARBON TO NITROGEN RATIO MAY BE AS HIGH AS 35:1 FOR PLANTINGS COMPOSED ENTIRELY OF PLANTS NATIVE TO THE PUGET SOUND LOWLANDS REGION. B. CALCULATED AMENDMENT RATES MAY BE MET THROUGH USE OF COMPOSTED MATERIAL MEETING (A.) ABOVE; OR OTHER ORGANIC MATERIALS AMENDED TO MEET THE CARBON TO NITROGEN RATIO REQUIREMENTS, AND NOT EXCEEDING THE CONTAMINANT LIMITS IDENTIFIED IN TABLE 220-13, TESTING PARAMETERS, IN WAC 173-350-220. THE RESULTING SOIL SHOULD BE CONDUCIVE TO THE TYPE OF VEGETATION TO BE ESTABLISHED. BLD2023-0640 APPROVED FOR CONSTRUCTION CITY OF EDMONDS ENGINEERING DIVISION DATE: APPROVED AS NOTED k 1 / � -�Y"6/15/2024 BY: CITY ENGINEERING DIViS10N 3 � 0I Q Z M oLO O CV C) U/ UIIr W q 0o z Lu 4 00 z 0 0 U) r—� Ncoz V C`) m— c� z (oCE z w Cam = J I 1— U> 0 0 2 06 0 � �/) T VW C= 06 p� o 0 LLJ w = `Cp � o 0 > o�0 co W — >� 0 uJ I U) 0 m Q N 7 0 Cn W J L.� O o0 zz Q LLJ = 0 U) J U) 0 Q W 0 LiJ v� 0 J QO Z � 0 �R~ ESUB ) z 0 W23/2024 ° CITY OF EDMONDS DEVELOPMENT drdWh-bS(-- -6F 6-CWdd by DP JDD scale date AS SHOWN 05/23/2 job no. 2022117 sheet `l, / - J . L of 0 0 m X w L� z m / m X W / z ry W W z CD W / N N 0 N / N N 0 N / 0 N O N \ N Ln Q0 X N �4 0 IF UN REAR/�AP I //46 74 ON L NE Li 1 I � LOT 1 I I � o � III Cq III � IIII� j � I TYPE I CB EIM73.38 (4" QI�,E,W) IE-75.69 (4"8) CONNECT TO FOOTING I � � DRAINS HERE I � PIPE ANCHOR I I C4.1 PER DETAIL MOCK 24 mw SET REBAR/CAP LLs#5,8o0 I� ESMT ZAND III wa BMW �1 �I � �LL1 � � � 00 ol oo ISHAPED REBAR DETAIL (TYP) 170LF 4" INSIDE DIAMETER PVC, � \ AS1M 3034, SDR 35, WITH RESTRAINED JOINT HUBS � 1 I � LOT 1 I I � o � III Cq III � IIII� j � I TYPE I CB EIM73.38 (4" QI�,E,W) IE-75.69 (4"8) CONNECT TO FOOTING I � � DRAINS HERE I � PIPE ANCHOR I I C4.1 PER DETAIL MOCK 24 mw SET REBAR/CAP LLs#5,8o0 I� ESMT ZAND III wa BMW �1 �I � �LL1 � � � 00 ol oo ISHAPED REBAR DETAIL (TYP) 170LF 4" INSIDE DIAMETER PVC, � \ AS1M 3034, SDR 35, WITH RESTRAINED JOINT HUBS � 3 � Q Z M o O N O . (n U W 'qCo� zWIt — z 00 N�z c� C,0_ c� z �oCE z W N0m = J T � U O 00 LL C � �o C) 0 W W T (0 0 0 > o�U o� w C- D W�IE _ 0 Lu 1 � 0 J LU Q J m 0 ctK n-LuK orEQUAL) Juiry is DRAINAGE IPIPE RAlED\FOR 25FT HEAD PRESSURE Ia OUTFACE / DIFFUSER nMJ PER DETAIL APPROX.SLOE�32% OUN RE R/C LS 188 8 I .16' & .49' W 0 PR P. C R. E�0� ���PPROVALFOR Z�EZ�VL z O GO L Z > 0 Lu w Z 0 Q Z 0 0 0 N O z a- W F--U mz =w X 0 U) W �i 0 J z QW o 00 LL BLQ2023-0640 U o &ESUB o 5/23/2024 W CITY OF EDMONDS DEVELOPMENT dr ed by DP JDD scale date 10 5 0 1.0 20 AS SHOWN 05/23/2 Emmi job no. SCALE IN FEET 2022117 1 "=10' sheet C T . 0 of 0 0 �_ M = X U-1 LL (n Z m in I— m = X L�J -, V Z ry LIJ W Z 0 Z L�J r- N N O N N N 0 N 0 U N O N I) N L0 l� X 4 N 85.....:....:....:....:....:....:....:....:....:.._:....:....:....:....:....:....:....:....:....:.._:....:....:....:....:....:....:....:....:....:.._:....:....:....:....:....:....:....:....:....:.._:....:....:....:....:....:....:....:....:....:.._:....:....:....:....:....:....:....:....:....:.._:....:....:....:....:....:....:....:....:....:.._:....:....:....:....:....:....:....:....:....:.._:....:....:....:....:....:....:....:....:....:.._:....:....:....:....:....:....:....:....:....:.._:....:....:....:....:....:....:....:....:....:.._:....:....:....:....:....:....:....:....:....:.._:....:....:....:....:....:....:....:....:....:.._:....:....:....:....:....:....:....:....:....:.._:....:....:....:....:....:....:....:....:....:.._:....:....:....:....:....:....:....:....:....:.._:....:....:....:....:....:....:....:....:....:.._:....:....:....:....:....:....:....:....:....:.._:....:....:....:....:....:....:....:....:....:.._:....:....:....:....:....:....:....:....:....:.._:....:....:....:....:....:....:....:....:....:.._:....:....:....:....:....:....:....:....:....:.._:....:....:....:....:....:....:....:....:....:.._:....:....:....:....:....:....:....:....:....:.._:...................:....:....:..... 85 .:. .:. .:. .:. .. ........ .:. .:. .:. ........ ........ .... ........ :. :. :. .:. :. .:. :. .. .... ........ R :. :. :. ........ ........ ........ ........ ........ ........ ..PROP SE:..RADE:::::....... R0... ........ ¢... 80...........................................:..¢:............................................ ... ::I:::::::::: :........:.........: ........ ........ ........ ........ ........ :...:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:.... .... ....... .:. .:. :. .:. .:. .:. .:. .:. :::::::: :::::::: :::::::: :::::::: ........ ........ ........ .. ....... .... ....... :....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:.... :....:... .:. .:. :::::::: :::::::: :::::::: :: .... ........ :....:....:....:....:....:....:....:....:....:....:....:.... :::: :::::::: ........ ........ ........ ........ ........ ........ :....:....:....:....:....:....:....:......:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:......:....:....:....:....:....:....:....:.... .:. .:. .:. .:. :::::::: :::::::: :::::::: :::::::: :::::::: :::::::: ::::::: ........ ........ ..:....:....:....:....:....:....:....:......:....:....:....:....:....:....:....:.... .:. :. :: :::: :::::::: ........ ..... ........ ...... :...:....:....:....:....:....:....:....:.. :....:....:....:....:....:.. CONCRETE PIPE ::: :::::: 80 ::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::......:::::::::: :..I ........ :: :: :: :: :: ..-. :::::::::::::::::::::::: ::..........:...:: ....:.......; :::alcHOR: pER OTaIL :.: :: ::: .:........................:..:............................................:..:............................................... 75:.........:..........:..........:......... ¢................................................¢................................................¢................................................¢................................................¢................................................¢................................................¢................................................¢................................................:................................................¢................................................¢................................................:................................................¢... ........ ...:... ...:... ...¢... :::::::: ........ :::....:..o...� ...¢... .. ..... ¢........: __ .. 75 .................... :.........::.........:........::........ ........ ........ ........ ........ ........ .:: ::: : : ........ ........ ........ .. .... ........ ........ ........ ........ ........ ........ ........ ....... .... ........ .... ........ .. ...... __--.-.. _ : : : : : : . . :. :. : : : : . . . . . . . . 70 I . :. . :. . :. . :. : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ........ ........ ........ :..¢:.. :. :. ::..:. . :. :. —. : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ........ ........ ........ ........ . .. : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ,� : :: : :: ........:170CF �IMSIDE DIAMETER PAC:.. .. ........ ........., ..........................:.......................................................................................... : : : : :�: : . . . Z : :._.... : : : : : : : : : : . . . . . . . . . . . . . . : : ........................ ........ : : : : : : : _ . . . : : : : : . . . �:: r-. . . . . . . . . . . : : ����. . . : . ,__....... ..... .. ................................................ ... . . . 70 . :.........:..........:..........:......... . :..........:..........:......... :. :. , : .$NSF .ROW..:. :. :. :. .:. .:. .:. .: :: .. .... .:. S1rM : 3034; SCR : 3 -0 .. .:::.....: , .::.........:. : .... . .:I :....::........:..........:.........:;:........:;: :. :. :.:..........:..........:..........:..........:.........::........::........::........ :. ........ .:. .:. .:. .:. ........ ........ ........ .:. .:. -. ........ . :. .. :. ... .. ........ :... . ,. :..........:..........:....... .... , . ....... ...............:...:........................:..?............................................:..:............................................... .........¢..........¢..........¢ 65....I :. . ,. . ,. : ¢... ...¢... ...¢... ¢... .......................................... ......... .:. .:. ....................... ...¢... .:. .:. .. _ :. :. ::CERTA-;-LOK :..ORE UAL ... �! NTS ...¢... ...¢... Q .................... ....... ... .................................................... :¢:.........¢� :..:....� ..... ...:...... :. :..........:. .TYPE :I : CB ... ........ .... ...... RIM=i7.6 ..... . . 65 ........ ........ :. :. :. ..................................................................................................................................................................... ¢... ¢... ¢... :...............................:..........:..........:..........:..........:..........:..........:..........:......... ......:..........:..........:..........:..........:..........:..........:..........:..........:..........:..........:..........:..........:......... . :. .... ........ ........ ........ .... ........ ........ ........ ........ .. :. :::: ........ :. :. :. ........ ........I�ATED:FOR:25FT:HEAD PRESSURE.....:::........:::.......�.:.... �..... ........ ... .. ....:..........:....... ; .:. :. .: I:....::........::........::........::........::........::........::........::........::........::........::........::........::........::........::........:::........:::: ::::::.. ........ :. :. :. :. :. :. :. :. :. ........ ........ ::. .. ........ ... ....,..:::: :. :. :. .:. .:. :::.... ....:.. ... ........ �...... ... .. .... ..... . IE`7:3:38 (4 N;E,11) .......:::...... :. :. .... ........ ...............:..I.:........................:..�.............................................:..�.............................................:..?:............................................:..�.............................................:..�............................................ 60 ........... ........... ........ ........ :. :. :. :. ........ ........ ... ........ ........ .......................................... ........... ........... ........... ........... :. .:. .:. ........ ........ :. :. :I:....::........::........::........::........::........::........::.::.....::..�..... :. .:. :. ................................................................................................................................................................................................................ ........... ...........:- ¢:........: ........ :. .:. .. .... ,... ........................................................................................................................-� ¢:........:¢:.........:..........:......... ,..... ........ .. :: ........ ......:: :.::..........: ¢:........: .... .. ,; ...... :: ....... _ ..................................IE..75 5..... 4...5...:..:............................................:..:...................................` ¢:........ ; 60 :......... ......:..........:..........:..........:..........:..........:..........:..........:..........:..........:.... ........:..¢:........: I......:..........:..........:..........:..........:.........:::........:::.....:...:....:... ........ .......... :: .::::::: :::::::: ::::::: CONNECT TO: FOOTING DRAINS:::::::: : ........ :: .... :::::::: .. .... ........ .... ........ ........ :::::::: :::::::: :::::::: :::::::: :::::::: ........ ........ ........ ........ :::::::: :::::::: :::::::: :: :::: :::::::: ........ ........ ........ ........ �..:.. :::::::: :::::::: :::::::: :::::::: :::::::: ::::; .:::.. ,. ::::::: :::::::: ...... ........ ....... ::::::: ....... :::::::: :::::: HEtE I...............:...:........................:..¢:............................................:..¢:............................................:..¢:............................................:..¢:........................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... :.........:..........:..........:......... 55 I ........ ........ ... ........ :..¢:.. :..¢:.. ........ ........ ........ ........ ........ ........ .. :..¢:.. ........ ........ ........ .. ........ ........ .. .... ........ .... ........ .... ........ ........ ........ ........ ........ ........:..,..: ........ ........ ........ ........ ,... ¢:..�...................................................................................................................................................................................................................................................................................................... ........ ........ ... ... ... ........ ..... ....... ....... ........ ...... ... ...... 55 ..........:..........:..........:......... ........ ...... ........ ........ ........ ........ .... .. .... ::::::. .. .. EXISTING: GRAQE :: /... ... f. .... ........ '.. ........ ........ ........ ........ ... .:I:.... . :I: :. :. :::::::: ........ ........ .:. .:. .:. .:. ........ ........ ........ ..... .. ........ ........ ........ .. :. :. :. :. .... ........ .... ........ :. ........ ........ .... �... ..... :. ......:: ::::::.. ........ �.... :..�.... ::::::.. ........ ........ ::::::.. ....... ... ... .. .. ........ .... ........ ...............:...:........................:..¢:............................................:..¢:............................................:..¢:............................................:..¢:............................................ 50:...............................:......... :..........:..........:......... ........ ........ ........ :..¢:.. :..¢:.. ........ ........ .... ........ :..¢ ........ ........ ........ ........ ¢... ........ ........ ........ �.. ....... ........ ¢:..................... .... ........ ....... .. ...... ........ :� ........ ........ .......................................... ........ 50 .... :. :. .... :. :. .... :. :: .. ........ :..I :. ........ ........ ........ :. .:. .:. .:. .:. .:. .:. :. ........ : ,: ........ ........ .... ........ :I:.... .:. .:. .:. .:. :. :. :. :. :. ... ........ ....... ........ .. .... ....... .. :, :.......::..:I:....:::........:::........::::....:.. ........ ........ 30.46 :..¢:.. :..¢:.. ........ .... :� ....... .:. .:. :� . ...... ........ �...: ........ ........ :::::::: ....�.... ..... .... .. .:::UNDISTURBED:SOIL :. ... ::. �... ........ ,... .... ....... :..¢:....................................... ¢:.,. ... .::........:.........::.........:.........::.........:::...... ........ ........ ....... .. ........ .:........................:..:............................................:..:...................................................................................................................................................................................................................................... 45.......................................................................................:.....................:..........:....... .........:..........:..........:..........:..........:..........:..........:... ..I......:..........:..........:..........:..........:..........:..........:... ..¢.. ........................................ ..¢.. .......F ... ..... ........ ........ .. .... ::..... ¢... ...¢... ¢... ........... ..... ....................... ............................................ :. :..¢:...:...::.:..:.....:.:��¢:........:..........: .. ..... ........ ........ .. :. .:. ... :PIPE.GLAMPS:PER::.......::::::::::::.:.. .... ::::: :::::::: :::::::: ¢. ¢. .................................................................................... .... ........ :::::::: ¢. -0. -0. °. ............................................................................................. .............................. ........ ........ ........ .........: . :::::::: ........ :::::::: :::::: 45 .... ........ .. .... .. I.... ........ ........ .. ........ ........ .. .... .. ... .. .... �. �..:: DETAIL _ .. �... ::..... ::::::.. ......:: ........ ::::::.. ...... .... ........ ...... .....:....:....:...:....:....:....:....:....:..¢:....:....:....:....:....:....:....:....:.... 40 :...I ......:.........¢........ .... ........ :....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:.... :....:. :....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:.... ........... ..... ........ ....................... ....... .......................:....:....:....:....:....:....:....:.... :....:....=..=.-.¢:....:....:....:....: .........:....:....:....:....:....:....:....:......:....:....:....:....:....:....:....:......:....:....:....:....:....:....:....:......:....:....:....:....:....:....:....:.... ..... ..... .. ........ ...... ........ �"::::: ..:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:.... ........ ........ :....:....:....:....:....:....:...........:....:....:....:....:....:....:....:......:....:....:....:....:....:....:....:.... ..:....:....:....:....:....:.. .... ........ ...... 40 :: I.... .... :::::::: :::::::: :......: :::::::: :::::::: ....... ........ ........ ........ ........ ........ :: .. ::::: :::::::: :: ..... 2 �:: .... :::: ;;- ..... :::::::: ........ :::::::: :::::::: .... ... �.. ....... ........ :::::::: :::::::: .. ........ ........ .... :::::::: :::::::: :::::::: :::::: ........ ........ ........ ...... ...... :: :::::::: . . . . . . . . . . ...............:...:...........................o:............................................:..o:............................................ 35:.........:..........:..........:......... I ......:......... :::::::: :::::::: :::::::: . . . :..o:.. :..o:.. :..o... ...o:.. ........................................................................................................................................................................ ........ ........ ........ ........ :: . . . . . . ......... :.. o:.. ....... .. ::::: :::::::: . :: . . . . :.. o:.. .... o... .... .: ................................................................ .................. ............... ........... ........ ... ..... -. .. :::: ....................... ... .... ::: ,--�':::: ::: :::::::: :::::::: :::::::: :::::::: :::::::: :�--........ ........ ........ .�i. . . . . . . . . . . . . . . . . . . . . . . . . . . ............................................................ ......................................................................................................................................................................................................................................... ::::: ........ ........ ..... ...... ....... :::::::: :::::::: ........ . . . . . . . . . . . .................................................................................... ........ :::::::: :::::::: :::::::: :::::: ...... . .............................................................................................................................. .............................. ........ ........ ........ ...... . . . . 35 :. :. ........ :....:....:..I.:....:....:....:....:....:..':....:....:....:....:....:................... :;: 3 ,........ ¢... 0 :. COCAITON: OF : Ex RR :..:..::........::.. .:..¢:.......... :.. .� .:... .............................................. 11ACIfSR SiRVEY ........ :. :.... :. .. :. ;::........::..::....: ..... .... ::.... :4 PYC DRAINAGE::..::...: ....................... .................. ................ ............................... ........... .. :::.....:: :: ............. .... : .:. :. :. ........ ........ ........ .... ..... .............................................................................................. .. ...................................................................................................................................................................................................... ....... . ........ .................................................................................... ........ ........ ........ ...... ............................................... .............................. 3 0 :.....::::::::::::::::::::::: :.........:..........:.........:........ :: :: :: ::: :: ... .. :PIP OUTFACE: W :::�. E i:... ........ ........ ........ ........ ........ ..... ........ ........ ........ ..... .... ........ .:. :. . ........ ........ ........ ........ .. ........ :. :. :. ........ ........ ........ ..... :. .. .. :. .. ,....:: ..... ... ...T..:.......PER:..�....... . ........ ........ ........ ........ ........ ... ... ........ ........ .. .... ........ ........ ........ ........ ........ ........ ........ ........ ........ ...... ........ ........ :I:....::........::........::........::........::..... . .... :...:........................:..:............................................:..:............................................:..:............................................:.. :.......:..........:..........:......... 25 . I ... ....... ....... .. ...... ....... ....... .... .......................................... :.. :..?:.. ...... ...':.. ....... :. :. .. :. .... .. ..... ................ ......... :..¢:.. .. :. .....,..... �-. .. �.. :..¢:.. :........... ...¢:..........: :. : °:. .... ... .... :..¢:.. ... .... ........ ...... ....... ........ .. ... ... ....... .. ....... ........ ................................................................................ .............. ......................................................................... :.u...:..sIAPEa:... :REi4R : pER....:..:. ..�¢..: — ........ ........ ....... ....... .................................................................................... ........ ........ ........ ...... ....... ....... ....... ..... .............................................................................................................................. .............................. 25 ....................... :.........::.........::..:::::::::::::::: ..:I:....::........::........::........::........::...... .:. ........ ..... .. :. :. .::........::.. .... .. ..... .. .... .... .. :. :. :... .....::.. :....::...... :::.::....::..... .... .... :. .. ........ ........ ..... ... .... ..... ........ ........ ......DETAIL: TYP)...::......:.: ...... ......:: (..�... ........ ........ ........ ........ ::::::.. ......:: ........ ........ ...... ........ ........ ...... ..... ......:: ........ ........ ...... :::I::::: ........ ........ ........ :::::::: ...... ...... :: �- ::::: :... _ -- :: :: :::: :::::::: ........ ...... ........ :::::::: :::::::: :::::::: :::::::: :::::: :::::: :::::::: ........ ........ :::::::: :::::::: ........ ........ ........ ...... :::::::: :::::::: :::::::: :::::: ..... ¢:....:..... :..¢:.. 20.....:....:....:...:....:....:....:............ .....:....:....:....:....:......:....:....:....:....:....:....:....:.... ;:::I ::::::::.......:........ ..:....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:. :....:....:.... :. .:. :... :....:....:....:....:.... :.. ---......:....:....:....:....:....:....:....:....:....:....:....:....:....:.... :. :. :....:....:....:....:....:....:....:.... :....:....:....:....:....:....:....:....:....:....:....:....:....:....:....:......:....:....:....:....:....:....:....:......:....:....:....:....:....:....:....:......:....:....:....:....:....:....:....:......:....:....:....:....:....:....:....:......:....:....:....:....:....:....:....:.... :....:....:....:....:....:....:....:......:....:....:....:....:....:....:....:.... ..:....:....:....:....:....:....:....:......:....:....:....:....:....:....:....:......:....:....:....:....:....:....:....:.... .............................. 20 : :. .... ........ ... :I:....:::........:::........:::..................:..........:.............:..........:..........:..........:..........:..........:..........:..........:..........:..........:..........:..........:..........:..........:..........:....... :. :. ........ ............_=-::........:.--.......:....--.--':1:.. :. :......:..........:..........:......... ::.........:..........:..........:......... :. :. _ .... .. .. _ ..... : EX PILE MBER:.::....::........::........::........:::........:::........:::........:::........:::........:::........:::........:::........:::........:::........::...... is:: .... ........ ........ ........ ........ ........ ........ :::::::: :. :. ........ ........ ........ ... ........ ...... ... . .. ... ... ....... .:. .:. 15...............:...:........................:.._:............................................:.._:............................................:.._:.............................:..:.........:.._:............................................:.._:............................................:.._:............................................:.._:............................................:.._:..............................................._................................................_.............................................._................................................_................................................_................................................_................................................_................................................-................................................-................................................-................................................-................................................-................................................-................................................-................................................-................................................-....................................: ....... ......::...........:. .....:... ..... :. :. :. :. :. ... EX :DITCFf ...:... : °. q::.....::..::....::........::........::........::........::........::........::........::........::........::........::........::........::........::...... .................W.I.L........................................................................................................................................................................ ...... .... , 15 0+00 0+50 1 +00 1 +50 2+00 2+48 DRAINS FOR STEEP SLOPES m a 8 12" Installation of the pipeline will be 0 _ _ - - � difficult due to the slope in which the ------- ° M --- pipe will be laid. Any damage to the ---- °;� o-° o'� slope due to construction must be • ,_, , _ o repaired to its original condition. A ° , a i- large load on the conrete anchor which .____ a; V ° supports the pipe at the top of the a a slope will result due to this installation. = - _ _ _ _ _ - = - °�°•' ° -_ `° ° ° This anchor should be moved as far concrete collar � Undisturbed ground away from the face of the slope as Plan View possible to maximize its support capability. The pipeline should be de- signed to withstand the weight of the Ground line 6" Min. Cover ° - water within the pipe. . °:° See details below commonly used to •a Rebar ° ° ' ° ° support and hold the pipe in place, ` o a Elev. View which should be used for this install- = ° ' " 4" Max. ation. If the pipeline fails, it will be the - owners responsibility to reinstall the _ = °' °a pipeline. If damage occurs to railway ' e _° e, property due to the failure of the Undisturbed ground pipeline, the property owner will be PIPE ANCHOR DETAIL responsible for damages. The property owner must not deposit grass clippings, yard waste, trees or other debris on the slope at any time. •a u- shaped tabor bent to pipe If possible the diffus should be placed at the petty line. shape and placed not less thou 30" into ground at 25'intervols. C Ciarr,ps The diffuser mu a placed out of BNSF dr age ditch. Application show a cross - section dr of the ditch in g Maximum a" Pie p I relations ' to the existing Solid pipe and able track. a drawin must ive to withstand weight, Duolcobles. %" Minimum. I g g of water in entire pipe. both rizontal and vertical I dis ces with reference to X x e ing top of rail. L o' o R\ Place 3"-6" spolls Cable Clamps around the pipe and around the ends foo 1'/p" x Vie" Goly. Straps erosion control. JJ 0 a U yz" Steel Bolts �` ,a: y } 3 X - X 3' - Underdroin / Open Ends CLAMP DETAIL DIFFUSER NO TO SCAT E BURLINGTON NORTHERN & SANTA FE RAIL WAY CO. o,, 199E BNSF DRAINS FOR STEEP SLOPE NOT TO SCALE OUTFALL PIPE - AT TOP OF TIMBER PORTION OF WALL 4" PVC T-JUNCTION MIDAIR OVER EX BNSF DITCH OUTFALL PIPE PROFILE SCALE: 1'=10'H, 1'=10'V EX PILE/TIMBER WALL ALTERNATIVE TERMINATION DETAIL - MIDAIR T-JUNCTION NOT TO SCALE NOTE: GEOTECHNICAL INSPECTION OF EXCAVATIONS AND SUBGRADE CONDITIONS AT CONCRETE PIPE ANCHOR. GEOTECHNICAL INSPECTION OF PIPE SURFACE ANCHORS TO VERIFY THE PIPE IS ADEQUATELY RESTRAINED. BNSF TO PERFORM INSPECTION OF OUTFALL LINE. FOR FZE�']EFZEI�CE OlV]LX �'0]� �l�s�' ]P]PROVAL BLD2023-0640 2/� K /t N yam? N 3 � F J ; ZQ "' O M cV � n O I 5. N �G � E _ rn x o W 1, 0 o � 0 eucA� . (n U zW �o� W T I.0 0 — z �o� �� — U ♦♦^^ N C) VJ z c� o — I C� z o 0 0 W m z_ N � I T J � U U — o 00 0 0/�S0� �,^J T V / �/ / w c o O0) -c J •— wI- W � E W c� 2 0 O U 0 C'� -U W W � �� (n w 0 �/� p J VJ 0 J �Wo � z T m ._ m J M V) Q III W U F-- z W I I I = Q LLJ lU) v / J LLI I— �0 O � CV 3 O z 0 fn rn 0 W 5 w Of z 0 F Z 0 X 0 0 0 cV 0 z Q 2 0 /0 VJ LL- co �ESUB o m 75 5/23/2024 ° CITY OF EDMONDS DEVELOPMENT dr`dW1'b,r-- — ' 'CFf6'CWdd by DP JDD scale date AS SHOWN 05/23/2 job no. 2022117 sheet \./ `t. � of