Loading...
APPROVED Koh Residence Supplemental Geotechnical Peer Review 12.28.2023LALSANDAU December 28, 2023 City of Edmonds 121 5th Avenue North Edmonds, WA 98020 Attn: Ms. Denise Nelson, CPT 1 Senior Permit Coordinator, City of Edmonds Building Division Transmitted via email to: denise.nelson@edmondswa.gov Re: Supplemental Geotechnical Peer Review Revised Permit Submittal Package - Koh Residence Building Permit No. BLD2023-0640 Edmonds, Washington Landau Associates Project No. 0074219.030.031 Dear Ms. Nelson: An applicant proposes to construct a single-family residence at 15604 75th Place West in Edmonds, Washington (site). The site is located in the North Edmonds Earth Subsidence and Landslide Hazard Area. Landau Associates, Inc. (Landau) previously reviewed the applicant's permit submittal package and summarized its findings in a letter dated July 28, 2023. The applicant's design consultants have prepared a revised permit submittal to address Landau's review comments. At the City of Edmonds' (City) request, Landau has reviewed the revised permit submittal. The review was completed in accordance with the scope outlined in Task Order No. 23-14, issued under the amended 2021-2023 Professional Services Agreement between the City and Landau. Landau reviewed geotechnical portions of the following documents for compliance with Chapters 19.10 and 23.80 of the Edmonds Community Development Code (ECDC): • Bush, Roed & Hitchings, Inc. 2023. Revised Civil Plans. November 20. • Motionspace Architecture + Design, PLLC. 2023. Revised Architectural Plans. November 20. • Motionspace Architecture + Design, PLLC. 2023. Permit Corrections Review Cycle 1 (RC1) for BLD2023-0640. December 18. • Nelson Geotechnical Associates, Inc. 2023. Geotechnical Comment Response. December 8. • Nelson Geotechnical Associates, Inc. 2023. Geotechnical Engineering Evaluation. May 23. Comments from Landau's July 2023 review are reproduced below in italics. The comments are followed by a brief assessment of the applicant's response: 155 NE 100th St, Ste 302 • Seattle, WA 98125 • 206.631.8680 • www.landauinc.com City of Edmonds - Revised Permit Submittal Package for Koh Residence Landau Associates Review Comment: Per Section 19.010.030(D) of the ECDC, vicinity maps shall identify all known landslide masses, debris flows, or mud flows on or near the site which could threaten proposed structures within 100 feet (ft), as referenced in the geotechnical evaluation. To be in accordance with the ECDC, these items should be added to the vicinity maps prepared by Bush, Roed & Hitchings, Inc. and Motionspace Architecture + Design, PLLC. Response: The Geotechnical Comment Response letter by Nelson Geotechnical Associates (NGA) indicates that there are no known landslide masses, debris flows, or mud flows near the site, other than the Earth Subsidence and Landslide Hazard Area. In Landau's opinion, this comment has been adequately addressed. Review Comment: Per Section 19.010.030(F)8 of the ECDC, civil plans shall identify grading plans, temporary and permanent shoring plans, and top and toe of slope setbacks. To be in accordance with the requirements of the ECDC, temporary and permanent shoring plans as well as top and toe of slope setbacks should be added to the civil plans prepared by Bush, Roed & Hitchings, Inc. Response: The Geotechnical Comment Response letter by NGA indicates that no temporary or shoring systems are anticipated to be required. The Civil Plans by Bush, Roed & Hitchings, Inc. have been updated to depict the recommended 50-foot buffer. In Landau's opinion, this comment has been adequately addressed. Review Comment: Per Section 19.010.030(H)3 of the ECDC, the geotechnical evaluation shall include an analysis of material gathered through appropriate explorations, such as borings or test pits, extending to a minimum depth of six ft below the proposed lowest footing or pile. The two exploratory borings completed by Nelson Geotechnical Associates, Inc. did not extend to 6 ft below the tip elevations of the proposed augercast piles. To be in accordance with the ECDC, additional explorations should be completed that extend to a minimum of 6 ft beyond the lowest proposed augercast pile tip elevation. Response: In its Geotechnical Comment Response letter, NGA has reduced the depths of proposed deep foundation elements to a minimum of 30 ft below ground surface, which is at least 6 ft shallower than the explorations completed at the site. Updated pile capacity recommendations have been provided for this new deep foundation configuration. In Landau's opinion, this comment has been adequately addressed. • Review Comment: Per Section 19.010.030(H)6 of the ECDC, the geotechnical engineer shall, as a part of the building permit process, provide analysis of the rate of retreat of the bluff prepared by a geologist and estimate the bluff retreat amount and regression rate for periods of 25 and 125 years. To be in accordance with the ECDC, this information should be added to the geotechnical evaluation by Nelson Geotechnical Associates, Inc. Response: The Geotechnical Comment Response letter by NGA presents estimates of bluff retreat amount over periods of 25- and 127-years. In Landau's opinion, this comment has been adequately addressed. • Review Comment: Per Section 23.80.050(F)1.d of the ECDC, the hazard analysis shall include an estimate of slope stability as well as an estimate of the effect construction and placement of structures will have on the slope over the estimated life of the structure. To be in accordance with the ECDC, this information should be added to the geotechnical evaluation by Nelson Geotechnical Associates, Inc. December 28, 2023 City of Edmonds - Revised Permit Submittal Package for Koh Residence Landau Associates Response: The Geotechnical Comment Response letter by NGA includes discussion regarding the stability of the slopes and the effect of the construction of structures on the stability of the slope over the estimated life of the structure. In Landau's opinion, this comment has been adequately addressed. Review Comment: Per Section 23.80.050(F)1.e of the ECDC, the hazard analysis shall include an estimate of the bluff retreat rate or an estimate of the percent risk of landslide area expansion that recognizes and reflects potential catastrophic events such as seismic activity or a 100-year storm event. To be in accordance with the ECDC, this information should be added to the geotechnical evaluation by Nelson Geotechnical Associates, Inc. Response: The Geotechnical Comment Response letter by NGA includes estimates of bluff retreat rate and an estimate of the percent risk of landslide area expansion. In Landau's opinion, this comment has been adequately addressed. Review Comment: Per Section 23.80.050(F)1.f of the ECDC, the hazard analysis shall include consideration of the run -out hazard of landslide debris and/or the impacts of landslide run -out on downslope properties. To be in accordance with the ECDC, this information should be added to the geotechnical evaluation by Nelson Geotechnical Associates, Inc. Response: The Geotechnical Comment Response letter by NGA includes discussion regarding the run -out hazard of landslide debris and the impacts of landslide run -out on downslope properties. In Landau's opinion, this comment has been adequately addressed. Review Comment: The geotechnical report by Nelson Geotechnical Associates, Inc. recommends a buffer of 50 ft from the top of the slope to the west of the project site. Based on a review of the Civil Plans and Architectural Plans by Bush, Roed & Hitchings, Inc. and Motionspace Architecture + Design, PLLC, the proposed structure will be situated approximately 6 ft away from the identified landslide hazard area. This discrepancy should be addressed in future permit submittals. Response: The Geotechnical Comment Response letter by NGA provides clarification regarding the extent of the recommended 50-foot buffer. The Civil Plans by Bush, Roed & Hitchings, Inc. have been updated to depict the recommended 50-foot buffer. In Landau's opinion, this comment has been adequately addressed. • Review Comment: Sheet C3.0 of the Civil Plans by Bush, Roed & Hitchings, Inc. identifies retaining walls designed by others on both sides of the proposed driveway. Design plans for these retaining walls should be included in the permit submittal package for review. Response: Sheet C3.0 of the Civil Plans by Bush, Roed & Hitchings, Inc. has been updated to include top of wall and bottom of wall elevations. Sheet S1.5 of the Architectural Plans by Motionspace Architecture + Design, PLLC has been updated to include a retaining wall structural detail. In Landau's opinion, this comment has been adequately addressed. • Review Comment: The structural calculations and architectural plans by Motionspace Architecture + Design, PLLC indicate that the proposed structure will be supported on 16-inch diameter augercast piles; however, the geotechnical engineering report by Nelson Geotechnical Associates, Inc. only provides axial capacities for 18-inch diameter augercast piles. The architectural plans and structural calculations should be updated to reference the information provided in the geotechnical report. Alternatively, the geotechnical report may be updated to provide axial capacities for 16-inch diameter augercast piles. December 28, 2023 City of Edmonds - Revised Permit Submittal Package for Koh Residence Landau Associates Response: The Architectural Plans by Motionspace Architecture + Design, PLLC have been updated to depict the use of 18-inch diameter augercast piles. The Geotechnical Comment Response letter by NGA includes updated axial capacity recommendations for 18-inch diameter augercast piles with reduced tip elevations. In Landau's opinion, this comment has been adequately addressed. This letter has been prepared to facilitate the City of Edmonds' evaluation of permit submittal documents for the proposed single-family residence at 15604 75th Place West in Edmonds, Washington. Landau reviewed geotechnical portions of the documents for compliance with Chapters 19.10 and 23.80 of the Edmonds Community Development Code and for conformance with conventionally accepted geotechnical engineering practices. Landau's peer review does not diminish the responsibility of the applicant's geotechnical consultant to serve as the project's Geotechnical Engineer of Record. Furthermore, the applicant's consultants are responsible for preparing a design suitable for the site conditions. Closing If you have questions or comments, please contact Sean Gertz at 425.329.0251 or at sgertz@landauinc.com. LANDAU ASSOCIATES, INC. Sean Gertz, PE Associate SMG [P:\074\219.030\R\KOH RESIDENCE SUPPLEMENTAL GEOTECHNICAL PEER REVIEW 12.28.2023.DOCX References City of Edmonds. Edmonds Community Development Code. Title 19 Building Codes. Chapter 19.10 Building Permits — Earth Subsidence and Landslide Hazard Area. City of Edmonds. Edmonds Community Development Code. Title 23 Natural Resources. Chapter 23.80 Geologically Hazardous Areas. December 28, 2023