Loading...
REVIEWED PLN RESUB4 BLD2023-0640+LANDSCAPE_ESTIMATE_NEW+6.24.2024_3.36.22_PM+4340391■-------------- Reviewed by City of Edmonds ; Planning Division RESUB Jun 25 2024 BLD2023-0640 DEVELOPMENT SERVICES DEPARTMENT Turnstone Landscape Services, LLC T U R N S T O N E Landscape Proposal LANDSCAPING 5312 47th Ave S Seattle, WA 98118 travis@turnstonelandscaping.com Travis Parent: 206-280-3998 Bill To: Koh Residence Date: 6/24/2024 0:00:00 15604 75th PI. W. Revised: 1 Edmonds, WA 98026 Quotation #: 1 Quote valid until: December 11, 2024 Prepared by: Travis Parent *Quantities are based on plans provided by the Landscape Architect Firm ADA LLC and Motionspace Architect + Design PLLC. Revised design sent 6/18/24 Description of Services AMOUNT AOA LLC. LANDSCAPE PLAN >Page 6/7 >>Item 3 GRADED AREAS $29,324.52 1. Excavate 9" of soil and remove. 2. Import 6" of 3-way. NW Premium Blend. 3. Lightly mix 3-way into top few inches of subgrade prior to planting. AOA LLC. LANDSCAPE PLAN >Page 6/7 >>Items 4-7 RESTORATION AREA PLANTING 1. Pits excavated 2x diameter of plant. 2. Backfilled with a mix of 30/70 mix of Steerco to native soil. $27,242.28 3. Plants planted 3" high and surface mulched 3" with hog fuel in a 24" diameter circle hog fuel per plant in EX vegetated areas. 4. Plants in completely bare areas, mulch continuously to a depth of 3". 5. Landscaped areas and along east side of road, use dark wood mulch from Pacific Topsoils. 6. Single stake mitigation trees with biodegradable bamboo stake and biodegradable tape. 7.Plants to be thoroughly watered after planting. 8. AOA planting approval and City of Edmonds to be notified. 9. Plant Material. ADA LLC. LANDSCAPE PLAN >Page 6/7 >>Items 4-7 ORNAMENTAL LANDSCAPE AREA PLANTING 1. Pits excavated 2x diameter of plant. 2. Backfilled with a mix of 30/70 mix of Steerco to native soil. 3. Plants planted 3" high and surface mulched 3" with hog fuel in a 24" diameter circle hog fuel per plant in EX $15,238.40 vegetated areas. 4. Plants in completely bare areas, mulch continuously to a depth of 3". 5. Landscaped areas and along east side of road, use dark wood mulch from Pacific Topsoils. 6. Stake Acer Palmatum. 7. Plants to be thoroughly watered after planting. 8. ADA planting approval and City of Edmonds to be notified 9. Plant material. 10. Ornamental landscape area. Permanent low flow spray irrigation system. AOA LLC. LANDSCAPE PLAN >Page 6/7 >>Item 8 IRRIGATION $14,952.00 1. Restoration area -Temporary Drip. *Assumes P.O.C. is available. *This proposal does not take into account any unforeseen or undisclosed site conditions such as foreign Sub Total $86,757.20 materials and objects discovered upon excavation that may arise during the execution of this project. Should anything arise of this nature the clients will be notified immediately of any costs before proceeding. It will be handled on a Time and Materials basis at the rates listed below. Tax 10.5% $9,109.51 $95,866.71 *All work outside of contract work scope will be charged as Time ($85/Hour) + Materials (Marked -up Total 20Y6) END.