REVIEWED BLD BLD2025-0016+Structural_Analysis_or_Calculations+1.6.2025_12.28.02_PM+4697737RECEIVED Jan 06 2025 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT BLD2025-0016 -------------- Reviewed by the City of I Edmonds I LONGITUDE ONE TWENTYO ENGINEERING & DESIGN Calculation Package for Foundation Stablllzatlon/Left STRUCTURAL ENGINEER L120 ENGINEERING & DESIGN 1315091s'PLNE KIRKLAND, WA 98034-5901 17521 72nd A ve W Edmonds, WA 98026 Project no: S241101-1XR December 2W'd7 2024 Prepared for: R&R Foundation Specialist 1611 East Marine View Drive Everett, WA 98201 P: 425.760.5077 CONTACT: MANS THURFJELL, PE EMAIL: MTHURFJELL@L120ENGINEERING.COM PHONE: (425) 636-3313 1 of 21 (425) 636-3313 L120Engineering.com 25'-0"' ALL I CN ' W2 •\\ {(13)}PILES CENT��1} •\,\ T 1 T 2 T 3 ,, •` (E) RESIDENCE -- `•\ 17521 72nd Ave W 4 Edmonds, WA 98026 \. T� `•\ (3) PILES CENTERED ON SUPPORT '\ (E)STRUCTURE •, DETTACHED GARAGE '•\ : } W` 2` j,. ' p.v v $� \ b o•\ uNE , ............ "NOTES. \\• a. MINIMUM AND MAXIMUM INSTALLATION TORQUE FOR HELICAL ASSEMBLIES SHALL BE SPECIFIED BY THE PILE MANUFACTURER- MINIMUM INSTALLATION TORQUE SHALL BE HIGH ENOUGH TOACHIEVE THE REQUIRED BEARING CAPACITY LOADING, INCLUDING A SAFETY FACTOR NO LESS THAN 2. THE MAXIMUM INSTALLATION TORQUE SHALL NOT EXCEED THEALLOWABLE TORSIONAL CAPACITY OF THE PILE SHAFTS ORANY PART OF THE PILE ASSEMBLY MAXIMUM INSTALLATION TOROLE RATING OF6,B43FT1HS FOR A 2-Va INCH DAMETER HELICAL PILE WITH 0.217INCH SHAFT WALL THICKNESS PER EBRSOH9. b. HELICAL ASSEMBLIESAS MANUFACTURED BY PRECISION PIERS, INC., IN ACCORDANCE WITH ESR6049. c. PILE ORANCHOR LOADS NOT TO EXCEED MAXIMUM CAPACITYAS DETERMINED BY THE MANUFACTURER FOR ANY PART OFTHEASSEMBLY. L MAXIMUM ONCENTER SPACING LISTED FOR TYPICAL PILE INSTALLATION UNLESS NOTED OTHERWISE ON PLAN, PILE SPACING& LOAD REQUIRMENTS TABLE MIN O.C. SPACINO,N YIN VERTNJLL CAPACRY, kIp PROOFTESTINO LOAO,Mp PILES PILETYPE SIM ENO ALLOWABLE LOADING � MIN VERTICAL CAPACITY LOCATION PILES OFFSET (MIN ULTIMATE CAPACITY) 14 HELICAL BOMp 16.0 Nip INTERIOR LEGAL DESCRIPTION Section 08 Township 27 Range 04 MEADOWDALE BEACH BLK 000 D-03 - S 91 FT OF N 182FT OF S 302FT OF W 148FT OF TR 143 EXC W 10FT THOF TO CITY OF ED PER AUD FILE NO 77021802651079/685 - AKA LOT B ASDELINEATED ON SKETCH CITY ED SP NO S 46-76 REC AFN 8004020198 TGW VAC W 1OFT BEING A PTN OF 72ND AVE W ORD NO 2257 AF NO 8201260100 VOL 1736 PG 141 OWNER NAME & ADDRESS BELL BRETT TIDIANA L 1752172nd Ave W Edmonds, WA 98026 NOTE: THE PROJECT WILL NOT RESULT IN CHANGING OF SITE TOPOGRAPHY OR EXISTING DEVELOPED AREAS. NOTE: L120'S SCOPE IS LIMITED TO THE PERIMETER SUPPORT SYSTEMICONTINUOUS FOOTINGS. THE INTERIOR CRAWL SPACE SUPPORTED SYSTEM FOR THE FIRST FLOOR SHALL BE INSTALLED PER R&R. SITE PLAN NOTES 1. VERIFY EXISTING STRUCTURES AND ALL DIMENSIONS ON SITE. 2. FOUNDATION DIMENSIONS ARETO OUTSIDE FACE OF CONCRETE STEM WALL PER R&R FOUNDATION SPECAUST (R&R) LEVEL SURVEY. 3. REFER TO STRUCTURAL CALCULATIONSPACKAGEBY L120 DATED DEC 23, 2024, FOR ADDITIONAL INFORMATION, SPECIFICATIONS, AND REQUIREMENTS. 4. LEVEL SURVEY PER R&R PROPOSAL DATED OCT 26, 2024. REFER TO STRUCNRAL CALCULAPONSPACK GEFORMODIFICATIONSAND ADDITIONAL REQUIREMENTS FOR LEVEL SURVEY. 5. PARCEL DIMENSIONS APPROXIMATED BY SNOHOMISH COUNTY ASSESSOR GIS MAPPING TOOLS &TAXSIFTER INCLUDING THE SELECTED PARCEL. PROPERTY DIMENSIONS PRE APPROXIMATE FOR REPRESENTATIVE PURPOSES ONLY. NOT TO SCALE. NOT TO BE USED FOR LEGAL PURPOSES 6. SITE FEATURES AND SOME EXISTING STRUCTURES ON ADJACENT PARCELS NOT SHOWN FOR CLARITY. 7. GEOTECH SPECK INSPECTOR SHALL BE CONTINUOUSLY PRESENT DURING HELICAL PILE INSTALLATION AND TESTING. ❑ EXISTING RESIDENCE STRUCTURE EXISTING ADJACENT STRUCTURE AREA OF PROPOSED WORK --- PROPERTY LINE • APPROXIMATE DIMENSION HELICAL PILE 1 SITE PLAN F 4 D Z o Z ZW 90 'I OrvON5 PT1 PROTECT NAME 17521 72nd Ave W Edmonds, WA 98026 PROTECT NUIYBER S241101-IXR DPAvm BY PAM CHECKED BY- MRT SHEET DATE - 12/23/2024 SCALE Z N a rn _ F rn 3of21 PROJECT NO. SHEET NO. PROJECT 17521 72nd Ave W, Edmonds„ WA LONGITUDE SUBJECT Foundation Stabilization/Jackin ONE TWENTYO ENGINEERING & DESIGN BY PAM DATE 12/23/24 Scope/Objective: To determine the required pile spacing and geometry to stabilize and lift (where required) the existing structural foundation. These findings have been based upon the calculated strength of the existing foundation system and the current vertical loading from the existing structure above (based on as -built assessments). The R&R Foundation Specialists' (R&R) proposed pile layout can be found in the following pages with structural recommendations based upon the findings of L120 Engineering & Design. Note that cosmetic damages to rigid wall coverings/members and siding are expected during a foundation lift. Such cosmetic damages/cracks are to be repaired by others following the completion of the foundation stabilization and lifting and are not included in the structural scope presented here. It should be further noted that L120's scope is limited to the perimeter support systems/continuous footings. The interior crawl -space support system for the first floor shall be installed per R&R. This could include the use of some or all of the following: longer support posts, adjustable post -base hardware, and/or the addition of taller wood support members. Settlement in these interior support areas shall be monitored and further adjustments shall be made if necessary. Structural Summary: - The foundation of the residence consists of continuous cast -in -place concrete stem wall and concrete strip footings. Below the footings, piles are to be installed at the locations indicated on the attached Level Survey. Piles to be installed in accordance with SSK-01. - The following load values represent the maximum expected pile loads for the indicated spacing. R&R to provide pile and equipment assemblies with capacities equal to or greater than the indicated load values. Allowable Load Capacity Requirement: Piles 1-6 ............ 8 kip minimum vertical capacity (allowable load) Note: Refer to the attached General Notes for additional requirements. - As determined by R&R, the site appears to have no lateral (horizontal) displacements or concerns. As such, the analysis and recommendations presented in this report have been strictly limited to vertical stabilization/jacking. If lateral movement is observed or expected additional structural analysis will be required. - Structural recommendations contained in this package are based on site photographs, dated October 16, 2024, and the geotechnical report, dated December 18, 2024, by Cobalt Geosciences. Both the photographs and geotechnical report were provided by R&R and are included within this package. Please inform L120 of site -specific conditions that were unconsidered by, may conflict with, or otherwise compromise the recommendations contained within this package, including, but not limited to, water drainage, slope stability, existing structural damage, or existing subsurface obstructions. In this instance, the structural assumptions, recommendations, and scope for this project will need to be revisited to consider and address the new findings Refer to the following pages for pile and connection specifications. L120 ENGINEERING & DESIGN 4of21 GENERAL NOTES HELICAL PILES 1. HELICAL PILES SHALL BE DESIGNED AND MANUFACTURED IN ACCORDANCE WITH THE 2021 INTERNATIONAL BUILDING CODE (IBC). 2. HELICAL PILES SHALL BE DESIGNED AND MANUFACTURED BY PRECISION PIERS, INC., AND SHALL BE IN ACCORDANCE WITH ESR-5049. 3. ALL MATERIAL PROPERTIES OF HELICAL PILE COMPONENTS SHALL BE IN ACCORDANCE WITH ESR-5049. 4. CORROSION PROTECTION OF ALL PILE COMPONENTS SHALL COMPLY WITH THE ICC-ES ACCEPTANCE CRITERIA FOR CORROSION PROTECTION OF STEEL FOUNDATION SYSTEMS USING POLYMER (EAA) COATINGS (AC228). 5. ALL HELICAL FOUNDATION COMPONENTS SHALL BE GALVANICALLY ISOLATED FROM CONCRETE REINFORCING STEEL, BUILDING STRUCTURAL STEEL, OR ANY OTHER METAL BUILDING COMPONENTS PER AC358 SECTION 3.9. 6. THE SHAFT SHALL BE DESIGNED AND FABRICATED TO SUPPORT THE SPECIFIED DESIGN LOADS. 7. ONLY MANUFACTURER -APPROVED CONNECTORS, ADAPTORS, AND ACCESSORIES MAY BE USED. 8. HELICAL PILES SHALL BE INSTALLED VERTICALLY INTO THE GROUND WITH AN ALLOWABLE ANGLE OF INCLINATION OF +/- 1 DEGREE FROM VERTICAL PER SECTION 4.2.1 OF ESR-5049. 9. MONITOR AND RECORD DEPTH OF PILE PENETRATION. PROVIDE TORQUE MONITORING DEVICE AS PART OF THE INSTALLING UNIT. MONITOR AND RECORD TORQUE APPLIED DURING THE INSTALLATION OF EACH PILE AT SPECIFIC DEPTHS. 10. HELICAL PILES SHALL BE INSTALLED TO THE MINIMUM TORQUE VALUE REQUIRED TO PROVIDE THE MINIMUM REQUIRED LOAD CAPACITIES INDICATED ON PLAN INCLUDING A FACTOR OF SAFETY NO LESS THAN TWO (2). THE MAXIMUM INSTALLATION TORQUE SHALL NOT EXCEED THE ALLOWABLE TORSIONAL CAPACITY OF ANY INDIVIDUAL COMPONENT OF THE PILE ASSEMBLY. 11. ALL BRACKETS AND HELICAL PILE ASSEMBLY COMPONENTS SHALL HAVE ADEQUATE CAPACITY TO ACHIEVE THE MINIMUM REQUIRED BEARING CAPACITY INCLUDING A FACTOR OF SAFETY NO LESS THAN TWO (2). 12. REPAIR BRACKETS MUST BE CONCENTRICALLY LOADED AND THE BRACKET PLATE MUST BE FULLY ENGAGED WITH BOTTOM OF CONCRETE FOUNDATION. 13. ALL HELICAL PILE ASSEMBLY COMPONENTS MUST HAVE ADEQUATE STRENGTH TO DEVELOP THE TORQUE REQUIRED FOR INSTALLATION AND ALL INDUCED STRESSES. 14. THE PILE QUANTITY, LAYOUT, AND SPACING INDICATED ON PLAN SHALL NOT BE CHANGED WITHOUT WRITTEN APPROVAL FROM THE ENGINEER -OF -RECORD PRIOR TO INSTALLATION. 15. CONTINUOUS SPECIAL INSPECTION IN ACCORDANCE WITH 2O21 IBC SECTION 1705.9 MUST BE PROVIDED FOR THE INSTALLATION OF THE HELICAL PILES AND FOUNDATION BRACKETS. ITEMS TO BE RECORDED AND CONFIRMED BY THE SPECIAL INSPECTOR MUST INCLUDE THE FOLLOWING: A. PRODUCT MANUFACTURER B. MANUFACTURER'S CERTIFICATION OF THE INSTALLERS C. PRODUCT TYPE AND CONFIGURATIONS FOR HELICAL PILE LEAD SHAFT SECTIONS, EXTENSIONS, BRACKETS, BOLTS, THREADED RODS, NUTS, WASHERS, AND TORQUES AS SPECIFIED IN THIS REPORT AND THE CONSTRUCTION DOCUMENTS D. INSTALLATION PROCEDURES FOR THE HELICAL PILE SHAFT, INSTALLATION EQUIPMENT USED, AND THE PRECISION PIERS FOUNDATION SYSTEMS INSTALLATION INSTRUCTIONS E. ANTICIPATED AND ACTUAL PILING DEPTH F. REQUIRED TARGET INSTALLATION TORQUE OF PILES AND MINIMUM DEPTH OF INSTALLATION G. INCLINATION AND POSITION OF PILES, TOP OF PILE EXTENSION IN FULL CONTACT WITH BRACKET, TIGHTNESS OF ALL BOLTS AND EVIDENCE THAT THE PILE FOUNDATION SYSTEMS ARE INSTALLED BY AN APPROVED PRECISION PIERS FOUNDATION SYSTEMS INSTALLER. 16. PILES IMPROPERLY INSTALLED BECAUSE OF MISLOCATION, MISALIGNMENT, OR FAILURE TO MEET OTHER SPECIFIED DESIGN/INSTALLATION CRITERIA ARE NOT ACCEPTABLE. ABANDON REJECTED PILES AND INSTALL ADDITIONAL PILES AS REQUIRED. HELICAL PILE PROOF TESTING THE CAPACITY OF THE INSTALLED PILES SHALL BE VERIFIED BY FIELD TESTING OF A MINIMUM THREE (3) PERCENT OF PILES UP TO FIVE (5) PILES MAXIMUM (ONE (1) MINIMUM) IN ACCORDANCE WITH THE PROCEDURE OUTLINED IN ASTM D1143 AND/OR THE 2021 INTERNATIONAL BUILDING CODE (IBC). THE MAXIMUM TEST LOAD SHALL BE TWO -HUNDRED (200) PERCENT OF THE SPECIFIED DESIGN LOAD. 5of21 GENERAL NOTES STRUCTURAL STEEL 1. REFERENCE STANDARDS: DESIGN, FABRICATION AND ERECTION ARE TO BE IN ACCORDANCE WITH THE LATEST EDITION OF THE AISC "CODE OF STANDARD PRACTICE FOR STEEL BUILDINGS AND BRIDGES". 2. MATERIALS: BOLTS - ASTM A307, UNLESS OTHERWISE NOTED ALL OTHER STEEL - ASTM A36 (Fy = 36,000 PSI) 3. ALL WELDING SHALL BE PERFORMED BY CERTIFIED WELDERS AND CONFORM TO AWS CODES D1.1 AND D1.3. WELDS NOT SPECIFIED ARE TO BE 1/4" CONTINUOUS FILLET MINIMUM. USE DRY E70 ELECTRODES. WHERE ON -SITE WELDING IS REQUIRED, SPECIAL INSPECTION IN ACCORDANCE WITH 2O18 AND 2021 IBC SECTION 1705.2 IS ALSO REQUIRED. CONCRETE 1. REFERENCE STANDARDS: ACI 301, ACI 318, IBC. 2. MINIMUM CONCRETE STRENGTH (28 DAYS): FOOTINGS AND STEM WALLS..................................................3,000 PSI - 5 SACK MIX BASEMENT FOUNDATION RETAINING WALLS .......................3,000 PSI - 5 SACK MIX SLAB-ON-GRADE........................................................................2,500 PSI - 5 SACK MIX SLAB -ON -GRADE... EXPOSED WEATHERING SURFACES ...... 3,000 PSI AIR -ENTRAINMENT 2.5% TO 5.5% FOR EXPOSED CONCRETE 3. MIXING: COMPLY WITH ACI 301. DO NOT EXCEED THE AMOUNT OF WATER SPECIFIED IN THE APPROVED MIX. PROPORTIONS OF AGGREGATE TO CEMENT SHALL BE SUCH AS TO PRODUCE A DENSE, WORKABLE MIX WHICH CAN BE PLACED WITHOUT SEGREGATION OR EXCESS FREE SURFACE WATER. 4. PLACING: COMPLY WITH ACI 301. PROVIDE A 3/4 INCH CHAMFER AT ALL EXPOSED CONCRETE EDGES, UNLESS INDICATED OTHERWISE ON ARCHITECTURAL DRAWINGS. 5. SLUMP: 4 INCHES PLUS OR MINUS 1 INCH. DO NOT ADD WATER TO MIX TO INCREASE SLUMP. GREATER SLUMP, ACCELERATED SET, OR HIGH EARLY STRENGTH MAY BE ACHIEVED BY USING APPROVED ADMIXTURES. 6. CURING: COMPLY WITH ACI 301. KEEP CONCRETE MOIST FOR SEVEN DAYS MINIMUM. 7. JOINTING: PROVIDE ADEQUATE JOINTING TO MINIMIZE EFFECTS OF VOLUME CHANGE. JOINTS SHOWN MAY BE ADJUSTED AT CONTRACTOR'S OPTION WITH PRIOR APPROVAL FROM ENGINEER. 8. WEATHER EXTREMES: COMPLY WITH ACI 305R FOR HOT WEATHER. COMPLY WITH ACI-306R FOR COLD WEATHER. 9. WATER/CEMENT RATIO SHALL NOT EXCEED 0.50 (BY WEIGHT), TYPICAL. 10. ALL SPECIFIED CONCRETE ANCHORS SHALL BE SIMPSON STRONG -TIE, HILTI, OR EQUIVALENT. SPECIAL INSPECTIONS REQUIRED. ANCHORS SHALL BE INSTALLED IN ACCORDANCE WITH MINIMUM EMBEDMENT, SPACING, EDGE DISTANCE, AND REQUIREMENTS PER MANUFACTURER. LONGITUDE ONE TWENTYO ENGINEERING & DESIGN PROJECT NO. SHEET NO. PROJECT 17521 72nd Ave W, Edmonds„ WA SUBJECT Sta��i4'nLt��r►tI�al4�ion Chart BY PAM DATE 12/23/24 PRECISION PIER52 7/8" DIAM HELICAL PILE CAPACITY PER TORQUE INSTALLATION - 2.875" O.D. X.203" WALL HELICAL PILE WITH DIGGA DRIVE HEAD (REFERENCE ESR-5049) Digga 6k Drive Head L120 ENGINEERING &DESIGN LONGITUDE ONE TWENTY° ENGINEERING & DESIGN PROJECT NO. SHEET NO. PROJECT 17521 72nd Ave W, Edmonds„ WA SUBJECT StRlu�'c��h���i4�l�r�H)an Chart BY PAM DATE 12/23/24 PRECISION PIERS2 7/8" DIAM HELICAL PILE CAPACITY PER TORQUE INSTALLATION - 2.875" O.D. X.203" WALL HELICAL PILE WITH DIGGA DRIVE HEAD (REFERENCE PRODUCT EVALUATION TEST REPORT (7/15/2024) DiggalOkDrive Head L120 ENGINEERING &DESIGN 8of21 Wednesday, October 16, 2024 SCOPE OF WORK R&R CREW RESPONSIBILITIES & DETAILS: - Crew will install (6) Helical Piles to lift home to maximum allowable recovery. - Crew will remove and repour (6) concrete holes to allow pile installation. - Crew will drill 3/8" holes and inject Polyurethane Foam to lift and support slab. - Handheld only. HOMEOWNER RESPONSIBILITIES: - Have work area cleared where piles will be installed. - Have flooring removed to allow access to slab. ADDITIONAL INFO: FOUNDATION - R&R will handle necessary permit and engineering coordination. - 25% deposit, 25% upon issue of permit and final 50% upon completion of project. - Permit cost is not included and will be billed on second 25% deposit payment. - Responsible party representative must be onsite during crew arrival, project completion and foundation lifting if applicable. - Permitting/scheduling times may vary beyond R&R control. MATERIAL CLAUSE: - Depth Clause: Piles are bid to 25' maximum depth. $20 per foot charge beyond that. - Poly Foam Clause: Project is bid up to 380lbs of foam at current cost. $7 per lb charge beyond that. - Homeowner will be notified if any unexpected items arise and no additional work will be completed without homeowner approval. 9of21 Wednesday, October 16, 2024 ELEVATION MAP L120 is in concurrence with pile layout recommended by R&R provided that the proposed layout is followed as marked. Refer to attached SSK-01 for installation details. NOTES: 1. It is acceptable to install piles at the spacing shown with ± 0'-6" tolerance to allow for unexpected obstructions encountered during pile installation. NOTE: L120's scope is limited to the perimeter support systems/continuous footings of the primary structure. All stabilization and replacement efforts of exterior decks and deck supporting elements are outside of 1-120's contract and scope and are not addressed in this package. - L120 10 of 21 Wednesday, October 16, 2024 JOB PHOTOS r- Crew will install Piles 5 & 6 here on interior walls. Crew Pile 3 will be installed here on interior wall. Crew will will remove and repour (2) concrete holes. Handheld remove and repour (1) concrete hole. Handheld only. Crew only. Crew will drill 3/8" holes and inject Polyurethane will drill 3/8" holes and inject Polyurethane Foam to lift Foam to lift and support slab. Crew will not install poly and support slab. in the bathroom. b Piles 1 & 4 will be installed here on interior wall. Crew Crew will install Pile 2 here on interior wall. Crew will will remove and repour (2) concrete holes. Handheld remove and replace concrete. Crew will install pile on only. Crew will drill 3/8" holes and inject Polyurethane other side of wall. Foam to lift and support slab. Photographs provided by R&R Foundation Specialists. Note that analysis assumptions such as building geometry, tributary areas, and loading were determined through examination of these photographs and industry knowledge of standard construction practices. - L120 11 of 21 LONGITUDE ONE TWENTY ENGINEERING & DESIGN PROJECT NO. NO. S241101-1XR SSK-01 PROJECT 17521 72nd Ave W, Edmonds„ WA SUBJECT Foundation Stabilization/Jacki BY PAM II II II (-D W 0 CL or� Q U- -1111=1111=IIII=1111=III . 1111=1111=IIII=1111= '=1111=IIII=1111=III � �I 1111=IIII=1111 ° i-1111=IIII=1111= '11=1111=1111=IIII-11 ''i=IIII=1111—III =_ ''=1111=1111=�1111= '=1111=I11i=11 —ln1-�111= NOTES: 1. CONTRACTOR TO VERIFY NOTED MINIMUM EXISTING FOUNDATION DIMENSIONS PRIOR TO INSTALLATION. ENGINEER -OF -RECORD TO BE NOTIFIED PRIOR TO INSTALLATION IF MINIMUMS NOT MET. 2. ALL ASSEMBLY COMPONENTS SHALL BE FULLY SEALED BY A CORROSION RESISTANT SYSTEM. THIS INCLUDES ALL FINAL CUT ENDS AND DRILLED HOLES. CORROSION PREVENTION COATING SYSTEM BY OTHERS. PRIME AND PAINT PER MFR OR GALVANIZATION PER ASTM 153/A123. 3. AT CUT INSTALLATION POCKET ALL EXPOSED STEEL REINFORCEMENT SHALL BE SEALED OR COATED TO PREVENT CORROSION. DATE 12/23/24 (E) SUPPORT (E) CONCRETE FOOTING T/SOIL = 11=IIII=1111= FIELD VERIFY 1111=IIII=11� 11=IIII=1111= 1111=IIII-1 11=IIII=111 IIII=1111- II=1111= -III=1 PRECISION PIERS HELICAL =1' PILE & REPAIR BRACKET ASSEMBLY PER R&R FOUNDATION SPECIALIST TO CONFORM TO ESR-5049 L120 ENGINEERING & DESIGN ESR-5049 Page 12 of 14 12 of 21 135° 4 r 0 Model No. HP287560130: Single Helix (10" Diameter) Lead Section T to 1 f 4P Mac uaa Model No. PP2870-702: Double Helix (10" d: 12" Diameters) Lead Section j� 84AX ,7, 1Ti i 6 24.1M_30.W­J Model No. PP2870-703: Triple Helix (8", 10" & 12" Diameters) Lead Section FIGURE 1—LEAD SHAFT SECTIONS OF THE 2'!s X 0.217-INCH HELICAL PILE 00.88' 2 t00 13 of 21 ESR-5049 PUT Page 13 of 14 Ncsr IYM'r tr_eprec aye ir�7teC 4X 00.875*0.03 THRU Coupling i 54.00*G.:--- � — 02.87 L 2.00*0.03 2.00*0.03 FIGURE 2—EXTENSION SHAFT SECTION OF THE 27l, X 0.217-INCH HELICAL PILE (Model No. EXT2882175) 12.00 FIGURE 3-101 REPAIR BRACKET WITHOUT BACK PLATE (Model No. FB1412123SO) ESR-5049 14 of 21 Page 14 of 14 Matt wm" Ao w and rmww 4 FIGURE 4-102 REPAIR BRACKET WITH BACK PLATE (Model No. FBB14121235) r-r t0.55" FIGURE 5—TEE PART (Model No. T610030000) FOR REPAIR BRACKETS (With or Without Back Plate) 15 of 21 LONGITUDE ONE TWENTYO ENGINEERING & DESIGN PROJECT NO. SHEET NO. PROJECT 17521 72nd Ave W, Edmonds„ WA SUBJECT Foundation Stabilization/Jacking BY PAM DATE LOAD ANALYSIS: IBC 2021 - 1-Story Building Helical Piles MAX TRIB Condition: Roof LL(snow ground): 25psf Floor LL: 40psf Roof/Floor DL: 15psf Wall DL: 12psf Roof Trib = 0.5*(12'*12') = 72ft2 Floor Trib = 0.5*02`12') = 72ft2 Wall Trib = 10'*(0.5*12') = 60ft2 P, = 15psf*(72ft2+72ft2) + 12psf*60ft2 = 2.9 k PLL = 25psf*72ft2 + 40psf*72ftz = 4.7 k PTL_ 110W = D+L = 2.9k + 4.7k = 7.6 kips Piles 1-6: Point Load Pt Load = 8 kips Refer to attached helical pile soil capacity charts. 12/23/24 (E) SUPPORT (E) CONCRETE FOOTING T/SOIL = FIELD VERIFY NOTES: 1. Both uniform and point loads analyzed in the following calculations. Uniform loads are assumed to be standard due to load distribution from bearing walls, however, the additional point load is conservatively considered here for any major beam supports from above. 2. Maximum loading on the grade beam was determined by inspection of the building geometry and through conservative assumptions regarding span lengths and support wall/foundation. All concrete walls assumed full tributary span of floor and roof members. Conclusion: Based on the loading and geometry of the structure we conclude that the foundation may be stabilized through the use of piles and connections per R&R. These are to be attached to the existing concrete footings (connections per R&R). L120 ENGINEERING & DESIGN 16 of 21 Appendix Parcel Details & Photographs 17 of 21 SnohomishOnline Government Information & Services County 40 Washington Property Account Summary 12/23/2024 Parcel Number 00513100014303 Property Address 17521 72ND AVE W , EDMONDS, WA 98026-5105 General Information Description Category Code Area Property Characteristics Use Code Unit of Measure Size (gross) Parties Role Taxpayer Owner ection 08 Township 27 Range 04 MEADOWDALE BEACH BLK 00 D-03 - S 91FT OF N 182FT OF S 302FT OF W 148FT OF TR 143 XC W 1 OFT THOF TO CITY OF ED PER AUD FILE NO 702180265 1079/685 - AKA LOT B ASDELINEATED ON SKETCH ITY ED SP NO S-46-76 REC AFN 8004020198 TGW VAC W IOFT EING A PTN OF 72ND AVE W ORD NO 2257 AF NO 8201260100 'OL 1736 PG 141 id and Improvements ive, Locally Assessed 17 I I I Single Family Residence - Detached Acre(s) 0.31 Percent Name Address 100 BELL BRETT 17521 72ND AVE W, EDMONDS, WA T/DIANA L 98026 100 BELL BRETT T & 17521 72ND AVE W, EDMONDS, WA DIANA L 98026-5105 United States Related Properties No Related Properties Found Property Values Value Type Tax Year 2024 Tax Year 2023 Tax Year 2022 Tax Year 2021 Tax Year 2020 Taxable Value Regular $1,162,600 $1,132,800 $919,100 $853,500 $818,400 Exemption Amount Regular Market Total $1,162,600 $1,132,800 $919,100 $853,500 $818,400 Assessed Value $1,162,600 $1,132,800 $919,100 $853,500 $818,400 Market Land $533,000 $506,000 $387,000 $360,000 $366,000 Market Improvement $629,600 $626,800 $532,100 $493,500 $452,400 Personal Property Active Exemptions 18 of 21 No Exemptions Found Events Effective Entry Date- Type Remarks Date Time 07/17/2017 07/17/2017 Excise Temporary Excise: T061325 Finalized to: E088168 15:12:33 Processed 07/07/2017 09/14/2017 Owner Property Transfer Filing No.: E088168 07/07/2017 by sasset 14:19:00 Terminated 07/07/2017 09/14/2017 Owner Added Property Transfer Filing No.: E088168 07/07/2017 by sasset 14:19:00 07/07/2017 07/17/2017 Excise Property Transfer Filing No.: T061325, submitted by eREET 15:12:00 Processed 07/07/2017 by ASCEREET 10/29/2015 10/29/2015 Excise Temporary Excise: T030438 Finalized to: E058511 10:35:06 Processed 10/16/2015 08/15/2016 Owner Added Party/Property Relationship by sasmjt 15:25:00 10/16/2015 08/15/2016 Owner Party/Property Relationship by sasmjt 15:25:00 Terminated 10/16/2015 10/29/2015 Excise Property Transfer Filing No.: T030438, submitted by eREET 10:35:00 Processed 10/16/2015 by ASCEREET 03/06/2004 04/20/2004 Owner Property Transfer Filing No.: 473452 03/06/2004 by sasmns 14:46:00 Terminated 03/06/2004 04/20/2004 Owner Added Property Transfer Filing No.: 473452 03/06/2004 by sasmns 14:46:00 03/06/2004 04/12/2004 Taxpayer Property Transfer Filing No.: 473452 03/06/2004 by strcem 11:42:00 Changed 03/06/2004 04/02/2004 Excise Property Transfer Filing No.: 473452, Quit Claim Deed 03/06/2004 12:54:00 Processed by strbjp Tax Balance Distribution of Current Taxes I District Rate Amount Voted Non -Voted Amount Amount CENTRAL PUGET SOUND REGIONAL TRANSIT AUT 0.16 $191.63 $0.00 $191.63 CITY OF EDMONDS 1.02 $1,190.83 $329.34 $861.49 EDMONDS SCHOOL DISTRICT NO 15 2.73 $3,171.82 $3,171.82 $0.00 PUB HOSP #2 0.05 $56.62 $0.00 $56.62 SNO-ISLE INTERCOUNTY RURAL LIBRARY 0.32 $377.03 $0.00 $377.03 SNOHOMISH COUNTY CNT 0.50 $586.56 $0.00 $586.56 STATE 2.25 $2,617.68 $0.00 $2,617.68 SNOHOMISH CONSERVATION DISTRICT $10.03 $0.00 $10.03 STATE FOREST FIRE TOTAL 1 $23.501 $0.00 $23.50 7.05 $8,225.70 $3,501.16 $4,724.54 Pending Property Values Pendingl Market Land Tax Yearl Value Marketl Market Total Current Use Current Use Current Use Improvement Val Value e Land Value Improvement Total Value 11 20251 $554,000.001 $659,900.001 $1,213,900.001 $0.001 $0.001 $0.0011 Levy Rate History 19 of 21 Tax Year Total Levy Rate 2023 2022 2021 6.799556 8.270203 8.207334 Real Property Structures Receipts Sales History Description Type Year Built More Information 1 Story wBasement Dwelling 1977 View Detailed Structure Information Date Receipt No. Amount Applied Amount Due 10/30/2024 00:00:00 13554499 $4,112.85 $4,112.85 04/24/2024 00:00:00 13263710 $4,112.85 $8,225.70 10/20/2023 00:00:00 12917248 $3,868.03 $3,868.03 04/O5/2023 00:00:00 12608078 $3,868.03 $7,736.06 10/21/2022 00:00:00 12360780 $3,816.33 $3,816.33 04/13/2022 00:00:00 12071141 $3,816.33 $7,632.66 10/22/202100:00:00 11801938 $3,515.45 $3,515.45 04/12/202100:00:00 11487492 $3,515.44 $7,030.89 10/27/2020 00:00:00 11354343 $3,808.91 $3,808.91 04/09/2020 00:00:00 10903648 $3,808.91 $7,617.82 10/24/2019 00:00:00 10735738 $3,581.30 $3,581.30 04/18/2019 00:00:00 10432054 $3,581.30 $7,162.60 Sale Date Entry Recording Sale Excise Deed Transfer Grantor(Seller) Grantee(Buyer) Other Date Number Amount Number Type Type Parcels BEAMIS BEAMIS 03/06/2004 04/02/2004 $0.00 473452 QC S CHRISTOPHER CHRISTOPHER No P & ISONO YASUYO BEAMIS PHILLIPS 10/16/2015 10/29/2015 $575,000.00 E058511 W S CHRISTOPHER ALEXANDER No PAUL/ISONO M/COLEMAN YASUYO COLLEEN PHILLIPS ALEXANDER BELL BRETT T 07/07/2017 07/17/2017 $775,000.00 E088168 W S M & No COLEMAN & DIANA L COLLEEN P Neighborhood Code Township Range Section Quarter Parcel Map 1504000 27 04 08 SW View parcel maps for this Township/Range/Section 20 of 21 It Ms MArI 1 i M! Existing building plan provided by Snohomish County records for Parcel #:00513100014303 for address: 17521 72nd Ave W, Edmonds, WA 98026 Note that analysis assumptions such as building geometry, tributary areas, and loading were determined through examination of these photographs and industry knowledge of standard construction practices. -L120 21 of 21 r, r• i ' r Photographs provided by R&R. Note that analysis assumptions such as building geometry, tributary areas, and loading were determined through examination of these photographs and industry knowledge of standard construction practices. -L 120