Loading...
APPROVED PLN ENG STM RESUB1 BLD2024-1041+CIVIL_Plan+10.24.2024_6.30.55_PM+4580722_J I I I--J I 9 00602100100900 i L 48 35 3 35 3S 346 O 1 SE -1/4, SEC25, TWP 27N, RGE 3E, W,M, 98TH AVE W SHORT PLAT - LOT I LOT 10\ TWIN VIEW ESTATES \ VOL. 17, PGS. T�157 \ _ � 1i ► i � / �/ i � ► I / 00450700300005 / ► I I / ♦��//' 00450700300004 i �/ / // / / i // — HE `°h Pb �v ;� p � / 1 1 df MlN LENGTH /FOO7,%HlG A� / ��/ IbRA/N DRYWELI,! TRENCH N� / ,�� �.� (PER GEOTECI, i / / i 12,980 RECOMMENDA770N�) �358 APPROVED LANDSCAPING LOCATION (TYP) N887 '45 W 216.50' SEE LANDSCAPE PLAN APPROVED AS PART OF 98TH AVE W SHORT PLAT (PLN2022-0088) 4" PVC F0077NG LOT 3 LOT i I SP 292(7-77) DRAIN ® 1.0.- MIN 00450700300010 00450700300007 (AFN 780404028 -il I I IMPERVIOUS AREAS LOT 1 HOUSE+COVERED D/W, PATIO, PORCH, WALK 2,610 SF UNCOVERED PA 770 AND WALK 50 SF UNCOVERED DRIVEWAY .1000 SF TOTAL = 3, 660 SF LOT COVERAGE (LOT 1) *TOTAL LOT AREA: 12,980 SF *ALLOWABLE COVERAGE (359) 4,543 SF HOUSE, COVERED DECK & GARAGE 2,295 SF PERCENT OF LOT COVERAGE. 1 Z 687o STORMWATER CONTROL SUMMARY PROJECT SITE CA TEGORY CA TEGORY 2 DISCHARGE LOCA 770N. ONSI TE /NFIL IRA LION TYPE OF AREA SQUARE FOOTAGE STORMWATER FAC/L/ TY LAWN AND LANDSCAPE 9 301 SF SOIL AMENDMENTS ROOFS 2,610 SF R—TANK DETENTION SYSTEM HARD SURFACES 259 RETROFIT 1,050 SF 0 SF R—TANK DETENTION SYSTEM N.A. PROJECT CLASS/F/CAT/ON PROJECT CLASSIFICATION: CA 7EGORY 2 EDMONDS WA TERSHED BASIN. WILLOW CREEK FLOW CONTROL STANDARD: R—TANK DETENTION SYSTEM STORMWATER BMPS. POST CONSTRUCTION SOIL AMENDMENT (T5.13) CIVIL ENGINEERING PLANS 10 00602100101000 10' DRAINAGE & UTILITY EASEMENT (1302082) Lo (TRACER WIRETOBE INSTALLED SERVICE WITH WATER LINE) 2. 0% M/N LOT 2 I SSCO 00450700300012 I /E 369.0f I CONSTRUCT/ON SEQUENCE BUILDING HEIGHT CALCULATIONS (AOG) SPOT ELEVATIONS FOR HEIGHT CALCULATIONS. ELEVA 77ON A: 370.55 ELEVA 77ON B. 372.97 ELEVA 77ON C. 372.27 ELEVA 77ON D: 370.60 TOTAL: = 1,486.39 AVERAGE ORIGINAL GRADE (AOG) = 371.60 FIN/SHED FLOOR = 372.00 ROOF AT RIDGE = 396.25 ALLOWABLE BUILDING HEIGHT = 396.60 PER CITY OF EDMONDS (371.60 + 25 FT) GRADING QUANTITIES 1. REVIEW TEMPORARY EROSION AND SEDIMENT CONTROL NOTES 2. CALL FOR UTILITY LOCATES. J. INSTALL TESC MEASURES AND MAINTAIN DUST CONTROL WHILE PREVEN77NG DISTURBANCE OF ANY AREAS OF VEGETATION OUTSIDE THE CONSTRUCTION ZONE. 4. HAVE EROSION CONTROL MEASURES INSPECTED BY CITY OF EDMONDS CITY ENGINEERING INSPECTOR. ALL TEMPORARY SEDIMENTATION AND EROSION CONTROL MEASURES MUST BE IN PLACE AND INSPECTED PRIOR TO ANY CONSTRUCTION OR SITE CLEARING. EROSION AND SEDIMENTATION CONTROL PRACTICES AND/OR DEVICES SHALL BE MAINTAINED UN77L PERMANENT VEGETATION IS ESTABLISHED. 5. ROUGH GRADE SITE AS REQUIRED TO INSTALL DRAINAGE FEATURES. 6. CLEAR, GRUB & ROUGH GRADE SITE. REVEGETATE DISTURBED AREAS NOT SUBJECT TO ADDITIONAL SURFACE DISTURBANCE IMMEDIATELY AFTER ROUGH GRADING. (OTHER EXPOSED AREAS SHALL BE STABILIZED PER EROSION CONTROL N07ES BELOW) 7. INSTALL UTILITIES AND 077-IER SITE IMPROVEMENTS, INCLUDING FRONTAGE IMPROVEMENTS. 8. STABILIZE AND COMPOST AMEND ALL EXPOSED SOILS PRIOR TO REVEGETATION OF ENTIRE SITE. 9. ESTABLISH LANDSCAPING AND PERMANENT VEGETA770N. ALL TEMPORARY EROSION CONTROL MEASURES SHALL BE REMOVED UPON FINAL SITE STABILIZATION AND APPROVAL BY CITY INSPECTOR. CUT.• t 150 CU YDS FILL: f 150 CU YDS 1) GRADING QUANTITIES INCLUDE ADDITIONAL CUT AND FILL QUANTITIES POTENTIALLY NEEDED FOR ORGANIC SOIL AMENDMENTS IN ACCORDANCE W177/ BMP T5.13 POST CONSTRUCTION SOILS QUALITY AND DEPTH. 2) GRADING QUANTITIES HAVE BEEN ESTIMATED AS SHOWN ABOVE. S17E IMPORT AND EXPORT IS BELOW 10,000 CY AND THUS NO HAUL ROUTE AGREEMENT IS REQUIRED. ELECTRIC VEHICLE CHARGING STATION NOTE THE VEHICLE PARKING SPACE WITHIN THE GARAGE SHALL BE ELECTRIC VEHICLE READY. THE GARAGE SHALL INCLUDE A FULLY —WIRED CIRCUIT W/7H LEVEL # OR LEVEL N (PER ECDC 1 Z 115) ELECTRICAL VEHICLE CHARGING RECEPTACLE OUTLET OR TERMINATION POINT, INCLUDING CONDUIT AND WIRING AND THE ELECTRICAL SERVICE CAPACITY (208 V/40 AMP MINIMUM) NECESSARY TO SERVE THE RECEPTABLE, THAT ALLOWS FOR FUTURE INSTALLA77ON OF AN ELECTRICAL VEHICLE CHARGING STATION. UTILITY NOTE ILL NEW U77L/T/ES ARE REQUIRED TO BE INSTALLED UNDERGROUND. CONSTRUCTION NOTE APPLICANT SHALL REPAIR/REPLACE ALL DAMAGE TO U77LI77ES OR FRONTAGE IMPROVEMEN IS IN Cl TY RIGHT —OF— WA Y PER Cl TY STANDARDS THA T IS CAUSED OR OCCURS DURING THE PERMITTED PROJECT. UTILITY SEPARATION REQUIREMENTS WA TER • 18" MIN/MUM COVER FOR WA TER SERVICES. • 3' MIN/MUM HORIZONTAL SEPARA 77ON BETWEEN WA TER SERVICES AND ALL OTHER UTILITIES, EXCEPT SANITARY SEWER. • 10' HORIZONTAL SEPARATION BETWEEN SANITARY SEWER AND WATER MAINS OR SERVICES • 12" MIN/MUM VERTICAL SEPARATION, FOR PERPENDICULAR CROSSINGS, BETWEEN WATER MAINS OR SERVICES AND ALL OTHER UTILITIES, EXCEPT SANITARY SEWER. SANITARY SEWER • 2' MINIMUM COVER FOR SIDE SEWERS & LATERALS. • 5' MIN/MUM HORIZONTAL SEPARATION BETWEEN SANITARY SEWER AND ALL 07HER UTILITIES, EXCEPT WATER. • 3' M/N/MUM HORIZONTAL SEPARATION BETWEEN SANITARY SEWER AND ALL OTHER UTILITIES ON PRIVATE PROPERTY, EXCEPT WA TER • 10' HORIZONTAL SEPARA 77ON BETWEEN SANI TAR SEWER AND WA TER MAINS OR SERVICES • 12" MINIMUM VERTICAL SEPARATION, FOR PERPENDICULAR CROSSINGS, BETWEEN SANITARY SEWER AND ALL OTHER UTILI TIES, EXCEPT WA TER. • 18" MIN/MUM VERTICAL SEPARA 77ON BETWEEN WATER AND SEWER, SEWER LAID BELOW WATER. STORM • 2' M/N/MUM COVER FOR STORM SYSTEMS UNLESS DUC77LE IRON PIPE /S USED. (EXCEPT 1' MINIMUM COVER WITH/N LANDSCAPE AREAS) • 5'MINIMUM HORIZONTAL SEPARA7ON BETWEEN STORM AND ALL OTHER UTILITIES. (EXCEPT 3' MINIMUM HORIZONTAL SEPARA 77ON WITHIN PRIVATE PROPERTY) OUTSIDE AGENCY U7L177ES • 36" MINIMUM COVER FOR JOINT GAS, ELECTRIC, TELEPHONE, CABLE TV SERVICE AND CONDUCTORS • 36" MIN/MUM COVER FOR A PRIMARY DISTRIBUTION SYSTEM. 0 N ST BOND 3 3 ST 216 ST W 2 PINE RR SJ 1E7H ST ST 2207H TTSW 3 3 99 e e 247H ST S 2447 ST SW 3 3 3 rn 228TH ST S Q o � �02 a� HOLLY LN3 ZTH MAPLE LNQ Q —7 11� -1,I ACCEPTABLE TIGHTLINE MATERIAL: SDR 35 SCH 40 N-12 F810 HANCOR PROJECT TEAM VICINITY MAP SCALE.- I' = 2000' N SCALE. 1" = 20' 0 10 20 40 OWNER / APPLICANT SELECT HOMES 8304 212TH ST SW EDMONDS, WA 98026 (425) 742-6044 EMAIL: KAYLA.CLARK0007LOOK.COM CONTACT. KAYLA CLARK SURVEYOR PACIFIC COAST SURVEYS, INC. PO BOX 13619 MILL CREEK, WA 98082 (425) 512-7099 CONTACT. DARREN J. RIDDLE, PLS SITE DATA CIVIL ENGINEER RAM ENGINEERING, INC. 19109 36TH AVE W, SUITE 100 LYNNWOOD, WA 98036 (425) 678-6960 EMAIL: ROBL®RAMENG/NEER/NGINC.COM CONTACT- ROB L. LONG, PE SITE ADDRESS. • 22216 98TH A VE W EDMONDS, WA 98020 TAX PARCEL ID NUMBER. 00450700J00002 TOTAL SITE AREA: 12,961 SF (0.30 AC) EXIS77NG ZONING: RS-8 AGENCIES/UTILITIES STORM DISTRICT CITY OF EDMONDS WATER DISTRICT OLYMPIC VIEW WATER & SEWER DISTRICT SEWER DISTRICT CITY OF EDMONDS SCHOOL DISTRICT EDMONDS SCHOOL DISTRICT NO. 15 FIRE DISTRICT SNOHOMISH COUNTY FIRE DISTRICT NO. 1 TELEPHONE ZIPLEY ELECTRICAL SNOHOMISH COUNTY PUD NO. 1 GAS PSE GARBAGE REPUBLIC SERVICE CONSERVATION SUBDIVISION DESIGN (EDC 20.75.048) *SETBACK REQUIREMENTS - STREET SETBACK M/M/NUM = 15 FEET REAR SETBACK MIN/MUM = 10 FEET SIDE SETBACK MIN/MUM = 5 FEET * PER EDC 20.75.048(B)(1) LEGAL DESCRIPTION LOT 1, CITY OF EDMONDS SHORT SUBDIVISION, PLN2022-0088, AS RECORDED UNDER RECORDING NUMBER ___--------- RECORDS OF SNOHOMISH COUNTY, WASHINGTON. StTUAIF IN THE COUNTY OF SNOHOMISH, STATE OF WASH/NGTON. VERTICAL DATUM BENCHMARK MON /N CASE ON CENTERLINE OF 98TH AVE. W. 25' EASTERLY OF SOU7HEAST CORNER (ON SOUTH LINE EXTENDED) OF SUBJECT PROPERTY. (OBTAINED FROM GPS OBSERVATIONS) COMPLIES WITH APPLICABLE DATUM : NA VD 88 CITY STORMWATER CODE APPROVED BY P ANNING Dec 1 2024 Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per city standards that is caused or occurs during the permitted project. 10/28/2024 SHEET INDEX P%AM ENGINEERING, INC. Civil Engineering / Land Planning 19109 36TH AVE W, SUITE 100 LYNNWOOD, WA 98036 PHONE: (425) 678-6960 WWW.RAMENGINEERINGINC.COM Me O� &F WAS Da 38608 w ZGISTEg�' O k 1.�� 1 SP-01 SITE DEVELOPMENT PLAN 2 TP-01 CLEARING, GRADING & TESC PLAN 3 GN-01 GENERAL NOTES & DETAILS RES U B ENGINEER. - Oct 25 2024 ROB L. LONG, PE CITY OF EDMONDS DRAWN BY.• DEVELOPMENT SERVICES BLD 202 4 � / �/ O4' DEPARTMENT MIKE MORRIS Know what's below. Call before you dig. ISSUE DA TE:• SCALE. 6127124 AS NOTED JOB NO. 21-011 SHEET.• SP-01 of SHT / OF 3 I I I 00450700300005 I I 00450700300004 APPROVED LANDSCAPING LOCATION (TYP) LOT 3 SEE LANDSCAPE PLAN APPROVED AS PART OF 98TH AVE W SHORT PLAT 00450700300010 (PLN2022-0088) LOT I 00450700300007 2" x 2" WOOD/STEEL FILTER FABRIC SECURED TO 2" x 2" 14 GA WIRE FABRIC EQUAL 0 I N NATIVE BACKFILL MATERIAL I9 0060AWj2W O J 2 TOE 368.0 I FILTER FABRIC FENCE PER CITY OF EDMONDS STD DWG NO. ER-900 I I SP 292(7-77) I (AFN 780404028-1) I F- — — — — — — FILTER FABRIC MATERIAL IN CONTINOUS ROLLS USE STAPLES OR WIRE RINGS TO ATTACH FABRIC TO WIRE 2" x 2" WOOD/STEEL POSTS -\ WIRE MESH FENCE TO SUPPORT FILTER FABRIC I I `BURY BOTTOM OF FILTER a MATERIAL 8" TO 12' NOTES: 1. CONTRACTOR/DEVELOPER SHALL MAINTAIN AND ENSURE PROPER EROSION CONTROL THROUGHOUT PROJECT. CITY INSPECTION REQUIRED ON 2. SILT FENCE TO BE PLACED DOWNSLOPE OF CONSTRUCTION ALL EROSION CONTROL METHODS ACTIVITY. BEFORE OTHER WORK CAN BEGIN REVISION DATE CITY OF EDMONDS FILTER FABRIC FENCE JANUARY 2018 FILTRATION SYSTEMS PUBLIC WORKS STANDARD DEPARTMENT DETAIL est. 189�j APPROVED BY: R. ENGLISH ER-900 LOT 2 00450700300012 L— — — — — — - I o III - -~-e-� �� II I I Ii3 II I I I►13 EXISTING GROUND I r �IW CONTOUR (TYP) I I 3Q I 'IIZ ALL MODULAR BLOCK WALLS ARE TO BE CONSTRUCTED AS f I PART OF 98TH AVE W SHORT I ................... PLAT CONSTRUCTION I i (PLN2022- 0088) .:..............I 00450700300001 I EXIS�76IG TREES TO REMAIN (TYP) I I I I I :.:.:.......... I :5t 125' , 3 - I I ... .. I ... 2; � I f 3 J� I LIMITS (TYP) (SEE DETAIL ER-9f2) LOT I SP 95-104839 (AFN 96091750P2)- 00450700J00013 I I I I LS A TH IN DE FULL WIDTH GRESS/EGRESS DETAIL NOTES: 1O THE MINIMUM LENGTH SHALL BE EXTENDED AS NECESSARY TO ENSURE MATERIAL IS NOT TRACKED OFF SITE AND/OR INTO THE PUBLIC RIGHT-OF-WAY. O ATB DRIVEWAY RAMP AND/OR SITE ACCESS ROAD 15' WIDE MIN. SEE TABLE BELOW FOR REQUIRED LENGTH. NOTES: 1. SURFACE WATER - ALL SURFACE WATER FLOWING OR DIVERTED TOWARD CONSTRUCTION ENTRANCES SHALL BE PIPED ACROSS THE ENTRANCE. IF PIPING IS IMPRACTICAL, A MOUNTABLE BERM WITH 5:1 SLOPES WILL BE PERMITTED. 2. MAINTENANCE - THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT OFF SITE AND/OR ONTO PUBLIC RIGHT-OF-WAY. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL QUARRY SPALLS AS CONDITIONS DEMAND AND REPAIR AND/OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. ALL SEDIMENT SPILLED, DROPPED, WASHED OR TRACKED OFF SITE AND/OR ONTO PUBLIC RIGHT-OF-WAY MUST BE REMOVED IMMEDIATELY. 3. WHEELS SHALL BE CLEANED TO REMOVE SEDIMENT PRIOR TO LEAVING THE SITE. WHEN WASHING IS USED, IT SHALL BE DONE ON AN AREA STABILIZED WITH QUARRY SPALLS AND WHICH DRAINS INTO AN APPROVED SEDIMENT TRAPPING DEVICE. 4.INSPECTION AND NEEDED MAINTENANCE SHALL BE PROVIDED AFTER EACH RAIN. *PROVIDE ATB OR ASPHALT TRANSITION WHERE FRONTAGE ROAD IS AN ARTERIAL. LENGTH TO BE DETERMINED BY CITY INSPECTOR. CITY INSPECTION REQUIRED ON ALL EROSION CONTROL METHODS BEFORE OTHER WORK CAN BEGIN REVISION DATE CITY OF EDMONDS STABILIZED CONSTRUCTION JANUARY 2018 ENTRANCE PUBLIC WORKS STANDARD DEPARTMENT DETAIL FS t . 189C3 APPROVED BY: R. ENGLISH E R — 9 01 PROJECT SIZE MIN LENGTH OF (FEET) QUARRY SPALLS' < 1/4 ACRE 30 < 1 ACRE 50 < 3 ACRE 100 > 3 ACRE 100 CATCH BASIN GRATE FILTER SOCK WITH ' OVER FLOW HOLES (TYP) CATCH BASIN NOTES: 1. CONTRACTOR/DEVELOPER SHALL MAINTAIN THIS APPLICATION AT ALL TIMES DURING CONSTRUCTION PERIOD. 2. ANY SEDIMENT IN CATCH BASIN INSERT SHALL BE REMOVED WHEN INSERT IS ONE-THIRD FULL. 3. CITY INSPECTION REQUIRED ON ALL EROSION CONTROL METHODS BEFORE OTHER WORK CAN BEGIN. _ REVISION DATE CITY OF EDMONDS TEMPORARY JANUARY 2018 SEDIMENT TRAP PUBLIC WORKS FOR CATCH BASINS STANDARD DEPARTMENT DETAIL FS t 189� APPROVED BY: R. ENGLISH E R — 9 02 SCALE. 1 '" = 20' 0 10 20 40 TESC NOTE TREE LEGEND TREE TAG NUMBER xxx xxx EXISTING TREE TO BE REMO VED xxx rE DRIP LINE q 0XISTING TREE TO REMAIN �\ Jam/ �\ TREE PROTECTION FENCING (LIMITS OF DISTURBANCE) INSTALL AND MAINTAIN ALL TESC MEASURES ACCORDING TO APPROVED PLANS, EDMONDS STANDARD DETAILS, AND THE SWPPP. CONTRACTOR /S RESPONSIBLE FOR MAINTENANCE AND ADJUSTMENTS TO TESC MEASURES AS NEEDED. CB INLET PROTECTION NOTE CATCH BASIN INLET PROTECTION SHALL BE INSERTED AND MAINTAINED ON ALL NEWLY CONSTRUCTED CATCH BASINS THROUGHOUT THE SI TE IMMEDIA TEL Y AFTER INSTALLA 770N. FILTER FABRIC FENCE NOTE ADDITIONAL FILTER FABRIC FENCING SHALL BE ADDED AS NEEDED. FENCING TO BE INSTALLED PER CITY OF EDMONDS STD DETAIL ER-900 (SEE DETAIL ON SHEET TD-01). STOCKPILE NOTE STOCKPILE SHALL TO STABILIZED BY PLASTIC COVERING. THE EXPOSED SOILS SHALL BE STABILIZED ACCORDING TO AN APPROVED TIMETABLE. (TYPICALLY, NO SOILS SHALL REMAIN EXPOSED FOR MORE THAN TWO DA YS FROM OCTOBER 1 THROUGH APRIL 30 AND NO MORE THAN SEVEN DAYS FROM MAY 1 THROUGH SEPTEMBER JO). SOILS NOTE ALL DISTURBED SOILS WILL BE COMPOST AMENDED PER CITY OF EDMONDS STD DETAIL SD-642. (SEE DETAIL ON SHT GN-01) OWNER/CONTRACTOR IS RESPONSIBLE FOR EROSION CONTROL AND DRAINAGE Know what's below. Call before you dig. ENGINEERING, INC. Civil Engineering / Land Planning P%AM 19109 36TH AVE W, SUITE 100 LYNNWOOD, WA 98036 PHONE: (425) 678-6960 WWW.RAMENGINEERINGINC.COM t 2 I. /�11.24/24 Z 2 Z C4 .15 R E S U B ENGINEER. - Oct 25 2024 ROB L. LONG, PE CITY OF EDMONDS DRAWN BY.• 'l DEVELOPMENT SERVICES BLD 202 4 O4' DEPARTMENT MIKE MORRIS APPROVED FOR CONSTRUCTION CITY OF EDMONDS 12/9/2024 DATE: EY r� CITY ENGINEERING DIVISION ISSUE DA TE.• SCALE: 6127124 AS NOTED JOB NO: 21-011 SHEET• TP-01 SHT 2 OF 3 W Z a w a RESIDENCE a 3 3 ONE-WAY 2 cr v CLEANOUT cr a WITH 45' 2' BEND AND ONE-WAY (MAX) CAP; SEE CLEANOUT STD SS-200B (TYP); SEE 1771 STD SS-200B NOT TO EXCEED 100' BETWEEN CLEANOUTS ZTWO-WAYEANOUT ONE-WAY CLEANOUT (WYE WITH CAP AND CLEANOUT COVER) AND CONCRETET (W/ CAP LEVELING COLLAR; SEE STD SS-2DOB AND CLEANOUT COVER) AND (SEE NOTE 5) CONCRETE LEVELING COLLAR; SEE STD SS-200C (SEE NOTE 5 & 6) NOTES: 1. SEWER PIPE SHALL BE SDR-35 AND JOINTS SHALL BE GASKETED. 2. PIPE SLOPE TO BE 2% MIN AND UP TO 50% MAX. 3. SEWER CLEANOUT LID TO BE 12" CAST IRON CLEANOUT COVER WITH 1/2" HEX BOLTS AND A PICK HOLE. EAST JORDAN IRON WORKS PRODUCT #00366102 OR APPROVED EQUAL 4. LEVELING COLLAR SHALL BE CONSTRUCTED AS FOLLOWS: • IN ROADWAYS PER COE STD DWG GU-424 • IN SIDEWALK/LANDSCAPED AREAS. EITHER 24"x24"x6' DEEP CONCRETE COLLAR OR 24' DIAMETER x 6' DEEP CONCRETE COLLAR 5. TWO-WAY CLEANOUT SHALL ONLY BE USED IN CITY ROW/EASEMENTS. WITH APPROVAL FROM THE CITY ENGINEER, IT SHALL BE USED IN LIEU OF A ONE-WAY CLEANOUT, IF ONE-WAY CLEANOUT CANNOT BE PHYSICALLY INSTALLED AT THE EDGE OF ROW/EASEMENT. TWO-WAY CLEANOUT SHALL BE INSTALLED AS CLOSE AS POSSIBLE TO EDGE OF ROW/EASEMENT. 6. TWO-WAY CLEANOUTS SHALL NOT BE INSTALLED ON PRIVATE PROPERTY. REVISION DATE CITY OF EDMONDS SEWER CLEANOUT DETAILS MARCH 2024 STANDARD m, PUBLIC WORKS DEPARTMENT DETAIL FS/ 159� SS-200A APPROVED BY: R. ENGLISH W 7a w 12' LOCKING COVER SEE NOTE 3 ON STD SS-200A OF PIPE GRIPPER PLUG EQUAL)E 27061 OR APPROVED 49rEND 12"t FINISHED GRADE LEVELING COLLAR SEE NOTE 4 ON STD SS _ 00A WATER TIGHT CAP 12" PVC SLEEVE 45' RISER 6' RISER 45' 6" WYE AND 6" CITY SUB 45' BEND 4" OR 6" SIDE SEWER 4- OR 6" GENERAL ONE-WAY CLEANOUT DETAIL SIDE SEWER CLEANOUT DETAIL AT PROPERTY LINE/CITY EASEMENT 12" LOCKING COVER 3 SEE NOTE 3 ON STD SS-200A it w LEVELING COLLAR 15 0 w SEE NOTE 4 ON STD SS-200A R a U ASPHALT SURFACE 12"t 1 FOOT LONG 12" PVC SLEEVE 6' RISER END OF PIPE GRIPPER PLUG (CHERNE 270261 OR APPROVED EQUAL) TYPICAL ONE-WAY CLEANOUT UNDER ASPHALT OR CONCRETE NOTE: SEE COE STD SS-200A FOR ADDITIONAL REQUIREMENTS. REVISION DATE CITY OF EDMONDS ONE-WAY SEWER MARCH 2024 STANDARD PUBLIC WORKS CLEANOUT DETAIL DEPARTMENT DETAIL Fs / 159� S S - 2 O O R APPROVED BY: R. ENGLISH UNDISTURBED PLANTS UNDISTURBED TURF (LAWN) (SEE NOTE 1) AREAS (SEE NOTE 1) UNDISTURBED UNDISTURBED 0" TURF/LAWN/LANDSCAPE NATIVE VEGETATION UNDISTURBED NATIVE SOIL UNDISTURBED NATIVE SOIL STEEP SLOPE NOTE: AMENDED SOILS SHOULD NOT BE INSTALLED ON FINISHED SLOPES OPTION 1 - NO DISTURBANCE EXCEEDING 33%. AREAS EXCEEDING 33% SHALL BE STABILIZED PER THE PLANTING BEDS TURF (LAWN) AREAS ENGINEER/GEOTECH OF RECORD. 2" ORGANIC MULCH �j���% GRASS: SEED OR SOD I 3' OF COMPOST -H 1.75" OF COMPOST INCORPORATED INCORPORATED INTO 5" OF -1 INTO 6.25" OF SITE SOIL (TOTAL SITE SOIL (TOTAL AMENDED -_ AMENDED DEPTH OF 9.5", FOR A DEPTH OF 9.5', FOR A SETTLED DEPTH OF 8') SETTLED DEPTH OF 8') SUBSOIL SCARIFIED 4" BELOW r' SUBSOIL SCARIFIED 4" BELOW COMPOST AMENDED LAYER J = COMPOST AMENDED LAYER (12" BELOW SOIL SURFACE) 1 -i (12" BELOW SOIL SURFACE) OPTION 2 - AMEND IN PLACE OR STOCKPILE AND AMEND GENERAL NOTES: PLANTING BEDS TURF (LAWN) AREAS 1. AREAS OF NO DISTURBANCE RGANIC OLL �• �., y.. /1/�������j//%��� SHALL BE FENCED AND EXISTING GS:2' ANDSOIL BE SODSEED it III III 0" - bIL� 1=1 ll I-11 OR PROTECTED ROMVEGETATION CONSTRUCTON IMPACTS. 6" IMPORTED ICI- II -II II -II II 2. TO MEASURE SETTLED DEPTH, 6" IMPORTED WATER SOIL SUFFICIENTLY TO TOPSOIL MIX (COMPACTED �- _ I -ifLl� TOPSOIL MIX FULLY SATURATE WITHOUT (COMPACTED DEPTH) - CAUSING EROSION. DEPTH) 6" 3. COMPOST SHALL MEET SPEC. REQUIREMENTS IN THE 2017 SUBSOIL IS I I�- SUBSOIL IS EDMONDS STORMWATER ADDENDUM (CHECKLIST 7). SCARIFIED 6" SCARIFIED 6" BELOW IMPORTED BELOW 4, COMPACTION OF TOPSOIL (WHERE IMPORTED TOPSOIL MIX 12 TOPSOIL MIX REQUIRED) BE TO 6 (MAX) - - OF THE MAXIMUM DRY DENSITY OPTION 3 - IMPORT TOPSOIL PER MODIFIED PROCTOR TEST (ASTM D1557). REVISION ATE D21 POST CONSTRUCTION SOIL PRIL20 CITY OF EDMONDS QUALITY AND DEPTH PUBLIC WORKS STANDARD DEPARTMENT DETAIL Fat 189�j SD-642 APPROVED BY: R. ENGLISH SE 1/4, SEC25, TWP 27N, RGE 3E, W.M. GENERAL NOTES 1. ALL MATERIALS AND WORK SHOWN ON THESE PLANS SHALL CONFORM TO THE CITY OF EDMONDS STANDARD PLANS AND DETAILS, THE FOLLOWING SPECIFICATIONS AND CODES, AND ALL OTHER APPLICABLE LOCAL MUNICIPAL, STATE, AND FEDERAL CODES, RULES AND REGULATIONS.• - CURRENT INTERNATIONAL BUILDING CODE (IBC) - CURRENT WSDOT/APWA STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION - 2019 WASHINGTON STATE DEPARTMENT OF ECOLOGY STORMWA TER MANAGEMENT MANUAL FOR WESTERN WASHINGTON (AS AMENDED /N DECEMBER 2014) 2. STANDARD PLAN AND TYPE NUMBERS INDICATED ON THESE DRAWINGS REFER TO CITY OF EDMONDS STANDARD DETAILS, UNLESS NOTED OTHERWISE. J. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOBSITE WHENEVER CONSTRUCTION IS IN PROGRESS. 4. DEVIATIONS FROM THESE PLANS MUST BE APPROVED BY THE ENGINEER OF RECORD AND THE LOCAL GOVERNING AUTHORITY. 5. CONTRACTOR SHALL RECORD ALL APPROVED DEVIATIONS FROM THESE PLANS ON A SET OF 'AS -BUILT" DRAWINGS AND SHALL SUMMARIZE ALL ASBUILT CONDITIONS ON ONE SET OF REPRODUCIBLE DRAWINGS FOR SUBMITTAL TO THE OWNER PRIOR PROJECT COMPLETION AND ACCEPTANCE. A SET OF AS -BUILT DRAWINGS SHALL BE SUBMITTED TO THE CITY OF EDMONDS PRIOR TO FINAL APPROVAL OF THE BUILDING OCCUPANCY/FINAL PROJECT APPROVAL. 6. ELEVATIONS SHOWN ARE /N FEET. SEE SURVEY FOR BENCHMARK INFORMATION. 7. THE LOCATIONS OF EXISTING UTILITIES AND SITE FEATURES SHOWN HEREON HAVE BEEN FURNISHED BY OTHERS BY FIELD SURVEY OR OBTAINED FROM AVAILABLE RECORDS AND SHOULD THEREFORE BE CONSIDERED APPROXIMATE ONLY AND NOT NECESSARILY COMPLETE. IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO INDEPENDENTLY VERIFY THE ACCURACY OF ALL U77LITY LOCATIONS SHOWN AND TO FURTHER DISCOVER AND PROTECT ANY OTHER UTILITIES NOT SHOWN HEREON WHICH MAY BE AFFECTED BY THE IMPLEMENTATION OF THIS PLAN. CONTRACTOR SHALL VERIFY LOCATION, DEPTH, SIZE, TYPE AND CONDITION OF EXISTING UTILITY LINES AT CONNECTION OR CROSSING POINTS BEFORE TRENCHING FOR NEW UTILITIES. ENGINEER ASSUMES NO RESPONSIBILITY FOR 77-IE COMPLETENESS OR ACCURACY OF THE EXISTING UTILITIES AND SITE FEATURES PRESENTED ON THESE DRAWINGS ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF CONFLICTS THAT ARISE. 8. CONTRACTOR SHALL LOCATE AND PR07ECT ALL UTILITIES DURING CONSTRUCTION AND SHALL CONTACT THE UNDERGROUND UTIL177ES LOCATION SERVICE (1-800-424-5555) AT LEAST 48 HOURS PRIOR TO CONSTRUCTION. 9. CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS AT 7HE PROJECT SITE BEFORE STARTING WORK AND SHALL N077FY OWNER'S REPRESENTA7VE OF ANY DISCREPANCIES 10. PIPE LENGTHS WHERE SHOWN ARE APPROXIMATE AND MAY CHANGE DUE TO FIELD CONDITIONS. 11. CONTRACTOR SHALL OBTAIN A COPY OF THE GE07ECHNICAL REPORT (WHERE APPLICABLE) AND SHALL THOROUGHLY FAMILIARIZE HIMSELF WITH THE CONTENTS THEREOF. ALL SITE WORK SHALL BE PERFORMED IN STRICT COMPLIANCE WITH THE RECOMMENDATIONS OF THIS REPORT. 12. STRUCTURAL FILL MATERIAL AND PLACEMENT SHALL CONFORM TO 7HE RECOMMENDATIONS OF THE PROJECT GE07ECHNICAL REPORT. 13. SUBGRADE SOILS /N ALL AREAS WHERE RAIN GARDENS, /NF/L IRA T/ON OR PERVIOUS PA VEMENT IS TO BE PLACED SHALL BE DEL/NEA TED AND PROTECTED AT ALL TIMES FROM COMPACTIVE ACTIVITIES (I.E. HEAVY EQUIPMENT, STOCKPILING). 14. MANHOLES, CATCH BASINS, UTILITIES AND PAVEMENT SHALL BEAR ON MEDIUM DENSE TO VERY DENSE NA77VE SOIL OR COMPACTED STRUCTURAL FILL. IF SOIL IS DISTURBED, SOFT, LOOSE, WET OR IF ORGANIC MATERIAL IS PRESENT AT SUBGRADE ELEVATION, REMOVE AND REPLACE WITH COMPACTED STRUCTURAL FILL PER GE07ECHNICAL REPORT. 15. SEE SURVEY AND ARCHITECTURAL DRAWINGS FOR DIMENSIONS AND LOCATIONS OF BUILDINGS, LANDSCAPED AREAS AND OTHER PROPOSED OR EXISTING SITE FEATURES. 16. SEE ARCHITECTURAL DRAWINGS FOR PERIMETER FOUNDATION DRAINS. FOUNDATION DRAINS SHALL BE INDEPENDENT OF OTHER SITE DRAIN LINES AND SHALL BE TIGH7LINED TO THE STORM DRAIN SYSTEM WHERE INDICATED ON THE PLANS 17. ALL REQUIRED STORMWA TER FACILITIES MUST BE CONSTRUCTED AND IN OPERATION PRIOR TO INSTALLATION OF ANY PAVEMENT UNLESS OTHERWISE APPROVED BY THE ENGINEER. 18. ALL ROOF DRAINS, CATCH BASINS AND OTHER EXTERNAL DRAINS SHALL BE CONNECTED TO THE STORM DRAINAGE SYSTEM, UNLESS NOTED OTHERWISE. 19. CONNECT F0077NG DRAINS TO INDIVIDUAL DRYWELL TRENCH. 20. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS REQUIRED FOR INSTALLATION OF ALL SITE IMPROVEMENTS INDICATED ON THESE DRAWINGS. 21. A SEPARATE IRRIGATION PERMIT MUST BE OBTAINED BY OLYMPIC VIEW WATER & SEWER DISTRICT. PRIOR TO FINAL CONSTRUCTION ACCEPTANCE, PROVIDE TO OVWSD A COPY OF 7HE BACKIFLOW TEST REPORT. TESTING REPORTS HEREAFTER SHALL BE PROVIDED TO OVWSD PER DISTRICT STANDARDS 22. AS A MINIMUM REQUIREMENT, ALL DISTURBED AREAS ON AND OFF SITE SHALL BE RETURNED TO THE EQUIVALENT OF THEIR PRECONSTRUCTION CONDITION /N ACCORDANCE WITH APPROPRIATE REQUIREMENTS AND STANDARDS 23. ALL DISTURBED SOIL AREAS SHALL BE COMPOST AMENDED AND SEEDED OR STABILIZED BY OTHER ACCEPTABLE METHODS FOR THE PREVENTION OF ONSITE EROSION AFTER THE COMPLETION OF CONSTRUCTION. SEE EROSION CONTROL PLANS FOR SPECIFIC GRADING AND EROSION CONTROL REQUIREMENTS. 24. THE CONTRACTOR SHALL KEEP OFF -SITE STREETS CLEAN AT ALL TIMES BY SWEEPING. WASHING OF THESE STREETS WILL NOT BE ALLOWED WITHOUT PRIOR APPROVAL. 25. THIS PROJECT IS NOT A BALANCED EAR7HWORK PROJECT. B07H EXPORT AND IMPORT OF SOIL AND ROCK MATERIALS ARE REQUIRED. 26. SLOPE OF FINISHED GRADE SHALL BE CONSTANT BETWEEN FINISHED CONTOURS OR SPOT ELEVATIONS SHOWN. 27. FINISHED GRADE SHALL SLOPE AWAY FROM BUILDING WALLS AT MINIMUM 57 SLOPE FOR A MINIMUM DISTANCE OF 10 FEET. 28. CONTRACTOR SHALL BE RESPONSIBLE FOR AND SHALL INSTALL AND MAINTAIN SHORING AND BRACING AS NECESSARY TO PROTECT WORKERS, EXISTING BUILDINGS, STREETS, WALKWAYS, UTILITIES AND OTHER EXISTING AND PROPOSED IMPROVEMENTS AND EXCAVATIONS AGAINST LOSS OF GROUND OR CAVING EMBANKMENTS CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR REMOVAL OF SHORING AND BRACING, AS REQUIRED. 29. CONTRACTOR SHALL OBTAIN APPROVAL FROM THE OVWSD AND FOLLOW OVWSD PROCEDURES FOR ALL WATER SERVICE INTERRUPTIONS, HYDRANT SHUTOFFS, STREET CLOSURES OR OTHER ACCESS RESTRICTIONS CONTRACTOR SHALL NOT RELOCATE OR ELIMINATE ANY HYDRANTS WITHOUT FIRST OBTAINING WRITTEN APPROVAL FROM THE FIRE MARSHAL. 30. COORDINATE AND ARRANGE FOR ALL U77LITY CONNECTIONS, UTILITY RELOCATIONS AND/OR SERVICE INTERRUPTONS W17H THE AFFECTED OWNERS AND APPROPRIATE UTILITY COMPANIES. CONNECTIONS TO EXIS77NG UTILITIES SHALL BE MADE ONLY WITH ADVANCE WRITTEN APPROVAL OF THE AUTHORITIES GOVERNING SAID UTILITIES. 31. ALL U7LITIES SHALL BE PLACED UNDERGROUND. 32. EXISTING UTILITY LINES IN SERVICE WHICH ARE DAMAGED DUE TO CONSTRUCTION WORK SHALL BE REPAIRED AT CONTRACTORS EXPENSE AND INSPECTED AND ACCEPTED BY CITY OF EDMONDS AND OWNER'S REPRESENTATIVE PRIOR TO BACKFILLING. 33. NEW UTILITY LOCATIONS ARE GENERALLY SHOWN BY DIMENSION, WHERE NO DIMENSIONS ARE INDICATED, LOCH77ONS MAY BE SCALED FROM DRAWINGS FIELD ADJUSTMENTS SHALL BE APPROVED BY OWNER'S REPRESENTATIVE AND CITY. 34. FIELD STAKE ALL U77LITY STUBS AT THE PROPERTY LINE. 35. TRENCH BACKF/LL OF UT7L/T/ES LOCATED WITHIN THE CITY RIGHT-OF-WAY SHALL BE COMPACTED TO 959 COMPAC77ON TEST REPORTS SHALL BE PROVIDED TO THE CITY PRIOR TO PA VI 36. WHERE NEW PIPE CLEARS AN EXISTING OR NEW UTILITY BY 6" OR LESS, PLACE ETHAFOAM 200 CUSHION BETWEEN THE UTILITIES. 37. SEE MECHANICAL DRAWINGS (WHERE APPLICABLE) FOR CON77NUA77ON OF S17E UTILITES WITHIN 7HE BUILDING. 38. SEE ELECTRICAL DRAWINGS (WHERE APPLICABLE) FOR EXTERIOR ELECTRICAL WORK. 39. SEE LANDSCAPE DRAWINGS (WHERE APPLICABLE) FOR SITE IRRIGATION SYSTEM. 40. PIPE MATERIAL AND SIGNAGE SUBMITTALS SHALL BE PROVIDED TO CITY ENGINEERING DIVISION FOR APPROVAL PRIOR TO INSTALLATION. 6" MIN DEPTH SET DEPTH AS REQ'D FOR POSITIVE FLOW FROM WALL/HOUSE FOOTING DRAIN filter fabric compacted backfill • ~ 4' rigid or 6" flexible + V'qo op, perforated pipe 24' o II p O O 0 o D o 0 12' o V a9 ° via washed rock a o Q� C7 1 112"-314' 0 0 SECTION A NTS FOOTING DRAIN DRYWELL TRENCH NOT TO SCALE TESC NOTES 1. ESC MINIMUM REQUIREMENT -CONSTRUCTION ACCESS ROUT, CONSTRUCTION VEHICLE ACCESS SHALL BE, WHENEVER PRACTICAL, LIMITED TO ONE ROUTE. ACCESS POINTS SHALL BE STABILIZED WITH QUARRY SPALLS OR CRUSHED ROCK TO MINIMIZE THE TRACKING OF SEDIMENT ONTO PUBLIC ROADS IF SEDIMENT IS TRANSPORTED ONTO A ROAD SURFACE, THE ROADS SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM ROADS BY SHOVELING OR SWEEPING AND BE TRANSPORTED TO A CONTROLLED SEDIMENT DISPOSAL AREA WITHIN 24 HOURS. STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER. 2. ESC MINIMUM REQUIREMENT -STABILIZATION OF EXPOSED AREAS. ALL SOILS EXPOSED BY LAND DISTURBING ACTIVITIES SHALL BE STABILIZED BY SUITABLE APPLICA77ON OF BMPS, INCLUDING, BUT NOT LIMITED, SOD, HYDROSEEDING, OR OTHER VEGETATION, PLASTIC COVERING, OR MULCHING. ALL BMPS SHALL BE SELECTED, DESIGNED, AND MAINTAINED IN ACCORDANCE WITH THE MANUAL. THE EXPOSED SOILS SHALL BE STABILIZED ACCORDING TO AN APPROVED TIMETABLE. (TYPICALLY, NO SOILS SHALL REMAIN EXPOSED FOR MORE THAN TWO DAYS FROM OCTOBER 1 THROUGH APR/L 30 AND NO MORE THAN SEVEN DAYS FROM MAY 1 THROUGH SEPTEMBER 30). J. ESC MINIMUM REQUIREMENT -PROTECTION OF ADJACENT PROPERTIES. ADJACENT PROPERTIES SHALL BE PROTECTED FROM SEDIMENT DEPOSITION BY APPROPRIATE USE OF VEGETATIVE BUFFER STRIPS, SEDIMENT BARRIERS OR FILTERS, DIKES OR MULCHING, OR BY A COMB/NATION OF THESE MEASURES AND OTHER APPROPRIATE BMPS. 4. ESC MINIMUM REQUIREMENT- MAINTENANCE. ALL EROSION AND SEDIMENT CONTROL BMPS SHALL BE REGULARLY INSPECTED AND MAINTAINED BY THE OWNER TO ENSURE CONTINUED PERFORMANCE OF THEIR INTENDED FUNCTION. ALL MAINTENANCE AND REPAIR SHALL BE CONDUCTED /N ACCORDANCE WITH THE MANUAL. 5. ESC MINIMUM REQUIREMENT -OTHER BMPS AS REQUIRED BY THE CITY, OTHER APPROPRIATE BMPS TO MITIGATE THE EFFECTS OF INCREASED RUNOFF SHALL BE APPLIED. 6. EROSION AND SEDIMENT CONTROL REQUIREMENT- UNDERGROUND UTILITY CONSTRUCTION. THE CONSTRUCTION OF UNDERGROUND UTILITY LINES SHALL SPECIFICALLY ADDRESS THE FOLLOWING. a. EROSION CONTROL FOR EXCAVATED AND STOCKPILED MATERIALS; b. THE PLACEMENT OF EXCAVATED MA TER/AL WHERE CONSISTENT W177-1 SAFETY AND SPACE CONSIDERATIONS SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES; C. TRENCH DEWATER/NG SYSTEMS (MUST DISCHARGE INTO SEDIMENT TRAPS, SEDIMENT PONDS, OR OTHER ACCEPTABLE MEANS), d. TRACKING AND SPILLING OF MATERIALS ON STREETS DUE TO HAULING,• e. DAILY CLEANUP AND STREET MAINTENANCE. 7. ADDITIONAL ESC MIN/MUM REQUIREMENTS FOR LARGER DEVELOPMENTS ALL NEW DEVELOPMENT AND REDEVELOPMENT THAT INCLUDED LAND DISTURBING ACTIVITIES OF GREATER THEN, OR EQUAL TO, ONE ACRE /N ADDITION TO MEETING THE MINIMUM REQUIREMENTS SET FORTH ABOVE SHALL COMPLY WITH ESC REQUIREMENTS LISTED BELOW. & ESC MINIMUM REQUIREMENT- DELINEATE CLEARING AND EASEMENT LIMITS. IN THE FIELD, MARK CLEARING LIMITS AND/OR ANY EASEMENTS, SETBACKS, SENSI77VE/CRITICAL AREAS AND THE BUFFERS, TREES AND DRAINAGE COURSES. 9. ESC MINIMUM REQUIREMENT -SEDIMENT TRAPPING. PRIOR TO LEAVING THE SITE, STORM WATER RUNOFF SHALL PASS THROUGH A SEDIMENT POND OR SEDIMENT TRAP, OR OTHER APPROPRIATE BMPS. SEDIMENT PONDS AND TRAPS, PERIMETER DIKES, SEDIMENT BARRIERS, AND OTHER BMPS INTENDED TO TRAP SEDIMENT ON -SITE SHALL BE CONSTRUCTED AS A FIRST STEP IN GRADING. THESE BMPS SHALL BE FUNCTIONAL BEFORE LAND DISTURBING ACTIVITIES TAKE PLACE. EARTHEN S7RUCTURES, SUCH AS DAMS, DIKES, AND DIVERSIONS SHALL BE SEEDED AND MULCHED ACCORDING TO AN APPROVED TIMETABLE. 10. ESC MINIMUM REQUIREMENT -CUT AND FILL SLOPES CUT AND FILL SLOPES SHALL BE DESIGNED AND CONSTRUCTED 1N A MANNER THAT WILL MINIMIZE EROSION. IN ADDITION, SLOPES SHALL BE STABILIZED /N ACCORDANCE NTH ESC REQUIREMENT NO. 2. 11. ESC MINIMUM REQUIREMENT -CONTROLLING OFF -SITE EROSION. PROPERTES AND WATER WAYS DOWNSTREAM FROM DEVELOPMENT SITES SHALL BE PROTECTED FROM EROSION DUE TO INCREASES IN THE VOLUME, VELOCITY, AND PEAK FLOW RATE OF STORM WATER RUNOFF FROM THE PROJECT SITE. 12. ESC MINIMUM REQUIREMENT -STABILIZATION OF TEMPORARY CONVEYANCE CHANNELS AND OUTLETS. ALL TEMPORARY ON -SITE CONVEYANCE CHANNELS SHALL BE DESIGNED, CONSTRUCTED AND STABILIZED TO PREVENT EROSION FROM THE EXPECTED VELOCITY OF FLOW FROM A TWO-YEAR, 24-HOUR FREQUENCY STORM FOR THE DEVELOPED CONDITION. STABILIZATION ADEQUATE TO PREVENT EROSION OF OUTLETS, ADJACENT STREAM BANKS, SLOPES AND DOWNSTREAM REACHES SHALL BE PROVIDED AT THE OUTLETS OF ALL CONVEYANCE SYSTEMS 13. ESC MINIMUM REQUIREMENT -STORM DRAIN INLET PROTECTION. ALL STORM DRAIN INLETS MADE OPERABLE DURING CONSTRUCTION SHALL BE PROTECTED SO THAT STORM WATER RUNOFF SHALL NOT ENTER THE CONVEYANCE SYSTEM WITHOUT FIRST BEING FILTERED OR OTHERWISE 77REATED TO REMOVE SEDIMENT. 14. ESC MINIMUM REQUIREMENT -REMOVAL OF TEMPORARY BMPS ALL TEMPORARY EROSION AND SEDIMENT CONTROL BMPS SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION IS ACHIEVED OR AFTER THE TEMPORARY BMPS ARE NO LONGER NEEDED. TRAPPED SEDIMENT SHALL BE REMOVED OR STABILIZED ON SITE. DISTURBED SOIL AREAS RESULTING FROM REMOVAL SHALL BE PERMANENTLY STABILIZED. 15. EROSION AND SEDIMENT CONTROL REQUIREMENT-DEWA7ER/NG CONSTRUCTI0N SITES DEWATERING SYSTEMS SHALL DISCHARGE INTO A SEDIMENT TRAP OR SEDIMENT POND. 16. EROSION AND SEDIMENT CONTROL REQUIREMENT-CON77ROL OF POLLUTANTS OTHER THAN SEDIMENT ON CONSTRUCTION SITES ALL POLLUTANTS OTHER THAN SEDIMENT THAT OCCUR ON SITE DURING CONSTRUCTION SHALL BE HANDLED AND DISPOSED OF /N A MANNER THAT DOES NOT CAUSE CONTAMINATION OF STORM WATER. 17. EROSION AND SEDIMENT CONTROL REQUIREMENT -FINANCIAL LIABILITY. PERFORMANCE BONDING, OR OTHER APPROPRIATE FINANCIAL 1NS77RUMENTS, SHALL BE REQUIRED FOR ALL PROJECTS TO ENSURE COMPLIANCE WITH THE APPROVED EROSION AND SEDIMENT CONTROL PLAN. [ORD. 3013 1, 19951 TREE PROTECT/ON NOTES 1. ANY WORK INSIDE THE DRIP LINES OF EXISTING TREES MUST TAKE PLACE IN ACCORDANCE WITH ECDC 23.10.070. 2. TREE PROTECTION MEASURES DURING DEVELOPMENT - A. PRECONSTRUCTION MEETING REQUIRED. PRIOR TO THE COMMENCEMENT OF ANY PERMITTED CLEARING AND GRADING ACTIVITY, A PRECONSTRUCTION MEETING SHALL BE HELD ON SITE WITH THE PERM/TTEE AND APPROPRIATE CITY STAFF. THE PROJECT SITE SHALL BE MARKED IN 7HE FIELD AS FOLLOWS.• 1. THE EXTENT OF CLEARING AND GRADING TO OCCUR, 2. DEL/NEAT/ON AND PR07ECT70N OF ANY CRI77CAL AREAS AND CRI77CAL AREA BUFFERS WITH CLEARING LIMIT FENCING,• J. FLAGGING OF TREES TO BE REMOVED AND TAGS ON TREES TO BE RETAINED, AND 4. PROPERTY LINES. B. PLACING MATERIALS NEAR TREES NO PERSON MAY CONDUCT ANY ACTIVITY WITHIN THE PROTECTED AREA OF ANY TREE DESIGNATED TO REMAIN, INCLUDING, BUT NOT LIMITED TO, OPERATING OR PARKING EQUIPMENT, PLACING SOLVENTS, STORING BUILDING MATERIAL OR STOCKPILING ANY MATERIALS, OR DUMPING CONCRETE WASHOUT OR OTHER CHEMICALS. DURING CONS7RUC77ON, NO PERSON SHALL ATTACH ANY OBJECT TO ANY TREE DESIGNATED FOR PROTECTION. C. PR07EC77VE BARRIER. BEFORE DEVELOPMENT, LAND CLEARING, GRADING, FILLING OR ANY LAND ALTERATION, THE APPLICANT SHALL: 1. ERECT AND MAINTAIN READILY VISIBLE TEMPORARY PROTECTVE TREE FENCING ALONG THE LIMITS OF DISTURBANCE WHICH COMPLETELY SURROUNDS THE PROTECTED AREA OF ALL RETAINED TREES, GROUPS OF TREES, VEGETA 77ON AND NATIVE SOIL. TREE PROTECTIVE FENCING SHALL BE A MIN/MUM HEIGHT OF THREE FEET, VISIBLE AND OF DURABLE CONSTRUCTION, ORANGE POLYETHYLENE LAMINAR FENCING IS ACCEPTABLE. 2. INSTALL HIGHLY VISIBLE SIGNS SPACED NO FURTHER THAN 15 FEET APART ALONG THE EN77RETY OF THE PROTECTIVE TREE FENCING. SAID SIGN MUST BE APPROVED BY THE DIRECTOR AND SHALL STATE, AT A MIN/MUM, "TREE AND SOIL PROTECTION AREA, ENTRANCE PROHIBITED," AND PROVIDE THE CITY PHONE NUMBER FOR CODE ENFORCEMENT TO REPORT VIOLATIONS. J. PROHIBIT EXCA VA 77ON OR COMPA C 77ON OF SOIL OR OTHER PO TEN 77ALL Y DAMAGING A C T/ W T/ES WITHIN THE BARRIERS, PROVIDED, THAT THE DIRECTOR MAY ALLOW SUCH ACTIVITIES APPROVED BY A QUALIFIED PROFESSIONAL AND UNDER THE SUPERVISION OF A QUALIFIED PROFESSIONAL RETAINED AND PAID FOR BY 77-IE APPLICANT. 4. MAINTAIN THE PROTECTIVE BARRIERS IN PLACE FOR THE DURA77ON OF THE PROJECT UNTIL THE DIRECTOR AUTHORIZES THEIR REMOVAL. 5. ENSURE THAT ANY APPROVED LANDSCAPING DONE /N THE PROTECTED ZONE SUBSEQUENT TO THE REMOVAL OF THE BARRIERS SHALL BE ACCOMPLISHED WITH MACHINERY FROM OUTSIDE THE PROTECTED ZONE OR BY HAND. 6. LIMIT THE 77ME PER/OD THA T THE CRITICAL ROOT ZONE /S COVERED BY MULCH, PLYWOOD, STEEL PLA TES OR SIMILAR MA TER/ALS, OR BY LIGHT SOILS, TO PROTECT THE TREES CRITICAL ROOT ZONE. 7. IN ADDITION TO THE ABOVE, THE DIRECTOR MAY REQUIRE THE FOLLOWING: A. IF EQUIPMENT IS AUTHOR/ZED TO OPERATE WITHIN THE PROTECTED ZONE, THE SOIL AND CR/77CAL ROOT ZONE OF A TREE MUST BE COVERED W/7H MULCH TO A DEPTH OF AT LEAST SIX INCHES OR WITH PLYWOOD, STEEL PLATES OR SIMILAR MATERIAL IN ORDER TO PROTECT ROOTS AND SOIL FROM DAMAGE CAUSED BY HEAVY EQUIPMENT. B. M/NIMIZE ROOT DAMAGE BY HAND -EXCAVATING A TWO -FOOT -DEEP TRENCH, AT EDGE OF CRI77CAL ROOT ZONE, TO CLEANLY SEVER THE ROOTS OF TREES TO BE RETA/NED. NEVER RlP OR SHRED ROOTS WITH HEAVY EQUIPMENT. C. CORRECTIVE PRUNING PERFORMED ON PR07ECTED TREES IN ORDER TO AVOID DAMAGE FROM MACHINERY OR BUILDING ACTIVITY. D. MAINTENANCE OF TREES THROUGHOUT CONSTRUCTION PERIOD BY WATERING AND FERTILIZING. D. GRADE. 1. THE GRADE SHALL NOT BE ELEVATED OR REDUCED WITHIN THE CRITICAL ROOT ZONE OF TREES TO BE PRESERVED WITHOUT THE DIRECTORS AUTHORIZATION BASED ON RECOMMENDATIONS FROM A QUALIFIED PROFESSIONAL. THE DIRECTOR MAY ALLOW COVERAGE OF UP TO ONE-HALF OF THE AREA OF THE TREES CRITICAL ROOT ZONE WITH LIGHT SOILS (NO CLAY) TO THE MIN/MUM DEPTH NECESSARY TO CARRY OUT GRADING OR LANDSCAPING PLANS, IF IT WILL NOT IMPERIL THE SURVIVAL OF THE TREE. AERA77ON DEVICES MAY BE REQUIRED TO ENSURE THE TREES SURVIVAL. 2. /F THE GRADE ADJACENT TO A PRESERVED TREE /S RAISED SUCH THAT IT COULD SLOUGH OR ERODE INTO THE TREES CRITICAL ROOT ZONE, /T SHALL BE PERMANENTLY STABILIZED TO PREVENT SOIL EROSION AND SUFFOCATION OF THE ROOTS. J. THE APPLICANT SHALL NOT INSTALL AN IMPERVIOUS SURFACE WITHIN THE CRITICAL ROOT ZONE OF ANY TREE TO BE RETAINED WITHOUT THE AUTHORIZATION OF THE DIRECTOR. THE DIRECTOR MAY REQUIRE SPECIFIC CONSTRUCTION METHODS AND/OR USE OF AERATION DEVICES TO ENSURE THE TREES SURVVAL AND TO MINIMIZE THE POTEN77AL FOR ROOT -INDUCED DAMAGE TO THE IMPERVIOUS SURFACE. 4. TO THE GREATEST EXTENT PRACTICAL, UTILITY TRENCHES SHALL BE LOCATED OUTS/DE OF THE CRITICAL ROOT ZONE OF TREES TO BE RETAINED. THE DIRECTOR MAY REQUIRE THAT UTILITIES BE TUNNELED UNDER THE ROOTS OF TREES TO BE RETAINED IF THE DIRECTOR DETERMINES THAT TRENCHING WOULD SIGN/FICAN7LY REDUCE THE CHANCES OF THE TREES SURVIVAL. 5. TREES AND OTHER VEGETATI0N TO BE RETAINED SHALL BE PROTECTED FROM EROSION AND SEDIMENTATION. CLEARING OPERATIONS SHALL BE CONDUCTED SO AS TO EXPOSE THE SMALLEST PRACTICAL AREA OF SOIL TO EROSION FOR THE LEAST POSSIBLE TIME. TO CONTROL EROSION, IT IS ENCOURAGED THAT SHRUBS, GROUND COVER AND STUMPS BE MAINTAINED ON 77-IE INDIVIDUAL LOTS, WHERE FEASIBLE. 6. THE DIRECTOR MAY APPROVE THE USE OF ALTERNATIVE TREE PROTECTION TECHNIQUES /F THOSE TECHNIQUES PROVIDE AN EQUAL OR GREATER DEGREE OF PROTECTION THAN THE TECHNIQUES LISTED IN THIS SUBSECTION. E. DIRECTIONAL FELLING. DIRECTIONAL FELLING OF TREES SHALL BE USED TO AVOID DAMAGE TO TREES DESIGNATED FOR RETENTION. Know what's below. Call before you dig. RAM ENGINEERING, INC. Civil Engineering / Land Planning 19109 36TH AVE W, SUITE 100 LYNNWOOD, WA 98036 PHONE: (425) 678-6960 WWW.RAMENGINEERINGINC.COM MN Z Z ''Zw �+ WA3�, O� .d s8608 W �GISTEg�' O k I R E S U B ENGINEER: Oct 25 2024 CITY OF EDMONDS DRAWN BY.• /� DEVELOPMENT SERVICES BLD 202 4 � / O4' DEPARTMENT APPROVED FOR CONSTRUCTION CITY OF EDMONDS 12/9/2024 DAZE: BY CITY ENGINEERING DIVISION /%/24 ROB L. LONG, PE MIKE MORRIS ISSUE DA 7E• SCALE: 6127124 AS NOTED JOB NO: 21-011 SHEET.• GN-01 SHT 3 OF 3