Loading...
APPROVED BLD2025-0053+Structural_Analysis_or_Calculations+1.13.2025_1.02.49_PM+4708494RECEIVED 1/6 BLD2025-0053 Jan 142025 Solid Bock Engineering, LLC Engineering / Deeigrl / Consulting /Covet. Mgmt. Phone: (425) 546-6408 www.5oli6iFockErigr.com E-mail: FMurza05olidrockengr.com January 11th, 2025 A SEPARATE PLUMBING PERMIT IS REQUIRED,EDMONDSOBTAINA PLUMBING PERMIT FROM THE CITY OF OBTAIN ELECTRICAL IERMTSTATEILABOR'ROM. INDUSTRIES ALL WORK SUBJECT TO TO FIELD FOR CODE COMPLIANCE APPROVED PLANS MUST BE ON JOB SITE Prime Home Remodeling I No has been i ! The following documentation shall be available on ? site for the building inspector: Benjamin Ponomarenko mechanical ' reviewed for this permit. , _� ! COE APPROVED ARCHITECTURAL PLAN SET 13030 121h Ave NW, I Please obtain a mechanical I COE APPROVED STRUCTURAL PLA"SET Marysville, WA 98271 rY t permit with the City of t !❑COE REVIEWEDCREDIT WORK HEFTTION PACKET !❑ENERGY CREDIT WORKSHEET - I Edmonds is Mechanical I '.❑SITE PLAN ❑ CIVIL PLAN 425-970-9000 work is to be done. !❑ I . admin@primehomeremodeling.com — - — - — - — - — - — - J `° Subject: Grossman Remodel Review At 8520 188th St SW, Edmonds, WA 98026 Site Owner: Michael & Anjanette Grossman SRE Project #: 24-00100 As requested, I was on site December 19th, 2024 and have reviewed the proposed interior remodel (master/laundry/kitchen update and interior wall relocations) and the existing structure roof framing in the Grossman residence at the address described above. The residence is a single -story structure with a crawl space below (not reviewed as it remains unchanged with no new loading) and a hip style truss roof above bearing primarily on the exterior walls. An existing roof framing plan copy is attached. All proposed wall removals/relocations: in the laundry, in the kitchen and in the master bathroom, are not structural and do not contain structural posts. All proposed wall removals/relocations were verified to not be a part of the house braced wall system, therefore, adequate to be removed/relocated. An existing/proposed floor plan copy is attached. The masonry fireplace is proposed to be removed in the living room (across from the kitchen). The fireplace has trusses running parallel at either side. The fireplace shaft (28" wide and 48" long within the roof) is to be filled in with 2x4 @ 24"o.c. ladder framing between the parallel structural members (at the roof and ceiling). Within the floor, ladder frame the fireplace shaft with floor joists, similar to existing. The fireplace foundation is to remain and support the ladder framing with a centered 2x4 pony wall. The master bedroom 2 ft front bump -out window wall, with 2 existing windows, is proposed to be replaced with 8ft wide slider. The bump -out wall/header supports 3 ft of roof loading (2 ft of eave and 1 ft of interior roof), at 15 psf dead roof load and 25 psf snow load, it supports 45 plf dead load and 75 plf snow load (standard gable wall roof loading). A (2)2x6 new header (min.) was verified adequate (calc sheet attached) to support the existing load with the new 8ft wide slider. If you have any further questions or I can be of any further assistance, please call me at the above number. _f A NI w a SkU�z 1� 23035� 7 o���sIONAL 01/11/2025 Filipp A. Murza, P.E. Lead Engineer Attachments f oo iNO 111 IN Fk Al � 1 yC I .• f � -tom - __ ��w�hy ';�,� �� ii��`ki;i `;rL- '• t: •.- � - - _ � I "*/_!.l��� ��� IRS',' � ,fit r'-�f J ��•' _ t c,� RUN r-nalyzed for -structural bearing support. Master bedroom windows proposed to be replaced with slid� 416 WoodWorks° s."VWFOR WOOD DESIGN COMPANY Solid Rock Engineering, LLC ngr. fmurza@solidrockengr.com fmurza@solidrockengr.com (425) 346-6408 Jan. 11, 2025 16:34 PROJECT Project: Grossman Remodel By: Prime Home Remodeling Site: 8520 188th St SW, Edmonds, WA SRE Project#:24-00100 8' Slider Header.wwbu Design Check Calculation Sheet Wood Works Sizer 13.2.1 Loads: Load Type Distribution Pat- Location [ft] Magnitude Unit tern Start End Start End dead roof Dead Full UDL 45.0 plf snow roof Snow Full UDL 75.0 if Maximum Reactions (lbs) and Bearing Lengths (in) : 8.333' Unfactored: Dead 188 188 Snow 312 312 Factored: Total 500 500 Bearing: Length 0.50* 0.50* Min re 'd 0.41 0.41 -ivunimum Dearing iengtn setting uses: vz for eno supports 8' Slider Header Lumber n-ply, Hem -Fir, No.2, 2x6, 2-ply (3"x5-1/2") Supports: All - Timber -soft Beam, D.Fir-L No.2 Total length: 8.33'; Clear span: 8.25'; Volume = 1.0 cu.ft. Lateral support: top = at supports, bottom = at supports; This section PASSES the design code check. Analysis vs. Allowable Stress and Deflection using NOS 2018 : Criterion Analysis Value Design Value Unit Analysis/Design Shear fv = 40 Fv' = 172 psi fv/Fv' = 0.23 Bending(+) fb = 817 Fb' = 1035 psi fb/Fb' = 0.79 Dead Defl'n 0.09 = < L/999 Live Defl'n 0.15 = L/676 0.28 = L/360 in 0.53 Total Defl'n 0.24 = L/422 0.41 = L/240 in 0.57 Additional Data: FACTORS: F/E(psi) CD CM Ct CL CF Cfu Cr Cfrt Ci LC# Fv' 150 1.15 1.00 1.00 - - - - 1.00 1.00 2 Fb'+ 850 1.15 1.00 1.00 0.814 1.300 - 1.00 1.00 1.00 2 Fcp' 405 - 1.00 1.00 - - - - 1.00 1.00 - E' 1.3 million 1.00 1.00 - - - - 1.00 1.00 2 Emin' 0.47 million 1.00 1.00 - - - - 1.00 1.00 2 CRITICAL LOAD COMBINATIONS: Shear : LC #2 = D + S Bending(+): LC it2 = D + S Deflection: LC #2 = D + S (live) LC #2 = D + S (total) Long-term Deflection = 1.5(Dead Load Deflection + 0.33*Live Load Deflection). Load Types: D=dead S=snow Load combinations: ASD Basic from ASCE 7-16 2.4; all LC's listed in the Analysis report CALCULATIONS: V max = 497, V design = 440 (NDS 3.4.3.1(a)) lbs; M(+) = 1029 lbs-ft EI = 27.04e06 lb-in^2/ply "Live" deflection is due to all non -dead loads (live, wind, snow...) Total deflection = 1.00 permanent + "live" Lateral stability(+): Lu = 8.31' Le = 15.25' RB = 21.1; b = single ply width Design Notes: 1. Analysis and design are in accordance with the ICC International Building Code (IBC 2021) and the National Design Specification (NDS 2018), using Allowable Stress Design (ASD). Design values are from the NDS Supplement. 2. Please verify that the default deflection limits are appropriate for your application. 3. Sawn lumber bending members shall be laterally supported according to the provisions of NDS Clause 4.4.1. 4. BUILT-UP BEAMS: it is assumed that each ply is a single continuous member (that is, no butt joints are present) and that each ply is equally top -loaded. Where beams are side -loaded, special fastening details may be required. trJ tmj x6> M 0 s'G P. LIJ t� p- r d d .o ---------------- U N v 4 4 v LJ 9a � !�1 i S e H R o v M� - N O 4 R 4 4 a q r 0 0 ti g a cl Y _ VN L J r Grossman -Remodel 50lid Rock En inee Y-0• 5'-Oe• IY-o' ( Y-6' 6 F€ I 14'-e3' g N♦N 1T-914' y � 7 0' zr< n � I i (� z[6D[ej rnacx z[+Dte] `ua. ♦ a J._e. G3 0 r-p 6 0 , 0 3[6)5[e] Y � zm 40 — ♦ � N 7-6' A�s}<fol a. Dale: V9l15 n_Pest : PAM `" Dram: MN1 �y,�, pq].] � Pro ed 415-E06aD Site Address: 852(d ISSth St SU1, Edmonds, WA 98m26 Owner/contact: AnJanelte Grossmen, 916-1i1-42m2 rin�C ^ "• novAir�� w, FEV�61QY5 Engineering/ Design/consulting/Gonst. rigmt. www.SolidRockEngr.com C4251 346-64m8 / FMurza95olldRockENGsRccm 9/9 O I I � I I I I I ' I O I Z I I QEI .I eRN0'. I� I \� i41 Ni= /J Date: M5 �lrosaman -Remodel ®lid Rock Engineering, LL pesigred: FAM Site Address: 8520 188th St SW, Edmonds, WA 98026 Owner/contact: AnJanette Grossmen, 916-111-42m2 G ,, , F'nnseicn we HEVIS10N5 Engineering/pesign/consulting/Gonst. Mgmt. www.SolfdRockEngr.ccm (425) 346-6408 / FMurza 95olldRoekEhGR-cam Draeal: MAM aeded, ppM SRE Ro ed 415-001W