Engineering Permit FormRIGHT OF WAY PERMIT
PERMIT NUMBER
City of • • .
www.edmondswa.gov i
Description: ROW WORK ASSOC. W/ EDMONDS GREENHILLS TOWNHOMES BLD2023-
ISSUED: 03/18/2025
0692
Address: 7103 210TH ST SW EDMONDS WA 98026-7219
EXPIRES: 03/13/2026
Permit Type: RIGHTOF WAY Permit Subtype: MULTIFAMILY Parcel Number: 00566900100601
NAME TYPE NAME ADDRESS PHONE
APPLICANT BK CHEN 9110 178TH ST SW, EDMONDS WA 98026 (206)331-5725
CONTACT BK CHEN 9110 178TH ST SW, EDMONDS WA 98026 (206)331-5725
CONTRACTOR A PERFECT CUT CONSTRUCTION LLC 9215 S 220TH PL, KENT WA 98031 (253)405-9771
OWNER HARBINGER HOLDINGS LLC 9110 178TH PL SW, EDMONDS WA 98026 (206)331-5725
FEE INFORMATION
DESCRIPTION AMOUNT PAID
CITY TECHNOLOGY FEE - PER PERMIT $45.00 $45.00
ROW - STANDARD - 4.1.24 $396.00 $396.00
REQUIREMENTS
REQUIREMENT TYPE NOTES
TRAFFIC CONTROL
Traffic control and public safety shall be in accordance with City regulations as required by the City
Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification
verifying completion of the required training in their posession.
RESTORATION
Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with
asphalt or City approved material prior to the end of the workday - No Exceptions
WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final
inspection and acceptance of the work.
INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM
24 HR NOTICE REQUIRED
The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of
any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its
departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney
fees by reason of granting this permit.
RELEASED BY: NED DATE: 03/18/2025
Printed: Tuesday, March 18, 2025 1:00:03 PM 1 of 3
OF WAY PERMIT
PERMIT
City •EdmondsRIGHT
www.edmondswa.gov i
CONDITIONS
CONDITION TYPE
NOTES
48 HRS NOTICE-ENGR FINAL
48 Working hours notice is required when requesting your FINAL engineering inspection.
ALERT RESIDENTS
ALERT AFFECTED RESIDENTS AND OR BUSINESSES PRIOR TO WORK START.
It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in
DAMAGE TO FRONTAGE
City right of Ways or Easements to City Standards caused by or occurring during the permitted
IMPROVEMENTS
project.
MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD
ESC REQUIREMENTS
REQUIREMENTS.
FINAL INSPECTION
The engineering division requires 48 hours notice prior to the date of the FINAL Inspection.
SCHEDULING
INSP PRIOR TO BACKFILL
Call for all required inspections. All work shall be inspected prior to backfill.
Electronic civil asbuilt shall be submitted to the City prior to final project acceptance. Asbuilt shall be
PROJECT CIVIL ASBUILT
submitted to Engineeringpermits@edmondswa.gov.
RESTORE LANDSCAPE
Restore landscape to like or better conditions
ROW COMPACTION TEST
Right of way compaction tests are required per City standards.
Sound or noise originating from temporary construction sites as a result of construction activity are
exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on
SOUND AND NOISE
weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all
other times the noise originating from construction sites and activities must comply with the noise
limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
TRAFFIC CONTROLS
Traffic Control per approved plan and MUTCD. All Flaggers shall be certified.
All utilities shall be located prior to any excavation. New locates shall be called for if at time of
UTILITY LOCATES
excavation, original locates are no longer identifiable.
INSPECTIONS
INSPECTION TYPE
DATE
RESULT
NOTES
COMPLETE
A-1 ENGINEERING PRECON
A-1 TESC AND MOBILIZE
E-7 CONCRETE SIDEWALK
E-7 CURB GUTTER
E-7 DRY UTILITY LOCATION
E-7 DWY APPROACH
E-7 FH REFLECTOR
E-7 HYDRANT
E-7 MAILBOX LOCATION
E-7 PAVEMENT COMPACTION TEST
REPORT
E-7 RE TOR LIMITS
E-7 SEWER LATERAL