Loading...
APPROVED ENG2025-0053 ROW PERMITOF WAY EUC PERMIT PERMIT NU�IBE City of Edmonds EdmondsRIGHT :iENG2025_00531 www.edmondswa.gov i Description: ZIPLY - TRANSFER LINES & REMOVE 2 BO POLES ISSUED: 03/18/2025 Address: 9230 232ND ST SW EDMONDS WA 98020-5025 EXPIRES: 09/14/2025 rmit Type: RIGHT OF WAY EUC Permit Subtype: STANDARD Parcel Number: 27033600117500 i NAME TYPE NAME ADDRESS PHONE APPLICANT ABBY COGSWELL 135 LAKE STREET S, KIRKLAND WA 98033 (971)331-6672 CONTACT ZIPLY NORTHWEST FIBER LLC 135 LAKE STREETS, KIRKLAND WA 98033 (971)331-6672 CONTRACTOR ZIPLY FIBER 1800 41ST ST, EVERETT WA 98201 (425)949-0230 OWNER MICHAEL NICEFARO 9230 232ND ST SW, EDMONDS WA 98020-5025 FEE INFORMATION DESCRIPTION AMOUNT PAID CITY TECHNOLOGY FEE - PER PERMIT $49.00 $49.00 ENG - INSPECTIONS-1.1.25 $274.00 $274.00 ROW - STANDARD - 1.1.25 $411.00 $411.00 REQUIREMENTS REQUIREMENT TYPE NOTES TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their posession. RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday - No Exceptions WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the work. INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM 24 HR NOTICE REQUIRED The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit. RELEASED BY: MAJ DATE: 03/18/2025 Printed: Tuesday, March 18, 2025 12:17:45 PM 1 of 2 RIGHT OF WAY EUC PERMIT PERMIT NU E City of Edmonds www.edmondswa.gov • • CONDITIONS CONDITION TYPE ALERT RESIDENTS ALERT AFFECTED RESIDENTS AND OR BUSINESSES PRIOR TO WORK START. It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in DAMAGE TO FRONTAGE City right of Ways or Easements to City Standards caused by or occurring during the permitted IMPROVEMENTS project. MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD ESC REQUIREMENTS REQUIREMENTS. Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the HOLD HARMLESS issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT. INSPECTIONS www.mybuildingpermit.com POTHOLING VERIFY CLEAR BORE CROSSINGS. RESTORE LANDSCAPE Restore landscape to like or better conditions Sound or noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on SOUND AND NOISE weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites and activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. All utilities shall be located prior to any excavation. New locates shall be called for if at time of UTILITY LOCATES excavation, original locates are no longer identifiable. INSPECTIONS INSPECTION TYPE DATE RESULT COMPLETE A-1 JOB START E-7 TRAFFIC CTRL X-2 ENGINEERING FINAL** Printed: Tuesday, March 18, 2025 12:17:45 PM 2 of 2 �� Of EDA404,,, INC. 1 s9 o SECTION A RIGHT OF WAY CONSTRUCTION PERMIT APPLICATION Complete and submit this Application in accordance with the Submittal Requirements outlined in Right -of -Way permit Handout E6�. RECEIVED Feb 13 2025 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT If any field is not applicable to your project, write "N/A" instead of leaving blank. All fields required. Incomplete Applications will be denied. General• Project Name W0909454 Site Address or if no site address use Property Address at NW corner of project area: 9230 232ND ST SW, Edmonds, WA Associated Permits: BLD PLN ENG • applicable) Name of CompanyZlply Northwest Fiber LLC Franchise Ordinance No: WN U-17 Point of Contact Abby Cogswell Title Program Manager Address 135 Lake Street S, Suite 155 City Kirkland State WA Zip 98033 Phone971-331-6672 Email abby.cogswell@ziply.com Contractor and Authorized Agent of • Name of CompanyZlply Northwest Fiber LLC • - •• •w) Contractor ContactsDuring Construction Primary Name„uuy i'Uyavvull Agent Name Abby Cogswell Title Program Manager Title Program Manager Mobile971-331-6672 Address 135 Lake Street S, Suite 155 Emailabby.cogswelI@ziply.com City Kirkland State WA Zip 98033 Secondary Name Phone 971-331-6672 Title Emailabby.cogsweII@ziply.com Mobile City of Edmonds Business License No: 313-013-420 Email State License No: ZIPLYFN782L3 jA Contractor verifies it is currently bonded Contractor verifies it currently has general liability insurance NOTE: ECDC 18.6o.02o requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city engineer. ❑ Multifamily residential ❑ Commercial ❑ City project ❑ Single family residential subdivision ❑ Single family -other ❑ Industrial ❑ Demo and rebuild or from vacant land? ❑ Other, please specify: ❑ Utility Franchise Work associated with development (check one of the above boxes as well) ❑ Traffic Control Only (no associated development) City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021 V Utility Franchise Work (no associated development) Project Description Include an overall narrative description of the proposed work. Be specific and detailed: Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc. Include whether this is construction, maintenance, or repair. Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for underground utilities, etc.) Telecommincations and broadband provider Ziply Fiber to replace and remove pole RCBHWAXX 12 and RCBHWAXX 1. RIGHT-OF-WAY CLOSURE AREA TOTAL DURATION (Number of Months) Sidewalk 72 hours + LF JxJ LF SF Alley 72 hours + LF JxJ F SF Parking 72 hours + LF JxJ LF SF SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTION C. 1. The work in the right of way is on or for the following type of facilities: 0 telecommunications ❑ cable ❑ power ❑ gas ❑ water ❑ sewer ❑ storm Details 1. of Work to be CompletedNo Does the utility owner have existin overhead infrastructure in the area of work? x 2. Will any equipment be added underground or above ground (e.g. pedestals, vaults, etc.)? x If yes, describe: 3. Does the proposed work connect a lot or commercial development with utilities that serve more than one lot or commercial development? 4. Does the work involve rebuilding or relocating an existing aboveground utility system which connects a lot or commercial development to an existing underground common utility system? 5. Does the work involve proposed additions to an aboveground utility system? If es: Are the additions for the purpose of serving new commercial development? Are the additions for the purpose of serving a single-family residential subdivision? Details of • to be Completed ®i 6. Does your project involve rebuilding or replacing utility equipment which currently serves more than one lot or commercial development? City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021 If yes, answer the following questions related to project area, i.e. the actual area in which the project is proposed: 6a. Does your project involve wires/cables/lines? If yes: X How many are existing? I I How many are to be added? 6b. Does your project involve poles? If yes: X How many poles are existing in the project area? 2 What is the height of the existing poles? How many poles are to be removed? 2 Are additional poles to be laced? How many? I I What is the height of the additionalpoles? 6c. Are any poles to be modified/rebuilt/replaced? If yes: 2 How many? What is the height of the poles after? Describe the modification rebuild: ---.Mmi SECTION C Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their possession. Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS. Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to any permit approval. Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials, officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever, foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the expiration, revocation, or termination of any resulting permit approval. Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable requirements of state and federal law. Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by owner to act on its behalf and have authority to bind the owner to this application. Fees. The Applicant is responsible for all permit fees. APPLICANT SIGNATURE: zL �i���Gti� DATE: 2/5/2025 APPLICANT PRINTED NAME: Abby Cogswell APPLICANT TITLE: Program Manager NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021 SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM ZiI PY fiber mil 23027 9321 OW? 74 so 94 ID6 P-087720 fi 2wu `. ® NESC RCBHWAXX HLLK PUD `--------------- 1� 1119E15 Replace 21 POLE ®94M 11 POLE T PLI 287147 POLE 14 of 126 21 TRANSFER PULL POLE I 23109 \.\ �` TK1763620 52 �I _ �, szzs s� �� �� •� �I 23115 » 22 <I ff3t7 � !%�fi ° 11 KS OFii:a \� �•j�ry /♦ 9495 I • 9327 Pole RCBHWAXX 12 \\ 47.7886671,-122.3573989 I fl H H 915°OAOril Y-las 9330 Pho1o911yw 793"New ole Placed 5'South $ 92t9 Q -dw Old Pole I e ncof a 23204 9332 I 9220 23211 j \\ M Wdl I 2XE24 � I \\ O I I 23222 1 2322/, t TT t 23226 _. 9226 \% RECEIVED JENNIFER WEEKS 303.854.7223 Feb 13 2025 OWNER/CONTRACTOR IS RESPONSIBLE FOR JENNIFER.WEEKS@ZIPLY.COM CITY OF EDMONDS EROSION CONTROLAND DRAINAGE DEVELOPMENT SERVICES DEPARTMENT WORK AREA OVERVIEW OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY UTILITIES MAY REQUIRE A SEPERATE PERMIT. Applicant shall repair/replace all ENGINEERING DIVISION damage to utilities or frontage improvements in City right-of-way APPROVED AS NOTED per city standards that is caused or occurs during the permitted project. jdl LVI,,1 >,.44z 03/13/2025 I SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM LEGEND: ® EXISTING UTILITY POLE ® PROPOSED NEW POLE WORK DETAILS: N 5Know wnat'sbelow 1 REMOVE AND REPLACE POLE Call befoaeyou dig. U RCBHWAXX 1 71WRM j v. Aim e� RCBHWAXX 1 - 23315 96th Ave W, Edmonds, WA 98020 OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING OWNER/CONTRACTOR IS RESPONSIBLE FOR Applicant shall repair/replace all EROSION CONTROL AND DRAINAGE damage to utilities or frontage ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY improvements in City right-of-way UTILITIES MAY REQUIRE A SEPERATE PERMIT. per city standards that is caused or occurs during the permitted project. ENGINEERING DIVISION APPROVED AS NOTED P11 (,�l�.iXH.,,,,p 03/13/2025 vv MMR��rt BO POLE IS STILL IN THE ROW -n IN W; RECEIVED Feb 13 2025 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT Fziplyfiber Everett, WA 98208 U? o a Z N O � W Q N Ny O 7 N Z L 0 0 Z o N w 0 m � � z< z u; 0 o < w ' a Z & & o W DATE: 4/4/2024 DESIGNED BY: M. NIMAN SCALE: SHEET: NOT TO 0' SCALE N0: 1 OF 1 SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM LEGEND: OSIGNALIZED INTERSECTION OCONE (CANDLESTICK) ® TYPE III BARRICADE WORK TRUCK WORK ZONE LIMITS PORTABLE SIGN Q EXISTING SIGN ® DRIVEWAY ARROW BOARD (WHERE REQUIRED) DIRECTION OF TRAFFIC (NOT PAVEMENT MARKINGS) FLAGGER-SPOTTER -111 FLAGGER STATION SIGN LEGEND: <9> E AHEAD W20-1 W20-4 W20 WORK DETAILS: REMOVE AND REPLACE POLE - RCBHWAXX12& RCBHWAXX1 SPOTTER NEEDED FOR PEDESTRIAN * TRAFFIC AND DRIVEWAY ACCESS. *work hours: 9am-3pm Estimated work days: 2-3 days* BUFFER AREA LONGITUDINAL BUFFER SPACE = B POSTED SPEED (MPH) 1 25 1 30 1 35 1 40 1 45 1 50 55 1 60 1 64 1 70 LENGTH (feet) 1 155 1 200 1 250 1 305 1 360 1 425 495 1 570 1 645 1 730 TRANSPORTABLE ATTENUATOR ROLL AHEAD DEVICE = R HOST VEHICLE WEIGHT (IN) 9,900 TO 22,000 HOST VEHICLE WEIGHT(Ibe) > 22,000 <45 MPH 45-55 MPH >55 MPH <45 MPH 45-55 MPH 155 MPH IOU 123' 172' 1. 100, 150' 50'-100' 50'-100, ONE LANE, TWO WAY I ONE LANE, TWO WAY TRAFFIC TAPER I TRAFFIC TAPER 25 MPH ,o, K X.11u IW20-7A �IW20-4 1I W20-1 -•�Bill- E� EP EP-A— EP rO EP— FIn\ PARKIN PARKING PARKING I `W20.1 W20-4 W20-7A X x x TRAFFIC CONTROL INSPECTION SHALL BE REQUIRED WHENEVER WORK ZONE IS SET UP SPACING (feet) CHANNELIZATION DEVIU40 MPH TAPER TA 017 / 70 40 NOTE: MON. - FRI. = 7:00am TO 4:00pm 35/45 30 25/30 20 MINIMUM SHOULDER TAPER LENGTH = L/3 (feet) SHOULDER POSTED SPEED (MPH) WIDTH (feet) 25 30 35 40 45 50 55 60 65 70 8 40 40 60 90 120 130 150 160 170 190 10 40 60 90 90 150 170 190 220 220 240 USE A MINIMUM 3 DEVICES TAPER FOR SHOULDER LESS THAN 8' �ziply�ber206 RECEIVED Feb 13 2025 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT SIGN SPACING = X (1) FREEWAY & EXPRESSWAYS 55170 MPH 1500, f RURAL HIGHWAYS 60165 MPH 8001a RURAL ROADS 45 / 55 MPH 500' a RURAL ROADS & URBAN ARTERIALS 35 / 40 MPH 350' 2 RURAL ROADS & URBAN ARTERIALS 25 / 30 MPH RESIDENTIAL & BUSINESS DISTRICTS 200't (2) URBAN STREETS 25 MPH OR LESS 100't (2) (1) ALL SPACING MAYBE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT -GRADE INTERSECTIONS AND DRIVEWAYS (2) THIS SPACE MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. Z J 0- O Z O U U_ LL LL N� I SCALE: SHEET: 111=50' 02 NO: 2 OF 18 ENGINEERING DIVISION APPROVED AS NOTED jP1/ 03/13/2025 Details Layers Help ♦ © Ci Q Q V Pole: RCBHWAXX 12 Properties Type: Joint Owned Account Code: 2411,501 Facility ID: RCBHWAXX 12 Height/Class 45.2 Highway / Private H Pole Owner SNOHOMISH COUN-Y FUG-1 Construction Status: Existing Address UNK_LOCATION Back Span 0 Central ice RCBHWAXX IND 8132 Lead 172 Jurisdiction WA Material Type UNKMAT Installed: 1/1/1967 Routes Items Wire Center Number 2150 Work Order (Old) 0021787 Work Order Number 9P001RC Attachments Items Ename: NM570586835 Id: 824595 Drop Information Equipment Pole: RCBHWAXX 12 Cables 1',k RETIREMENT: Pole: RCBHWAXX 12 45/2 INSTALLED: 1967 ziply- fiber RECEIVED Feb 13 2025 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT ANW �•+� ziply- fiber Underground cable and drop coming from the PED. New pole was placed behind the PED (shorter distance). 1) Hand dig 6' from old pole to PED and from PED to New pole. 2) Transfer the riser to the new pole. 3) Follow the drop back to the PED and move it up the new pole. (drop continues to 9230 232ND STREET) 4) Transfer cable attachment and 4 drops to new pole. Note: only 1 active copper drop can remove any others. Transfer fiber drops. 5) Place new anchor and down guy 6) Remove Pole RECEIVED Feb 13 2025 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT RECEIVED Feb 13 2025 CITY OF EDMONDS CITY OF EDMONDS MyBuildingPermit.com DEVELOPMENT SERVICES DEPARTMENT Right -of -Way Application #1610584 - W0909454 Applicant First Name Last Name Company Name abby cogswell Ziply Northwest Fiber LLC Number Street Apartment or Suite Number E-mail Address 135 Lake Street S abby.cogswell@ziply.com City State Zip Phone Number Extension Kirkland WA 98033 (971) 331-6672 Contractor Company Name LOCALTEL COMMUNICATIONS Number Street Apartment or Suite Number 135 Lake Street S Suite 155 City State Zip Phone Number Extension Kirkland WA 98033 (971) 331-6672 State License Number License Expiration Date UBI # E-mail Address ZIPLYFN782L3 5/25/2024 iyini m9n abby.cogswell@ziply.com Project Location Number Street Floor Number Suite or Room Number 9230 232ND ST SW City Zip Code County Parcel Number EDMONDS 98020 27033600117500 Associated Building Permit Number Tenant Name W0909454 Additional Information (i.e. equipment location or special instructions)_ Work Location Property Owner First Name Last Name or Company Name Michael Nicefaro Number Street Apartment or Suite Number 9230 232ND ST SW City State Zip EDMONDS WA 98020-5025 Certification Statement - The applicant states: I certify that I am the owner of this property or the owner's authorized agent. If acting as an authorized agent, I further certify that I have full power and authority to file this application and to perform, on behalf of the owner, all acts required to enable the jurisdiction to process and review such application. I have furnished true and correct information. I will comply with all provisions of law and ordinance governing this type of application. If the scope of work requires a licensed contractor to perform the work, the information will be provided prior to permit issuance. Date Submitted: 2/5/2025 Submitted By: abby Cogswell Page 1 of 2 i CITY OF EDMONDS MyBuildingPermit.com Right -of -Way Application #1610584 - W0909454 Project Contact Company Name: Ziply Northwest Fiber LLC Name: abby cogswell Email: abby.cogswell@ziply.com Address: 135 Lake Street S Phone #: (971) 331-6672 Kirkland WA 98033 Project Type Utility Purveyor Activity Type Utility Work Scope of Work Disturbance of Surface Project Name: W0909454 Description of Work: (2) Two Pole Replacements: Transfer attachments to existing new poles and remove old/bad poles. Project Details Project Information Job Number W0909454 Page 2 of 2