Loading...
APPROVED ENG RESUB4 BLD2023-0692+Transportation_Impact_Form+11.23.2024_9.44.56_AM+4636180RESUB Ot I:I), BLD2023-0692 APPENDIX A Nov 25 2024 �-+ b�Pagel of 2 CITY OF EDMONDS DEVELOPMENT SERVICET DEPARTMENT + Transportation Impact Analysis ,Ov. i%0o Worksheet PERMITTING & DEVELOPMENT ENGINEERING DIVISION 121 5th Avenue N P: 42 5.771.0220 www.edmondswa.gov '_Name of Proposed Project: Owner/Applicant Harbinger Holdings, LLC Name 9110 178th PI SW Edmonds Greenhill Street/Mailing Address Edmonds WA 98026 City Telephone: 206 331 5725 State Applicant Contact Person: BK Chen Name Street/Mailing Address Zip City Telephone: Traffic Engineer who prepared the Traffic Impact Analysis (if applicable): Telephone: Contact Name E-mail: 1. PROJECT DESCRIPTION 7103 210th St SW Edmonds WA 98026 a. Location - Street address: b. Specify existing land use: Multi -family residence 2 units State Zip Attach a vicinht r map and site plan.) c. Specify proposed type and size of development: Mufti -family residence 6 units (# of residential units and/or square footage of building) d. Date construction will begin and be completed: Dec. 2024 to May 2026 e. Define proposed access locations: Private driveway direct access to 210th St SW f. Define proposed sight distance at site egress locations: 100 feet + HANDOUT UPDATED 05.092023 APPENDIX A Page 2 of 2 2. MITIGATION RECOMMENDATIONS State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact fee shall be calculated from the attached Impact Fee Rate Tables and as identified in ECDC 3.36.125, except as otherwise provided for independent fee calculations in ECDC 3.36.130. Check the applicable box below and calculate the fees as necessary: ❑ NO CHANGE Q' CHANGE IN USE Fee for prior use shall be based on fee established at the time the prior use was permitted. If the previous use was permitted prior to the adoption of Ordinance 3516 (effective date: 09/12/04), the 2004 impact fee rate shall be used. ITE Land Use Category I Per Unit Rate Fee New Use 230 $ 3,318.13 X Prior Use 210 (Duplex) $ 840.72 X New Use Fee: $ - Prior Use Fee: $ p NEW DEVELOPMENT ITE Land Use Category Per Unit Fee Rate New Use I I I X ❑ INDEPENDENT FEE CALCULATION Units in square feet, # of dwelling, etc. 6 K Use Fee _ $ 19,908.78 _ $ 1,681.44 FEE DUE: $18.227.34 n Units in square feet, # of dwelling, vfp, etc. Impact/Mitigation Fee: 1 $ Independent Review Fee: $296.00 (+ peer review fee) 1 $ FEE DUE FEE DUE ENGINEERING DIVISION APPROVED AS NOTED City of Edmonds, Engineering Division Approval 1 No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative. HANDOUT UPDATED 05.09.2023 2017-2019 - Impact Fee Rate Table ITE Land Use Code - Description Fee Calculation 2017 (w/ $2,543.01 cost per tii * 2018 (w/ $4,036.61 cost per to 2019 and beyond (w/ $5,530.21 cost er tii * 110 - Light Industrial per sq. foot $3.64 $5.77 $7.91 140 - Manufacturing per sq. foot $2.72 $4.32 $5.92 151 - Mini -warehouse per sq. foot $0.97 $1.54 $2.10 210 - Single-family house per uwnet ling $2,873.60 $4,561.37 $6,249.14 220 - Apartment per dwelling $1,881.83 $2,987.09 $4,092.36 230 - Condominium pet unit ing $1,525.81 $2,421.97 $3,318.13 240 - Mobile home unit $1,627.53 $ ,5 3.4 3, 39. 3 251 - Senior Housing per dwelling $584.89 $928.42 $1,271.95 320 - Motel per room $1,525.81 $2,421.97 $3,318.13 420 - Marina per boat berth $457.74 $726.59 $995.44 444 - Movie theater per screens $31,905.90 $50,645.37 $69,384.85 492 - Health/fitness club per sq. foot $6.74 $10.98 $14.66 530 - High school per sq. foot $1.98 $3.15 $4.31 560 - Church per sq. foot $1.68 $2.67 $3.65 565 - Day care center per sq. foot $15.77 $25.02 $34.29 620 - Nursing home per bed $483.17 $766.96 $1,050.74 710 - General office per sq. foot $5.01 $7.95 $10.89 720 - Medical office per sq. foot $9.54 $15.14 $20.74 820 - Shopping center per sq. foot $3.26 $5.17 $7.08 826 - Specialty retail per sq. foot $2.06 $3.27 $4.48 850 - Supermarket per sq. foot $10.50 $16.84 $22.84 850 - Convenience market 15-16hrs per sq. foot $14.07 $22.38 $30.58 912 - Drive-in bank per sq. foot $15.97 $25.41 $34.73 932 - Restaurant: sit-down per sq. foot $10.04 $15.95 $21.84 933 - Fast food, no drive -up per sq. foot $22.28 $35.36 $48.44 934 - Fast food with drive -up per sq. foot $26.24 $41.66 $57.07 936 - Coffee/donut shop, no drive- u per sq. foot $13.88 $22.04 $30.19 938 - Coffee/donut shop, drive -up, no indoor seating per sq. foot $25.56 $40.37 $55.58 945 - Gas station with convenience per vehicle fueling position $6,916.99 $10,979.58 $15,042.18 EFFECTIVE EFFECTIVE EFFECTIVE 1/1/2017 1/1/2018 1/1/2019 *Note: ITE Trip Generation (90 Edition) _> 4pm-6pm PM Peak Hour Trip Ends �1 HANDOUT UPDATED 05.092023 2004 - Impact Fee Rate T:b:e::] Edmonds Road Jmpacf Fee Rate study TABLE 4 IMPACT FEE RATES (1) (j3) (4) (5) (6) Trip ITE ITE Land Use TNew Length Net New Trips per Impact Fee Per Unit @ $ Code Cate o Ri s' Factor4 Unit of Measure763.66 er Tri110 Lighrt Industrial 00% 1.59 1.56 1,000 sq ft 1.19 per square foot 140 Manufacturing 00% 1,59 1.18 1,000 sq ft 0.90 per square foot I re ou e r 210 Single family 1.01 100% 1.09 1.10 dwelling 840.72 per dwelling unit 220 Apaftment 0.6? 100% 1.15 0.71 dwelling 544.49 per dwelling unit 230 Condominium 0.54 100% 1.15 0.62 dwellinq 474.24 per dwelling unit 240 Mobile Home 0.56 100% 1.09 0.61 dwelling 466.14 per dwelling unit 310 Hotel 0.til 100% 1.25 0.76 room 582.29 per room 320 Motel 0.47 100% 1.25 0.59 room 448.65 per room 420 Marina 0.19 100% 0.97 0.18 berth 140.74 Fer boat hcrth 430 Golf course 0.30 100% 1.00 0.30 acre 229.10 per acre 444 Movie Theater 3.80 100% 0.7? 2.74 1,000 sq ft 1.36 per square foot 492 Racquet club 1.83 100% 0.97 1.78 1,000 sq ft 3.58 Fer square foot 53D High Scholl 1.02 100% 0.62 0.63 1,000 sq ft 0.48 per square foot 560 Chutch 0.66 100% 1.15 0.76 1 000 sq ft 0.58 per square foot 61D Hospital 0.92 100% 1.56 1.44 1,000 5q ft 1.10 per square foot 62D Nursing home 0.20 100% 0.87 0.17 bed 132,88 per bed 710 General Office 1.49 100% 1.59 2,37 1,000 5q ft 1.81 per square foot 720 Ihecical office 3,66 1004E 1,50 5.49 1,000 sq It 4.19 per square foot 820 Shopping Center 3.74 81% 0.40 1.21 1,000 sq It 0.93 per square foot 832 Restaurant: sit- 10.86 56% 1,06 6,45 1.000 sq ft 4.92 per square foot doAn 833 Fast food, no 26.15 52% 0.62 8.43 1,000 sq ft 6.44 per square foot drlae-up 834 Fast food, vol 33.48 514'a 0.62 10.59 1,000 sq ft 6.08 per square foot drh-e-up 844 Gas station 14.56 60% 0.53 4.63 pump 3,535.82 Per of 845 Gas station 13.38 47% 0.53 3.33 pump 2,545.26 Per vfps w/convenience 850 Supermarket 11.51 55% 0.65 4.11 1,000 sq ft 3,14 per square foot 851 Corrvenience 53.73 39% 0.40 8.38 1,000 sq ft 6.40 per square fool market-24 hr 912 Dtir a -in Bank S4.77 51% 0.47 13.13 1,000 sq ft 10.03 per square foot 21TE Trip Generation (bth Edition): 4-6 PM Peak Hour ltlp Ends Excludes pass -by trips: see "Trip Generation Handbook: An ITE Proposed Recommended practice, (199a) 4 Rolic to average trip length. s vfp: vel-Icle fueling position Henderson, Young & Company EFFECTIVE 9/12/2004 City of EdmDnds, Washington Aprll 15, 2003 Page 18 HANDOUT UPDATED 05.092023