Resolution 1577RESOLUTION NO. 1577
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
EDMONDS, WASHINGTON, ADOPTING A REVISED FEE
SCHEDULE FOR THE CITY' S DEVELOPMENT -RELATED
FEES AND CHARGES FOR SERVICES.
WHEREAS, ECDC 15.00.020 provides for the establishment and amendment of certain
fees charged by the city by resolution; and
WHEREAS, city staff has analyzed the full costs associated with city permitting and
service activities; and
WHEREAS, the city council has previously established and affirms as its goal that permit
fees shall be set to cover the costs of processing and issuing permits and requests for service; and
WHEREAS, the city council adopted the 2025 schedule of fees to be charged in relation
to development activity by way of Resolution on December 3, 2024; and
WHEREAS, this Resolution is intended to replace the Resolution adopted by city council
on December 3, 2024, setting the 2025 schedule of fees to be charged in relation to development
activity; now therefore,
THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, HEREBY
RESOLVES AS FOLLOWS:
Section 1. The fees and charges for services set forth in the schedule attached as Exhibit A
to this Resolution, which is incorporated herein by this reference, are hereby adopted, along with
the referenced tables, which are also included therein, and shall be effective on January 1, 2026.
Section 2. The fees and charges set forth in Exhibit A shall be automatically increased on
January 1st of each year after 2026 by the 12-month percentage change set forth in the October -
to -October Seattle -Tacoma -Bellevue, WA, CPI-U.
Section 3. If any section, sentence, clause or phrase of this resolution or any fee or charge for
service adopted or amended hereby should be held to be invalid or unconstitutional by a court of
competent jurisdiction, such invalidity or unconstitutionality shall not affect the validity or
constitutionality of any other section, sentence, clause or phrase, or any fee or charge adopted or
amended hereby.
Section 4. Resolution adopted December 3, 2024 shall have no further effect as of January 1,
2026 as the fees adopted December 3, 2024 are being replaced by the fees adopted herein.
RESOLVED this 28th day of October, 2025.
CITY OF EDMONDS
MAYOR, MIKE ROSEN
ATTEST:
DEPUTY CITY CLERK, EMILY VILLATA
FILED WITH THE CITY CLERK: October 23, 2025
PASSED BY THE CITY COUNCIL: October 28, 2025
RESOLUTION NO. 1577
Exhibit A
2026
FEES ASSOCIATED
WITH DEVELOPMENT
o�
EL)
Building - Engineering - Planning -
Fire
121 51h Ave N, Edmonds WA 98020
425.771.0220
1.1.26 effective date — draft with strikethrough.
Exhibit A
GENERAL PLANNING & DEVELOPMENT PERMIT FEES
.Jp4 are subject to amending
Building / Planning / Engineering / Fire
City Technology Fee for each permit application ........... ... ... $-3££50_50
Development Review Committee Meeting.. .... ..... _ ..............$0
Pre -Application Meeting 2
(50% applied toward future plan check fee for that specific project only)
Recording Fee (For recording documents with Snohomish County) . . . Recording Cost+ $!37.0g143.00
Violation Compliance Fee .................................................. . ..... $250.00 or up to 5x Permit Fee
Residential State Building Code Surcharge Fee ................ ........... .»................ ................................... $6.50
....................................... .................................. ................... ,...................... Each additional dwelling unit $2.00
Commercial State Building Code Surcharge Fee ... ....... . . . .. .......................... ,........ $25.00
_...................................... — ......................... .. ............................... Each additional dwelling unit $2.00
Nota plico0le ic, cerrp+t?.mingr permirs,suchas plumbing merfhofir..01,1d•!oo)
Credit Card Pavment Transaction Fee ...... ... _....................................... ...... ................_...................... 3.25%
ACH (Elect: onic Checi.l Payment Fee ................................. . ... ... ............. ...... .._........................ .._.......... $.50
FaAi.#,.MMHt'toteN.�Eruurn.nNnw•prsm.ts-+�rt�hri.•pJrarwuw�me�cboaual..�e-roof}
PLAN REVIEW & INSPECTION FEES:
General plan review fee per reviewing department/division ._........... ......................... .... $T37.g9143.00 hr (%
hr min.)
Plan review for re -submittals after the 3" review ................................. ............................ $137 0B143.00 hr
-Commercial Ener-Qv Code Review.._. ..... ............... ...... . ... ................ ...... .......... _.SM6.00
Residential Energy Code Review. ..... _ .._ ._ :_ .... _............... $143.00
Development Project Peer Review (Peer Review) .. ......................$197.0 43.00/hr+ cost of consultant* review
fee
charged for outside consultant peer review services when City staff lacks the expertise and/or capacity
to review a specific project or aspect of a project. This fee is assessed in addition to other applicable
project review fees.
General Inspection Fee per department/division................. ........................................... ...$92143.00 ea
Re -Inspection Fees: $}37.90/ea143.00 for the first re•inspe:tion. 5286.00 for the 21. $572.00 for thithird and
subsepuent re -inspections. per permit
Engineering Inspection Fee** .... ......... _..... ....................................................... 3.3% of Value of Improvements
* Consultant refers to any professional services, including legal, environmental, engineering, etc.
** Applies to Civil Site Improvements, such as Subdivisions, Commercial & Multi -Family Permits
In-house Technical Reviews:
Stormwater Engineer Review Fee ........ ................... I.......... ............................... .. ...... $i§!.99166.00 hr
Transportation Engineer Review Fee......... .._ ......................... ...... .................... .... $iC'1 99166.00/hr
Utility Engineer Review Fee ......................... ........................................................ ........ $463 991 .00 hr
Arborist Review Fee ......... ............ .. ......... .,., .............. .. .............. .......... $!§!-99166.00 hr
department (Building. Planning Residential Fire & General Engineering). Commercial, multi -family & mixed use fire
reviews are calculated at 2S% of the budding permit fee and includes up to 3 reviews-
— i Formatted: Font: 10
Formatted: Indent: Left: 0.47", First line: 0"
Formatted: Indent: Left: 0.47", First line: 0" 1
Formatted: Superscript
Formatted: Indent: Left: 0.47", First line: 0", Right: 0.3",
Tab stops: 6.44", Right,Leader:... + Not at 6.4"
Formatted: Not Hlghllght
Formatted: Space After: 0 pt I
Formatted: Space After: 0 pt
Exhibit A
REFUNDS:
The City may authorize refunding of any permit fee paid which was erroneously paid or collected. The City may matted: Indent: Left: 0.25, Right: -0.13"
authorize refunding of not more than 80 percent of the permit fee paid when no work has been done under a permit
issued in accordance with the applicable code(s). The City may also refund not more than 80 percent of the plan
review fee paid when an application for a permit for which a plan review fee has been paid is withdrawn or canceled
before any plan reviewing is done. Refunds shall not be granted of any fee on an expired permit. Any application for a
refund must be made in writing and describe the circumstances to justify. Refunds for permit fees covered by
19.70.025 ECDC may be authorized by the Building Official. The Planning Manager may authorize refunds of Planning
fees or service charges. The City Engineer may authorize refunds of Engineering fees or service charges.
-BUILDING PERMIT FEES:
Accessory Dwelling Unit Compliance(ADU)............................................................................
$592-001.287.00
Adult Family Home Compliance (AFH)......................................................................................
$692-091 716.00
Alternate Methods Review ........... ....... ..............................
......................... ..$43q-.99143.00 hr+ Peer Review
Appeal of Building Official Interpretation ..........................
......................... .... ......$?-2;3831 716.M+HE Fee
Changeof Use......................................................................................................................
$632,681.287.0O
Certificate of Occupancy Re -Issuance ...................................
........... ....... ..................... $1398143.00 hr
Demolition (Residential Primary Structure)...............................................................................$37��91.001.00
Demolition (Commercial Primary Structure)..........................................................................
$619-991.501.50
Demolition (Secondary Structure or Interior Only) ................................................
.................... $18q-9715.00
Electric Vehicle Charging Stations (EV) ............ ........... ...................
.... ........ .............. $ _ . 92950
Fence.. ........................................ _._............... ............... ._...
............................. ............................. $137-99143.00
Clearing & Grading Permit (ossoc. w/large Multi -Family
and Commercial Building Permits) ...........................
... ...................................... _...................... Hourly review fee per reviewing department/division + Inspection Fees
Clearing & Grading Permit for Short Subdivision Civil Plan Review ........... »........................................................ Formatted: Indent: Left: 0.47", First line: 0.01"
............. ......... .........................._..$3:78258A�7.576.00-+ Hourly Technical Review Fee
Clearing & Grading Permit for Subdivision Civil Plan Review . .............. ..... ._... . .........
$+s 39Q Er76.4 55.O0
+ Hourly Technical Review Fee
Hot Tub/Spa (Single-Family)........................................................................................................ $948:+09429.00
Manufactured Coach Installation — (Commercial Federal HUD Label) ...................................... $Q99715.00
Manufactured Home Installation (Federal HUD Label)................................................................ $68-- 6W 1j.D
Parking Lot ........................................................ ..................................... -...................... $248.90286.00 + TABLE 1
Re -roof (Commercial).......................................................Valuation based on $2.50 per square foot +TABLE 1
Re -roof (Residential - includes sheathing)......................................................... ....................... $137.99143.00
Retaining Wall (Commercial, per wall).................................................$9}9221.144, Cost of Peer Review
Retaining Wall (Residential, per wall) .................. ................................ $8?1 991,072.50-+ Cost of Peer Review
Solar/Photovoltaic (Residential) .. ............... „.............. ... ............................. $15O.00 + Cost of I Fire Inspection
Solar/Photovoltaic (Commercial) - Valuation does not include cost of solar panels or inverters .......................
.......I _ _ ....................._..........................TABLE 1 + Cost of 1 Fire Inspection
Swimming Pool (Pre -manufactured, above ground).................................................................... $1S0.O9429.00
Swimming Pool (In -Ground) .................. ..............................................................................................TABLE 1
Temporary Certificate of Occupancy (Commercial Only — valid for 6o-14 days)....................................$408.00
Temporary Structures and Attached Tents (180 days or less per calendar year) ................ $68l 991.14d.
Unit Lot Subdivision Conversion, (Per unit)............................................................................... $2;z4.901.287.00
Wireless Communication and Facilities on Private Property......................................................... .TABLE 1
Exhibit A
SIGNS:
Sign (Per sign excluding specific sign categories listed below) ................................................ $294.00500.00
Monument Sign (Per sign)......... ..... .. . .............................. ................... ..... ................... $284-00500.00
Blade Sign (Includes all blade signs in proposal) ............................................ .. ..........................$0.00
Pedestrian Sign (Includes all pedestrian signs in proposal) ................. ...................$
PoleSign (Per sign) ......................................... ..................... .... ............... ....... $443,2.3..LV5. O
Murals (Includes all murals in a proposal) ......................... ............. ...... ............................. $294-00429.00
*Planning ADB Design Review may apply
ESLHA DESIGNATED PROPERTIES:
Additional fees associated with development in the North Edmonds Earth Subsidence Landslide Hazard Area (ESLHA)
ESLHAAdministrative Fee . .... .... .......... ........................ ..... ..............................
............... $2,%8-893 087.00
ESLHA Consultant Review.......................................................... ........
Full cost of review is paid by applicant.
Deposit at Application for Peer Completeness Review ..... ..........
............................... „................. $750.00
Deposit at Full Application .... ....... ....... .. . ......................
................ ................................ $3,500.00
Deposit at Re -submittal if additional Peer Review is needed ..
... ....... ..... ......... ................. ........ $2,000.00
ESLHA Minor Project Administrative Processing Fee ..... ...............
...... ... ................. $37-2-00388.00
ESLHASubmittal Packet .............................................. . ...........................
.. ............................... $18.00
MECHANICAL PERMITS:
BASEPERMIT FEE: ....... ............. „.................. .............................................................................. $62?G71_00
UNIT FEE SCHEDULE:
For the installation or relocation of each:
FURNACE - Forced -air or gravity -type, including ducts and appliance vents .............................. $37.0047_00
AIR HANDLER - Including ducts (Diffusers, blowers, etc.)
Up to and including 10,000 cfm (4719 L/s).......................................................................... $37.00190.00
Over 10,000 cfm (4719 L/s) including ducts....................................................................... $50..0 250.00
GAS HEATER - Suspended, recessed wall or floor -mounted unit .................................................
$37-0047_00
COMMERCIAL GENERATOR ... ........ „...........................................................................................5336.88439.00
RFSiDFn:TtAl f.. ........................ ........................................------...._...._.............$286.00
HYDRONIC HEATING SYSTEM .............................................................................
$196.99286.00
APPLIANCE VENT- (Type B, 8W, L gas vent, etc.) ..... ........ .........................................
............................ $18.00
INCINERATOR......................................................................................................................................
$62.00
VENTILATION AND EXHAUST
Fan connected to single duct (Bath, laundry, kitchen exhaust, etc.) ....................................
$18 0835.00
Each system which is not a portion of any heating or air-conditioning system
.................. $48 0935_00
HOOD —Commercial Type 1, Type 2, Fume Hood including ducts ........................................
$196.00572.00
GAS PIPING: (New or relocated)
Gas -Piping systems of 1 to 5 outlets.................................................................................,...........
$37-0047_00
Each additional outlet over 5................................................ ....... ....................... ....
................................ $7.00
BOILER OR COMPRESSOR
Up to and including 50 HP (176 KW) ............... ...............................................................................$62.00
Over50 HP (176 kW) .. .. .......................... . ....... .................... ..............................................
. $124.00
ABSORPTION SYSTEM, AIR CONDITIONING SYSTEM OR HEAT PUMP
Up to and including 1,750,000 Btu/h (512.9 kW) ............................ ...... ................
.................... $62.00
Formatted: Font: Not Bold
Exhibit A
Over 1,750,000 Btu/h (512 9 kW) .. ... _.... .................................................................... ...$124.00
OTHER FEES:
Commercial Plan review hourly fee ....................................... ............................................... $43-7 B143.00 hr
Each appliance or piece of equipment regulated by the IMC for which no other
fee is listed (Fire dampers, ductless mini- split systems, etc.) ................................................... $37-0G47.00
NEW SINGLE FANA""" RESIDENTIALSTRUCTURE MECHANICAL SYSTEMS:
(Includes all mechanical systems as part of initial build for New Single Family Townhomes Cot(age'Houses.
Detached Accessory Dwellrna Units & Attached SFR's)....................................................... .............$369.00
PLUMBING PERMITS:
BASEPERMIT FEE: .................................................................................................................................... $62.00
UNIT FEE SCHEDULE:
Forthe installation, alteration, repair, addition, or relocation of each: ............................................$48Cy8=3_00
Plumbing fixture (on one trap or a set of fixtures on one trap)
Drain w/in footprint of building (rainwater systems, roof deck drains, etc.)
Water Heater (includes expansion tank)
Re -pipe - Drain, vent or water piping (each fixture served)
Water Service Line (replacement or repair)
For the installation, alteration, repair, addition, or relocation of each:
Water treating equipment(wotersoftener)............................................ __..... .............................
$43.9047.00
Backflow protective device - 2" and smaller .. .................. ......... ... _..... ................................
...... $43 G947_00
Backflow protective device - Over 2".............................................................................................
$150971_00
Graywater system or reclaimed water system (in addition to fixture fee) ................................
$8"9439.00
Non -grease waste pre-treatment interceptor (oil/water separator, etc.) ...............................
$13-7-. G143.00
Medical gas piping system serving 1 to 5 inlet/outlet(s) for a specific gas _..........................
$137 GG143.00
Each additional medical gas inlet/outlet.........................................................
.................... $1-8-.W 3_00
Grease Trap (HGI Inside Building)...............................................................................................
$?7-3-GG429.00
Gravity Grease Interceptor(GGI)).........................................................................................
$354GG1.001.00
OTHER FEES:
Commercial plan review fee hourly fee .................................................. I............................. $437-GG143.00 hr
Plumbing items for which no fee is indicated ....................... »................................................................ $37.00
NEW SIm-,LIE FAMILY RESIDENTIAL PLUMBING SYSTEMS:
(Includes interior systems and waterline as part of the initial build for New Single Family, Townhomes Cottage
Houses OetochedAccessoryDwelling Units &AttochedSFR's)...................................... ........................... $405.00
IMPACT FEES
PARK IMPACT FEES:
_ ................ _ _
Wng
Non -Residential Development ................ ..... .....................
....... ......... ............. $i-341.97 per square foot
Residential Development....._ ....._. _ ........
_..... .51.35per square foot
Residential Administrative Fee..................................4..........
............................................... $68. 143.00
Commercial Administrative Fee .. ....... ................................
......... ...................... .................. ......$i37L98286.00
ParkImpact Fee Appeal. ...... ...................... 444 ........ .........................................
............................ $248.OD
ParkImpact Deferral Fee ....................... _ ...................... .......
,_............. .................. .......... 4............ -...$274.00
plus City Attorney Fees
Formatted: Indent: Left: 0.5", First line: 0"
Formatted: Indent: Left: 0.31", First line: 0" 1
Exhibit A
TRANSPORTATION IMPACT FEES :
Refer to City Code & Handouts to calculate impact fee. The following applies in addition to impact fee:
Residential and ADU Administrative Fee ...................................... ........................... ............... $6°.8971.00
Commercial and Multi -family Administrative Fee „ .................. „................... . ......... ............$?7 80143.00
Independent Fee Calculation -Transportation Engineer Review ............... ............... .... ...... ........ $322.00
plus peer review fee as applicable
Transportation Impact Deferral Fee ............................................ ........ ........ ................................ $274.00
plus City Attorney Fees
GRADING PERMIT FEES
PLAN REVIEW:
r-
CUBICYARDS
PLAN REVIEW FEE
$68.00
50 cubic yards or less
(Only w4dhen located in a designated critical area)
51 to 100 cubic yards
$137.09143.00
101 to 1,000 cubic yards
$273.99286.00
1,001 to 10,000 cubic yards
$545.00572.00
$-545572.00 for the first 10,000 cubic yards, plus
10,001 to 100,000 cubic yards
$4-3 9 J43.00 for each additional 10,000 yards or fraction
thereof.
$' ,'�991,859.00 for the first 100,000 cubic yards, plus
100,001 to 200,000 cubic yards
$1,37-00143.00 for each additional 10,000 cubic yards or
fraction thereof.
$3-,J- ki3.285.00 for the first 200,000 cubic yards, plus
200,001 cubic yards or more
$444-.99143.00 for each additional 10,000 cubic yards or
fraction thereof.
PERMIT FEE:
CUBIC YARDS
PERMIT FEE
Base Permit Fee
$43.00
50 cubic yards or less
$19,?99143.00
(When located in a designated critical area)
51 to 100 cubic yards
$137.90143.00
$�37 99143.00 for the first 100 cubic yards, plus $31,00 for
101 to 1,000 cubic yards
each additional 100 cubic yards, or fraction thereof.
Exhibit A
$416.00429.00 for the first 1,000 cubic yards, plus $55.00
1,001 to 10,000 cubic yards
for each additional 1,000 cubic yards, or fraction thereof
$918v31 001.00 for the first 10,000 cubic yards, plus
10,001 to 100,000 cubic yards
$80.00 for each additional 10,000 cubic yards or fraction
thereof.
$; 643.991.716.00 for the first 100,000 cubic yards, plus
100,001 cubic yards or more
$124.00 for each additional 10,000 cubic yards or fraction
thereof.
FIRE PERMIT FEES
FIRE SPRINKLER PERMITS:
Residential IRC Structures /NFPA 13DlOne/Two Family & TownhomeA_
New Residential Fire Sprinkler Systems......... ......................... $371.00
R i nr a f i er n=` r S A-r "F' a'+� -
Commercial & Multi -Family Fire Sprinkler Systems / NFPA 13 or 13 R
weepy„eFR'
�rov�mr>i fleat:
1 to 5 sprinklers heads ... ................................. ......... ......_..... .................. ...... ............ ........ - $321.0031-1.00
6 to 25 sprinkler headsor-mor................................................................................ $571. 4
Each additional over 25 .. ...................................................._......•--................................... S9.00lhead
A&II160F.alP2"i o-ati''"- ...R _ i mnassar er»mti.
Alternative Automatic FueExtingLishina5 stems(per system) 7%.00
FIRE ALARM PERMITS:
1 to 5 initiating devices, Communicator (AES, Cellular) ................ ............ _........................... $3?1.00331:08
6 ermoreto 25, Including panel replacement ................ ....................................... $-371. Q-+-TABLE--11 066.00
Each additional over 2559.00/devicedK::rtitl mspeetia+r:/flan review+ as
,,, a"fie Timm"
TANK PERMITS:
Residential fill, remove or install (per each) ......................... ..... .......................... .......................... ...... $274.00
Commercial fill, remove or Install (per each).......................................................................... $577.00958-89
OTHER FIRE PERMITS:
FiFe SUPPFessionS;stemsiCommercial Hood Fire Suppression System (per system)
$404.00 -- -
—Standpipejstond"ofone-permit -Per unrtl....::........... .......................... .........................
..... $577.0Q�ts886
F,re Pump lcommerciol onfv -Per unit l......................................................................... ........ __... 0.....5614.00
FireConnection ............................ ......... ... .. ............. -.......... I ........ ,....... .. _ . ........... ........$619.00
Fire Operational (Food trucks, beverage dispenser systems, self -standing temporary tents, etc )$398.0013;Z.80
Fire Smoke Control Systems .. .............................................................................. ...............$1,090.00
Formatted: Indent: First line: 0"
Formatted: Font: Italic
Formatted: Lek Tab stops: -1', Left + -0.5", Left
Formatted: Justified, Right: 0.75", Tab stops: -1", Left +
-0.5", Left + 0.63", Left + Not at 0.7"
Formatted: Font: Italic_ ,
Formatted: Riaht: 0.75", Tab stops: -1", Left
Formatted: Indent: First line: 0"
Formatted: Font: Italic
Formatted: Font: Italic
Formatted: Font: Italic
Formatted: Indent: Left: 0", First line: 0"
Exhibit A
PLAN REVIEW & INSPECTION FEES:
Plan review not associated with a Building permit flhr min.) ..................................................$199.-30/hr
Plan review for a commercial multi -family or mixed -use Budding permit .... 2595 of the Building Permit Fee
Otherolan review t1hrmm.)....................... _..........................................._......._.........................S199.00/hr
Additional Inspections beyond the typical rough -in and final included in permit fees:
Inspection11hr min.) . ......._....................................................._.._ ...............5199.00/hr
Re•insawron(s) (i" $, 2 7 oer inspection ...................................... . _....__ ...... ............... ........_. _S199.00
3" Re -inspection... .. ......... ..............................................................................................$398.00
Insoection Overtime -Weekday Call Back (2hr min. tM$299.00/hrJ.................................................. S398.00
Inspection Overtime- Weekend/Holiday 14hr min S199.00/hr)............................................ .....S597.00
NOTE Work concealed without inspection or work not ready at the time of inspection will be charged a
reinspect ion fee.
PLANNING AND LAND USE FEES
GENERAL:
Type I (Staff decisions, no notice) ........_......... _ .. . ........... ............................ $341 001.931.00
Type 11 A (Staff decisions with notice) ...,.... .................................. $4.283883 647.00
Type IIIA(ADB /Hearing Examiner) ........... ... _. ... ..... .. Hearing Examiner Cost +$?_L88-2Q6,2?1.00
Type IIIB (Hearing Examiner) ....................... ............................. Hearing Examiner Cost + $2,489.006,221.00
Type IV (Rezone, Development Agreement)..... . . .................................. ......................... .. $8.-67#,W13.943.00
Type V (Plan & Edmonds Community Development Code Amendments) ........................... $8 6�4�818 233.
Lot Line Adjustment ................................................. ..... ................................................. $ ,34 _-002.717.00
Short Subdivision Preliminary Approval ...... .............. ........ $3,9993.432.00 + Hourly Technical Review Fee
Short Subdivision Civil Plan Review ............... ................................................. See Clearing & Grading Fee
Short Subdivision Final Approval...__..... ...........................................................» 1 716.00
Subdivision Preliminary Approval.............Hearing Examiner Cost+ $8,074,093 432+ Hourly Technical Review •— Formatted:
Indent: Left: 0.48", First line: 0"
Fee
Subdivision Civil Plan Review ....................... ....................................................... See Clearing & Grading Fee
Subdivision Final Approval ............ ........................................ .............. ........................ $',9 2,991,716.00
Modification Request .......................................................................................................... $3-2_3389_$t7,Q0
Minor Change to Approved Plat .......... ................ ................................................... . $341 091.716.00
Major Change to Approved Plat ............................. ............. .. .... ........ Same as Original Application Fee
PRO Preliminary Approval ...................... _........... .. .............. $o 07- ^^2.574.00
PRD Final Approval ................ .................. .. _...................................... .... ....$',�=992.574.00
ADB Design Review -Signs ........................................ ... ... .... ..... . ......... . ....... $' •r-g9.992 360.00
Design Review - ADB Design Departures - IIIA. . _. 55 792.
Oesian Review - Low Density Residential ......... __ .. _ _ ..__ _ 58.00
_ _
Design Review - MulUfamdy and Mixed Use ..52.360.00 ..........
Staff Design Review if project exceeds SEPA threshold .............. . ............ ......................................$1,203.00
Landscape Plan Inspection Fee ...................................... .. ................... ................ ....... ...1% of Estimate
Multifamily Tax Exemption Application... _............................................ .................... $1686A81 7. 16-00
SEPAReview ...................................................... _ .. ..... ............... .................................... $93:7.091,716.00
SEPA Planned Action Compliance Review (Hwy 99)..... .... .. .............. ..................... ......... .. $341.00
EISReview...................................................................................... ...... .................. , .......................... Cost
Amateur Radio ...................................... .. ... ....... ...................................................... $141 0@1,716.00
Critical Areas Checklist Application .................. .... ... _. .... .............. ....... .................... $437-00143.00
Critical Areas Checklist Update .................................................. . ............... ..... ................. ..... $68.9 243.00
Exhibit A
Critical Areas Variance / Reasonable Use Application ............. Hearing Examiner Cost + $---734917.160.00
Critical Areas Study Admin .............._............. ..... .... ................................. $-I-- .8143.00hr(min.1hr)
Critical Areas Contingent Review (See ECDC23.40.195 for more detail on fees) ..... ... ... $}.-333,883 432.00
Shoreline Contingent Review (See ECDC24.80.100).................................. »......................... $ _ 3.432.00
Planning Fee not categorized................................................................................................... $337-98143.00 hr
Requestfor Reconsideration........................................................................................................ $34180858.00
Note: When an application Is heard by the Hearing Examiner (HE), the cost of the hearing is billed to the applicant.
APPEALS:
Appeal of Staff Decision , $558:8A1.716.00 + Hearing Exammer Cost
Appeal of Type IIIB Decision to City Council............................................................................. $"44)91 716.00
Appeal of Notice of Civil Violation .......................................... $i �(r3 831.716.00 + HeannR Exammer 4oa
ADB = Architectural Design Board EIS = Environmental Impact Statement
HE = Hearing Examiner PRD = Planned Residential Development
SEPA = State Environmental Policy Act
ENGINEERING FEES
MISCELLANEOUS FEES:
Backflow Prevention Compliance Fee ................. ........................
$204-98216.00
Developers Agreements ................... _..............................._....
.._............... $?7488286.00 + $}.3W-.BB143.00 hr+ City
Attorney Fees
Fire/ Aid Sign Address Fabrication Fee(Persign)...... ..................
$14 99143.00
Street Sign Fabrication Fee(Persign)..........................................
$247.08286.00
Signal Maintenance (Perhour).................. ..............................
$13799143.00
Water and Sewer Availability Letters (Perletter)..........
..... ......... $S8- 107.00
Latecomers Agreement ..................................... ..........
..................... $ 2; 4-BB286.00 + $337- 89143.00 h r + City
Attorney Fees
LID Sewer Agreement..........................................................................
$274 9 286.00 + $437.GG143.00 hr + City
Attorney Fees
Utility Company Agreement ...... .............. .............. .._
........... ........ ... $2- 499286.00+ $447 0914 .00 hr+City
Attorney Fees
Variance from Underground Wiring ..............................
.................. $411.0 429.00 + $4-37L9 143.00 hr+ City
Attorney Fees
GENERAL FACILITY CHARGES - UPDATED PER ORD. 4323, EFFECTIVE 1/1/2024
GFC's shall be paid at the time of permit issuance based on the GFC in effect on the date of each specific
application. GFC's are charged in addition to other applicable permit fees. The following does not represent the
entire fee schedule or project applicability. Please refer to ECDC 7.30.035 and ECDC 7.50.070.
• Water System GFC's are based on meter size:
Meter Size General Facility Charge
Formatted: Font: 8 pt J
Exhibit A
/<" $ 6,358.00
1" $15,895.00
1" ' $31,790.00
2" $50,864.00
For Single Family Residences Only: GFC is based on meter size required for domestic demand (typically Y..").
GFC shall not be based on meter upsizing for fire sprinkler system when using combination fire/domestic line.
• Sewer Utility GFC._..... .................. „.......................-............. „... $6,598.00 per ERU
o Single-family residential development = 1.0 ERU per dwelling unit
o Accessory dwelling unit (attached or detached) = 0.67 ERU per dwelling unit
o A multifamily residential development = 0.67 ERU per dwelling unit
o Applicants for non-residential development shall pay a GFC based on the size of the water meter.
• Stormwater Management GFC ...... ._... .................... ............... $3,122.00 per ESU
o A single-family residential development with up to 5,000 sf hard surface area = 1.0 ESU
o All other construction calculated according to a ratio of 1.0 ESU per 3,000 sq ft of new, replaced, or
new plus replaced impervious surface area.
o For subdivisions, payment shall be required at the time of civil construction plan Issuance.
RIGHT-OF-WAY FEES:
Right -of -Way Construction Permit ............................ .....$4 .Q0429.00 + Inspection
Fees
Right -of -Way Construction Permit —Small Wireless ......... $431.BB429.00 +
SIP.98113.00 hour for any portion of an
hour after the first three hours of staff review
time+ City Attorney Fees for legal review (if
necessary) +Inspection Fees
Right -of -Way Minor Construction Permit................»_......$00143.00+ Inspection
Fees
Street Restoration for Water Meter installation ........... ..$47;40481 669.00+ Street
Overlay Cut Penalty Fee if applicable
Street Overlay Cut Penalty Fee ..................... ................... $274 BB286.00 + ROW
Permit Fees
+Add'I per SQYD charge times overlay cut multiplier
Encroachment Permit ............... ....................... ..„ ............ ..._..$444-9@429.00 + Inspection Fees + Recording Fees
Street Use Permit........,.„ .... .......................... I ............... ......... $g3709143.00+Sidewalk Dining Fees if applicable
Sidewalk Dining Street Use Permit ............... ............ I .... ..... $13798715.00+ Monthly ROW Use Fee
Sidewalk Dining Annual Renewal Fee.......„...._ ................... „$37-09429.00Annual Fee +Monthly ROW Use Fee
@ $0.50/ SO FT x 12.84% (leasehold tax)
Right -of -Way Disruption Fee..._.»..__....„ ... .......... „„...._. $274.00 + ROW Permit+ Monthly Closure Fees
Closure fees charged for any activity that occupies or closes, sidewalks, parking spaces(s), parking lanes(s) or
other paved area of a street/road for more than 72 hours. Monthly portion of Fee [$ per month] = 1% of
assessed value per square foot of abutting property x right of way area [SF] disrupted/closed. If
disruption/closure affects any portion of the area of a parking space, the area of disruption closure is calculated
based upon the area of a full parking space.
SEWER FEES:
General
New GFC = General Facility Charge ESU = Equivalent Service Unit Facility
Commercial ROW = Right of Way ERU = Equivalent Residential Uni Charges May
& Multi- G99 - .-,.Regal lmaeil y 9h,Fgc rc _ E, .._',.... S,,.., ee 6 JR4 Apply
Family
............ .......................... ....... $28286.000 + Inspection Fees
New Single Family . ........................................ $�9143.00 + Inspection Fees
Formatted: Indent: Left: 0.44", First line:
Formatted: Right: -0.08"
� Formatted: Indent: Left: 0.44", First line: 0"
Exhibit A
Line Replacement............................$4-3�GG286.00 + Inspection Fees
FRepair-Full
r - Partial Line Replacement ...................... $4-37.98143.00 (Includes 1 inspection
+ Add'I Inspection Fees, if applicable)
al Conditions (Grinder Pumps, Ejectors)..... $43�GG143.00 + Sewer Fees + Utility Engineer Review
age Permit (Pool, Hot Tub, Jacuzzi) ........................... $69.00 Each Occurrence
STORMWATER FEES:
Stormwater Permit ............. $" ".^^^29 00 + Inspection Fees
WATER METER FEES:
Meter Size Meter Fee* Meter Drop -In Only Fee
*Installation of New Service & Meter 3/4" $362 !.@93 730.00 3/4"
upsize
to 1" - $3144GQ320.02
1" $',CQ�9�3 793.00
*General Facility Charges may apply
ICC VALUATION TABLE
- - - IA 18 #A 4B IIIA MR 1u
A! sembly, Meallew-wh4-A a 22390 322-.4A 34-2,a9 380::8 280M 272 46 :290Q4 294
VA porn
47 2 CAA 6
A �AS6gm y iheaierc-w+kcxsF5tage 306.63 294 :7 22S 24 272 92 263 47 245 24 262.66 224
A 2 Assembly, pyhtGWbs 2640:7 266 2 249 23 23R R2 22369 247-" 23052 203
A 2 Assemtly sastauranis bars banquet 7 g :227 e „16, 2
25 22426 .
42 195 74
204 42 1 o�71
galls
'
---Assembly,-shur— 341 24
29P 22 269 62 277 50 25R I R 250 0E 267 24
2390 := 06
I 2613E
P49 47 22R 96 22:7 64 207 19 290 A6 247 38
49297 479 07
--- 4,46embly.--WORM 30E 63
292 75 29324 271 92 251 47 24424 26l66
2323E 2- 3
-RRys ness-- 2924E
E EdYGalioHel - - - 279 29
262 09 271 97 260 46 227 85 22948 250.4E
29A 50 260.99 25 4-7 233-48 ^ 2PI 55 244 97
24226 20284
204 55 198 00
F-4-FadOgran4i-WdudFla-meder UWmard 16252
1a4.68 14493 4-a9 4244-9 444. -7 . 132-99
402.98 85:&0
161 52
492 68 44-0-93 4884E 42449 4- 747 431.99 192
98 94 90
H-4 * 4WaAi-explosives 451 65
143.114 435,05 128 61 444-.6-4 4A7:60 1 422�f
9340 0-.90
'
154 6a
442 R 1 435 05 423§1 4 44-64 ', 497.60 42244
92 45 R 5 23
H 9 HP A A 292 18
28209 2-7� 260 46 237-85 229 48 25046
242 56 29284
22493
25557 248.84 228.11 247 64 214 63 23R 4E
195F12 499-.67
469-M
445-043 43932 497-.82 493-26 0.00 41-7-1
277 92 0-GO
-2anstit 249 21
1 3 IRSt al .eStPR Red --- 244 48
306 26 298 74 2135 23 264 I 0 060 275 22
331n9 ' 220 97 ' 34946 2—gg-34 278 a ' ao�na
23R 22 0$0 1
263-.05 ' 254--.33
1-4 Ina'Wimal, day cam fewitliiIie 264 543 25a 57 242.84 23R 41 217 64 211 63 1238r7i
195R2 4 89 6:7
fatted Table
Exhibit A
P MeMPRt♦la
o 1 Residential hotels
P27 42
9 34
� 258-06
a
24A 22
9
240-60
2-20.62
244-69
. 2n0.cn .•
498.79..
42935
02-6
R
Vie twa4araily
214 77
�244.25
295 24
205 52
200 99
1967
4@7-.
4 77 :77
3 49026
4:74 76
483 32
196-.82
49375
455 95
47:767
aae F1
42707
-and
R-4-Resdentialc-e/asst6ted4;vmg-(90MIee
26493
255 57
244-.M
2-1944
247 64
241 62
MR 45
495.92
48a67
- 4 Stamp. -FRoderalle45465
442.84
43305
: 427.64
44.?64
406 60
424 44
94�0
6422 1
449 65
441 84
433,05
4244
4 2-.61
4Q560
42044
94.40
82 33 1
44337
IN 46 400 93 96 59
August 20245
8&02
8&36
9494
68 09
64 85
Adopted by
City of Edmonds effective Jan
1, 202H
Group/2o2A1ntcrnntione1Building Code)
_IA _
IB
_IIA _
_118
_IIIA
IIIB
IV
VA
.j(8-turn
A-1 Assembly theaters, with stage
340.83 328.70
319.00
306.43
286.33
278.03
295.95
266.82
6,6j Forn
A-1 Assembly, theaters. without stage
312.91 300.76
92 1.08
278.51
258.66
250.36
268.03
239.1
22 8-94
A-2 Assembly nightclubs
272.09 264.11
255.82
246.06
230.47
224.21
237.62
209.58
201.63
A-2 Assembly, restaurants, bars. banquet
271.09 263.11
253.82
245.06
228.47
223.21
236.62
207.58
200.63 1
halls
A-3 Assembly, churches
317.60 305.47
295.77
283.20
26
255-18
272.73
243.9 6
233.75
A-3 Assembly, general oommunity halls.
266.72 254.59
243.89
232.31
211.46
204.17
221.84
191.95
182.74
libraries, museums _
_
A-4 Assembly. arenas
311.91 299.78
289.08
277.51
256.66
24R36
_
267.03
237.14
227.94
B Business
301.40 290.70
280.27
268.41
245.13
236.39
258.10
219.07
209.02
E Educational
290.11 279.78
270.34
258.97
240.45
228.20
250.06
210.46
203.65
F-1 Factory and industrial moderate
165.82 157.82
147.89
142.31
126.72
120.56 `
135.68
105.08
97_84
hazard- - -- - - - -
- -
--
--
--
F-2 Factory and Industrial, low hazard
164.82 156.82
147.89
141.31
126.72
119.56
134.68
105.08
96_84
H-1 High Hazard. explosives
154.69 146.69
137.76
131.18
116.91
109.75
124.55
95._27
0.00
H234 High Hazard
154.69 146.69
137.76
131.18
116.91
109.75
124.55
95,_27
87.03
H-5 HPM
301.40 290.70
280.27
268.41
245.13
236.39
258.10
219.07
209.02
1-1 Institutional supervised environment
277.74 267.79
258.23
248.47
227.43
221.32
247.95
204.83
197.52
1-2 Institutional, hospitals
473.85 463.15
452.71
440.86
415.54
0.00
430.54
389.49
0.00
1.2 Institutional nursino home&
326.90 316.19
305.76
293.90
272.12
0.00
283.59
246.07
0.00
1.3Institutional. restrained
318.07 307.36
296.93
285.07
264.31
254.57
274.7
258.10
226.20
1-4 Institutional, day rare fadllties
277.74 267.79
258.23
248.47
227.43
221.32
247.95
204.8
197.52
M Mercantile
203.08 195.10
185.80
177.05
161.11
155.85
168.60
140.22
133.27
P•1 Residential. hotels
280.94 270.99
261.43
251.67
230.13
224.02
251.15
207.53
200.22
R-2 Residential, multiple family
234.59 224.64
215.08
205.32
185.03
178.92
204.B0
162.43
155.12
R-3 Residential. one- and tyro -family
218.08 212.28
207.18
202.76
195.98
189.00
206,85
182.23
170.80
R-4 Residential, care/assisted living
277.74 267.79
258.23
248,47
227.43
221.32
4j 7.95,
204.83
12=
facilities
S-1 Storage, moderate hazard
153.69 145.69
135.76
130.18
114-91
108.75
123.55
93.27
86_03
S-2 Storage, low hazard
152.69 144.69 1 135.76 i 129.18
114.91
107.75
12255
93_27
85.03
iatted: Font: 8 pt
tatted Table
Exhibit A
U Utility, miscellaneous
Square Foot Construction Costs a"' `
12265 115.66 107.12 102.79 91_57 85_78 97_87 72_88 69_64
a. Private Garages use Utility, miscellaneous f. 5unroom(unheated)=$37.00 per sq. ft.
b. For shell only buildings deduct20 percent g. Deck, Ramp, Stairs, Trellis, Porch = $26.00 per sq. ft.
c. N.P. = not permitted h. Dock = $46.00 per sq. ft.
d. Unfinished basements (Group R-3) = $36.00 persq ft i. Unheated Storage=$33.00 per sq. ft.
e. Carport = $33.00 per sq. ft.
VALUATION BASED BUILDING PERMIT FEES
TABLE 1
Total Valuation**
Residential
Commercial
$1 to $500
$109 Base fee + $33
$131 Base fee + $40
$109 Base fee + $33 for the first $500 + $3.25 for
$131 Base fee + $40 for the first $500 + $3.90 for
$501 to $2,000
each additional $100, or fraction thereof to and
each additional $100, or fraction thereof to and
including $2,000
including $2,000
$109 Base fee + $8&-28&-98 for the first $2,001 +
$131 Base fee + $97.0 28688 for the first $2,001
$2,001 to $25,000
$15.20 for each additional $1,000, or fraction
+ $18.20 for each additional $1,000, or fraction
thereof to and including $25,000
thereof to and including $25,000
$109 Base fee + $131.GQ858$6 for the first
$131.00 Base fee + $SZ1-.W715 W for the first
$25,001 to
$25,001 + $10.80 for each additional $1,000, or
$25,001 + $13 for each additional $1,000, or
$50,000
fraction thereof to and including $50,000
fraction thereof to and including $50,000
$109 Base fee + $49&4gQ 71. 16,28 for the first
$131 Base fee + $84.7-1-43D44 for the first
$50,001 to
$50,001 + $7.60 for each additional $1,000, or
$50,001 + $9.10 for each additional $1,000, or
$100,000
fraction thereof to and including $100,000
fraction thereof to and including $100,000
$109 Base fee + $4,986.003 575 for the first
$131 Base fee + $13037 150 for the first $100,001
$100,001 to
$100,001 + $6.50 for each additional $1,000, or
+ $7.80 for each additional $1,000, or fraction
$500,000
fraction thereof to and including $500,000
thereof to and including $500,000
$109 Base fee + $3,6935 220 for the first
$131 Base fee + $ 4,4 9 98 580 for the first $500,001
$500,001 to
$500,001 + $5.40 for each additional $1,000, or
+$6.50 for each additional $1,000, or fraction
$1,000,000
fraction thereof to and including $1,000,000
thereof to and including $1,000,000
$109 Base fee + $64-W7 550 for the first
$131 Base fee + $7-,F83j0.100 )9 for the first
$1,000,001 and
$1,000,000 + $4.30 for each additional $1,000, or
$1,000,000 + $5.20 for each additional $1,000, or
up
fraction thereof
fraction thereof
The Building Valuation Data table shall be updated on January 1 st of each year to the latest version as published by ICC
**See Valuation Table located on previous page.
TABLE 1 - VALUATION BASED APPLICABLE PERMITS:
Commercial Structures: New, Additions & Remodels
Residential Structures: New, Additions & Remodels
Accessory Structures (Green house/Shed)
Deck, Stairs, Ramps
Garages & Carports
Swimming Pools (In -Ground)
Cell Communications/ Wireless Facilities
Other permit types as determined
Exhibit A
Commercial: Hot/Tub and Spas, Solar/ Photovoltaic Systems, Re -roofs & Tenant Improvements
For Valuation based projects, plan review fees are calculated at 85% of the building permit fee and includes up to 3
reviews per division/ department (Building, Plan nin&pesidential fire & General Engineering). Commercial, multi -fa
& mixed -use fire reviews are calculated at 25% of the building permit fee and includes up to 3 reviews.
Plus: $6.50 Residential State Surcharge Fee per permit and $2 per each dwelling unit
$25.00 Commercial State Surcharge Fee per permit and $2 per each dwelling unit
To be removed once a separate Resolution Is approved'"
Non -Development Services Fees
SPECIAL EVENT PERMITS:
(Direct any inquires to the City Clerk's office)
Small event / less than 100 people „........................... ........................ ............. $50.00
Small event — Edmonds -based NP entity. _ ... ........ .......................... . .. _ .....$25.00
Major event / more than 100 people............................................................... ........$125.00
Major event — Edmonds -based NP entity........... ......................... ................ _ ..... ,..$62.50
Formatted: Left
Formatted: Not Highlight
Formatted: Not Highlight
Formatted: Highlight