Ordinance 4420Docusign Envelope ID: 005313C3-7E80-439A-9C1D-13641376961`132A ORDINANCE NO. 4420 AN ORDINANCE OF THE CITY OF EDMONDS, WASHINGTON, ADOPTING THE 2025 AMENDMENTS TO THE EDMONDS COMPREHENSIVE PLAN. WHEREAS, the city's capital programs, plans and projects undergo a comprehensive public review process on an annual basis; and WHEREAS, the city's planning board had a full, detailed presentation on September 10, 2025, including a question and answer period with city staff; and WHEREAS, on September 24, 2025, the planning board conducted a public hearing and in October, the board finalized its formal recommendation to the city council; and WHEREAS, the city council had a full, detailed PowerPoint presentation by the parks and public works departments on November 3, 2025, followed by a public hearing on November 25, 2025; and WHEREAS, outside of the capital facilities plan, several concerns from the public emerged regarding the extent of the North Bowl Hub, which was created as part of the 2024 comprehensive plan periodic update; and WHEREAS, these concerns included access and environmental constraints as well as potential neighborhood character impacts; and WHEREAS, the planning board revisited options for the North Bowl Hub during its September 10, 2025 meeting and made a recommendation about revising the extent of the hub at its September 24, 2025 meeting; and WHEREAS, after the planning board's work on the North Bowl Hub, this topic was reintroduced to the city council on October 14, 2025; and WHEREAS, the council held a public hearing on the topic on November 3, 2025; and WHEREAS, the city council would like to further revise the FLUM in response to public comment received; NOW THEREFORE, Docusign Envelope ID: 005313C3-7E80-439A-9C1D-BB4B7696FB2A THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, DO ORDAIN AS FOLLOWS: Section 1. The City of Edmonds Comprehensive Plan and, specifically, the Capital Facilities Plan Element, and Capital Improvement Plans, are hereby amended to read as shown in Exhibit A, which is attached hereto and incorporated herein by this reference as if fully set forth herein. Section 2. The City of Edmonds Comprehensive Plan and, specifically, the North Bowl Hub portion of the Future Land Use Map (FLUM), is hereby amended to remove the map adopted with the 2024 periodic update as shown in Exhibit B and replace it with the new (proposed) FLUM for the North Bowl Hub as shown in Exhibit C, both of which are attached hereto and incorporated herein by this reference as if fully set forth herein. Section 3. Effective Date. This ordinance, being an exercise of a power specifically delegated to the City legislative body, is not subject to referendum and shall take effect five (5) days after passage and publication of an approved summary thereof consisting of the title. APPROVED: kk' 1°bsua. MAYOR MIKE ROSEN ATTEST/AUTHENTICATED: DEPUTY CITY CLERK, EMILY VILLATA APPROVED AS TO FORM: OFFICE OF THE CITY ATTORNEY: BY JEFF TARADA FILED WITH THE CITY CLERK: December 6, 2025 PASSED BY THE CITY COUNCIL: December 9, 2025 PUBLISHED: December 12, 2025 Docusign Envelope ID: 005313C3-7E80-439A-9C1D-BB4B7696FB2A EFFECTIVE DATE: December 17, 2025 ORDINANCE NO. 4420 Docusign Envelope ID: 005313C3-7E80-439A-9C1D-BB4B7696FB2A SUMMARY OF ORDINANCE NO.4420 of the City of Edmonds, Washington On the 91h day of December, 2025, the City Council of the City of Edmonds, passed Ordinance No. 4420. A summary of the content of said ordinance, consisting of the title, provides as follows: AN ORDINANCE OF THE CITY OF EDMONDS, WASHINGTON, ADOPTING THE 2025 AMENDMENTS TO THE EDMONDS COMPREHENSIVE PLAN. The full text of this Ordinance will be mailed upon request. DATED this 9ch day of December, 2025. DEPUTY CITY CLERK, EMILY VILLATA 4840-7251-8158,v. 1 "F .1CITYOF EDMONDS . J -�,,- PUBLIC WORKS '�' 2026-2031 PROPOSED CAPITAL FACILITIES PLAN & CAPITAL IMPROVEMENT PROGRAM TRANSPORTATION & UTILITIES MAP FACILITIES & WWTP PROJECTS MAP TRANSPORTATION 1 PRESERVATION/ MAINTENANCE 7 SAFETY/ CAPACITY ANALYSIS 19 NON -MOTORIZED TRANSPORTATION 41 FERRY RELATED 75 TRAFFIC CALMING 77 TRAFFIC PLANNING 79 WATER 86 STORMWATER 91 ANNUALLY FUNDED 94 EDMONDS MARSH ESTUARY RESTORATION 95 PERRINVILLE CREEK BASIN 98 STORM DRAINAGE IMPROVEMENT 101 COMPLIANCE RELATED 104 SEWER 106 FACILITIES 112 WASTEWATER TREATMENT PLANT 131 CFP/CIP COMPARISON 2025-2026 150 ID: 005313C3-7E80-439A-9C1 D-BB4B7696FB2A DRAFT 1.4 PWT-92 PWD-04 0 PWT-28 • PWT-100 PWT-83 PWW-11 PWT-34 ® PWT-24 PWT-52 PWT-61 I PWT-49 PWT-68 • PWD-03 PWT-03 PWT-46 PWT-05 PWT PWT-84 PWT-101 I PWT-17 PWT-89 PWT-71 P T-81 r/ PWT-77 PWT-40 PWS-02 PWT-691 FM PWT-007-,o0 ®PWD-17 PWD-26 / TOZ O--IWT j�PWTa18 • `PWW-011; PWT-PPWW-02 PWT-87 PWT-78 T-65 PWT-33 PWT-36 •PWW-11 PWT-51 - --. PWT-73 PWD-05 PWD-01 - ---< PWT-09 PWT-45 PWT-12 PWT-35 PWT-37 PWT-93 ?WT 88 PWT-16 PWT-72 PWT-55 PWT-48 PWT-19 PWT-41 PWT-52 Imi PWT-85•PWT-102 PWT-11 PWT-25 PWT-15 PWT-22 PWT-08 PWT-21 PWT-29 PWT-14 PWT-20 PWT-90 PWT-30 PWT-20 PWT-96 PWT-47 PWT-13 PWT 80 pWT 32 PWT 31 PWT-86, PW..A PWT-01 _PWT-06 WT 06 PWT-23 PWT 79� PWT-50 PWS-11 PWT-74 PWT-76 _PWT-99 ` PWD-22 PWT-10 * Site specific projects only. Citywide/annual citywide projects not shown. PWT-43 • ® September 2025 ID:005313C3-7E80-439A-9C1D-BB4B7696FB2A DRAFT 1.4 PWF-07 0 * PWF-01 QO PWF-25 PWF-09 o PWF-15 PWF-03 ® ® PWF-16 0 PWF-10 asm S I"Opi ON w " fit I � il►f wYs.� �i r r t. ice• 1".*1*4is IIL me MM M __M A PWF-01 PWF-04 PWF-0% 0 PWPO-0 �p10 m PWF-23 ®PWF-11 �• o, PWF-14 0 5 .S PWF-17#* • PWF-18 • PWF-11 PWF-27 PW PWF-23 IWF r, —milli r 4M A. PWF-02 W all r i ' ! IrIL OAW All1iON PWF-12 0 PWF-16 0 * Site specific projects only. Citywide/annual citywide projects not shown. September 2025 z F- LL Docusign Envelope ID: 005313C3-7E80-439A-9C1D-BB4B7696FB2A TRANSPORTATION DRAFT 1.4 PRESERVATION/ MAINTENANCE PWT-01 Annual Street Preservation Program Str-25020/22/33 $681,988 $2,630,000 $2,630,000 $2,630,000 $2,630,000 $2,630,000 $13,831,988 $50,500,000 $64,331,988 PWT-04 Main St Overlay from 6th Ave to 8th Ave $10,000 $0 $0 $0 $0 $0 $10,000 $0 $10,000 PWT-05 Puget Dr @ OVD Signal Upgrades $0 $0 $0 $98,000 $542,000 $0 $640,000 $0 $640,000 PWT-06 Signal Upgrades -100th Ave @ 238th St $0 $0 $0 $181,000 $845,000 $0 $1,026,000 $0 $1,026,000 PWT-07 Main St @ 3rd Signal Upgrades $0 $0 $0 $121,000 $419,000 $0 $540,000 $0 $540,000 PWT-28 175th St SW Slope Repair $0 $0 $0 $164,000 $1,090,000 $0 $1,254,000 $0 $1,254,000 PWT-61 Olympic View Dr Overlay -196th / SR-524 Str-25031/32 $963,700 $0 $0 $0 $0 $0 $963,700 $0 $963,700 to Talbot Rd PWT-68 88th Avenue Overlay and Sidewalk Repair Str-25018 $2,100 $0 $0 $0 $0 $0 $2,100 $0 $2,100 PWT-69 7th Avenue Sidewalk Repair $0 $0 $0 $150,000 $630,000 $0 $780,000 $0 $780,000 PWT-103 ✓ 7th Ave N Pedestrian Improvements $424,600 $0 $0 $0 $0 $0 $424,600 $0 $424,600 PWT-104 ✓ 76th Ave W Overlay from 220th St SW to $0 $135,000 $820,000 $0 $0 $0 $955,000 $0 $955,000 SR-99 SAFETY/ CAPACITY ANALYSIS PWT-08 ✓ 228th St SW from Hwy 99 to 95th PI W $0 $0 $0 $3,000,000 $4,500,000 $9,000,000 $16,500,000 $9,000,000 $25,500,000 Corridor PWT-10 ✓ Hwy 99 Revitalization Project - Stage 3 Str-25004/5 $2,833,000 $4,192,000 $10,000,000 $9,607,000 $0 $0 $26,632,000 $0 $26,632,000 PWT-11 ✓ Hwy 99 Revitalization Project - Stage 4 Str-25006/7 $2,137,000 $5,000,000 $4,555,000 $13,100,000 $12,000,000 $0 $36,792,000 $0 $36,792,000 PWT-12 ✓ Hwy 99 Revitalization Project - Stage 5 $0 $0 $0 $0 $0 $0 $0 $52,000,000 $52,000,000 PWT-13 ✓ Hwy 99 Revitalization Project - Stage 6 $0 $0 $0 $0 $0 $500,000 $500,000 $23,500,000 $24,000,000 PWT-14 ✓ Hwy 99 Revitalization Project - Stage 7 $0 $0 $0 $0 $0 $0 $0 $44,000,000 $44,000,000 2026-2031 PUBLIC WORKS CAPITAL FACILITIES PROGRAM I CAPITAL IMPROVEMENTS PROJECTS 2 Docusign Envelope ID: 005313C3-7E80-439A-9C1D-13134137696FI32A TRANSPORTATION DRAFT 1.4 PWT-15 ✓ Hwy 99 Revitalization Project - Stage 8 $0 $0 $0 $0 $0 $0 $0 $41,000,000 $41,000,000 PWT-16 ✓ Hwy 99 Revitalization Project - Stage 9 $0 $0 $0 $0 $0 $1,000,000 $1,000,000 $22,000,000 PWT-17 ✓ 196th St SW / 88th Ave W Intersection $0 $0 $0 $0 $0 $0 $0 $1,500,000 Improvements PWT-18 ✓ Main St @ 9th Ave Intersection Str-25010 $0 $0 $0 $216,000 $1,184,000 $0 $1,400,000 $0 Improvements PWT-19 ✓ 76th Ave W @ 220th St SW Intersection Str-25028/29 $1,488,500 $2,100,000 $3,370,000 $3,300,000 $0 $0 $10,258,500 $0 Improvements PWT-20 SR-104 Adaptive System - 236th to 226th Str-25008 $53,038 $0 $0 $4,400,000 $0 $0 $4,453,038 $0 PWT-21 ✓ SR-104 @ 100th Ave W Intersection $0 $0 $0 $350,000 $1,350,000 $2,900,000 $4,600,000 $0 Improvements PWT-22 ✓ SR-104 @ 95th PI W Intersection $0 $0 $0 $0 $0 $0 $0 $300,000 Improvements PWT-23 ✓ SR-104 @ 238th St SW Intersection $0 $0 $0 $0 $0 $0 $0 $1,611,000 Improvements PWT-24 ✓ Olympic View Dr @ 76th Ave W $0 $0 $0 $0 $0 $0 $0 $1,411,000 Intersection Improvements PWT-25 ✓ 84th Ave W (212th St SW to 238th St SW) Str-25011 $0 $0 $0 $0 $0 $0 $0 $16,800,000 PWT-43 ✓ SR-104 @ 76th Ave W Intersection $0 $0 $0 $0 $0 $0 $0 $2,650,000 Improvements PWT-59 Traffic Signal Program Str-25016/17 $30,280 $0 $0 $0 $0 $0 $30,280 PWT 97 ✓ 76th Ave W Adaptive System from 206th $0 $0 $0 $435,000 $2,465,000 $0 $2,900,000 St SW to 220th St SW PWT-98 Citywide Lighting Improvements $580,000 $0 $0 $0 $0 $0 $580,000 NON -MOTORIZED TRANSPORTATION PWT-29 ✓ 232nd St SW Walkway from 100th Ave to $0 $0 $0 $645,000 $3,655,000 $0 $4,300,000 SR-104 PWT-31 ✓ 236th St SW Walkway from Hwy 99 to $0 $0 $0 $0 $350,000 $1,900,000 $2,250,000 76th Ave W PWT-32 ✓ 84th Ave W Walkway from 238th St SW to $0 $0 $0 $150,000 $380,000 $2,200,000 $2,730,000 234th St SW 2026-2031 PUBLIC WORKS CAPITAL FACILITIES PROGRAM I CAPITAL IMPROVEMENTS PROJECTS $0 $23,000,000 $1,500,000 $1,400,000 $10,258,500 $4,453,038 $4,600,000 $300,000 $1,611,000 $1,411,000 $16,800,000 $2,650,000 $30,280 $0 $2,900,000 $0 $580,000 $0 $4,300,000 $0 $2,250,000 $0 $2,730,000 3 Docusign Envelope ID: 005313C3-7E80-439A-9C1D-BB4B7696FB2A TRANSPORTATION DRAFT 1.4 PWT-33 ✓ 80th Ave W Walkway from 212th St SW to $0 $0 $0 $0 $0 $0 $0 $2,900,000 $2,900,000 206th St SW PWT-34 ✓ 80th Ave W Walkway from 188th St SW to $0 $0 $0 $0 $0 $0 $0 $6,300,000 $6,300,000 Olympic View Dr PWT-35 ✓ 218th St SW Walkway from 76th Ave W to $0 $0 $0 $0 $0 $0 $0 $3,900,000 $3,900,000 84th Ave W PWT-36 ✓ Walnut St Walkway from 6th Ave S to 7th $0 $0 $0 $0 $0 $0 $0 $400,000 $400,000 Ave S PWT-40 ✓ Maplewood Dr Walkway from Main St to $0 $0 $0 $350,000 $350,000 $3,800,000 $4,500,000 $0 $4,500,000 200th St SW PWT-45 ✓ SR-104 / Pine S Walkway from HAWK to $0 $0 $0 $0 $0 $0 $0 $6,800,000 $6,800,000 Pine / SR-104 to 9th PWT-47 ✓ 104th Ave W / Robinhood Ln Walkway $0 $0 $0 $0 $0 $0 $0 $2,200,000 $2,200,000 from 238th St to 106th Ave W PWT-60 Pedestrian Safety Program Str-25014/15 $20,180 $0 $0 $0 $0 $0 $20,180 $0 $20,180 PWT-66 4th Avenue Cultural Corridor $0 $0 $0 $1,060,000 $1,060,000 $6,360,000 $8,480,000 $0 $8,480,000 Caspers / 9th Ave N / Puget Multi -Use PWT-71 ✓ path from Admiral Way to Olympic View $0 $0 $0 $1,000,000 $1,000,000 $9,500,000 $11,500,000 $0 $11,500,000 Dr PWT-72 ✓ SR-104 Multi -Use path from Sunset Ave $0 $0 $0 $2,500,000 $5,000,000 $20,000,000 $27,500,000 $0 $27,500,000 to 100th Ave W PWT-73 ✓ 212th St SW Multi -Use path from 74th $0 $0 $0 $0 $500,000 $1,500,000 $2,000,000 $3,200,000 $5,200,000 Ave W to Hwy 99 PWT-74 ✓ SR-104 Multi -Use path from 100th Ave W $0 $0 $0 $0 $1,500,000 $2,000,000 $3,500,000 $19,500,000 $23,000,000 to 244th St SW PWT-75 ✓ Main St Bike lanes from the Ferry $0 $0 $0 $0 $750,000 $1,750,000 $2,500,000 $6,000,000 $8,500,000 Terminal to 6th Ave PWT-76 ✓ 240th St SW / 78th Ave W Walkway from $0 $0 $0 $300,000 $300,000 $3,915,000 $4,515,000 $0 $4,515,000 Hwy 99 to 236th St SW PWT-77 ✓ 9th Ave N Bike lanes from Main St to $0 $0 $0 $0 $50,000 $230,000 $280,000 $0 $280,000 Caspers St PWT-78 ✓ Main St Bike lanes from 9th Ave to 84th $0 $0 $0 $89,000 $501,000 $0 $590,000 $0 $590,000 Ave W PWT-79 ✓ 238th St SW bike lanes from SR-104 to $0 $0 $0 $0 $80,000 $460,000 $540,000 $0 $540,000 84th Ave W 2026-2031 PUBLIC WORKS CAPITAL FACILITIES PROGRAM I CAPITAL IMPROVEMENTS PROJECTS 4 Docusign Envelope ID: 005313C3-7E80-439A-9C1D-BB4B7696FB2A TRANSPORTATION DRAFT1.4 PWT-80 ✓ 236th St SW Walkway from 94th Ave W to 84th Ave W PWT-81 ✓ Sunset Ave Multi -Use path from Caspers St to 3rd Ave N I SR-104 PWT-83 ✓ Olympic View Dr Multi -Use path from 76th Ave W to City Limits PWT-84 ✓ 196th St SW Multi -Use path from 88th Ave W to 76th Ave W PWT-87 ✓ Maple St Walkway from 8th Ave to 9th Ave PWT-88 ✓ 218th St SW Walkway from 84th Ave W to 76th Ave W PWT-89 ✓ 88th Ave W Walkway from 200th St SW to 196th St SW PWT-91 ✓ Olympic Ave Walkway from Olympic View Dr to Puget Dr PWT-92 ✓ Meadowdale Beach Rd Walkway from 75th PI W to Olympic View Dr PWT-93 ✓ 6th Ave Walkway from Elm Way to Pine St PWT-96 ✓ 234th St SW Walkway from Hwy 99 to 76th Ave W PWT-102 ✓ 224th St SW bike lanes from 76th Ave W to Interurban Trail through re -striping FERRY RELATED Ferry Storage Improvements from Pine St PWT-51 to Dayton St TRAFFIC CALMING PWT-52 Traffic Calming Program TRAFFIC PLANNING $0 $0 $0 $0 $500,000 $2,600,000 $3,100,000 $0 $3,100,000 $0 $0 $0 $0 $0 $0 $0 $5,400,000 $5,400,000 $0 $0 $0 $0 $0 $0 $0 $18,000,000 $18,000,000 $0 $0 $0 $0 $0 $0 $0 $9,300,000 $9,300,000 $0 $0 $0 $0 $0 $0 $0 $925,000 $925,000 $0 $0 $0 $0 $0 $0 $0 $3,900,000 $3,900,000 $0 $0 $0 $0 $0 $0 $0 $2,150,000 $2,150,000 $0 $0 $0 $0 $0 $0 $0 $1,250,000 $1,250,000 $0 $0 $0 $0 $0 $0 $0 $6,600,000 $6,600,000 $0 $0 $0 $0 $0 $0 $0 $1,100,000 $1,100,000 $0 $0 $0 $0 $0 $0 $0 $2,350,000 $2,350,000 $0 $0 $0 $150,000 $0 $0 $150,000 $0 $150,000 $0 $0 $0 $62,000 $353,000 $0 $415,000 $0 $415,000 Str-25012113 $62,650 $22,000 $22,000 $22,000 $22,000 $22,000 $172,650 $330,000 $502,650 PWT-53 ADA Transition Plan (Right -of -Way) $0 $0 $0 $455,000 $0 $0 Update PWT-54 Transportation Plan Update Str-25009 $0 $0 $0 $0 $0 $450,000 $455,000 $0 $455,000 $450,000 $0 $450,000 2026-2031 PUBLIC WORKS CAPITAL FACILITIES PROGRAM I CAPITAL IMPROVEMENTS PROJECTS 5 Docusign Envelope ID: 005313C3-7E80-439A-9C1D-BB4B7696FB2A TRANSPORTATION DRAFT1.4 PWT-70 Safety Action Plan 670-25011 $74,000 $0 $0 $0 $0 $0 $74,000 $0 $74,000 PWT-99 SR-104 Overpass Feasibility Study $0 $0 $0 $410,000 $0 $0 $410,000 $0 $410,000 PWT-100 Olympic View Dr Active Transportation $0 $0 $0 $0 $0 $0 $0 $155,000 $155,000 Feasibility Study PWT-101 196th St SW Active Transportation $0 $0 $0 $0 $0 $0 $0 $155,000 $155,000 Feasibility Study EXPENSE TOTAL $9,361,036 $14,079,000 $21,397,000 $44,945,000 $44,006,000 $72,717,000 $206,505,036 $369,087,000 $575,592,036 Funding Source 2026 i i 26-31 Total 2032-46 Grand Total Federal Grants $3,192,579 $4,550,800 $644,000 $0 $0 $0 $8,387,379 $0 $8,387,379 Fund 112 - Street (Gas Tax & Multi- $14,800 $0 $0 $59,000 $0 $450,000 $523,800 $0 $523,800 Modal) Fund 125 - REET $302,809 $750,000 $750,000 $750,000 $750,000 $750,000 $4,052,809 $11,250,000 $15,302,809 Fund 126 - REET $683,460 $801,000 $948,000 $1,372,000 $772,000 $772,000 $5,348,460 $11,580,000 $16,928,460 Fund 421 -Water Utility $194,400 $12,000 $0 $0 $0 $0 $206,400 $0 $206,400 Fund 422 - Stormwater Utility $7,500 $6,500 $0 $0 $0 $0 $14,000 $0 $14,000 Fund 423 - Sewer Utility $100 $0 $0 $0 $0 $0 $100 $0 $100 State Grants $4,682,888 $4,250,000 $10,000,000 $9,607,000 $0 $0 $28,539,888 $0 $28,539,888 Transportation Impact Fees $282,500 $2,578,700 $475,000 $0 $0 $0 $3,336,200 $0 $3,336,200 Unsecured Funding $0 $1,130,000 $8,580,000 $32,781,000 $42,484,000 $70,745,000 $155,720,000 $344,057,000 $499,777,000 Unsecured Grants $0 $0 $0 $376,000 $0 $0 $376,000 $2,200,000 $2,576,000 FUNDING TOTAL $9,361,036 $14,079,000 $21,397,000 $44,945,000 $44,006,000 $72,717,000 $206,505,036 $369,087,000 $575,592,036 2026-2031 PUBLIC WORKS CAPITAL FACILITIES PROGRAM I CAPITAL IMPROVEMENTS PROJECTS 6 DRAFT 1.4 PRESERVATION/MAINTENANCE - •� , it J:• ,rL Aiiiie ff A Iwo, how Iwo M'iF r 2026 2031 PUBLIC WORKS CAPITAL FACILITIES PROGRAM I CAPITAL IMPROVEMENTS PROJECTS 7 Documn Envelope ID: 005313C3-7E80-439A-9C1D-BB4B7696FB2A PWT-01 ANNUAL STREET PRESERVATION PROGRAM Benefit Maintains the City's pavement infrastructure and reduces the need for larger capital investment to rebuild City streets. Description Annual pavement preservation program to maintain City streets. Estimated Project Cost* $700K to $2.6M per year *Projects starting before 2026 include prior year expenditures. Budget Design $75,000 $130,000 $130,000 $130,000 $130,000 $130,000 $2,500,000 Construction $606,988 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $48,000,000 Expense Total $681,988 $2,630,000 $2,630,000 $2,630,000 $2,630,000 $2,630,000 $50,500,000 Fund 125 - REET $249,794 $750,000 $750,000 $750,000 $750,000 $750,000 $11,250,000 Fund 126 - REET $249,794 $750,000 $750,000 $750,000 $750,000 $750,000 $11,250,000 Fund 421 - Water Utility $182,400 $0 $0 $0 $0 $0 $0 Unsecured Funding $0 $1,130,000 $1,130,000 $1,130,000 $1,130,000 $1,130,000 $28,000,000 Funding Source Total $681,988 $2,630,000 $2,630,000 $2,630,000 $2,630,000 $2,630,000 $50,500,000 ID: 005313C3-7E80-439A-9C1 D-BB4B7696FB2A PWT-04 MAIN ST OVERLAY FROM 6TH AVE TO 8TH Fr1-"d: h��n ayal Coert z d 2 AVE I MAIN ST Sno-Isle Frances AndersonAnderson Yost ParF * 14iO_ : �.� �, Library Center n w Q H m AcF nF Benefit Improve pavement conditions, pedestrian accessibility (with ADA curb ramps) and bike safety on this segment of Main Street. Description The project will provide a full -width grind and pavement overlay of Main St. from 6th Ave to 8th Ave. This project also includes upgrading all non -compliant ADA pedestrian curb ramps within the project limits, an eastbound bike lane and westbound bike sharrow markings. Estimated Project Cost* $1,855,000 "Projects starting before 2026 include prior year expenditures. Budget Project Cost 2026 2027is 2029 2030 2031 203246 Construction $10,000 $0 $0 $0 $0 $0 $0 Expense Total $10,000 $0 $0 $0 $0 $0 $0 Fund 126 - REET $10,000 $0 $0 $0 $0 $0 $0 Funding Source Total $10,000 $0 $0 $0 $0 $0 $0 ID:005313C3-7E80-439A-9C1D-BB4B7696FB2A PWT-05 PUGET DR @ OVD SIGNAL UPGRADES oe 0 PUGET DR > z a w _U QEdmond. C = Elementary N 0 A sr Pete-: Benefit This upgrade will provide safer roadway conditions since the hanging signal heads will be replaced with fixed signal heads on mast arms. Description The project will rebuild the existing traffic signal and remove the signal heads currently on span wire and install standard traffic signal poles with mast arms. Estimated Project Cost* $640,000 *Projects starting before 2026 include prior year expenditures Budget Projectr Design $0 $0 $0 $98,000 $0 $0 $0 Construction $0 $0 $0 $0 $542,000 $0 $0 Expense Total $0 $0 $0 $98,000 $542,000 $0 $0 Unsecured Funding $0 $0 $0 $98,000 $542,000 $0 $0 Funding Source Total $0 $0 $0 $98,000 $542,000 $0 $0 Docusign Envelope ID: 005313C3-7E80-439A-9C1D-BB4B7696FB2A PWT-06 SIGNAL UPGRADES - 7 OOTH AVE @ 238TH ST SW Benefit The existing traffic signal is near the end of its anticipated service life. Description Install new traffic signal poles and upgrade existing vehicle detection system. Estimated Project Cost* $1,026,000 *Projects starting before 2026 include prior year expenditures Budget Project I - Design $0 $0 $0 $181,000 $0 $0 $0 Construction $0 $0 $0 $0 $845,000 $0 $0 Expense Total $0 $0 $0 $181,000 $845,000 $0 $0 Unsecured Funding $0 $0 $0 $181,000 $845,000 $0 $0 Funding Source Total $0 $0 $0 $181,000 $845,000 $0 $0 )omisign Envelope ID: 005313C3-7E80-439A-9C1D-BB4B7696FB2A WORKSPUBLIC • • Puget PWT-07 Sound M '4//I/ST F 4 0 it flreekott: � � � MAIN ST @ 3RD SIGNAL . Souing D...u.o ... South vo:r UPGRADES qq,�w: e f io;? ..,,�, a MAIN ST m A Benefit The existing traffic signal is near the end of its anticipated service life. Description Install new traffic signal poles and upgrade existing vehicle detection system. Estimated Project Cost* $540,000 *Projects starting before 2026 include prior year expenditures. Budget Project Cost 20262030 Design $0 $0 $0 $121,000 $0 $0 $0 Construction $0 $0 $0 $0 $419,000 $0 $0 Expense Total $0 $0 $0 $121,000 $419,000 $0 $0 Unsecured Funding $0 $0 $0 $121,000 $419,000 $0 $0 Funding Source Total $0 $0 $0 $121,000 $419,000 $0 $0 ID:005313C3-7E80-439A-9C1D-BB4B7696FB2A '. '• t t � ri �� ? t __.. • , . ,. _ . rat 11 ice.• l [ 1 PEDESTRIAN t '! -qv +.�= r,' IMPROVEMENTS f ,_. ,. , a ••� f • •i :•ti 11111-fir w t . 9. A. J +,, _. �, `i.tt�I.1a• • �• 1O _s�..,�•� lr/f tr �►� �. t 1•►i:. � . �.�� .' �.- . .�' i 1J1U��e�•. wM �." • �r^'� .r^'^ 3 ``•.. •-t �L••!i1•ts]e '�'t�.,ta•r}tt•t ...- • `� J1101I. ..t� '�w1•f.`�✓• wry 'IIa't .I/rtw►1Xr Benefit Improve access and safety for pedestrians of all abilities to Civic Park and other destination points within proximity to 7th Ave. N. Description Reconstruction of approximately 13 ramps and installation of a raised crosswalk along 7th Ave between Bell St and SR-524 Estimated Project Cost* $484,180 *Projects starting before 2026 include prior year expenditures. Budget 2031 203246 Project126 Construction $424,600 2027 $0 2028 $0 20292030 $0 $0 $0 $0 Expense Total $424,600 $0 $0 $0 $0 $0 $0 Fund 125 - REET $45,856 $0 $0 $0 $0 $0 $0 Fund 126 - REET $45,856 $0 $0 $0 $0 $0 $0 State Grants $332,888 $0 $0 $0 $0 $0 $0 Funding Source Total $424,600 $0 $0 $0 $0 $0 $0 n Envelope ID: 005313C3-7E80-439A-9C1D-BB4B7696FB2A PWT-104 a9cMF 76TH AVE W OVERLAY s F FROM 220TH ST SW TO SR-99 LL� Benefit Improve pavement condition and improve accessibility for pedestrians of all abilities (as well possibly bicycle users with bike lane additions) Description Pavement overlay along 76th Ave from 220th St SW to SR-99 along with ADA pedestrian curb ramp upgrades. The addition of bike lanes on both sides of the stretch will be considered (following completion of parking study). The addition of bike lanes along this stretch was ranked as HIGH PRIORITY PROJECT (in 2024 Transportation Plan). Estimated Project Cost* $955,000 *Projects starting before 2026 include prior year expenditures. Budget Project Design $0 $135,000 $0 $0 $0 $0 $0 Construction $0 $0 $820,000 $0 $0 $0 $0 Expense Total $0 $135,000 $820,000 $0 $0 $0 $0 Federal Grants $0 $106,000 $644,000 $0 $0 $0 $0 Fund 126 - REET $0 $29,000 $176,000 $0 $0 $0 $0 Funding Source Total $0 $135,000 $820,000 $0 $0 $0 $0 Docusign Envelope ID: 005313C3-7E80-439A-9C1 D-1313467696F132A WORKSPUBLIC • • UH' PWT-28 175TH ST SW SLOPE REPAIR 3 n Snohomish \" County Park Benefit Repair roadway and stabilize slope embankment. Description The project will stabilize the roadway subgrade and embankment and rebuild the damaged pavement on 175th St. SW. Estimated Project Cost* $1,254,000 *Projects starting before 2026 include prior year expenditures. Budget Design $0 $0 $0 $164,000 $0 $0 $0 Construction $0 $0 $0 $0 $1,090,000 $0 $0 Expense Total $0 $0 $0 $164,000 $1,090,000 $0 $0 Unsecured Funding $0 $0 $0 $164,000 $1,090,000 $0 $0 Funding Source Total $0 $0 $0 $164,000 $1,090,000 $0 $0 ID:005313C3-7E80-439A-9C1D-BB4B7696FB2A PWT-61 OLYMPIC VIEW DR OVERLAY - 196TH / SR- 524 TO TALBOT RD Benefit Description A S c Puget Sound Lynndale Park 1WID* A SM, Improve pavement condition and improve accessibility for pedestrians of all abilities. Pavement overlay along Olympic View Dr, from 196th St. SW / SR-524 to Talbot Road, along with ADA pedestrian curb ramp upgrades. Estimated Project Cost* $1,500,000 *Projects starting before 2026 include prior year expenditures. Budget • . Design $15,000 $0 $0 $0 $0 $0 $0 Construction $948,700 $0 $0 $0 $0 $0 $0 Expense Total $963,700 $0 $0 $0 $0 $0 $0 Fund 126 - REET $263,700 $0 $0 $0 $0 $0 $0 Federal Grants $700,000 $0 $0 $0 $0 $0 $0 Funding Source Total $963,700 $0 $0 $0 $0 $0 $0 )ocusign Envelope ID: 005313C3-7E80-439A-9C1D-BB4B7696FB2A PWT-68 88TH AVENUE PugefSound OVERLAY AND SIDEWALK REPAIR Hots Park Sierra Para v �rl oq 196Tt, ST SR Benefit Improve pavement conditions, pedestrian accessibility (with ADA curb ramps) and pedestrian safety. z 0 0 ,o Description This project will resurface 88th Ave and improve the existing asphalt sidewalk on the east side of 88th Ave from 196th St SW to 185th PI SW in the Seaview neighborhood. All City utilities along this section of 88th Ave have been upgraded in recent years and the street is ready to pave.Curb ramps will be upgraded and portions of the existing sidewalk that are currently in failure will be repaired. Estimated Project Cost* $1,180,000 'Projects starting before 2026 include prior year expenditures. Budget Project I Design $0 $0 $0 $0 $0 $0 $0 Construction $2,100 $0 $0 $0 $0 $0 $0 Expense Total $2,100 $0 $0 $0 $0 $0 $0 Fund 126 - REET $1,000 $0 $0 $0 $0 $0 $0 Fund 422 - Stormwater Utility $1,000 $0 $0 $0 $0 $0 $0 Fund 423 - Sewer Utility $100 $0 $0 $0 $0 $0 $0 Funding Source Total $2,100 $0 $0 $0 $0 $0 $0 ID:005313C3-7E80-439A-9C1D-BB4B7696FB2A PWT-69 7TH AVENUE SIDEWALK REPAIR Cd the '^ �r - Gvic • - Rayfield r M.rwDj r Z I N A� Benefit Improve pedestrian access and safety to Civic Park and other destination points within proximity to 7th Ave. N. Description Reconstruction of approximately 600 LF of existing sidewalk and curb and gutter along the frontage of Civic Park on 7th Ave. N. Estimated Project Cost* $780,000 *Projects starting before 2026 include prior year expenditures Budget Design $0 $0 $0 $150,000 $0 $0 $0 Construction $0 $0 $0 $0 $630,000 $0 $0 Expense Total $0 $0 $0 $150,000 $630,000 $0 $0 Unsecured Funding $0 $0 $0 $150,000 $630,000 $0 $0 Funding Source Total $0 $0 $0 $150,000 $630,000 $0 $0 DRAFT 1.4 SAFETY/CAPACITY ANALYSIS �• `.� � t � ,. fit. ��. � pig. � ► fk ki \ •'act\ l;t �' ; / � �i� _ '' �• �} � _ :— - - - :� .�,-Sates:, ram` '., I• -=1��'•• It `F' C7 jj !'% 2026 2031 PUBLIC WORKS CAPITAL FACILITIES PROGRAM I CAPITAL IMPROVEMENTS PROJECTS 19 ID:005313C3-7E80-439A-9C1D-BB4B7696FB2A PWT-08 228TH ST SW FROM HWY 99 TO 95TH PL W CORRIDOR Pi Sf SW 3 N A Benefit This project would improve active transportation safety and traffic flows along this corridor. Community Transit would then explore the feasibility of creating a new east - west bus route along 228th St. SW, if this project moves forward (creating more direct connection between Edmonds Transit Station and Mountlake Terrace Transit Station). Description Widen 228th St. SW from Hwy. 99 to 95th PI. W to three lanes (with center two-way left turn lane) or left turn lane at key intersections, with curb and gutter, sidewalks, and bike lanes on both sides of the street. The section of 228th St SW between 92nd Ave W and 80th Ave W is within Snohomish County. This project ranked as LOW PRIORITY in 2024 Transportation Plan. Estimated Project Cost* $25,500,000 *Projects starting before 2026 include prior year expenditures. Budget • . Design $0 $0 $0 $3,000,000 $1,500,000 $0 $0 Right of Way $0 $0 $0 $0 $3,000,000 $0 $0 Construction $0 $0 $0 $0 $0 $9,000,000 $9,000,000 Expense Total $0 $0 $0 $3,000,000 $4,500,000 $9,000,000 $9,000,000 Unsecured Funding $0 $0 $0 $3,000,000 $4,500,000 $9,000,000 $9,000,000 Funding Source Total $0 $0 $0 $3,000,000 $4,500,000 $9,000,000 $9,000,000 Envelope ID: 005313C3-7E80-439A-9C1 D-131341376961`132A PWT-10 . .� REVITALIZATION PROJECT - STAGE 3 Benefit Improve aesthetics, safety, and user experience along this segment of the Hwy 99 corridor. Description The Stage 3 Highway 99 project limits are from 244th St SW to —400 feet north of 238th St. SW. The project will provide new sidewalk, landscaped planter strips, street lighting, separated bike lanes, ADA compliant pedestrian curb ramps and utility improvements (including undergrounding of overhead utility lines). The project will also widen the intersection of Highway 99 and 238th St. SW to provide a second northbound left turn lane and widen 238th St. from Highway 99 to 84th Ave. for this additional lane and bike lane addition. This project was ranked as HIGH PRIORITY in 2024 Transportation Plan. Estimated Project Cost* $29,500,000 *Projects starting before 2026 include prior year expenditures. Budget Project Cost 2026029 2030 2031 203246 Design $799,000 $1,226,000 $0 $0 $0 $0 $0 Right of Way $2,034,000 $2,966,000 $0 $0 $0 $0 $0 Construction $0 $0 $10,000,000 $9,607,000 $0 $0 $0 Expense Total State Grants Unsecured Funding Funding Source Total $2,833,000 $4,192,000 $2,833,000 $4,192,000 $0 $0 $10,000,000 $9,607,000 $10,000,000 $9,607,000 $0 $0 $2,833,000 $4,192,000 $10,000,000 $9,607,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 ID: 005313C3-7E80-439A-9C1 D-BB4B7696FB2A PWT-11 HWY 99 REVITALIZATION PROJECT - STAGE 4 Benefit Improve aesthetics, safety, and user experience. In addition, future economic development would be improved. Description The Stage 4 Highway 99 project limits are from 224th St SW to —800 feet north of 220th St. SW. The project will provide new sidewalk, landscaped planter strips, street lighting, separated bike lanes, ADA compliant pedestrian curb ramps and utility improvements (including undergrounding of overhead utility lines). The project will also widen the intersection of Highway 99 and 220th St. SW to provide a second left turn lane for the northbound, southbound, and westbound movements. A multi -use path will be added on the north side of 220th St. SW from Hwy 99 to the Interurban Trail. This project was ranked as HIGH PRIORITY in 2024 Transportation Plan. Estimated Project Cost* $38,000,000 "Projects starting before 2026 include prior year expenditures Budget Design $1,000,000 $1,000,000 $475,000 $0 $0 $0 $0 Right of Way $1,137,000 $4,000,000 $4,080,000 $0 $0 $0 $0 Construction $0 $0 $0 $13,100,000 $12,000,000 $0 $0 Expense Total $2,137,000 $5,000,000 $4,555,000 $13,100,000 $12,000,000 $0 $0 Transportation Impact Fees $84,000 $2,295,500 $475,000 $0 $0 $0 $0 Federal Grants $536,000 $2,646,500 $0 $0 $0 $0 $0 State Grants $1,517,000 $58,000 $0 $0 $0 $0 $0 Unsecured Funding $0 $0 $4,080,000 $13,100,000 $12,000,000 $0 $0 Funding Source Total $2,137,000 $5,000,000 $4,555,000 $13,100,000 $12,000,000 $0 $0 ID:005313C3-7E80-439A-9C1D-BB4B7696FB2A PWT-12 HWY 99 REVITALIZATION PROJECT - STAGE 5 212TH ST SW � �RPC �00 N A Benefit Improve aesthetics, safety, and user experience. In addition, future economic development will be improved along the corridor. Description Along Hwy 99 from 216th St SW to 212th St. SW, the project will add a planter strip on both sides of the street, new street lighting, separated bike lanes, better stormwater management, targeted utility replacements, including undergrounding of overhead utilities, landscaping and other softscape treatments to identify the area as being in Edmonds. This project ranked as LOW PRIORITY in 2024 Transportation Plan. Estimated Project Cost* $52,000,000 *Projects starting before 2026 include prior year expenditures. Budget Design, ROW, and $0 $0 $0 $0 $0 $0 $52,000,000 Construction Expense Total $0 $0 $0 $0 $0 $0 $52,000,000 Unsecured Funding $0 $0 $0 $0 $0 $0 $52,000,000 Funding Source Total $0 $0 $0 $0 $0 $0 $52,000,000 ID: 005313C3-7E80-439A-9C1 D-BB4B7696FB2A PWT-13 HWY 99 Chest REVITALIZATION Lutheran Park and Church Rido PROJECT - STAGE 6 239TH ST A4 Benefit Improve aesthetics, safety, and user experience. In addition, future economic development would be improved along the corridor. Description Along Hwy 99 from 238th St. SW to 234th St. SW, the project will add a planter strip on both sides of the street, new street lighting, separated bike lanes, better stormwater management, targeted utility replacements, including undergrounding of overhead utilities, landscaping and other softscape treatments to identify the area as being in Edmonds. This project was ranked as MEDIUM PRIORITY in 2024 Transportation Plan. Estimated Project Cost* $24,000,000 *Projects starting before 2026 include prior year expenditures. Budget Project r Design, ROW, and $0 $0 $0 $0 $0 $500,000 $23,500,000 Construction Expense Total $0 $0 $0 $0 $0 $500,000 $23,500,000 Unsecured Funding $0 $0 $0 $0 $0 $500,000 $23,500,000 Funding Source Total $0 $0 $0 $0 $0 $500,000 $23,500,000 D ID: 005313C3-7E80-439A-9C1D-B64B7696F62A PWT-14 HWY 99 REVITALIZATION PROJECT - STAGE 7 2.,0111 Q 4 D ~ 3 2 a Y i 2 J 0 Nile Country Club Golf Course N --L - - A Benefit Improve aesthetics, safety, and user experience. In addition, future economic development would be improved along the corridor. Description Along Hwy 99 from 234th St. SW to 228th St. SW, the project will add a planter strip on both sides of the street, new street lighting, separated bike lanes, better stormwater management, targeted utility replacements, including undergrounding of overhead utilities, landscaping and other softscape treatments to identify the area as being in Edmonds. This project was ranked as MEDIUM PRIORITY in 2024 Transportation Plan. Estimated Project Cost* $44,000,000 *Projects starting before 2026 include prior year expenditures. Budget Design, ROW, and $0 $0 $0 $0 $0 $0 $44,000,000 Construction Expense Total $0 $0 $0 $0 $0 $0 $44,000,000 Unsecured Funding $0 $0 $0 $0 $0 $0 $44,000,000 Funding Source Total $0 $0 $0 $0 $0 $0 $44,000,000 ID: 005313C3-7E80-439A-9C1 D-BB4B7696FB2A PWT-15 HWY 99 REVITALIZATION PROJECT - STAGE 8 Benefit Improve aesthetics, safety, and user experience. In addition, future economic development would be improved along the corridor. Description Along Hwy 99 from 228th St. SW to 224th St. SW, the project will add a planter strip on both sides of the street, new street lighting, separated bike lanes, better stormwater management, targeted utility replacements, including undergrounding of overhead utilities, landscaping and other softscape treatments to identify the area as being in Edmonds. This project is ranked as MEDIUM PRIORITY in 2024 Transportation Plan. Estimated Project Cost* $41,000,000 *Projects starting before 2026 include prior year expenditures. Budget Project11.11 L10 I 11JA Design, ROW, and $0 $0 $0 $0 $0 $0 $41,000,000 Construction Expense Total $0 $0 $0 $0 $0 $0 $41,000,000 Unsecured Funding $0 $0 $0 $0 $0 $0 $41,000,000 Funding Source Total $0 $0 $0 $0 $0 $0 $41,000,000 Docusiqn Envelope ID: 005313C3-7E80-439A-9C1D-BB4B7696FB2A PWT-16 HWY 99 REVITALIZATION PROJECT - STAGE 9 r+ J. iw-.."4^<t A Benefit Improve aesthetics, safety, and user experience. In addition, future economic development would be improved along the corridor. Description Along Hwy 99 from approximately 500 feet north of 220th St. SW to 216th St. SW, the project will add a planter strip on both sides of the street, new street lighting, separated bike lanes, better stormwater management, targeted utility replacements, undergrounding of overhead utilities, landscaping and other softscape treatments to identify the area as being in Edmonds. This project was ranked as MEDIUM PRIORITY in 2024 Transportation Plan. Estimated Project Cost* $23,000,000 "Projects starting before 2026 include prior year expenditures Budget 11JI , Design, ROW, and $0 $0 $0 $0 $0 $1,000,000 $22,000,000 Construction Expense Total $0 $0 $0 $0 $0 $1,000,000 $22,000,000 Unsecured Funding $0 $0 $0 $0 $0 $1,000,000 $22,000,000 Funding Source Total $0 $0 $0 $0 $0 $1,000,000 $22,000,000 ID:005313C3-7E80-439A-9C1D-BB4B7696FB2A PWT-17 ' 196TH ST SW / 88TH Seventh Day Adventist AVE W INTERSECTION Church IMPROVEMENTS 196TH ST SW l,t, 3 A sub Map�ewoo00 d OR H'i Park 00 A Benefit Improve traffic flow characteristics and safety at the intersection. The improvements would improve the LOS, meeting City LOS Standards. Delays and queuing would increase along 196th St. SW. Description Install traffic signal at the intersection of 196th St. SW @ 88th Ave. W. An alternative solution consists in the restriction of northbound and southbound movements to right - turn only (prohibiting left turn and through movements). This is same alternative as one concluded by consultant in a 2007 Study but not recommended by City Council. This could be implemented as an alternate solution, or as an interim solution until traffic signal warrants are met. The existing LOS is F (below City Standards: LOS D). The addition of a signal would improve This project was ranked as LOW PRIOIRITY in the 2024 Transportation Plan. Estimated Project Cost* $1,500,000 *Projects starting before 2026 include prior year expenditures. Budget • . Design $0 $0 $0 $0 $0 $0 $300,000 Right of Way $0 $0 $0 $0 $0 $0 $260,000 Construction $0 $0 $0 $0 $0 $0 $940,000 Expense Total $0 $0 $0 $0 $0 $0 $1,500,000 Unsecured Funding $0 $0 $0 $0 $0 $0 $1,500,000 Funding Source Total $0 $0 $0 $0 $0 $0 $1,500,000 ID:005313C3-7E80-439A-9C1D-BB4B7696FB2A PWT-18 Z w MAIN ST @ 9TH AVE INTERSECTION IMPROVEMENTS MAINST Anderson Anderson Center Center Field w Q 2 H AJ Benefit The existing intersection is stop -controlled for all approaches and the projected intersection LOS in 2044 is LOS F (below the City's concurrency standards: LOS D). The installation of a traffic signal would improve the intersection delay to LOS B. Description Installation of a traffic signal or mini -roundabout. The preliminary cost estimate for a new traffic signal is $1,410,000 for all project phases. A conceptual cost estimate for a mini -roundabout is approximately $500,000. This project was ranked as MEDIUM PRIORITY in 2024 Transportation Plan. Estimated Project Cost* $1,400,000 `Projects starting before 2026 include prior year expenditures Budget Design $0 $0 $0 $216,000 $0 $0 $0 Construction $0 $0 $0 $0 $1,184,000 $0 $0 Expense Total $0 $0 $0 $216,000 $1,184,000 $0 $0 Unsecured Funding $0 $0 $0 $216,000 $1,184,000 $0 $0 Funding Source Total $0 $0 $0 $216,000 $1,184,000 $0 $0 ID:005313C3-7E80-439A-9C1D-BB4B7696FB2A PWT-19 76TH AVE W @ 220TH ST SW INTERSECTION IMPROVEMENTS Benefit Reduce the intersection delay and improve the Level of Service (LOS). The projected LOS in 2044 would be improved from LOS F to LOS D. Improve active transportation conditions. Description Reconfigure eastbound lanes to a left turn lane and through/ right turn lane. Add eastbound and westbound dedicated left turn lanes with a protected -permitted phase. Provide right turn overlap for westbound movement during southbound left turn phase. Additional improvements include wider sidewalk, bike lanes, street lighting, and various utility improvements (including conversion overhead utility lines to underground). A multi -use path will be added along 220th St SW from 76th Ave. W to Hwy 99. This project was ranked as MEDIUM PRIORITY in 2024 Transportation Plan . Estimated Project Cost* $11,000,000 *Projects starting before 2026 include prior year expenditures. Budget 2027 2028 2029 2030 2031 203246 -Project Cost 2026 Design $253,500 $100,000 $0 $0 $0 $0 $0 Right of Way $1,235,000 $2,000,000 $0 $0 $0 $0 $0 Construction $0 $0 $3,370,000 $3,300,000 $0 $0 $0 Expense Total Transportation Impact Fees Fund 421 - Water Utility Fund 422 - Stormwater Utility Federal Grants Unsecured Funding Funding Source Total $1,488,500 $2,100,000 $198,500 $283,200 $12,000 $12,000 $6,500 $6,500 $1,271,500 $1,798,300 $0 $0 $1,488,500 $2,100,000 $3,370,000 $3,300,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $3,370,000 $3,300,000 $0 $0 $0 $3,370,000 $3,300,000 $0 $0 $0 n ID:005313C3-7E80-439A-9C1D-BB4B7696FB2A PWT-20 SR-104 ADAPTIVE SYSTEM - 236TH TO 226TH Benefit Improve traffic flows along this regional corridor / principal arterial with a current Average Daily Traffic (ADT) of — 25,000 vehicles per day. Description The project will add a traffic signal adaptive system on a 1.25-mile segment of SR104 from 236th St to 226th St. The system will monitor and synchronize the timing of five existing signalized intersections (SR104 @ 236th St, SR104 @ 232nd St, SR104 @ 95th PI, SR104 @ 100th Ave, SR104 @ 226th St) and improve traffic flows along SR104. This project was identified as MEDIUM PRIORITY in 2024 Transportation Plan. Estimated Project Cost* $4,600,000 *Projects starting before 2026 include prior year expenditures. Budget • , Design $53,038 $0 $0 $0 $0 $0 $0 Construction $0 $0 $0 $4,400,000 $0 $0 $0 Expense Total $53,038 $0 $0 $4,400,000 $0 $0 $0 Federal Grants $45,879 $0 $0 $0 $0 $0 $0 Fund 125 - REET $7,159 $0 $0 $0 $0 $0 $0 Fund 126 - REET $0 $0 $0 $600,000 $0 $0 $0 Unsecured Funding $0 $0 $0 $3,800,000 $0 $0 $0 Funding Source Total $53,038 $0 $0 $4,400,000 $0 $0 $0 ID:005313C3-7E80-439A-9C1D-BB4B7696FB2A PWT-21 SR-104 @ 100TH AVE W INTERSECTION IMPROVEMENTS • EDMONDS WAY W Q PUD Sub Star, A Benefit Improve access and safety at the signalized intersection and improve active transportation safety. Description Implement Westgate Circulation Access Plan, install mid -block pedestrian crossing along 100th Ave. W, improve safety to access the driveways within proximity to the intersection, and re -striping of 100th Ave. W with the potential addition of bike lanes. This project was identified in the SR-104 Completed Streets Corridor Analysis (completed in 2015) and ranked as MEDIUM PRIORITY in 2024 Transportation Plan. Estimated Project Cost" $4,600,000 `Projects starting before 2026 include prior year expenditures Budget Design $0 $0 $0 $350,000 $350,000 $0 $0 Right of Way $0 $0 $0 $0 $1,000,000 $0 $0 Construction $0 $0 $0 $0 $0 $2,900,000 $0 Expense Total $0 $0 $0 $350,000 $1,350,000 $2,900,000 $0 Unsecured Funding $0 $0 $0 $350,000 $1,350,000 $2,900,000 $0 Funding Source Total $0 $0 $0 $350,000 $1,350,000 $2,900,000 $0 Docusiqn Envelope ID: 005313C3-7E80-439A-9C1D-BB4B7696FB2A PWT-22 SR-104 @ 95TH PL W INTERSECTION IMPROVEMENTS Benefit Improve intersection safety for pedestrians and vehicles. Description Upgrade all ADA Curb Ramps; and add C-Curb for access management. This project was identified in the SR-104 Complete Streets Corridor Analysis (completed in 2015) and ranked as LOW PRIORITY in 2024 Transportation Plan. Estimated Project Cost* $300,000 *Projects starting before 2026 include prior year expenditures. Budget Design, ROW, Construction $0 $0 $0 $0 $0 $0 $300,000 Expense Total $0 $0 $0 $0 $0 $0 $300,000 Unsecured Funding $0 $0 $0 $0 $0 $0 $300,000 Funding Source Total $0 $0 $0 $0 $0 $0 $300,000 ID:005313C3-7E80-439A-9C1D-BB4B7696FB2A PWT-23 3 SR-104 @ 238TH ST SW 5 " s INTERSECTION IMPROVEMENTS MadrSchooll o. FQ 238THSTSW School 2lOy Os. �9r Korean P—bytes A Church Benefit Improve vehicular and pedestrian safety. The existing Level of Service (LOS) at this intersection is LOS F and will be improved to LOS C with these improvements (meet City LOS Standards). Description Install traffic signal. This project was identified in the SR-104 Complete Street Corridor Analysis (completed in 2015). This project was identified as LOW PRIORITY in 2024 Transportation Plan. Estimated Project Cost* $1,611,000 *Projects starting before 2026 include prior year expenditures. Budget Project Cost Design 2026 $0 $0 $0 $0 $0 $0 $242,000 Construction $0 $0 $0 $0 $0 $0 $1,369,000 Expense Total $0 $0 $0 $0 $0 $0 $1,611,000 Unsecured Funding $0 $0 $0 $0 $0 $0 $1,611,000 Funding Source Total $0 $0 $0 $0 $0 $0 $1,611,000 Docusign Envelope ID: 005313C3-7E80-439A-9C1D-66467696FI32A PWT-24 OLYMPIC VIEW DR @ 76TH AVE W INTERSECTION IMPROVEMENTS Benefit The improvement will reduce the intersection delay. The projected Level of Service is LOS F in 2044, which is below the City's concurrency standards (LOS D). The project will improve the Level of Service to LOS B. Description Install traffic signal (the intersection currently stop controlled for all movements (identified as LOW PRIORITY PROJECT in 2024 Transportation Plan). This intersection is a shared intersection with City of Lynnwood. Estimated Project Cost* $1,411,000 *Projects starting before 2026 include prior year expenditures Budget Project CostI Design, ROW, Construction $0 $0 $0 $0 $0 $0 $1,411,000 Expense Total $0 $0 $0 $0 $0 $0 $1,411,000 Unsecured Funding $0 $0 $0 $0 $0 $0 $1,411,000 Funding Source Total $0 $0 $0 $0 $0 $0 $1,411,000 )ocusign Envelope ID: 005313C3-7E80-439A-9C1D-BB4B7696FB2A WORKSPUBLIC • • most �j, 208TH ST SW PWT-25 Park 212TH 51 5W 3 84TH AVE W (212TH ST - --,� SW TO 238TH ST SW) Puget 3 3 s 3 s < Sound a = = C a 3 3oO .. l 81H .15'M a 2228THSTy� D L tn� D 9 236TH ST SW : A Benefit Improve traffic flow, access and active transportation use with the addition of left turn lane at selected intersections, sidewalks, bike lanes on both sides of the street, and street lighting. Description Widen 84th Ave. W to curb and gutter, bike lanes, sidewalk on each side of the street and addition of left turn lane at selected key intersections. This project was ranked as MEDIUM PRIORITY in 2024 Transportation Plan. The segment of 84th Ave. W from 230th St. SW to 220th St SW is within Snohomish County ROW. Estimated Project Cost* $16,800,000 *Projects starting before 2026 include prior year expenditures Budget Project . 2030 I Design, ROW, Construction $0 $0 $0 $0 $0 $0 $16,800,000 Expense Total $0 $0 $0 $0 $0 $0 $16,800,000 Unsecured Funding $0 $0 $0 $0 $0 $0 $16,800,000 Funding Source Total $0 $0 $0 $0 $0 $0 $16,800,000 3ocusign Envelope ID: 005313C3-7E80-439A-9C1D-BB4B7696FB2A WORKSPUBLIC TRANSPORTATION-� PWT-43 e 5eettle 243rd PI S':f La ke SR-104 @ 76TH AVE W B. a "' °, INTERSECTION ��M��or IMPROVEMENTS qy rd zosrH sT �N zosTH sr LAKE BALLINGER WAY ti z N 2041H Plc zQ4TH PL > Q Z o z w 4 < i p .aupw a C"U Benefit Improve access, safety and delay at the intersection for vehicles and active transportation users. Description Extend bike lanes within proximity to intersection in northbound and southbound directions. Add westbound right turn lane along SR-104 (125' storage length). This project was ranked as MEDIUM PRIORITY in 2024 Transportation Plan. Estimated Project Cost* $2,650,000 *Projects starting before 2026 include prior year expenditures. Budget Design, ROW, and $0 $0 $0 $0 $0 $0 $2,650,000 Construction Expense Total $0 $0 $0 $0 $0 $0 $2,650,000 Unsecured Funding $0 $0 $0 $0 $0 $0 $2,650,000 Funding Source Total $0 $0 $0 $0 $0 $0 $2,650,000 ID:005313C3-7E80-439A-9C1D-BB4B7696FB2A PWT-59 TRAFFIC SIGNAL PROGRAM Benefit Improve reliability of traffic signal operation. Description This program started in 2019 and provides new signal upgrades, such as vehicle detection at intersections, new vehicle/pedestrian head equipment and other signal - related upgrades. These improvements will improve the safety of the City's transportation system. Estimated Project Cost* $30,280 *Projects starting before 2026 include prior year expenditures. Budget Design $1,000 $0 $0 $0 $0 $0 $0 Construction $29,280 $0 $0 $0 $0 $0 $0 Expense Total $30,280 $0 $0 $0 $0 $0 $0 Fund 126 - REET $30,280 $0 $0 $0 $0 $0 $0 Funding Source Total $30,280 $0 $0 $0 $0 $0 $0 ID:005313C3-7E80-439A-9C1D-BB4B7696FB2A PWT-97 76TH AVE W ADAPTIVE a �; SYSTEM FROM 206TH ST SW TO 220TH ST SW �r . 1 E Benefit Improve traffic flows along the entire corridor and reduce intersection delays at signalized intersections (220th St. SW, 216th St. SW, 212th St. SW, and 206th St. SW). 0 Description Installation of a signal adaptive system along 76th Ave. W from 206th St. SW to 220th St. This project was ranked as HIGH PRIORITY in 2024 Transportation Plan. Estimated Project Cost* $2,900,000 "Projects starting before 2026 include prior year expenditures Budget Design $0 $0 $0 $435,000 $0 $0 $0 Construction $0 $0 $0 $0 $2,465,000 $0 $0 Expense Total $0 $0 $0 $435,000 $2,465,000 $0 $0 Unsecured Funding $0 $0 $0 $0 $2,465,000 $0 $0 Fund 112 - Street (Gas Tax & $0 $0 $0 $59,000 $0 $0 $0 Multi -Modal) Unsecured Grants $0 $0 $0 $376,000 $0 $0 $0 Funding Source Total $0 $0 $0 $435,000 $2,465,000 $0 $0 ID: 005313C3-7E80-439A-9C1 D-BB4B7696FB2A PWT-98 CITYWIDE LIGHTING IMPROVEMENTS Benefit Improve night-time safety of all users at those intersections. Description Install new light poles at key intersections where serious injury collisions have occurred recently. The intersections include 76th Ave. W @ Interurban Trail, 8th Ave. S @ 14th St. SW, 76th Ave. W @ 200th St. SW, SR-524 @ 9th Ave. N, and 84th Ave. W @ 236th St. SW. Estimated Project Cost* $700,000 *Projects starting before 2026 include prior year expenditures. Budget Construction $580,000 $0 $0 $0 $0 $0 $0 Expense Total $580,000 $0 $0 $0 $0 $0 $0 Federal Grants $580,000 $0 $0 $0 $0 $0 $0 Funding Source Total $580,000 $0 $0 $0 $0 $0 $0 DRAFT 1.4 NON -MOTORIZED TRANSPORTATION t. oil fir• ..\ ; ' '• � = y- �:�.'� _ - - 2026 2031 PUBLIC WORKS CAPITAL FACILITIES PROGRAM I CAPITAL IMPROVEMENTS PROJECTS 41 ID:005313C3-7E80-439A-9C1D-BB4B7696FB2A PWT-102 224TH ST SW BIKE LANES FROM 76TH AVE W TO INTERURBAN TRAIL THROUGH RE -STRIPING Benefit Improve bicycle safety with a new west -east connection across Highway 99 to / from the Interurban Trail. Description Addition of bike lanes along 224th St. SW from 76th Ave. W to Interurban Trail. The project was ranked as MEDIUM PRIORITY in 2024 Transportation Plan. Estimated Project Cost* $150,000 *Projects starting before 2026 include prior year expenditures Budget Design and Construction $0 $0 $0 $150,000 $0 $0 $0 Expense Total $0 $0 $0 $150,000 $0 $0 $0 Unsecured Funding $0 $0 $0 $150,000 $0 $0 $0 Funding Source Total $0 $0 $0 $150,000 $0 $0 $0 ID: 005313C3-7E80-439A-9C1 D-BB4B7696FB2A PWT-29 232ND ST SW WALKWAY FROM 100TH AVE TO SR-104 Salem • �. n•gno Lutheran Chu: ch Benefit This project would improve pedestrian safety, connecting Scriber Lake School / ball fields to a residential area and a principal arterial. Description Install sidewalk along 232nd St. SW from 100th Ave. W to SR-104. This project ranks as MEDIUM PRIORITY in 2024 Transportation Plan. Estimated Project Cost* $4,300,000 'Projects starting before 2026 include prior year expenditures. Budget Project Design $0 $0 $0 $645,000 $0 $0 $0 Construction $0 $0 $0 $0 $3,655,000 $0 $0 Expense Total $0 $0 $0 $645,000 $3,655,000 $0 $0 Unsecured Funding $0 $0 $0 $645,000 $3,655,000 $0 $0 Funding Source Total $0 $0 $0 $645,000 $3,655,000 $0 $0 ID:005313C3-7E80-439A-9C1D-BB4B7696FB2A PWT-31 A.0 236TH ST SW Chr,., WALKWAY FROM HWY Lutheran r Church 99 TO 76TH AVE W W a A Benefit This project would improve pedestrian safety along a stretch on the east side of Highway 99, linking Hwy 99 to a minor arterial. Description Install sidewalk along 236th St. SW from Hwy 99 to 76th Ave. W. This project ranked as HIGH PRIORITY in the 2024 Transportation Plan. Estimated Project Cost* $2,250,000 "Projects starting before 2026 include prior year expenditures Budget Design $0 $0 $0 $0 $350,000 $0 $0 Right of Way $0 $0 $0 $0 $0 $0 $0 Construction $0 $0 $0 $0 $0 $1,900,000 $0 Expense Total $0 $0 $0 $0 $350,000 $1,900,000 $0 Unsecured Funding $0 $0 $0 $0 $350,000 $1,900,000 $0 Funding Source Total $0 $0 $0 $0 $350,000 $1,900,000 $0