Loading...
WSDOT ILA for Hwy 99 Stage 3 - Amendment 1Has the original City contract boilerplate language been modified? Yes No If yes, specify which sections have been modified: Description of Services: Type of Contract: (GR) Grants (I) Intergovernmental Agreement (L) Lease Agreement Bid/RFP Number: (S) Purchase of Services (W) Public Works (O) Other Effective Date: Completion Date: Originator: Routed by: Department/Division: Date: Name of Consultant/Contractor: CONTRACT TITLE: Total Amount of Contract: Budget # Budget # Budget # Amount: Are there sufficient funds in the current budget to cover this contract? Yes No Remarks: Authorization Level: Project Manager Risk Management/Budget City Attorney Consultant/Contractor Other City Council Approval Date (if applicable) Mayor City Clerk SI G N A T U R E FI N A N C I A L DE T A I L S CO N T R A C T CO N T E N T DE S C R I P T I O N CONTRACT ROUTING FORM No. (City Clerk Use Only) Amount: Amount: Bertrand Hauss Emiko Rodarte Public Works /Engineering 02/13/2026 WSDOT Amendment to ILA Agreement between WSDOT and the City of Edmonds for Highway 99 Stage 3 WSDOT agreed to reimburse the City for the City’s Preliminary Engineering (PE) and Right of Way work for the design development needed for the future Project paving of SR 99 and the SR 104 ramps and related additional Complete Streets elements $ 1,429,349.00 WSDOT Complete Streets expense reimbursement NTE WSDOT 4 4 1/27/26 IE21ST02 07/08/2025 4 4 4 Mayor 12/31/2027 Docusign Envelope ID: 7BAE135E-42A0-46C1-9894-C221DF62BED5Docusign Envelope ID: 9366CD0A-4545-40B3-BBD2-0316A707DFEA GCC 1120 Amendment No. 1 Page 1 of 2 GCC 1120 Amendment No. 1 Agreement between the Washington State Department of Transportation and the City of Edmonds Preliminary Engineering and Right of Way SR 99 and SR 104 This Amendment No. 1 to Agreement GCC 1120 is made and entered into between the Washington State Department of Transportation (“WSDOT”) and the City of Edmonds, a political subdivision of the State of Washington (“City”), collectively the “Parties” and individually the “Party.” RECITALS 1. On July 8, 2025, WSDOT and the City entered into Agreement GCC 1120 (“Agreement”) regarding the City’s Highway 99 Revitalization Stage 3 Project (“Project”). In the Agreement, WSDOT agreed to reimburse the City for the City’s Preliminary Engineering (PE) and Right of Way work for the design development needed for the future Project paving of SR 99 and the SR 104 ramps and related additional Complete Streets elements, collectively the “Work.” 2. The City has approved a supplement to the design phase of its Project, which includes additional Complete Street elements work such as reducing travel lane width to provide more space for bike lane crossings at 238th St SW and 240th St SW. WSDOT’s share of the cost for this additional Complete Streets elements work is estimated at $136,450, as shown in Exhibit B-1. 3. WSDOT and the City have agreed to amend the Agreement to address the additional Complete Streets elements work. NOW THEREFORE, pursuant to RCW 47.28.140, the above recitals, all of which are incorporated herein as if fully set forth below, and in consideration of the terms, conditions, covenants and performances contained herein, and the attached Exhibit B-1 that is incorporated herein by this reference, IT IS MUTUALLY AGREED AS FOLLOWS: 1. Section 6.1 of the Agreement allows the Agreement to be amended or modified by the mutual, written agreement of the Parties. 2. The Parties agree that Exhibit B is hereby deleted from the Agreement and replaced with Exhibit B-1. 3. Section 2 of the Agreement is hereby deleted and replaced with Section 2 as follows: 2. REIMBURSEMENT BY WSDOT 2.1 WSDOT, in consideration of the faithful performance of the Work performed by the City, will reimburse the City for the actual direct and related indirect costs of the Work, up to the amount of One Million Four Hundred Twenty-Nine Thousand Three Hundred Forty- Docusign Envelope ID: 7BAE135E-42A0-46C1-9894-C221DF62BED5Docusign Envelope ID: 9366CD0A-4545-40B3-BBD2-0316A707DFEA GCC 1120 Amendment No. 1 Page 2 of 2 Nine Dollars ($1,429,349), as shown in Exhibit B-1. The total estimated amount of $1,429,349 is the sum of Preliminary Engineering for Paving ($288,681) and Complete Streets ($576,916), and Right of Way ($563,752). Reimbursement will be made in accordance with the terms of Section 3 below. 2.2 In the event that the actual direct and related indirect costs of the Work by the City are anticipated to exceed $1,429,349, the Parties may, if they mutually agree, negotiate a written Amendment to this Agreement pursuant to Section 6.1 to address said increase. 4. All other terms and conditions of the original Agreement shall remain in full force and effect except as modified by this Amendment No. 1. 5. Counterpart and Electronic Signature This Amendment No. 1 to the Agreement may be signed in multiple counterparts, each of which constitutes an original and all of which taken together constitute one and same agreement. Electronic signatures or signatures transmitted via e-mail in a "PDF" may be used in place of original signatures on this Amendment No. 1. Each Party intends to be bound by its electronic or "PDF" signature on this Amendment No. 1, is aware that the other Parties are relying on its electronic or "PDF" signature, and waives any defenses to the enforcement of this Amendment No. 1 based upon the form of signature. IN WITNESS WHEREOF, the Parties hereto have executed this Amendment No. 1 to the GCC 1120 Agreement as of the Party’s date last signed below. The City of Edmonds Washington State Department of Transportation Sign and Date: Sign and Date: Mike Rosen Mayor City of Edmonds Cameron Kukes Assistant Regional Administrator Program Management Docusign Envelope ID: 7BAE135E-42A0-46C1-9894-C221DF62BED5 2/18/2026 Docusign Envelope ID: 9366CD0A-4545-40B3-BBD2-0316A707DFEA 2/18/2026 Overlay Estimate Phase Amount Inflated Notes PE $280,000 $288,681 per WSDOT inflation rate Construction $2,400,000 $2,505,600 per WSDOT inflation rate TOTAL $2,680,000 $2,794,281 COMPLETE STREETS ADDITIONS ESTIMATE Phase Amount Inflated amount Notes Permitting (PE Phase)$106,806 Design ( PE Phase)$256,333 City/PM / Admin (PE Phase)$64,084 Total PE $427,223 $440,466 per WSDOT inflation rate Additional Design per Amendment 1 $136,450 $136,450 Added work by WSDOT for Bike Crossings * Revised Total PE per Amendment 1 $563,673 $576,916 RW $512,500 $563,752 per WSDOT inflation rate Construction Subtotal $1,410,000 $1,472,040 per WSDOT inflation rate Design Contingency $282,000 $294,408 per WSDOT inflation rate Construction Management $320,407 $334,505 per WSDOT inflation rate Management Reserve $213,612 $223,011 per WSDOT inflation rate Construction Total $2,226,019 $2,323,964 TOTAL $3,302,192 $3,464,632 Total Project PE $865,597 *Additional PE funding not inflated since the ROW $563,752 WSDOT PE work order is active Construction $4,829,564 TOTAL $6,258,913 Exhibit B-1 Exhibit B-1 GCC 1120 Page 1 of 16 Docusign Envelope ID: 7BAE135E-42A0-46C1-9894-C221DF62BED5Docusign Envelope ID: 9366CD0A-4545-40B3-BBD2-0316A707DFEA Supplemental Agreement Number Organization and Address Phone: Original Agreement Number Project Number Execution Date Completion Date Project Title New Maximum Amount Payable Description of Work The Local Agency of desires to supplement the agreement entered in to with and executed on and identified as Agreement No. All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: I Section 1, SCOPE OF WORK, is hereby changed to read: II Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read: III Section V, PAYMENT, shall be amended as follows: as set forth in the attached Exhibit A, and by this reference made a part of this supplement. If you concur with this supplement and agree to the changes as stated above, please sign in the Appropriate spaces below and return to this office for final action. By: By: Consultant Signature Approving Authority Signature Date DOT Form 140-063 Revised 09/2005 Exhibit B-1 GCC 1120 Page 2 of 16 City of Edmonds SCJ Alliance 11/01/2022 LA-10229 WSDOT directed that bike lanes extend through the intersections at 238th St and 240th St rather than ending at pedestrian curb ramps as was originally designed. This change requires a change to the section with corresponding design analysis. This amendment adds additional project management time and design analyses N/A The contract will be increased by $242,157 from $4,389,690 to $4,631,517 Amendment 3 LA-10229 Shea, Carr & Jewell, Inc (dba SCJ Alliance) 8730 Tallon Lane NE, Suite 200 Lacey, WA 98516 N/A 11/01/2022 12/31/2027 Highway 99 Gateway - Revitalization Stage 3 244th St SW to 238th St SW $4,631,517 The objective of the Stage 3 project is to design and construct improvements to Highway 99 from 244th St SW to 238th St SW consistent with the Conceptual Plans developed in the Highway 99 Revitalization Stage 1 planning project and the Highway 99 Revitalization & Gateway Stage 2 construction. The scope of work includes new sidewalks, street lighting, crosswalks, improved storm water management, , targeted utility replacements, landscaping, a new dual left turn pocket at 238th St SW and potential utility undergrounding. Scott Sawyer Mike Rosen Docusign Envelope ID: 7BAE135E-42A0-46C1-9894-C221DF62BED5Docusign Envelope ID: 9366CD0A-4545-40B3-BBD2-0316A707DFEA Exhibit “A” Summary of Payments Basic Agreement Supplement #1 Total Direct Salary Cost Overhead (Including Payroll Additives) Direct Non-Salary Costs Fixed Fee Total DOT Form 140-063 Revised 09/2005 Original + Previous Amendments Amendment 3 Exhibit B-1 GCC 1120 Page 3 of 16 $751,937 $1,160,909 $2,226,872 $249,642 $4,389,360 $74,519 $142,898 $0 $24,740 $242,157 $826,456 $1,303,807 $2,226,872 $274,382 $4,631,517 Docusign Envelope ID: 7BAE135E-42A0-46C1-9894-C221DF62BED5Docusign Envelope ID: 9366CD0A-4545-40B3-BBD2-0316A707DFEA Exhibit A Scope of Work HIGHWAY 99 GATEWAY-REVITALIZATION PROJECT – STAGE 3 244TH STREET SW TO 238TH STREET SW AMENDMENT 3 City of Edmonds, WA Prepared For: Bertrand Hauss, Project Manager, City of Edmonds Prepared By: Scott Sawyer, Project Manager, SCJ Alliance Date Prepared: November 05, 2025 Introduction At the time the original scope of work was prepared, the goal of the Edmonds Highway 99 Gateway Revitalization Stage 3 project was to design and construct improvements to Highway 99 between 244th Street SW and 238th Street SW. These improvements were to be consistent with the Conceptual Plans developed during the Stage 1 planning effort and the Stage 2 construction. The intent was to continue the transformation of Highway 99 through Edmonds, building on the upgrades completed in Shoreline. The project scope included new sidewalks, upgraded street lighting, improved stormwater management, targeted utility replacements, a dual-left turn pocket for northbound traffic at 238th Street SW, potential undergrounding of overhead distribution utilities, and landscaping and streetscape treatments reflecting the unique character of Edmonds. Since then, the project has evolved. WSDOT introduced a Complete Streets element, and the City of Edmonds advanced additional improvements. Amendment 1 added work related to Complete Streets, including preparation of a memo documenting cost allocation to WSDOT. Amendment 2 incorporated further requirements of the Complete Streets mandate, such as wider, accessible side-street crossings that required regrading. More recently, WSDOT directed that bike lanes extend through the intersections at 238th Street SW and 240th Street SW, rather than ending at pedestrian curb ramps as originally designed. To accommodate this, turning and through lanes will be narrowed, resulting in a three-foot curb shift on the east side of the 238th Street SW intersection. This change requires WSDOT approvals and preparation of a new design analysis (Design Analysis 5). Exhibit B-1 GCC 1120 Page 4 of 16 Docusign Envelope ID: 7BAE135E-42A0-46C1-9894-C221DF62BED5Docusign Envelope ID: 9366CD0A-4545-40B3-BBD2-0316A707DFEA Highway 99 Stage 3: Scope of Work- Amendment 3 November 5, 2025 Page 2 of 7 1201 Third Ave, Suite 550  Seattle, WA 98101  Office 206.739.5454  Fax 360.352.1509  scjalliance.com Also, this amendment addresses elements added to the scope of work from the original contract. These include Design Analyses 2, 3, and 4 Finally, this amendment extends project management services from December 31, 2025 to July 31, 2027. The original agreement tied project management to that date or to the advertisement date, whichever came first. As the design schedule has extended beyond initial assumptions, additional budget is needed to continue project management through the remainder of the design phase with the expected advertisement date of July 1, 2027. SCOPE OF WORK Phase 1 Project Management (added work SC38) Task 1 Project Kick-Off meeting (No Change) Task 2 Project Management Plan (No Change) Task 3 Contract Administration (added work SC38) 1) Contract Management (added work SC38). Maintain necessary edits including annual OH updates. 2) Subconsultant Contract Management (added work SC38). Manage subconsultant agreements with subconsultant firms and vendors. Update FAR OH rates annually and ensure COIs and subconsultant agreements stay up to date. Review and approve subconsultant and vendor invoices and track against budgets. 3) Invoice and Progress Reports (added work SC38). Prepare a monthly progress invoice with progress reports attached. Task 4 Schedule (added work SC38) 1) Draft Baseline Schedule (no change). 2) Final Baseline Schedule (no change). 3) Schedule Updates (added work SC38). Prepare schedule updates every 3 months. Task 5 Team and Project Management (added work SC38) 1) Project Management (added work SC38). Manage the project by directing and supervising staff and reviewing work for the duration of the project. This management is for overall work rather than specific tasks. 2) Weekly Status Reports (no change). 3) Bi-Weekly Status Calls (added work SC38). Prepare for and attend bi-weekly meetings with the City’s Project Manager. The meetings will be 1.5 hours in duration and will be attended by two Consultant staff. Assume 40 additional meetings. 4) Bi-Monthly Meetings (no change) Exhibit B-1 GCC 1120 Page 5 of 16 Docusign Envelope ID: 7BAE135E-42A0-46C1-9894-C221DF62BED5Docusign Envelope ID: 9366CD0A-4545-40B3-BBD2-0316A707DFEA Highway 99 Stage 3: Scope of Work- Amendment 3 November 5, 2025 Page 3 of 7 1201 Third Ave, Suite 550  Seattle, WA 98101  Office 206.739.5454  Fax 360.352.1509  scjalliance.com 5) Action Item Tracking (added work SC38) Maintain the action item spreadsheet. 6) Filing and Information Management (added work SC38) Maintain the filing and information management system identified in the original contract. Understanding ¨ The original contract Project Management work ended on December 31, 2025. This amendment extends the work previously identified to July 31, 2027. Deliverables ¨ All deliverables are the same as original contract. Phase 2 Funding and Grant Assistance (No Change) Phase 3 Survey and Basemapping (1AG) (No Change) Phase 4 Potholing (no change) Phase 5 Utility Coordination (no change) Phase 6 Geotechnical Engineering (no change) Phase 7 WSDOT Project Development Approval (added work SC34 and SC37) Task 1 Combined Design Approval-Project Development Approval (no change) Task 2 Basis of Design (added work SC34) 1) Update Basis of Design (added work SC34). Update basis of design for new lane width and bike lane design. Task 3 Design Parameter Checklist (added work SC34) 1) Update Design Parameter Checklist (added work SC34). Update Design Parameter Checklist for new lane width and bike lane design Task 4 Design Analysis (added work SC34 and SC37) 1) Add Design Analysis 5 (added work SC34). Prepare new Design Analysis, Design Analysis 5. This design analysis will cover reducing through lanes to 10.5’ from their previous 11’ to make room for the bike lane through the intersection. 2) Design Analyses 2, 3, and 4 (added work SC37). Prepare new Design Analyses 2, 3, and 4 based on the similar Stage 2 design analyses. Task 5 ADA and MEF Documentation (added work SC34) Exhibit B-1 GCC 1120 Page 6 of 16 Docusign Envelope ID: 7BAE135E-42A0-46C1-9894-C221DF62BED5Docusign Envelope ID: 9366CD0A-4545-40B3-BBD2-0316A707DFEA Highway 99 Stage 3: Scope of Work- Amendment 3 November 5, 2025 Page 4 of 7 1201 Third Ave, Suite 550  Seattle, WA 98101  Office 206.739.5454  Fax 360.352.1509  scjalliance.com 1) Update ADA and MEF documentation (added work SC34). Update ADA and MEF documentation for new lane width and bike lane design Task 6 Vehicle Turning Exhibits and Channelization Plans for Approval (added work SC34) 1) Update vehicle turning exhibits (added work SC34). Update vehicle turning exhibits for new lane width and bike lane design 2) Update Channelization Plan (added work SC34). Update Channelization Plan for new lane width and bike lane design 3) Additional Meetings (added work SC34). Add three additional WSDOT meetings for new design. Add two additional meetings with CT. Task 7 Cost Estimating for Complete Streets vs Original Project Scope (added work SC34) 1) Update Memo. Update memo for new work added by bike crossing. Understanding ¨ Except for the design analyses, the new work will be incorporated into the deliverables already identified in the original scope. Deliverables ¨ Design Analysis 5 via email in PDF format ¨ Design Analysis 2 via email in PDF format ¨ Design Analysis 3 via email in PDF format ¨ Design Analysis 4 via email in PDF format ¨ Updated Complete Streets memo via email in PDF format ¨ All other deliverables are the same as original contract Phase 8 Traffic Analysis (added work SC34) Task 1 Safety Analysis (no change) Task 2 Intersection Control Evaluation (no change) Task 3 Traffic Analysis (added work SC34) 1) Update Traffic Analysis. Review bike signal phasing and effects on queue lengths for new design and prepare a memo summarizing findings. This task includes two meetings with WSDOT. Exhibit B-1 GCC 1120 Page 7 of 16 Docusign Envelope ID: 7BAE135E-42A0-46C1-9894-C221DF62BED5Docusign Envelope ID: 9366CD0A-4545-40B3-BBD2-0316A707DFEA Highway 99 Stage 3: Scope of Work- Amendment 3 November 5, 2025 Page 5 of 7 1201 Third Ave, Suite 550  Seattle, WA 98101  Office 206.739.5454  Fax 360.352.1509  scjalliance.com Understanding ¨ Bike signals are not required. Deliverables ¨ Bike Signal Traffic Operations Tech Memo via email in PDF format Phase 9 Design Management and Meetings (no change) Phase 10 Transportation Design (SCJ) (added work SC34) Task 1 30% Transportation Plans (no change) Task 2 60% Transportation Plans (added work SC34) 1) Roadway Design (added work SC34). Update the following sheets for the updated design ¨ Site Preparation Notes, Plans and Details ¨ Roadway Typical Sections ¨ Paving Notes, Plans, and Details. Includes roadway modeling in AutoCAD. ¨ Curb Ramp Plans ¨ Intersection Grading Plans ¨ Driveway Profiles and Details (9 driveways impacted by shifting the curb line) ¨ Channelization Notes, Plans, and Details ¨ Signing Notes, Plans, Schedules, and Details ¨ Transit Stop and Station Notes, Details and Plans Task 3 90% Transportation Design (no change) Task 4 95% Transportation Design (no change) Task 5 100% Transportation Design (no change) Understanding ¨ The new work will be incorporated into the deliverables identified in the original scope. Deliverables ¨ Same as original contract Phase 11 Traffic and Electrical Design (added work SC34) Task 1 Preliminary Signal, Temporary Signal, and RRFB Plans (added work SC34) Exhibit B-1 GCC 1120 Page 8 of 16 Docusign Envelope ID: 7BAE135E-42A0-46C1-9894-C221DF62BED5Docusign Envelope ID: 9366CD0A-4545-40B3-BBD2-0316A707DFEA Highway 99 Stage 3: Scope of Work- Amendment 3 November 5, 2025 Page 6 of 7 1201 Third Ave, Suite 550  Seattle, WA 98101  Office 206.739.5454  Fax 360.352.1509  scjalliance.com 1) Preliminary Signal Plans (added work SC34). Update the preliminary signal plans at SR 99 and 238th Street SW for the addition of recall at the pedestrian signals and detection loops on the bike lane. Task 2 30% Traffic and Electrical Design (no change) Task 3 60% Traffic and Electrical Design (no change) Task 4 90% Traffic and Electrical Design (no change) Task 5 95% Traffic and Electrical Design (no change) Task 6 100% Traffic and Electrical Design (no change) Understanding ¨ The new work will be incorporated into the deliverables already identified in the original scope. Deliverables ¨ Same as original contract Phase 12 Stormwater Design (OCI) (no change) Phase 13 Water Design (no change) Phase 14 Sanitary Sewer Design (no change) Phase 15 Utility Undergrounding Design (no change) Phase 16 Art, Landscape, and Irrigation Design (no change) Phase 17 Estimate of Probable Cost (SCJ) (no change) Phase 18 Project Manual (no change) Phase 19 Construction Schedule (no change) Phase 20 Quality Assurance and Quality Control (no change) Phase 21 Assistance During Bidding (no change) Phase 22 Public Involvement (no change) Phase 23 NEPA and SEPA Documentation (no change) Phase 24 Permitting (no change) Phase 25 Right of Way Calculations (no change) Exhibit B-1 GCC 1120 Page 9 of 16 Docusign Envelope ID: 7BAE135E-42A0-46C1-9894-C221DF62BED5Docusign Envelope ID: 9366CD0A-4545-40B3-BBD2-0316A707DFEA Highway 99 Stage 3: Scope of Work- Amendment 3 November 5, 2025 Page 7 of 7 1201 Third Ave, Suite 550  Seattle, WA 98101  Office 206.739.5454  Fax 360.352.1509  scjalliance.com Phase 26 Right of Way Plans (no change) Phase 27 Right of Way Acquisition Design Support (no change) Phase 28 Right of Way Acquisition (RESGNW) (no change) Phase 29 Management Reserve (no change) END of SCOPE OF WORK Edmonds_Hwy99_Stg3_amendment 2_v2.docx Exhibit B-1 GCC 1120 Page 10 of 16 Docusign Envelope ID: 7BAE135E-42A0-46C1-9894-C221DF62BED5Docusign Envelope ID: 9366CD0A-4545-40B3-BBD2-0316A707DFEA SCJ Alliance Client: Project: Job #:Template Version: File Name: Stage 3 Amendment 3.xlsm Contract Type: Consultant Fee Determination DIRECT SALARY COST Classification Hours Direct Hourly Rate Amount Principal 104.0 $104.79 $10,898.16 PM2 Project Manager 527.0 $74.98 $39,514.46 Senior Planner 19.0 $73.00 $1,387.00 PM2 Project Manager 16.0 $62.74 $1,003.84 E3 Engineer 180.0 $46.64 $8,395.20 E2 Engineer 292.0 $40.31 $11,770.52 Project Accountant 36.0 $43.05 $1,549.80 Total Direct Salary Cost $74,518.98 OVERHEAD Overhead Rate: 191.76% Direct Salary Cost:$74,518.98 Overhead Cost $142,897.60 FIXED FEE Fixed Fee Rate: 33.20% Direct Salary Cost:$74,518.98 Fixed Fee Cost $24,740.30 TOTAL SALARY COST Total Salary Cost $242,156.88 SUBCONSULTANTS No x Subconsultant Fee Subtotal:$0 $0.00 Q Subconsultant Markup:0%$0.00 REIMBURSABLE EXPENSES Copies, Printing, etc. 0.0% of the Direct Salary Costs $0.00 Mileage 0 miles at $0.700 per mile $0.00 Expenses Subtotal:$0.00 Expenses Markup:0%$0.00 SUBTOTAL (SALARY, SUBCONSULTANTS AND EXPENSES) Subtotal (Salary, Subconsultants and Expenses)$242,156.88 MANAGEMENT RESERVE FUND (MRF) Management Reserve: $0 $0.00 Total Estimated Budget: $242,156.88 Subconsultant Fee Determination Summary - Exhibit E-1 Highway 99 Gateway - Revitilization Stage 3 7/2/202521-000551 LAG Contract City of Edmonds 11/19/2025 Page 1 Exhibit B-1 GCC 1120 Page 11 of 16 Docusign Envelope ID: 7BAE135E-42A0-46C1-9894-C221DF62BED5Docusign Envelope ID: 9366CD0A-4545-40B3-BBD2-0316A707DFEA Subconsultant Labor Hour Estimate SCJ Alliance Client:City of Edmonds Template Version: 7/2/2025 Project:Highway 99 Gateway - Revitilization Stage 3 Contract Type:LAG Contract No. of Sheets: No. of Sheets: 0 N/A Job #:21-000551 No. of Lots: No. of Lots: 0 N/A File Name: Stage 3 Amendment 3.xlsm Totals:105 75 73 63 47 40 43 0 $0.00 Template Version:Scott Sawyer Susann Babaei Ryan Shea George Hilen Andrew Armstrong Danyal Ali Kim Brown Phase & Task No.Principal PM2 Project Manager Senior Planner PM2 Project Manager E3 Engineer E2 Engineer Project Accountant Total Direct Labor Hours & Cost Total Cost PHASE 01 Task 3 1,599.58$ 1 1.0 9.0 10.0 1,599.58$ 2 2.0 18.0 9.0 29.0 6,325.90$ 3 2.0 36.0 18.0 56.0 11,970.75$ Subtotal Hours: 5.0 54.0 0.0 0.0 0.0 0.0 36.0 95.0 19,896.23$ Task 4 5,407.37$ 3 3.0 18.0 21.0 5,407.37$ Subtotal Hours: 3.0 18.0 0.0 0.0 0.0 0.0 0.0 21.0 5,407.37$ Task 5 27,089.71$ 1 8.0 100.0 108.0 27,089.71$ 3 60.0 60.0 120.0 35,050.84$ 5 40.0 40.0 9,746.20$ 6 20.0 20.0 4,873.10$ Subtotal Hours: 68.0 220.0 0.0 0.0 0.0 0.0 0.0 288.0 76,759.84$ Total Phase Hours: 76.0 292.0 0.0 0.0 0.0 0.0 36.0 404.0 404.0 Total Phase Direct Labor: $7,964.04 $21,894.16 $0.00 $0.00 $0.00 $0.00 $1,549.80 $31,408.00 102,063.44$ PHASE 07 Task 2 1,315.15$ 1 1.0 4.0 5.0 1,315.15$ Subtotal Hours: 1.0 4.0 0.0 0.0 0.0 0.0 0.0 5.0 1,315.15$ Task 3 2,040.33$ 1 1.0 2.0 8.0 11.0 2,040.33$ Design Parameter Checklist (added work SC34) Update Design Parameters Checklist Phase & Task Title Schedule Updates PROJECT MANAGEMENT (added work SC38) Team and Project Management (added work SC38) Project Management Contract Administration (added work SC38) Contract Management Schedule (added work SC38) Filing and Information Management Invoice and Progress Reports Subconsultant Contract Management Action Item Tracking Bi-Weekly Status Calls WSDOT PROJECT DEVELOPMENT APPROVAL (added work SC34 and SC37) Basis of Design (added work SC34) Update Basis of Design 1 of 4 11/19/2025 Exhibit B-1 GCC 1120 Page 12 of 16 Docusign Envelope ID: 7BAE135E-42A0-46C1-9894-C221DF62BED5Docusign Envelope ID: 9366CD0A-4545-40B3-BBD2-0316A707DFEA Subconsultant Labor Hour Estimate SCJ Alliance Client:City of Edmonds Template Version: 7/2/2025 Project:Highway 99 Gateway - Revitilization Stage 3 Contract Type:LAG Contract No. of Sheets: No. of Sheets: 0 N/A Job #:21-000551 No. of Lots: No. of Lots: 0 N/A File Name: Stage 3 Amendment 3.xlsm Totals:105 75 73 63 47 40 43 0 $0.00 Template Version:Scott Sawyer Susann Babaei Ryan Shea George Hilen Andrew Armstrong Danyal Ali Kim Brown Phase & Task No.Principal PM2 Project Manager Senior Planner PM2 Project Manager E3 Engineer E2 Engineer Project Accountant Total Direct Labor Hours & Cost Total CostPhase & Task Title Subtotal Hours: 1.0 2.0 0.0 0.0 8.0 0.0 0.0 11.0 2,040.33$ Task 4 46,438.57$ 1 40.0 80.0 120.0 21,871.11$ 2 9.0 36.0 84.0 129.0 24,567.46$ Subtotal Hours: 9.0 76.0 0.0 0.0 164.0 0.0 0.0 265.0 46,438.57$ Task 5 11,087.38$ 1 24.0 40.0 64.0 11,087.38$ Subtotal Hours: 0.0 24.0 0.0 0.0 0.0 40.0 0.0 64.0 11,087.38$ Task 6 14,269.29$ 1 2.0 4.0 6.0 1,011.28$ 2 8.0 40.0 48.0 7,188.90$ 3 5.0 15.0 3.0 23.0 6,069.12$ Subtotal Hours: 5.0 25.0 3.0 0.0 0.0 44.0 0.0 77.0 14,269.29$ Task 7 2,527.64$ 1 1.0 4.0 8.0 13.0 2,527.64$ Subtotal Hours: 1.0 4.0 0.0 0.0 8.0 0.0 0.0 13.0 2,527.64$ Total Phase Hours: 17.0 135.0 3.0 0.0 180.0 84.0 0.0 419.0 419.0$ Total Phase Direct Labor: $1,781.43 $10,122.30 $219.00 $0.00 $8,395.20 $3,386.04 $0.00 $23,903.97 77,678.34$ PHASE 08 Task 3 5,451.20$ 1 2.0 4.0 16.0 22.0 5,451.20$ Subtotal Hours: 2.0 4.0 16.0 0.0 0.0 0.0 0.0 22.0 5,451.20$ Total Phase Hours: 2.0 4.0 16.0 0.0 0.0 0.0 0.0 22.0 22.0$ Cost Estimating for Complete Streets vs Original Project Scope Update Memo ADA and MEF Documetation (added work SC34) Update ADA and MEF Documentation Design Analysis (added work SC34 and SC37) Design Analysis 5 Design Analyses 2-4 Vehicle Turning Exhibits and Channelization Plans for Approval (added work SC34) Update vehicle turning exhibits Update Channelization Plan Additional Meetings Traffic Analysis (added work SC34) Update Traffic Analysis Traffic Analysis (added work SC34) 2 of 4 11/19/2025 Exhibit B-1 GCC 1120 Page 13 of 16 Docusign Envelope ID: 7BAE135E-42A0-46C1-9894-C221DF62BED5Docusign Envelope ID: 9366CD0A-4545-40B3-BBD2-0316A707DFEA Subconsultant Labor Hour Estimate SCJ Alliance Client:City of Edmonds Template Version: 7/2/2025 Project:Highway 99 Gateway - Revitilization Stage 3 Contract Type:LAG Contract No. of Sheets: No. of Sheets: 0 N/A Job #:21-000551 No. of Lots: No. of Lots: 0 N/A File Name: Stage 3 Amendment 3.xlsm Totals:105 75 73 63 47 40 43 0 $0.00 Template Version:Scott Sawyer Susann Babaei Ryan Shea George Hilen Andrew Armstrong Danyal Ali Kim Brown Phase & Task No.Principal PM2 Project Manager Senior Planner PM2 Project Manager E3 Engineer E2 Engineer Project Accountant Total Direct Labor Hours & Cost Total CostPhase & Task Title Total Phase Direct Labor: $209.58 $299.92 $1,168.00 $0.00 $0.00 $0.00 $0.00 $1,677.50 5,451.20$ PHASE 10 Task 02 51,605.96$ 1 1.0 4.0 16.0 21.0 3,411.01$ 2 1.0 4.0 16.0 21.0 3,411.01$ 3 1.0 16.0 40.0 57.0 9,478.66$ 4 1.0 16.0 40.0 57.0 9,478.66$ 5 1.0 8.0 24.0 33.0 5,433.56$ 6 1.0 4.0 16.0 21.0 3,411.01$ 7 1.0 2.0 8.0 11.0 1,875.77$ 8 1.0 2.0 8.0 11.0 1,875.77$ 9 1.0 40.0 24.0 65.0 13,230.52$ Subtotal Hours: 9.0 96.0 0.0 0.0 0.0 192.0 0.0 297.0 51,605.96$ Total Phase Hours: 9.0 96.0 0.0 0.0 0.0 192.0 0.0 297.0 297.0$ Total Phase Direct Labor: $943.11 $7,198.08 $0.00 $0.00 $0.00 $7,739.52 $0.00 $15,880.71 51,605.96$ Phase 11 Task 1 5,357.94$ 1 16.0 16.0 32.0 5,357.94$ Subtotal Hours: 0.0 0.0 0.0 16.0 0.0 16.0 0.0 32.0 5,357.94$ Total Phase Hours: 0.0 0.0 0.0 16.0 0.0 16.0 0.0 32.0 32.0$ Total Phase Direct Labor: $0.00 $0.00 $0.00 $1,003.84 $0.00 $644.96 $0.00 $1,648.80 5,357.94$ Total Hours All Phases 104.0 527.0 19.0 16.0 180.0 292.0 36.0 1,174.0 1174.0 Channelization Notes, Plans, and Details Driveway Profiles and Details Intersection Grading Plans Curb Ramp Plans Transportation Design (added work SC34) 60% Transportation Plans (added work SC34) Site Preparation Notes, Plans, and Details Roadway Typical Sections Paving Notes, Plans and Details Preliminary Signal, Temporary Signal, and RRFB Plans (added work SC34) Update Preliminary Signal Plans Traffic and Electrical Design (added work SC34) Transit Stop and Station Notes, Details and Plans Signing Notes, Plans, Schedules, and Details 3 of 4 11/19/2025 Exhibit B-1 GCC 1120 Page 14 of 16 Docusign Envelope ID: 7BAE135E-42A0-46C1-9894-C221DF62BED5Docusign Envelope ID: 9366CD0A-4545-40B3-BBD2-0316A707DFEA Subconsultant Labor Hour Estimate SCJ Alliance Client:City of Edmonds Template Version: 7/2/2025 Project:Highway 99 Gateway - Revitilization Stage 3 Contract Type:LAG Contract No. of Sheets: No. of Sheets: 0 N/A Job #:21-000551 No. of Lots: No. of Lots: 0 N/A File Name: Stage 3 Amendment 3.xlsm Totals:105 75 73 63 47 40 43 0 $0.00 Template Version:Scott Sawyer Susann Babaei Ryan Shea George Hilen Andrew Armstrong Danyal Ali Kim Brown Phase & Task No.Principal PM2 Project Manager Senior Planner PM2 Project Manager E3 Engineer E2 Engineer Project Accountant Total Direct Labor Hours & Cost Total CostPhase & Task Title Total Direct Labor Estimate All Phases $10,898.16 $39,514.46 $1,387.00 $1,003.84 $8,395.20 $11,770.52 $1,549.80 $74,518.98 242,156.88$ 4 of 4 11/19/2025 Exhibit B-1 GCC 1120 Page 15 of 16 Docusign Envelope ID: 7BAE135E-42A0-46C1-9894-C221DF62BED5Docusign Envelope ID: 9366CD0A-4545-40B3-BBD2-0316A707DFEA Phase Task Total Edmonds WSDOT Notes 1 3 19,896.23$ 15,817.50$ 4,078.73$ Extend Contract 2 Years WSDOT agreed 20.5% for invoices 1 4 5,407.37$ 4,298.86$ 1,108.51$ Extend Contract 2 Years WSDOT agreed 20.5% for invoices 1 5 76,759.84$ 61,024.07$ 15,735.77$ Extend Contract 2 Years WSDOT agreed 20.5% for invoices 7 2 1,315.15$ -$ 1,315.15$ Work due to Bike Crossing 7 3 2,040.33$ -$ 2,040.33$ Work due to Bike Crossing 7 4 $ 46,438.57 $ 24,567.46 $ 21,871.11 Design Analysis 2-4 Missing from Original Contract. Design Analysis 5 is due to Bike Crossing 7 5 11,087.38$ -$ 11,087.38$ Work due to Bike Crossing 7 6 14,269.29$ -$ 14,269.29$ Work due to Bike Crossing 7 7 2,527.64$ -$ 2,527.64$ Work due to Bike Crossing 8 3 5,451.20$ -$ 5,451.20$ Work due to Bike Crossing 10 2 51,605.96$ -$ 51,605.96$ Work due to Bike Crossing 11 1 5,357.94$ -$ 5,357.94$ Work due to Bike Crossing 242,156.90$ 105,707.89$ 136,449.01$ Docusign Envelope ID: 7BAE135E-42A0-46C1-9894-C221DF62BED5Docusign Envelope ID: 9366CD0A-4545-40B3-BBD2-0316A707DFEA