Loading...
2026-06-02 Council Packet Edmonds City Council Agenda June 02, 2026 Posted: 6/1/2026 3:57 PM Page 1 Agenda Edmonds City Council Regular Meeting Council Chambers 250 5TH AVE NORTH, EDMONDS, WA 98020 ZOOM: HTTPS://ZOOM.US/J/95798484261 PHONE: +1 253 215 8782 MEETING ID: 957 9848 4261 JUNE 02, 2026, 6:00 PM 1. CALL TO ORDER / FLAG SALUTE 2. LAND ACKNOWLEDGMENT We acknowledge the original inhabitants of this place, the Sdohobsh (Snohomish) people and their successors the Tulalip Tribes, who since time immemorial have hunted, fished, gathered, and taken care of these lands. We respect their sovereignty, their right to self-determination, and we honor their sacred spiritual connection with the land and water. 3. ROLL CALL 4. APPROVAL OF THE AGENDA 5. PRESENTATION 1. Proclamation for Edmonds Serves Only One Reading Required – Mayor's Office (5 minutes) 2. Mayor’s Finance Update – Mayor’s Office (5 minutes) 6. AUDIENCE COMMENTS This is an opportunity to comment regarding any matter not listed on the agenda as closed record review or as a public hearing. Speakers are limited to three minutes. Please state clearly your name and city of residence. If attending via Zoom, raise a virtual hand to be recognized. If using a phone to dial in, press *9 to raise a hand. When prompted, press *6 to unmute. 7. RECEIVED FOR FILING 1. 2025 Transportation Impact Fee Report 2. PW Q1 Capital Projects Report 8. APPROVAL OF THE CONSENT AGENDA 1. Approval of City Council Meeting Minutes Only One Reading Required Edmonds City Council Agenda June 02, 2026 Posted: 6/1/2026 3:57 PM Page 2 2. Approval of claim checks and wire payment. Only One Reading Required 9. COUNCIL BUSINESS 1. Family Burial Grounds (HB 2239) Third Reading – Planning and Development Services (30 minutes) 2. Adoption of the 2027-2032 6-year Transportation Improvement Program (TIP) Second Reading – Engineering (20 minutes) 10. COUNCIL COMMENTS 11. MAYOR'S COMMENTS ADJOURNMENT For disability accommodations, materials in alternate formats, accessibility information, or language interpretation/ translation needs, please contact the City Clerk at 425-775-2525 at your earliest opportunity. Providing at least 72-hour notice will help ensure availability. City Council Agenda Item 5.1 June 2, 2026 - Regular Meeting TITLE:Proclamation for Edmonds Serves (Only One Reading Required) DEPARTMENT:Mayor's Office PRESENTER:Mayor Rosen NEEDED FROM COUNCIL:Informational RECOMMENDATION:Mayor Rosen will read a proclamation regarding Edmonds Serves. The proclamation will be received by Brian Baird, Founder and Executive Director of the National Museum and Center for Service. BUDGET: Total Dollar Amount:N/A ☐ Approved in Budget Fund(s):N/A ☐ Budget Reallocation Required ☒ No Budget Impact PROBLEM/ISSUE STATEMENT: N/A CONTEXT, ANALYSIS, & ALTERNATIVES: N/A RECOMMENDATION: Mayor Rosen will read a proclamation regarding Edmonds Serves. The proclamation will be received by Brian Baird, Founder and Executive Director of the National Museum and Center for Service. BUDGET IMPACTS: N/A ITEM HISTORY: N/A ADDITIONAL INFORMATION: ATTACHMENTS: Proclamation for Edmonds Serves.   Item 5.1       Packet pg. 3/125   Item 5.1       Packet pg. 4/125 City Council Agenda Item 7.1 June 2, 2026 - Regular Meeting TITLE:2025 Transportation Impact Fee Report (Only One Reading Required) DEPARTMENT:Engineering PRESENTER:Bertrand Hauss NEEDED FROM COUNCIL:Informational RECOMMENDATION:Receive item for filing. BUDGET: Total Dollar Amount:N/A ☐ Approved in Budget Fund(s):N/A ☐ Budget Reallocation Required ☒ No Budget Impact PROBLEM/ISSUE STATEMENT: Annual Transportation Impact Fee Report Update. CONTEXT, ANALYSIS, & ALTERNATIVES: In 2004, the City authorized the collection of Transportation Impact Fees to help pay for transportation projects that are needed to serve new growth and development. Pursuant to Section 3.36.125 of the Edmonds City Code (ECC), Attachment 1 is an accounting of the Transportation Impact Fee Fund for 2025. The City collected a total of $324,959 in transportation impact fees during 2025. These revenues combined with the earned interest of $200,740 and the 2025 beginning fund balance of $3,152,364 resulted in a total available funding of $3,642,938. On the expense side and in accordance with Section 3.36.100 of the ECC, the transportation impact fee fund paid $20,547 for the local match on the 76th Ave. W /220th St. SW Intersection Improvement Project and $14,578 for the Highway 99 Revitalization Stage 4 Project. RECOMMENDATION: Receive item for filing. BUDGET IMPACTS: Move to receive 2025 Transportation Impact Fee Report for filing. ITEM HISTORY: On May 26, 2026, this was presented to Council. ADDITIONAL INFORMATION: ATTACHMENTS: Attachment 1 – Presentation Attachment 2 – Report   Item 7.1       Packet pg. 5/125 2025 Transportation Impact Fee Report May 2026   Item 7.1       Packet pg. 6/125 2025 Fee Summary $3,152,364Beginning Balance $324,959Impact Fees Expenditures ($20,547)76th/220th Intersection Improvements ($14,578)Highway 99 Revitalization – Stage 4 $200,7402025Interest $3,642,938Ending Balance   Item 7.1       Packet pg. 7/125 Transportation Impact Fee History $- $100,000 $200,000 $300,000 $400,000 $500,000 $600,000 $700,000 $800,000 $900,000 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 10-Year History Impact Fees IMPACTFEESYEAR $139,0312016 $372,4812017 $201,3482018 $442,2452019 $805,6482020 $292,7302021 $323,8882022 $323,5732023 $351,6052024 $324,9592025 $3,643,842TOTAL   Item 7.1       Packet pg. 8/125 2025 Transportation Impact Fee Receipts and Funds Transfer Transportation Impact Fee Fund Account Number: 112.22.00.345.3458600.000.345860. 2025 Owner/Applicant Site Address Fund Name Transaction Reference Amount Transferred Cumulative Total Beginning Balance $3,152,363.80 01/10/2025 BLD2024-0235 Subcleff vacant SFR X $6,249.14 8908 189th Pl. SW $3,158,612.94 01/19/2025 BLD2024-1290 Coburn SFR SFR w/ ADU Remodel to create ADU w/in existing SFR X $3,124.57 903 12th Pl. N $3,161,737.51 02/27/2025 BLD2024-1041 Select Homes Inc.vacant SFR X $6,249.14 22216 98th Ave. W $3,167,986.65 02/27/2025 BLD2024-1042 Select Homes Inc.vacant SFR X $6,249.14 22214 98th Ave. W $3,174,235.79 03/10/2025 BLD2022-0996 Wong/Skypiea LLC vacant SFR X $6,249.14 16516 74th Pl. W $3,180,484.93 03/14/2025 BLD2023-0692 Edmonds Greenhills duplex townhome 6 townhome units X $18,227.34 7103 210th St. SW $3,198,712.27 03/31/2025 BLD2024-1571 Bajrovic SFR SFR w/ ADU Remodel to create ADU w/in existing SFR X $3,124.57 22815 76th Ave. W $3,201,836.84 04/30/2025 BLD2025-0329 Complete Vein Care office medical clinic Change of use 3,523 sq. ft. general office to medical clinic X $38,379.66 8129 244th St. SW $3,240,216.50 05/23/2025 BLD2024-1250 DLR Group/New Start Center motel transitional housing Replace 55 room motel with 50 transitional housing units X $18,625.75 22127 Highway 99 $3,258,842.25 05/30/2025 BLD2025-0045 JCR Collective/Stone Court office church Change of use 1,434 sq. ft. general office to church X $2,638.56 22617 76th Ave. W, Unit 101/102 $3,261,480.81 06/03/2025 BLD2024-1676 Austin Sisley SFR SFR w/ DADU Construct DADU Unit A on property w/ existing SFR X $3,124.57 22612 93rd Pl. W, Unit A $3,264,605.38 06/03/2025 BLD2025-0340 Austin Sisley SFR SFR w/ DADU Construct DADU Unit B on property w/ existing SFR X $3,124.57 22612 93rd Pl. W, Unit B $3,267,729.95 06/12/2025 BLD2025-0201 LJB Designs/Great Kids Academy medical office daycare Change of use 5,120 sq. ft. medical office to daycare center X $99,543.78 7935 244th St. SW $3,367,273.73 06/23/2025 BLD2024-1459 Bukowski/Citizen Design Collaborative SFR office Change of use SFR to 674 sq. ft. general office X $6,499.14 304 Daley St. $3,373,772.87 07/07/2025 BLD2024-1369 Magellan Architects/O2 Dontics daycare center medical office Change of use 1,354 sq. ft. daycare to medical office X $19,186.18 8420 196th St. SW $3,392,959.05 07/17/2025 BLD2024-0327 Village Life/Nichols vacant SFR X $6,249.14 17626 Talbot Rd.$3,399,208.19 08/07/2025 BLD2025-0210 Park SFR SFR w/ DADU Construct DADU on property with existing SFR X $3,124.57 22128 95th Pl. W, Unit A $3,402,332.76 08/22/2025 BLD2024-1662 Willowdale LLC SFR SFR w/ DADU Construct DADU Unit A on property w/ existing SFR X $3,124.57 20701 82nd Ave. W, Unit A $3,405,457.33 08/22/2025 BLD2024-1663 Willowdale LLC SFR SFR w/ DADU Construct DADU Unit B on property w/ existing SFR X $3,124.57 20701 82nd Ave. W, Unit B $3,408,581.90 08/28/2025 BLD2024-1600 Landsverk Quality Homes Inc.vacant SFR X $6,249.14 7800 173rd St. SW $3,414,831.04 08/28/2025 BLD2025-0082 Landsverk Quality Homes Inc.vacant SFR X $6,249.14 7925 Cyrus Pl.$3,421,080.18 09/17/2025 BLD2024-0318 Southend Holdings LLC vacant SFR X $6,249.14 738 Sprague St.$3,427,329.32 09/23/2025 BLD2025-0455 Fitchett SFR SFR w/ DADU Construct DADU on property w/ existing SFR X $3,124.57 8419 218th St. SW $3,430,453.89 09/24/2025 BLD2024-0950 Johnson SFR SFR w/ DADU Convert accessory structure to DADU on property w/ existing SFR X $3,124.57 720 Walnut St. $3,433,578.46 09/26/2025 BLD2025-0942 Trolson SFR SFR w/ ADU Convert garage to ADU on property w/ existing SFR X $3,124.57 645 Maple St. $3,436,703.03 09/30/2025 BLD2025-0849 Pine Court Estates vacant SFR X $6,249.14 23708 84th Ave. W $3,442,952.17 10/15/2025 BLD2024-1404 Patel SFR SFR w/ DADU Convert garage to DADU on property w/ existing SFR X $3,124.57 536 Bell St. $3,446,076.74 10/16/2025 BLD2024-0181 Shelley SFR SFR w/ ADU Construct ADU on property w/ existing SFR X $3,124.57 9125 196th St. SW $3,449,201.31 10/21/2025 BLD2025-1010 Pine Court Estates vacant SFR X $6,249.14 23710 84th Ave. W $3,455,450.45 10/24/2025 BLD2025-0441 Oliver SFR SFR w/ DADU DADU on property w/ existing SFR X $3,124.57 553 Seamont Ln. $3,458,575.02 10/29/2025 BLD2025-0685 Select Homes Inc. SFR SFR w/ DADU Construct DADU on property w/ existing SFR X $3,124.57 742 Bell St., Unit A $3,461,699.59 11/14/2025 BLD2025-0613 SMR Edmonds LLC SFR SFR w/ DADU Construct DADU on property w/ existing SFR X $3,124.57 17748 Talbot Rd.$3,464,824.16 12/02/2025 BLD2025-0105 Westgate RE LLC SFR SFR w/ DADU Construct DADU Unit A on property w/ existing SFR X $3,124.57 22706 92nd Ave. W, Unit A $3,467,948.73 12/02/2025 BLD2025-0106 Westgate RE LLC SFR SFR w/ DADU Construct DADU Unit B on property w/ existing SFR X $3,124.57 RECEIPTS TRANSFERS Date Permit Number Previous ITE Land Use New ITE Land Use Notes Fee Collected with Building Permit Fee Amount   Item 7.1       Packet pg. 9/125 2025 Transportation Impact Fee Receipts and Funds Transfer Transportation Impact Fee Fund Account Number: 112.22.00.345.3458600.000.345860. 2025 Owner/Applicant Site Address Fund Name Transaction Reference Amount Transferred Cumulative Total RECEIPTS TRANSFERS Date Permit Number Previous ITE Land Use New ITE Land Use Notes Fee Collected with Building Permit Fee Amount 22706 92nd Ave. W, Unit B $3,471,073.30 12/12/2025 BLD2025-0644 Marshall-Inman SFR SFR w/ DADU Construct DADU Unit A on property w/ existing SFR X $3,124.57 646 Alder St., Unit A $3,474,197.87 12/12/2025 BLD2025-0645 Marshall-Inman SFR SFR w/ DADU Construct DADU Unit B on property w/ existing SFR X $3,124.57 646 Alder St., Unit B $3,477,322.44 112 -$35,124.17 $3,442,198.27 $324,958.64 $200,740.31 $3,642,938.58 to 76th/220th Intersection and Hwy 99 Stg 4 Total Transportation Impact Fess collected in 2025 = Interest Earned 2025 2025 YEAR-END BALANCE=   Item 7.1       Packet pg. 10/125 City Council Agenda Item 7.2 June 2, 2026 - Regular Meeting TITLE:PW Q1 Capital Projects Report (Only One Reading Required) DEPARTMENT:Engineering PRESENTER:Andy Rheaume NEEDED FROM COUNCIL:Informational RECOMMENDATION:Receive for filing. BUDGET: Total Dollar Amount:0 ☐ Approved in Budget Fund(s):N/A ☐ Budget Reallocation Required ☒ No Budget Impact PROBLEM/ISSUE STATEMENT: Council requests quarterly capital projects status updates. CONTEXT, ANALYSIS, & ALTERNATIVES: The attached report contains an individual project page for capital projects active during the first quarter of 2026. RECOMMENDATION: Receive for filing. BUDGET IMPACTS: N/A ITEM HISTORY: Report was initially emailed to City Council in April 2026, but not formally submitted for filing. ADDITIONAL INFORMATION: ATTACHMENTS: Attachment 1 – Capital Projects Report   Item 7.2       Packet pg. 11/125 PROJECT STATUS REPORT PUBLIC WORKS - STORMWATER PWD-01 EDMONDS MARSH WATER QUALITY IMPROVEMENTS (PHASE 1) Est Construction Start Date Q2 2027 Estimated Completion Date Q3 2027 Project Manager Russell Lynch Description The project will be improving water quality of stormwater runoff by replacing existing catch basins along the west side of SR-104 funded via a DOE grant. The catch basins will be replaced with catch basins that include water filter cartridges. Staff proposes this effort in order to provide water quality mitigation for all discharges that directly enter the marsh from these locations. Status WSDOT review of design report is currently in progress. The design consultant is currently working on 90% project design. Expected construction start date has been revised from Spring 2026 to Spring 2027. Ecology grant original expiration date of 12/31/2025 was recently extended to new expiration date of 1/14/2028. ROW Project Initiation Date 8/1/2021 Total Budget $418,000 Total Expenditures $146,825 Remaining Budget $271,175 Budget Available65%   Item 7.2       Packet pg. 12/125 PROJECT STATUS REPORT PUBLIC WORKS - STORMWATER PWD-03 PERRINVILLE CREEK FLOW MANAGEMENT PROJECTS Est Construction Start Date TBD Estimated Completion Date Q3 2027 Project Manager Ryan Hague Description Reducing scouring flows to reduce sediments load in Perrinville Creek was identified in a previous basin report completed in 2015 as a critical element of restoring this creek which has been significantly impacted by urban development. The projects funded by this program are incremental steps toward recovering this stream run as adequate fish habitat. These efforts have become even more critical given recent challenges around the Perrinville Creek outfall area. This program is a fund for implementing projects within the Perrinville Creek basin to reduce scour flows in the creek. It allows staff flexibility to respond to ad-hoc opportunities such as rain garden cluster projects, or ensure matching funds are available for chasing grant applications for flow reductions projects. Status Site selection in progress. ROW Project Initiation Date 8/1/2020 Total Budget $100,000 Total Expenditures $88,695 Remaining Budget $11,306 Budget Available11%   Item 7.2       Packet pg. 13/125 PROJECT STATUS REPORT PUBLIC WORKS - STORMWATER PWD-04 LOWER PERRINVILLE CREEK RESTORATION PROJECT Est Construction Start Date TBD Estimated Completion Date TBD Project Manager Ryan Hague Description The purpose of this project is to improve the environmental health of the creek necessary to support fish habitat, and to restore the storm water capacity. The project consists of the modifications to three structures that currently prevent fish passage and are undersized for the flows on the creek, (1) the culvert at the BNSF track, remove and replace with a fish-friendly culvert or bridge with adequate flow capacity, which will be led and funded by BNSF and the Tulalip Tribes using grant funds, (2) return flow to the creek between the high flow bypass structure and the BNSF culvert by blocking the structure and restoring creek capacity and (3) culvert at Talbot Road, will be removed and replaced with a fish-friendly culvert or bridge that provides adequate fish passage and storm water flow capacity. This project will increase the resiliency of the watershed by building the structures that mimic the natural channel performance necessary for fish habitat and stormwater flow capacity. The project also includes time and effort to research and apply for supplemental/additional funding sources for construction of the Edmonds portions of the work (Items 2 & 3). Due to the project complexity and number of stakeholders, the planning and design phase is estimated to be 2-years. Status Construction easement negotiations with property owners & BNSF in progress. Preliminary stream alignment design in progress, coordination with DFW to extend the HPA for the diversions structure in progress and monitoring various grants and appropriations to apply for to fund the City portion of the project. BNSF/Tribes pursuing RR culvert/bridge separately. ROW Project Initiation Date 6/1/2022 Total Budget $4,500,000 Total Expenditures $363,863 Remaining Budget $4,136,137 Budget Available92%   Item 7.2       Packet pg. 14/125 PROJECT STATUS REPORT PUBLIC WORKS - STORMWATER PWD-05 EDMONDS MARSH WATER QUALITY IMPROVEMENTS (PHASE 2) Est Construction Start Date Q2 2027 Estimated Completion Date Q3 2027 Project Manager Russell Lynch Description The project will be improving water quality of stormwater runoff by replacing existing catch basins along the east side of SR-104 via a state funded appropriation. The catch basins will be replaced with catch basins that include water filter cartridges. Staff proposes this effort in order to provide water quality mitigation for all discharges that directly enter the marsh from these locations. Status WSDOT review of design report is currently in progress. The design consultant is currently working on 90% project design. Expected construction start date has been revised from Spring 2026 to Spring 2027. Ecology grant original expiration date of 12/31/2025 was recently extended to new expiration date of 1/14/2028. ROW Project Initiation Date 1/1/2024 Total Budget $458,000 Total Expenditures $86,178 Remaining Budget $371,822 Budget Available81%   Item 7.2       Packet pg. 15/125 PROJECT STATUS REPORT PUBLIC WORKS - STORMWATER PWD-12 PHASE 5 STORM MAINTENANCE PROJECT (2025) Est Construction Start Date Q2 2026 Estimated Completion Date Q2 2026 Project Manager Russell Lynch Description Annual storm drain replacement project for 2025 construction. Project proposes to replace or rehab storm drain infrastructure in several locations throughout the City. Location of work identified by City crews via first had knowledge or video inspection results. Much of Edmonds stormwater infrastructure is past its lifespan and requires routine replacement or repair in order to preserve the function of the storm drain system. Failure to conduct annual maintenance projects will increase chances of a storm drain system failure. Status Included as part of 2025 Combined CIPP Rehab Project, along with Phase 12 Sewer Replacement Project. Contractor bid price is $285,780. Construction for this work likely to begin in May 2026. ROW Project Initiation Date 12/1/2023 Total Budget $2,011,000 Total Expenditures $222,808 Remaining Budget $1,788,192 Budget Available89%   Item 7.2       Packet pg. 16/125 PROJECT STATUS REPORT PUBLIC WORKS - STORMWATER PWD-13 PHASE 6 STORM MAINTENANCE PROJECT (2026) Est Construction Start Date Q2/3 2026 Estimated Completion Date Q4 2026 Project Manager Russell Lynch Description Annual storm drain replacement project for 2026 construction. Project proposes to replace or rehab storm drain infrastructure in several locations throughout the City. Location of work identified by City crews via first had knowledge or video inspection results. Much of Edmonds stormwater infrastructure is past its lifespan and requires routine replacement or repair in order to preserve the function of the storm drain system. Failure to conduct annual maintenance projects will increase chances of a storm drain system failure. Status Design consultant has submitted 90% project design, review comments have been returned and bid ready package is expected mid-April. ROW Project Initiation Date 11/22/2024 Total Budget $1,318,000 Total Expenditures $370,126 Remaining Budget $947,874 Budget Available72%   Item 7.2       Packet pg. 17/125 PROJECT STATUS REPORT PUBLIC WORKS - STORMWATER PWD-17 STORM AND SURFACE WATER COMPREHENSIVE PLAN Est Construction Start Date N/A Estimated Completion Date Q4 2025 Project Manager Ryan Hague Website https://www.edmondswa.gov/government/departments/public_works_and_utilities/stormwate r_utility_system/storm_surface_water_documents Description The City of Edmonds (City) owns and operates an extensive system of drainage pipes, ditches, and other assets to convey stormwater runoff into streams, lakes, and Puget Sound to prevent and minimize damage to private property, streets, and other infrastructure. The City is faced with the challenge of conveying this runoff safely and cost-effectively while preventing or minimizing the adverse impacts of high flows (erosion, flooding, and sediment deposition) and of stormwater pollutants on water quality and aquatic habitat. In addition, recent state and federal stormwater regulations make it technically and financially challenging to address these issues while balancing utility ratepayer costs. To proactively address these challenges and remain in compliance with the State-mandated National Pollutant Discharge Elimination System Western Washington Phase II Municipal Stormwater Permit (NPDES Phase II permit) and other increasing regulatory requirements, the City is updating its current comprehensive storm and surface water management plan. This permit has and will continue to have a significant impact on the workload and operational budget of both the Engineering Division and the Storm Crews within the Public Works Department. Per the State Department of Ecology, the plan will also include the work findings from their required (Stormwater Management Action Plan) SMAP process of City drainage watersheds. Project will also include recommendations for stormwater utilities rates to be adjusted at the discretion of Council. Status • Initial public engagement process completed. • Draft project goals developed. • Draft capital improvment plan for next seven years develped. • Scoping to finish the Storm Comp Plan in progress. ROW Project Initiation Date 10/1/2016 Total Budget $733,000 Total Expenditures $554,537 Remaining Budget $178,463 Budget Available24%   Item 7.2       Packet pg. 18/125 PROJECT STATUS REPORT PUBLIC WORKS - STORMWATER PWD-22 7317 LAKE BALLINGER WAY FLOODPLAIN PURCHASE & STRUCTURE REMOVAL Est Construction Start Date Q4 2025 Estimated Completion Date Q1 2026 Project Manager Russell Lynch Description The project purchases an existing single family residential property in 2023 located within the Lake Ballinger flood plain. The City secured a $500,000 Department of Ecology grant to aid in this process. The home is the lowest property on the lake and is badly damaged from previous flooding to the point it is generally uninhabitable. The City intends to remove the home and any pollution generating surfaces from the site in 2024 as part of the initial 2023 purchase. The grant has restrictions that prevent this parcel to be used for public use. After demolition of the structures and impervious surfaces, the planned site use would be for public utility benefit only. Because the City storm drain line for SR-104 cuts through in an easement immediately adjacent to this parcel, the City plans to pursue a future project to split appropriate flows from the City storm drain system and provide water quality treatment to the maximum extent feasible. The future project would provide water quality treatment for a very heavily trafficked highway (SR-104) and would make significant improvement in water quality to Lake Ballinger and its downstream course to Lake Washington via McAleer Creek. Status Property was acquired in September 2024. Structure demolition successfully completed in January 2026. Construction closeout for demolition contract in progress. DOE closeout in progress. ROW Project Initiation Date 1/1/2023 Total Budget $940,000 Total Expenditures $788,019 Remaining Budget $151,981 Budget Available16%   Item 7.2       Packet pg. 19/125 PROJECT STATUS REPORT PUBLIC WORKS - STORMWATER PWD-23 PERRINVILLE CREEK BASIN ANALYSIS UPDATE Est Construction Start Date N/A Estimated Completion Date Q1 2025 Project Manager Ryan Hague Website https://tinyurl.com/muyxv3m4 Description City of Edmonds and Lynnwood joint project to supplement/update the Perrinville Creek 2015 basin analysis that determined possible locations for projects that would help decrease the peak storm flows during high rain events. Project will be updated to reflect projects completed and also determine if there are other locations within the basin to aid in the reduction of peak flows in the basin. Status Update to 2015 Perrinville Flow Reduction Study Analysis. RFQ to hire consultant was advertised Q3 2023. Have received notice from DOE that we will be receiving a $469,200 grant that will be available for this projects. Proceeds will be shared with the City of Lynnwood so that this can be reviewed basin wide. Interlocal Agreement being drafted between Lynnwood and Edmonds. Consultant selection complete. Scope and Fee being drafted. ROW Project Initiation Date 12/1/2023 Total Budget $649,200 Total Expenditures $163,743 Remaining Budget $485,457 Budget Available75%   Item 7.2       Packet pg. 20/125 PROJECT STATUS REPORT PUBLIC WORKS - SEWER PWS-02 2027 SANITARY SEWER COMPREHENSIVE PLAN UPDATE Est Construction Start Date N/A Estimated Completion Date Q4 2027 Project Manager Greg Malowicki Description The existing sewer comprehensive plan was last updated in 2013 and is in need of an update. This project would be a comprehensive evaluation of the City’s sewer system, its replacement program and operations, with recommendations for improvements or adjustments and recommended priorities for selecting future capital maintenance projects. Status Consultant Selection is completed, BHC selected for plan update and a scope and fee is being drafted. ROW Project Initiation Date 1/12/2026 Total Budget $500,000 Total Expenditures $4,069 Remaining Budget $495,931 Budget Available99%   Item 7.2       Packet pg. 21/125 PROJECT STATUS REPORT PUBLIC WORKS - SEWER PWS-04 PHASE 12 SEWER REPLACEMENT (2025) Est Construction Start Date Q2 2026 Estimated Completion Date Q2 2026 Project Manager Russell Lynch Description Per the approved 2013 Sewer Comprehensive Plan, the project will replace/rehab pipe and related appurtenances at various locations throughout the City due to old age, being undersized, need to increase capacity, or more prone to breakage due to its material properties. Status Included as part of 2025 Combined CIPP Rehab Project, along with Phase 5 Storm Replacement Project. Contractor bid price is $651,098. Construction for this work likely to begin in April 2026. ROW Project Initiation Date 12/1/2023 Total Budget $2,700,000 Total Expenditures $623,823 Remaining Budget $2,076,177 Budget Available77%   Item 7.2       Packet pg. 22/125 PROJECT STATUS REPORT PUBLIC WORKS - SEWER PWS-05 PHASE 13 SEWER REPLACEMENT (2026) Est Construction Start Date Q2 2026 Estimated Completion Date Q4 2026 Project Manager Russell Lynch Description Per the approved 2013 Sewer Comprehensive Plan, the project will replace/rehab pipe and related appurtenances at various locations throughout the City due to old age, being undersized, need to increase capacity, or more prone to breakage due to its material properties. Status Design consultant has submitted 90% project design. Review comments have been provided and final bid package should be delivered by mid-April. ROW Project Initiation Date 3/10/2025 Total Budget $2,503,000 Total Expenditures $362,337 Remaining Budget $2,140,663 Budget Available86%   Item 7.2       Packet pg. 23/125 PROJECT STATUS REPORT PUBLIC WORKS - SEWER PWS-06 PHASE 14 SEWER REPLACEMENT (2027) Est Construction Start Date Q2 2027 Estimated Completion Date Q4 2027 Project Manager Greg Malowicki Description Per the approved 2013 Sewer Comprehensive Plan, the project will replace pipe and related appurtenances at various locations throughout the City due to old age, being undersized, need to increase capacity, or more prone to breakage due to its material properties. Status Consultant and sites selected, working on PSA for March 2026. ROW Project Initiation Date 1/26/2026 Total Budget $2,603,000 Total Expenditures $21,172 Remaining Budget $2,581,828 Budget Available99%   Item 7.2       Packet pg. 24/125 PROJECT STATUS REPORT PUBLIC WORKS - TRANSPORTATION PWT-01 2025 2025 ANNUAL STREET PRESERVATION PROGRAM Est Construction Start Date 5/6/2025 Estimated Completion Date 12/1/2025 Project Manager Ryan Hague Website https://edmondswa.gov/overlays Description Annual pavement preservation program to maintain City streets. Status 2025 Overlays - Construction is complete and closeout procedures are ongoing ROW Project Initiation Date 2/29/2024 Total Budget $1,648,800 Total Expenditures $1,292,803 Remaining Budget $355,997 Budget Available22%   Item 7.2       Packet pg. 25/125 PROJECT STATUS REPORT PUBLIC WORKS - TRANSPORTATION PWT-01 2025 RAMPS 2025 ANNUAL STREET PRESERVATION PROGRAM - RAMPS Est Construction Start Date 5/6/2025 Estimated Completion Date 12/1/2025 Project Manager Ryan Hague Website https://edmondswa.gov/overlays Description Ramps included in 2025 annual pavement preservation program to maintain City streets. Status Construction is complete and closeout procedures are ongoing. Ramps budget is part of 2025 Overlays budget. ROW Project Initiation Date 1/1/2025 Total Budget $353,000 Total Expenditures $298,152 Remaining Budget $54,848 Budget Available16%   Item 7.2       Packet pg. 26/125 PROJECT STATUS REPORT PUBLIC WORKS - TRANSPORTATION PWT-01 2026 2026 ANNUAL STREET PRESERVATION PROGRAM Est Construction Start Date TBD Estimated Completion Date TBD Project Manager Ryan Hague Website https://edmondswa.gov/overlays Description Annual pavement preservation program to maintain City streets. Status 2026 Overlays - 50% plans have been submitted ROW Project Initiation Date 8/1/2025 Total Budget $681,538 Total Expenditures $63,441 Remaining Budget $618,097 Budget Available91%   Item 7.2       Packet pg. 27/125 PROJECT STATUS REPORT PUBLIC WORKS - TRANSPORTATION PWT-04 MAIN ST OVERLAY FROM 6TH AVE TO 8TH AVE Est Construction Start Date Q4 2024 Estimated Completion Date Q2 2026 Project Manager Jaime Hawkins Website https://edmondswa.gov/overlays Description The project will provide a full-width grind and pavement overlay of Main St from 6th Ave to 8th Ave. This project also includes upgrading all non-compliant ADA pedestrian curb ramps within the project limits, an eastbound bike lane and westbound bike sharrow markings. Status Completion of construction is scheduled for June 2026. Substantial completion was achived in Q4 of 2025. Remaining items consist of Final Federal Documentation, ADA survey, and As-Builts / Records Drawings. ROW Project Initiation Date 1/1/2023 Total Budget $2,740,690 Total Expenditures $1,986,972 Remaining Budget $753,718 Budget Available28%   Item 7.2       Packet pg. 28/125 PROJECT STATUS REPORT PUBLIC WORKS - TRANSPORTATION PWT-10 HWY 99 REVITALIZATION PROJECT - STAGE 3 Est Construction Start Date Q2 2028 Estimated Completion Date Q4 2029 Project Manager Bertrand Hauss Website https://edmondswa.gov/hwy99corridor Description The Stage 3 Highway 99 project limits are from 244th St SW to ~400 feet north of 238th St SW. The project will provide new sidewalk, landscaped planter strips, street lighting, separated bike lanes, ADA compliant pedestrian curb ramps and utility improvements (including undergrounding of overhead utility lines). The project will also widen the intersection of Highway 99 and 238th St SW to provide a second northbound left turn lane and widen 238th St from Highway 99 to 84th Ave for this additional lane and bike lane addition. This project was ranked as HIGH PRIORITY in 2024 Transportation Plan. Status The consultant is currently working on the 60% PS&E (scheduled to be submitted for City review in early Summer 2026). The SEPA document and Phase 1 ESA were completed in May '25 (in order to complete the environmental portion of the project).Phase 2 ESA on NE and NW properies of Hwy 99 @ 238th were recently completed (with no contaminated soils found). The ROW phase will begin once the 60% Design is completed. Stormwater options on on the NW corner property at Hwy 99 @ 238th are currently being evaluated.The channelization plans / Design Analys were recently submitted to WSDOT (following revisions regarding bicycle crosswalk addition and bike lane location in regards to new SWIFT bus stops). Coordination with PUD for the undergrounding portion of the project will soon begin (since curb alignment / stormwater items are nearing final location determination). ROW Project Initiation Date 4/1/2022 Total Budget $28,457,000 Total Expenditures $1,933,342 Remaining Budget $26,523,658 Budget Available93%   Item 7.2       Packet pg. 29/125 PROJECT STATUS REPORT PUBLIC WORKS - TRANSPORTATION PWT-103 7TH AVE N PEDESTRIAN IMPROVEMENTS Est Construction Start Date Q3 2026 Estimated Completion Date Q3 2026 Project Manager Ryan Hague Description Reconstruction of approximately 13 ramps and installation of a raised crosswalk along 7th Ave between Bell St and SR-524 Status Design is complete. Project is expected to go to construction in August after the summer festival season wraps up at Civic Field. ROW Project Initiation Date 2/1/2025 Total Budget $484,180 Total Expenditures $98,117 Remaining Budget $386,063 Budget Available80%   Item 7.2       Packet pg. 30/125 PROJECT STATUS REPORT PUBLIC WORKS - TRANSPORTATION PWT-11 HWY 99 REVITALIZATION PROJECT - STAGE 4 Est Construction Start Date 01 2029 Estimated Completion Date Q4 2030 Project Manager Bertrand Hauss Website https://edmondswa.gov/hwy99corridor Description The Stage 4 Highway 99 project limits are from 224th St SW to ~800 feet north of 220th St SW. The project will provide new sidewalk, landscaped planter strips, street lighting, separated bike lanes, ADA compliant pedestrian curb ramps and utility improvements (including undergrounding of overhead utility lines). The project will also widen the intersection of Highway 99 and 220th St SW to provide a second left turn lane for the northbound, southbound, and westbound movements. A multi-use path will be added on the north side of 220th St SW from Hwy 99 to the Interurban Trail. This project was ranked as HIGH PRIORITY in 2024 Transportation Plan. Status The City reviewed the 30% Design Plans in March 2025. The Final Biological Assessment was submitted to WSDOT in March 2024 (~ 2 year approval process / response scheduled for Spring 2026). The conversion of overhead utility lines to underground was recently added to the project scope of work (following approval from WSDOT). Additional progress on the Design Phase will start again once the BA has been approved. All the environmental documents will need to be completed. The revised Channelization Plan and Design Analysis are currently being reviewed by WSDOT. ROW Project Initiation Date 4/1/2022 Total Budget $37,000,000 Total Expenditures $1,247,750 Remaining Budget $35,752,250 Budget Available97%   Item 7.2       Packet pg. 31/125 PROJECT STATUS REPORT PUBLIC WORKS - TRANSPORTATION PWT-19 76TH AVE W @ 220TH ST SW INTERSECTION IMPROVEMENTS Est Construction Start Date TBD Estimated Completion Date TBD Project Manager Bertrand Hauss Website https://www.edmondswa.gov/government/departments/public_works_and_utilities/76th___ 220th_intersection_improvements_project Description Reconfigure eastbound lanes to a left turn lane and through/ right turn lane. Add eastbound and westbound dedicated left turn lanes with a protected-permitted phase. Provide right turn overlap for westbound movement during southbound left turn phase. Additional improvements include wider sidewalk, bike lanes, street lighting, and various utility improvements (including conversion overhead utility lines to underground). A multi-use path will be added along 220th St SW from 76th Ave W to Hwy 99. This project was ranked as MEDIUM PRIORITY in 2024 Transportation Plan . Status The BA was revised / submitted in Summer 2025 to account for the addition of a Multi-Use path along 220th St. SW from 76th Ave. W to Hwy 99. A response is expected in Fall / Winter 2026. The 60% Stormwater Report andf 60% PS&E were submitted to the City for review in late 2025 by the consultant. Comments will be provided by the City in Spring 2026 (early if possible). In addition, the NEPA documents will be submitted to WSDOT for their review around this same time frame. The conversion of overhead transmission lines to undergound was added to the project scope. No construction funds have been secured for this project. ROW Project Initiation Date 1/1/2018 Total Budget $11,000,000 Total Expenditures $951,205 Remaining Budget $10,048,795 Budget Available91%   Item 7.2       Packet pg. 32/125 PROJECT STATUS REPORT PUBLIC WORKS - TRANSPORTATION PWT-20 SR-104 ADAPTIVE SYSTEM - 236TH TO 226TH Est Construction Start Date TBD Estimated Completion Date TBD Project Manager Bertrand Hauss Description The project will add a traffic signal adaptive system on a 1.25-mile segment of SR104 from 236th St to 226th St. The system will monitor and synchronize the timing of five existing signalized intersections (SR104 @ 236th St, SR104 @ 232nd St, SR104 @ 95th Pl, SR104 @ 100th Ave, SR104 @ 226th St) and improve traffic flows along SR104. This project was identified as MEDIUM PRIORITY in 2024 Transportation Plan. Status The 30% Design City comments were provided to Transpo Group. No Construction grant has yet been secured for the Construction Phase. The consultant has started working on the 60% Design Phase. The project is currently hold until Construction funding is secured. No ROW acquisition phase is needed as part of this project. The City is looking for grant opportunities to funds the construction phase (such as TIB and Infrastructure Bill program). A NHFP grant was submitted in February 2026 and a Regional Mobility grant shortly after. ROW Project Initiation Date 4/1/2022 Total Budget $4,000,000 Total Expenditures $265,179 Remaining Budget $3,734,821 Budget Available93%   Item 7.2       Packet pg. 33/125 PROJECT STATUS REPORT PUBLIC WORKS - TRANSPORTATION PWT-52 TRAFFIC CALMING PROGRAM Est Construction Start Date Q4 2026 Estimated Completion Date Q4 2026 Project Manager Bertrand Hauss Website https://www.edmondswa.gov/government/departments/public_works_and_utilities/transportat ion_system/traffic_calming_program Description Install traffic calming devices along selected stretches throughout the City with speeding issues (through completion of detailed evaluation). This ongoing annual program started in 2015 and is included in the City's 6-year Transportation Improvement Program (TIP) and Capital Improvement Program (CIP). Status The Press Release for the 2026 Traffic Calming Program recently went out (petition forms due early March). As part of the 2025 Traffic Calming Program, speed tables will be installed along OVD from High St to Talbot St. and along Maplewood Dr. from Main St to 200th St. SW. ROW Project Initiation Date 1/1/2026 Total Budget $62,650 Total Expenditures $2,349 Remaining Budget $60,301 Budget Available96%   Item 7.2       Packet pg. 34/125 PROJECT STATUS REPORT PUBLIC WORKS - TRANSPORTATION PWT-59 TRAFFIC SIGNAL PROGRAM Est Construction Start Date Q4 2026 Estimated Completion Date Q4 2026 Project Manager Bertrand Hauss Description This program started in 2019 and provides new signal upgrades, such as vehicle detection at intersections, new vehicle/pedestrian head equipment and other signal-related upgrades. These improvements will improve the safety of the City’s transportation system. Status As part of the 2025 Traffic Signal Program, the Detection System was upgraded at OVD @ 196th to a thermal video detection, The selection as part of 2026 Traffic Signal Program is still being determined. ROW Project Initiation Date 1/1/2026 Total Budget $30,280 Total Expenditures $218 Remaining Budget $30,062 Budget Available99%   Item 7.2       Packet pg. 35/125 PROJECT STATUS REPORT PUBLIC WORKS - TRANSPORTATION PWT-60 PEDESTRIAN SAFETY PROGRAM Est Construction Start Date Q3 2026 Estimated Completion Date Q4 2026 Project Manager Bertrand Hauss Description This program started in 2019 and will provide pedestrian safety improvements, such as additional signage / striping, flashing LED’s around stop signs, or other improvements. These improvements will improve the safety of the City’s transportation system. Status The location(s) where improvements will be completed as part of the 2026 Pedestrian Safety Program are still being determined. The final list with proposed improvements should be known by Summer 2026 and installation completed by the end of 2026. ROW Project Initiation Date 1/1/2026 Total Budget $20,180 Total Expenditures $13,828 Remaining Budget $6,352 Budget Available31%   Item 7.2       Packet pg. 36/125 PROJECT STATUS REPORT PUBLIC WORKS - TRANSPORTATION PWT-61 OLYMPIC VIEW DR OVERLAY - 196TH / SR-524 TO TALBOT RD Est Construction Start Date Q2 2026 Estimated Completion Date Q3 2026 Project Manager Ryan Hague Description Pavement overlay along Olympic View Dr, from 196th St SW / SR-524 to Talbot Road, along with ADA pedestrian curb ramp upgrades. Status Bids open in end of Apr 2026il. Construction should begin in late spring, 2026. ROW Project Initiation Date 1/1/2025 Total Budget $1,500,000 Total Expenditures $73,599 Remaining Budget $1,426,401 Budget Available95%   Item 7.2       Packet pg. 37/125 PROJECT STATUS REPORT PUBLIC WORKS - TRANSPORTATION PWT-68 88TH AVENUE OVERLAY AND SIDEWALK REPAIR Est Construction Start Date Q3 2025 Estimated Completion Date Q2 2026 Project Manager Jaime Hawkins Description This project will resurface 88th Ave and improve the existing asphalt sidewalk on the east side of 88th Ave from 196th St SW to 185th Pl SW in the Seaview neighborhood. All City utilities along this section of 88th Ave have been upgraded in recent years and the street is ready to pave. Curb ramps will be upgraded and portions of the existing sidewalk that are currently in failure will be repaired. Status All Curb ramp work has been completed. Grading and Overlay of 88th Ave. W from 194th St. SW to 185th Pl. SW is pending and scheduled for Q2 2026. ROW Project Initiation Date 3/1/2024 Total Budget $1,180,000 Total Expenditures $526,907 Remaining Budget $653,093 Budget Available55%   Item 7.2       Packet pg. 38/125 PROJECT STATUS REPORT PUBLIC WORKS - TRANSPORTATION PWT-70 SAFETY ACTION PLAN Est Construction Start Date N/A Estimated Completion Date Q2 2026 Project Manager Bertrand Hauss Description A comprehensive safety plan aimed at reducing and eliminating serious-injury and fatal crashes affecting all roadway users. In order to qualify for future Infrastructure Implementation Grant or Planning / Demonstration Grant (through Safe Streets for All / SS4A, the project needs to be identified in this plan. Status Fehr and Peers were selected as the consultant to complete the plan. The DRAFT Plan was recently submitted to the City for review. The 2nd phase of the Public Engagement once all our comments in the DRAFT plan will start of March 9th, 2026 (through March 23rd, 2026). The Plan is scheduled to go in front of Council in April (for final approved along with Vision Statement resolution). This will allow the City to apply for Infrastructure Bill later this year. ROW Project Initiation Date 1/1/2024 Total Budget $375,000 Total Expenditures $235,085 Remaining Budget $139,915 Budget Available37%   Item 7.2       Packet pg. 39/125 PROJECT STATUS REPORT PUBLIC WORKS - TRANSPORTATION PWT-98 CITYWIDE LIGHTING IMPROVEMENTS Est Construction Start Date Q3 2026 Estimated Completion Date Q4 2026 Project Manager Bertrand Hauss Description Install new light poles at key intersections where serious injury collisions have occurred recently. The intersections include 76th Ave W @ Interurban Trail, 8th Ave S @ 14th St SW, 76th Ave W @ 200th St SW, SR-524 @ 9th Ave N, and 84th Ave W @ 236th St SW. Status The lighting analysis at all locations has been completed. Some of the locations can be addressed with PUD luminaire additions. Several locations (not included in initial scope of work) are also being added to the project (in order to maximize the number of intersections for which lighting enhancements will be completed with secured grant). ROW Project Initiation Date 5/1/2025 Total Budget $700,000 Total Expenditures $38,273 Remaining Budget $661,727 Budget Available95%   Item 7.2       Packet pg. 40/125 PROJECT STATUS REPORT PUBLIC WORKS - WATER PWW-04 PHASE 15 WATER REPLACEMENT PROGRAM (2025) Est Construction Start Date Q2 2025 Estimated Completion Date Q4 2025 Project Manager Russell Lynch Description Per the approved 2017 Water Comprehensive Plan, the project will replace/maintain pipe and related appurtenances at various locations throughout the City due to old age, being undersized, need to increase flow or pressure, or more prone to breakage due to its material properties. Status Construction closeout in progress ROW Project Initiation Date 12/1/2023 Total Budget $4,091,000 Total Expenditures $4,056,414 Remaining Budget $34,586 Budget Available1%   Item 7.2       Packet pg. 41/125 PROJECT STATUS REPORT PUBLIC WORKS - WATER PWW-05 PHASE 16 WATER REPLACEMENT PROGRAM (2027) Est Construction Start Date Q2 2027 Estimated Completion Date Q4 2027 Project Manager Russell Lynch Description Per the approved 2017 Water Comprehensive Plan, the project will replace/maintain pipe and related appurtenances at various locations throughout the City due to old age, being undersized, need to increase flow or pressure, or more prone to breakage due to its material properties. Status PSA amendment to increase scope of one site was executed on 3/24/26. Design consultant expects to submit bid ready plans and specifications in July 2026. ROW Project Initiation Date 11/1/2024 Total Budget $3,836,000 Total Expenditures $435,992 Remaining Budget $3,400,008 Budget Available89%   Item 7.2       Packet pg. 42/125 PROJECT STATUS REPORT PUBLIC WORKS - WATER PWW-11 YOST & SEAVIEW RESERVOIR REPAIRS & UPGRADES Est Construction Start Date Q3/4 2026 Estimated Completion Date Q2 2028 Project Manager Russell Lynch Description This work is being done to provide structural upgrades, repair leakages, and upgrades to our two underground potable water storage reservoirs. Preliminary findings completed in early 2023 were used to determine order of magnitude/preliminary costs and next steps for the now planned repairs and upgrades project. The Yost Reservoir report shows that it will need a major structural and seismic retrofit, plus repairs to address leakage from the reservoir. The report for the Seaview Reservoir shows similar issues as the Yost Reservoir, with a less serious leakage issue. Status 90% Design completed and reviewed. Building permit applied for. ROW Project Initiation Date 1/1/2021 Total Budget $9,659,000 Total Expenditures $628,483 Remaining Budget $9,030,517 Budget Available93%   Item 7.2       Packet pg. 43/125 7 4 5 City Council Agenda Item 8.1 June 2, 2026 - Regular Meeting TITLE:Approval of City Council Meeting Minutes (Only One Reading Required) DEPARTMENT:City Clerk's Office PRESENTER:Luke Lonie, City Clerk NEEDED FROM COUNCIL:Action RECOMMENDATION:Approve the minutes of the May 26, 2026 City Council Regular Meeting. BUDGET: Total Dollar Amount:N/A ☐ Approved in Budget Fund(s):N/A ☐ Budget Reallocation Required ☒ No Budget Impact PROBLEM/ISSUE STATEMENT: N/A CONTEXT, ANALYSIS, & ALTERNATIVES: N/A RECOMMENDATION: Approve the minutes of the May 26, 2026 City Council Regular Meeting. BUDGET IMPACTS: N/A ADDITIONAL INFORMATION: ATTACHMENTS: 1. 2026-05-26 Council Meeting Minutes Draft   Item 8.1       Packet pg. 44/125 Edmonds City Council Minutes Regular Meeting May 26, 2026 Page 1 Edmonds City Council Regular Meeting Action Minutes May 26, 2026 ELECTED OFFICIALS PRESENT Mike Rosen, Mayor Michelle Dotsch, Council President Chris Eck, Councilmember Will Chen, Councilmember Erika Barnett, Councilmember Vivian Olson, Councilmember Susan Paine, Councilmember Jenna Nand, Councilmember STAFF PRESENT Mike DeLilla, City Engineer Bertrand Hauss, Transportation Engineer Mike Clugston, Planning and Development Director Jeff Taraday, City Attorney Luke Lonie, City Clerk 1.CALL TO ORDER / FLAG SALUTE The Edmonds City Council meeting was called to order at 6:00 pm by Mayor Rosen in the Council Chambers, 250 5th Avenue North, Edmonds, and virtually. The meeting was opened with the flag salute. 2.LAND ACKNOWLEDGMENT Councilmember Olson read the City Council Land Acknowledgment. 3.ROLL CALL 4.APPROVAL OF THE AGENDA COUNCILMEMBER PAINE MOVED APPROVAL OF THE AGENDA. MOTION CARRIED UNANIMOUSLY. 5.PRESENTATIONS 1.Proclamation for LGBTQ+ Pride Month Only One Reading Required – Mayor's Office (5 minutes) Mayor Rosen proclaimed June 2026 as LGBTQ+ Pride Month. 2.Proclamation for National Gun Safety Awareness Month Only One Reading Required – Mayor's Office (5 minutes)   Item 8.1       Packet pg. 45/125 Edmonds City Council Minutes Regular Meeting May 26, 2026 Page 2 Mayor Rosen proclaimed June 2026 as National Gun Safety Awareness Month. 3.2025 Transportation Impact Fee Report First Reading – Engineering (10 minutes) Mike DeLilla, City Engineer, and Bertrand Hauss, Transportation Engineer, presented on the 2025 Transportation Impact Fees. 4.Mayor’s Finance Update – Mayor’s Office (5 minutes) Mayor Rosen gave an update on the upcoming budget retreat and announced the City will be canceling its Flock contract due to the intent of the federal government to gain access to local Flock cameras. 6.AUDIENCE COMMENTS The following community members provided audience comment: 1. Joan Longstaff – Expressed concern with the quality of the disability housing complex where she lives. 2. Tim Amen – Thanked Council for their attention to the issue at the Lynnwood Wastewater Treatment Plant. 3. Logan Cong – Expressed concern with unfair treatment regarding code enforcement. 4. Joe Scordino – Discussed the graffiti issues in the City of Edmonds and the agreements with Washington State Department of Transportation (WSDOT). 7.RECEIVED FOR FILING 1.Claim for Damages for filing First Reading 2.Cemetery Columbarium Repair Project Only One Reading Required 3.March 2026 Monthly Financial Report Second Reading 4.Outside Boards and Committees Reports Only One Reading Required 8.APPROVAL OF THE CONSENT AGENDA COUNCILMEMBER CHEN MOVED TO APPROVE THE CONSENT AGENDA. MOTION CARRIED UNANIMOUSLY. The agenda items approved are as follows: 1.Approval of City Council Meeting Minutes Only One Reading Required 2.Approval of claim checks and wire payments. Only One Reading Required 3.Approval of payroll and benefit checks, direct deposit and wire payments. Only One Reading Required   Item 8.1       Packet pg. 46/125 Edmonds City Council Minutes Regular Meeting May 26, 2026 Page 3 4.Reappoint Wayne Grotheer for Position #1 to Edmonds Public Facilities District Board Only One Reading Required 5.Ordinance Amending Authorized Employee Positions Second Reading 6.Award of OVD Overlay Construction Contract Second Reading 7.Authorization to purchase (1) 2026 Bobcat PA185V Air Compressor Second Reading 8.Water Quality Control Technician Job Description Revision Second Reading 9.Interlocal Agreement with City of Mukilteo Public Works Second Reading 9.PUBLIC HEARING 1.Public Hearing: 2027-2032 6-year Transportation Improvement Program (TIP) First Reading – Engineering Mike DeLilla, City Engineer, and Bertrand Hauss, Transportation Engineer, presented on the 2026-2032 Transportation Improvement Program. The following community members provided public testimony: 1. Joe Scordino – Suggested that a community survey would have been helpful when developing the Transportation Improvement Plan. Council asked questions and discussed the proposed Transportation Improvement Program further. 10.COUNCIL BUSINESS 1.Family Burial Grounds (HB 2239) Second Reading – Planning and Development Mike Clugston, Planning and Development Director, briefed Council on House Bill 2239 which allows family burial grounds on private property, as well as the options given to cities related to this bill. COUNCILMEMBER OLSON MOVED TO INSTITUTE A SIX-MONTH INTERIM ORDINANCE TO PROHIBIT FAMILY BURIAL GROUNDS IN EDMONDS. THE MOTION CARRIED UNANIMOUSLY 11.COUNCIL COMMENTS Councilmembers commented on various topics.   Item 8.1       Packet pg. 47/125 Edmonds City Council Minutes Regular Meeting May 26, 2026 Page 4 12.MAYOR'S COMMENTS Mayor Rosen provided comments. ADJOURNMENT The meeting was adjourned at 8:01 pm. Luke Lonie, City Clerk   Item 8.1       Packet pg. 48/125 City Council Agenda Item 8.2 June 2, 2026 - Regular Meeting TITLE:Approval of claim checks and wire payment. (Only One Reading Required) DEPARTMENT:Finance PRESENTER:Richard Gould NEEDED FROM COUNCIL:Action RECOMMENDATION:Approval of claim checks and wire payment. BUDGET: Total Dollar Amount:$575,272.07 ☒ Approved in Budget Fund(s):various ☐ Budget Reallocation Required ☐ No Budget Impact PROBLEM/ISSUE STATEMENT: Approval of claim checks #282202 – #282275 dated May 27, 2026 for $565,578.13 and wire payment of $9,693.94. CONTEXT, ANALYSIS, & ALTERNATIVES: The Council President shall be designated as the auditing committee for the city council. The council president shall review the documentation supporting claims paid and review for approval by the city council at its next regular public meeting all checks or warrants issued in payment of any claim, demand or voucher. A list of each claim, demand or voucher approved and each check or warrant issued indicating the check or warrant number, the amount paid and the vendor or payee shall be filed in the city council office for review by individual councilmembers prior to each regularly scheduled public meeting. RECOMMENDATION: Approval of claim checks and wire payment. BUDGET IMPACTS: $575,272.07 ITEM HISTORY: N/A ADDITIONAL INFORMATION: ATTACHMENTS: Attachment #1 – Claim checks dated May 27, 2026   Item 8.2       Packet pg. 49/125   Item 8.2       Packet pg. 50/125   Item 8.2       Packet pg. 51/125   Item 8.2       Packet pg. 52/125   Item 8.2       Packet pg. 53/125   Item 8.2       Packet pg. 54/125   Item 8.2       Packet pg. 55/125   Item 8.2       Packet pg. 56/125   Item 8.2       Packet pg. 57/125   Item 8.2       Packet pg. 58/125   Item 8.2       Packet pg. 59/125   Item 8.2       Packet pg. 60/125   Item 8.2       Packet pg. 61/125 City Council Agenda Item 9.1 June 2, 2026 - Regular Meeting TITLE:Family Burial Grounds (HB 2239) (Third Reading) DEPARTMENT:Planning and Development Services PRESENTER:Mike Clugston NEEDED FROM COUNCIL:Action RECOMMENDATION:Move to set a required public hearing for June 23, 2026 and adopt the interim ordinance in Attachment 4, an ordinance of the City of Edmonds, Washington, establishing an interim regulation to prohibit family burial grounds within the city on a temporary basis. BUDGET: Total Dollar Amount:0 ☐ Approved in Budget Fund(s):0 ☐ Budget Reallocation Required ☒ No Budget Impact PROBLEM/ISSUE STATEMENT: House Bill 2239, passed by the Washington State Legislature in March 2026, amends state laws regarding the disposition of human remains to allow for the creation of family burial grounds on private property. The legislation takes effect on June 11, 2026 and will apply to all jurisdictions in Washington, including the City of Edmonds. CONTEXT, ANALYSIS, & ALTERNATIVES: The following key provisions of HB 2239 apply throughout Washington State: •Family Burial Grounds: By definition, "family burial ground" means an area of privately owned land that is designated for the interment of human remains, and in which interments may be, but are not required to be, restricted to a group of persons who are related to each other by birth, marriage, or adoption. The definition includes mausoleums and columbaria constructed on a family burial ground. •Local Regulation: Cities are authorized to enact ordinances regulating or prohibiting the establishment of family burial grounds. •No Fees Allowed: A property owner may not offer plots at a family burial ground for sale or charge fees in connection with the burials. •Dimensional Minimums: Family burial grounds cannot comprise more than 10% of the parcel on which it is located and must be set back at least 25 feet from any property line, 100 feet from public rights-of-way or access easements, and 150 feet from designated critical areas. •Construction: A mausoleum, columbarium or similar structure must be built to Class A fireproof construction. [In Edmonds, that structure would be considered to be a detached accessory structure with a maximum height of 15 feet.]   Item 9.1       Packet pg. 62/125 •Reporting: Within 30 days of internment, the property owner would have to record the internment with the Snohomish County Auditor as well as the Department of Archeology and Historic Preservation. •Relocation: Remains may be relocated to or from cemeteries and family burial grounds with appropriate permissions. •Disclosure: Before selling a property with a family burial ground, the property owner must inform buyers and disclose the existence of the family burial ground in the seller's disclosure statement. •Remediation: Property owners must remediate, at their own expense, any violations of provisions regarding the construction of structures within the burial ground. On May 26, Council unanimously moved to pursue a six-month pause on family burial grounds in Edmonds to allow for further study prior to adopting permanent regulations later this year. RECOMMENDATION: Move to set a required public hearing for June 23, 2026 and adopt the interim ordinance in Attachment 4, an ordinance of the City of Edmonds, Washington, establishing an interim regulation to prohibit family burial grounds within the city on a temporary basis. BUDGET IMPACTS: None ITEM HISTORY: The topic was introduced to the PSPHSP Committee on May 19, 2026 and to full Council on May 26, 2027. ADDITIONAL INFORMATION: A summary of the bill is included as Attachment 1 while the session law is in Attachment 2. Attachment 3 is a very rough map to give some idea of where family burial grounds might be able to be located in one area of Edmonds using the base dimensional standards in HB 2239, including lack of critical areas. The parcels with red clouds are potentially subdividable while the parcels with blue clouds are not – those parcels are simply large enough to satisfy the dimensional standards. If family burial grounds are allowed in Edmonds, it may make sense to distinguish between subdividable and nonsubdividable parcels since subdividable parcels will certainly be redeveloped in the future. That said, any of the parcels on the map could now host up to two detached accessory dwelling units so further development on all of the parcels on the map could be expected in the future, regardless of whether they are subdividable. While family burial grounds would seem reasonable on larger, rural, parcels such as farms that have been family-owned for generations, it is uncertain why the Legislature also provided for them in more dense urban areas. Council will need to consider whether family burial grounds will restrict future infill housing opportunities and whether that is consistent with the goals, policies and targets for housing in the Comprehensive Plan, including for middle housing and ADUs. ATTACHMENTS: Attachment 1 – Bill Summary HB 2239 (2026) Attachment 2 – Session Law HB 2239 (2026) Attachment 3 – Sample Vicinity Map   Item 9.1       Packet pg. 63/125 Attachment 4 – Draft Interim Ordinance   Item 9.1       Packet pg. 64/125 FINAL BILL REPORT SHB 2239 C 173 L 26 Synopsis as Enacted Brief Description: Providing Washingtonians and their loved ones with location choices for interment of remains. Sponsors: House Committee on Civil Rights & Judiciary (originally sponsored by Representatives Abell, Bernbaum, Chase, Simmons, Walsh, Burnett and Engell). House Committee on Civil Rights & Judiciary Senate Committee on Law & Justice Background: Disposition of Human Remains on Private Land. State law defines "human remains" as the body of a deceased person, in any stage of decomposition, as well as the remains following cremation, alkaline hydrolysis, or natural organic reduction. Disposition of human remains after cremation, alkaline hydrolysis, or natural organic reduction may occur on private lands with the consent of the property owner. Otherwise, it is a misdemeanor to dispose of any human remains in any place except a building dedicated exclusively for religious purposes or a cemetery, such as a burial park for earth interments, a mausoleum for crypt interments, and a columbarium for permanent niche interments. State Law Governing Private Cemeteries. Private cemeteries are governed as "cemetery authorities," meaning entities that either hold a certificate of authority from the Funeral and Cemetery Board (Board) or operate cemeteries that are outside the Board's jurisdiction. In order to operate a private cemetery, an individual or legal entity must form a corporation and obtain a cemetery license from the Board, which administers and enforces state law related to operations of cemeteries. A private cemetery is subject to various requirements related to cemetery property and endowment care fund requirements. This analysis was prepared by non-partisan legislative staff for the use of legislative members in their deliberations. This analysis is not part of the legislation nor does it constitute a statement of legislative intent. SHB 2239- 1 -House Bill Report   Item 9.1       Packet pg. 65/125 Relocation of Human Remains from a Cemetery Plot. Human remains may be removed from a cemetery plot with the consent of the cemetery authority and the written consent of a surviving family member of the decedent in the following order: surviving spouse or state-registered domestic partner; surviving children; surviving parents; and surviving siblings. If the required consent cannot be obtained, permission from the superior court is sufficient. Local Government Regulation of Private Cemeteries. In addition to state law, private cemeteries may be subject to local regulations. Tax Exemptions for Cemeteries. All lands, buildings, and personal property used exclusively for public burial grounds or cemeteries that do not discriminate based on race, color, national origin, or ancestry are exempt from taxation. The Washington State Department of Archaeology and Historic Preservation. The Washington State Department of Archaeology and Historic Preservation (DAHP) is responsible for the study and preservation of the state's archaeological and historical resources. State law requires the DAHP to maintain a centralized database and geographic information systems spatial layer of all known cemeteries and burial sites in Washington. Summary: Establishing a Family Burial Ground. A natural person may designate an area of land the person owns as a "family burial ground," defined as an area of private land designated for the burial of human remains, and in which interment may be, but is not required to be, restricted to a group of persons who are related to each other by birth, marriage, or adoption. "Family burial ground" includes any mausoleums or columbaria constructed on a family burial ground. If a property is co-owned by two or more persons, written consent of all co-owners is required before a family burial ground may be established on the property. A family burial ground may not be established on property co-owned by a combination of natural persons and legal entities. A family burial ground may not comprise more than 10 percent of the parcel and is subject to specified setback requirements. The property owner may not offer plots in the family burial ground for sale or charge fees in connection with the burials. Before selling the property, the property owner must inform buyers and disclose the existence of the family burial ground in the seller's disclosure statement. Mausoleums and Columbaria on a Family Burial Ground. A mausoleum, columbarium, or similar structure constructed on a family burial ground SHB 2239- 2 -House Bill Report   Item 9.1       Packet pg. 66/125 must be constructed with such material and workmanship as to ensure its durability and permanence and must be of class A fireproof construction. A mausoleum, columbarium, or similar structure must also be constructed and installed in compliance with all applicable building permitting laws, public health laws, and laws governing class A construction. A violation of these requirements is a civil infraction. Reporting Interments in a Family Burial Ground. Within 30 days of an interment in the family burial ground, the owner must record the interment with the county auditor and provide specified information about the deceased person and the location of the grave, mausoleum, or columbarium. The property owner must also report each interment to the DAHP. Relocation of Human Remains from a Family Burial Ground. A property owner may relocate human remains from a family burial ground on their property with the written consent of one of the following surviving family members of the decedent, in the order named: surviving spouse or state-registered domestic partner; surviving children; surviving parents; or surviving siblings. The consenting family member has the right to designate another lawful place for disposition of human remains in which the relocated human remains will be reinterred. If the property owner is unable to obtain consent for relocation of remains from a surviving family member, the property owner may petition the superior court for an order authorizing the relocation. In cases where the relocation is authorized by the superior court, the property owner has the right to designate another lawful place in which the relocated remains will be reinterred. However, in designating a place, the property owner must make all reasonable efforts to consult with any surviving family members. Upon obtaining the required consent or court authorization, the property owner must obtain a permit from the DAHP to disinter the human remains from the family burial ground and to reinter the remains in another lawful place. Local Government Regulation of Family Burial Grounds. Cities and counties are authorized to enact ordinances regulating or prohibiting the establishment of family burial grounds. Cities, towns, and counties must prescribe local procedures to ensure the owner of the property on which a family burial ground is located remediates, at the owner's expense, any violation of the provisions governing the construction and installation of mausoleums, columbaria, and similar structures on a family burial ground. Other Provisions. Family burial grounds are included as a lawful place for disposition of human remains, along with cemeteries. Family burial grounds are also exempt from the cemetery licensing requirement and are not subject to the authority of the Board. SHB 2239- 3 -House Bill Report   Item 9.1       Packet pg. 67/125 The tax exemption for public burial grounds and cemeteries does not apply to family burial grounds. Votes on Final Passage: House 96 0 Senate 46 2 (Senate amended) House 96 0 (House concurred) Final Passage Votes Effective:June 11, 2026 January 1, 2027 (Section 20) SHB 2239- 4 -House Bill Report   Item 9.1       Packet pg. 68/125 CERTIFICATION OF ENROLLMENT SUBSTITUTE HOUSE BILL 2239 Chapter 173, Laws of 2026 69th Legislature 2026 Regular Session FAMILY BURIAL GROUNDS EFFECTIVE DATE: June 11, 2026—Except for section 20, which takes effect January 1, 2027. Passed by the House March 12, 2026 Yeas 96 Nays 0 LAURIE JINKINS Speaker of the House of Representatives Passed by the Senate March 6, 2026 Yeas 46 Nays 2 DENNY HECK President of the Senate CERTIFICATE I, Bernard Dean, Chief Clerk of the House of Representatives of the State of Washington, do hereby certify that the attached is SUBSTITUTE HOUSE BILL 2239 as passed by the House of Representatives and the Senate on the dates hereon set forth. BERNARD DEAN Chief Clerk Approved March 24, 2026 10:23 AM FILED March 25, 2026 BOB FERGUSON Governor of the State of Washington Secretary of State State of Washington   Item 9.1       Packet pg. 69/125 AN ACT Relating to recognizing individual and family connectivity 1 with the land by providing Washingtonians and their loved ones with 2 the option to have their remains interred in a family burial ground; 3 amending RCW 7.80.120, 68.04.060, 68.04.080, 68.04.100, 68.05.400, 4 68.20.010, 68.20.140, 68.50.130, and 84.36.020; reenacting and 5 amending RCW 64.06.020; adding a new section to chapter 68.04 RCW; 6 adding a new section to chapter 68.28 RCW; adding a new section to 7 chapter 43.334 RCW; adding a new chapter to Title 68 RCW; creating a 8 new section; prescribing penalties; and providing an effective date.9 BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF WASHINGTON:10 NEW SECTION. Sec. 1. It is the intent of the legislature to 11 enable creation of family burial grounds on privately owned property 12 in order to provide greater flexibility and options for individuals 13 in choosing where to be interred.14 It is further the intent of the legislature to honor and support 15 individual and family connectivity with the land.16 NEW SECTION. Sec. 2. (1) A natural person may designate an area 17 of land owned by the person as a family burial ground.18 SUBSTITUTE HOUSE BILL 2239 AS AMENDED BY THE SENATE Passed Legislature - 2026 Regular Session State of Washington 69th Legislature 2026 Regular Session By House Civil Rights & Judiciary (originally sponsored by Representatives Abell, Bernbaum, Chase, Simmons, Walsh, Burnett, and Engell) READ FIRST TIME 02/04/26. p. 1 SHB 2239.SL   Item 9.1       Packet pg. 70/125 (2) If a property is co-owned by two or more natural persons, a 1 family burial ground may be established on the property only with the 2 3 written consent of all co-owners of the property. (3) A family burial ground may not be established on any property 4 co-owned by a combination of natural persons and legal entities.5 (4) A family burial ground must be set back at least 25 feet from 6 an existing parcel boundary and may not be established:7 (a) Within 150 feet of a designated critical area, as defined in 8 RCW 36.70A.0309 ; (b) Within 100 feet of the property line of a public right-of-way 10 11 or boundary of an easement; or (c) Within 100 feet of an existing well source used for drinking 12 water or 200 feet of an existing spring source used for drinking 13 14 water. (5) A family burial ground may not comprise greater than 10 15 percent of the area of the parcel upon which it is established.16 NEW SECTION. Sec. 3. (1)(a) A mausoleum, columbarium, or 17 similar structure constructed on a family burial ground and used or 18 intended to be used for interments of human remains must comply with 19 the requirements of this section, whether constructed under or above 20 the surface of the earth, where any portion of the building is 21 exposed to view, or, when interment is completed, is less than three 22 feet below the surface of the earth and covered by earth.23 (b) A building on a family burial ground not erected for or not 24 used as a place for interment of human remains which is converted or 25 26 altered to such use is subject to this section. (2) A building or structure constructed on a family burial ground 27 and intended to be used for interment of human remains:28 (a) Must be of class A fireproof construction and constructed 29 with such material and workmanship as to ensure its durability and 30 permanence as dictated and determined by most current mausoleum 31 32 construction and engineering science; and (b) Must be constructed and installed on the family burial ground 33 in compliance with all applicable local building permitting laws, 34 public health laws, and laws governing class A construction.35 (3) Any person who violates this section commits a civil 36 infraction enforceable according to chapter 7.80 RCW and is subject 37 to a monetary penalty of $500. A notice of civil infraction may be 38 issued by a local law enforcement officer or a local public health 39 p. 2 SHB 2239.SL   Item 9.1       Packet pg. 71/125 official if after investigation it has reasonable cause to believe an 1 infraction has been committed. Cities, towns, and counties shall 2 prescribe local procedures to ensure the owner of the property on 3 which the burial ground is located remediates any violation of this 4 5 section at the owner's expense. NEW SECTION. Sec. 4. The owner of the property on which a 6 family burial ground is located may not:7 (1) Offer for sale plots in the family burial ground or space in 8 a mausoleum or columbarium located on the family burial ground; or9 (2) Charge fees for any goods or services provided by the owner 10 in connection with interment of human remains in the family burial 11 12 ground. NEW SECTION. Sec. 5. Within 30 days of each interment in a 13 family burial ground, the owner of the property on which a family 14 burial ground is located shall report the interment to the Washington 15 state department of archaeology and historic preservation and record 16 every interment with the county auditor of the county in which the 17 land is situated. The owner shall report to the department and record 18 19 with the county auditor: (1) The deceased person's name as it appears on the death 20 21 certificate; (2) The deceased person's date of birth as it appears on the 22 23 death certificate; (3) The deceased person's date of death as it appears on the 24 25 death certificate; (4) The name of the owner or owners and the legal description of 26 the property, including the assessor parcel number, where the human 27 28 remains are interred; and (5) The latitude and longitude coordinates of the grave, 29 mausoleum, or columbarium, such as those given by a global 30 positioning system, that are verified by two witnesses or the county 31 coroner, sheriff, or a designee of the county coroner or sheriff.32 NEW SECTION. Sec. 6. Before the sale of the property on which a 33 family burial ground is located, the owner of the property shall 34 disclose to the prospective buyer the existence of the family burial 35 ground and any mausoleums or columbaria erected on the family burial 36 ground.37 p. 3 SHB 2239.SL   Item 9.1       Packet pg. 72/125 NEW SECTION. Sec. 7. (1)(a) The owner of the property on which 1 a family burial ground is located may relocate human remains from the 2 family burial ground with the written consent of one of the following 3 surviving family members, in the order named:4 (i) The surviving spouse or state registered domestic partner of 5 6 the decedent; (ii)7 The surviving children of the decedent; (iii) The surviving parents of the decedent; or8 (iv)9 The surviving siblings of the decedent. (b) The surviving family member who gives consent to relocate 10 human remains from the family burial ground has the right to 11 designate another lawful place for disposition of human remains in 12 which the relocated human remains will be reinterred.13 (2) If the property owner is unable to obtain the required 14 consent from any surviving family member specified in subsection (1) 15 16 of this section: (a) The property owner may petition the superior court of the 17 county in which the family burial ground is situated for an order 18 authorizing the relocation of human remains from the family burial 19 20 ground; and (b) The property owner has the right to designate another lawful 21 place for disposition of human remains in which the relocated human 22 remains will be reinterred. In designating a place to reinter the 23 remains, the property owner shall make all reasonable efforts to 24 consult with any surviving family members of the person whose remains 25 26 will be relocated from the family burial ground. (3) Upon obtaining the required consent or court authorization, 27 the owner of the property must notify the Washington state department 28 of archaeology and historic preservation and obtain a permit from the 29 department to disinter the human remains from the family burial 30 ground and to reinter the human remains in another lawful place for 31 32 disposition of human remains. (4) The owner of the property on which a family burial ground is 33 located is responsible for all costs associated with disinterring 34 human remains from the family burial ground and reinterring the 35 remains in another lawful place for disposition of human remains.36 NEW SECTION. Sec. 8. Cities and counties are authorized to 37 enact ordinances regulating or prohibiting the establishment of 38 family burial grounds or the extension of existing family burial 39 p. 4 SHB 2239.SL   Item 9.1       Packet pg. 73/125 grounds and to give power to local planning commissions to pass upon 1 and make recommendations to local legislative bodies concerning the 2 establishment or extension of family burial grounds.3 Sec. 9. RCW 7.80.120 and 2024 c 286 s 2 are each amended to read 4 as follows:5 (1) A person found to have committed a civil infraction shall be 6 assessed a monetary penalty.7 (a) The maximum penalty and the default amount for a class 1 8 civil infraction shall be $250, not including statutory assessments, 9 except for an infraction of state law involving (i) potentially 10 dangerous litter as specified in RCW 70A.200.060(((4))) (5), in which 11 case the maximum penalty and default amount is $500; ((or)) (ii) a 12 person's refusal to submit to a test or tests pursuant to RCW 13 79A.60.040 and 79A.60.700, in which case the maximum penalty and 14 default amount is $1,000; ((or)) (iii) the misrepresentation of 15 service animals under RCW 49.60.214, in which case the maximum 16 penalty and default amount is $500; ((or)) (iv) untraceable firearms 17 pursuant to RCW 9.41.326 or unfinished frames or receivers pursuant 18 to RCW 9.41.327, in which case the maximum penalty and default amount 19 is $500; ((or)) (v) the failure to report the loss or theft of a 20 firearm under RCW 9.41.368, in which case the maximum penalty and 21 default amount is $1,000; or (vi) unlawful construction of a 22 mausoleum or columbarium on a family burial ground, as provided in 23 section 3 of this act, in which case the penalty is $500;24 (b) The maximum penalty and the default amount for a class 2 25 civil infraction shall be $125, not including statutory assessments;26 (c) The maximum penalty and the default amount for a class 3 27 civil infraction shall be $50, not including statutory assessments; 28 and29 (d) The maximum penalty and the default amount for a class 4 30 civil infraction shall be $25, not including statutory assessments.31 (2) The supreme court shall prescribe by rule the conditions 32 under which local courts may exercise discretion in assessing fines 33 for civil infractions.34 (3) Whenever a monetary penalty is imposed by a court under this 35 chapter it is immediately payable. If the person is unable to pay at 36 that time the court may grant an extension of the period in which the 37 penalty may be paid. If the penalty is not paid on or before the time 38 established for payment, the court may proceed to collect the penalty 39 p. 5 SHB 2239.SL   Item 9.1       Packet pg. 74/125 in the same manner as other civil judgments and may notify the 1 2 prosecuting authority of the failure to pay. (4) The court may also order a person found to have committed a 3 4 civil infraction to make restitution. Sec. 10. RCW 68.04.060 and 1979 c 21 s 2 are each amended to 5 6 read as follows: "Mausoleum" means a structure or building for the entombment of 7 human remains in crypts (1) in a place used, or intended to be used, 8 and dedicated, for cemetery purposes, or (2) on a family burial 9 ground established pursuant to chapter 68.--- RCW (the new chapter 10 created in section 22 of this act)11 . Sec. 11. RCW 68.04.080 and 2019 c 432 s 5 are each amended to 12 13 read as follows: "Columbarium" means a structure, room, or other space in a 14 building or structure containing niches for permanent placement of 15 human remains (1) in a place used, or intended to be used, and 16 dedicated, for cemetery purposes, or (2) on a family burial ground 17 established pursuant to chapter 68.--- RCW (the new chapter created 18 in section 22 of this act)19 . Sec. 12. RCW 68.04.100 and 2005 c 365 s 32 are each amended to 20 21 read as follows: "Interment" means the placement of human remains in a cemetery or 22 family burial ground23 . NEW SECTION. Sec. 13. A new section is added to chapter 68.04 24 RCW25 to read as follows: "Family burial ground" means an area of privately owned land that 26 is designated pursuant to chapter 68.--- RCW (the new chapter created 27 in section 22 of this act) for the interment of human remains, and in 28 which interments may be, but are not required to be, restricted to a 29 group of persons who are related to each other by birth, marriage, or 30 adoption. "Family burial ground" includes any mausoleums or 31 32 columbaria constructed on a family burial ground. Sec. 14. RCW 68.05.400 and 1979 c 21 s 13 are each amended to 33 34 read as follows: p. 6 SHB 2239.SL   Item 9.1       Packet pg. 75/125 The provisions of this chapter do not apply to any of the 1 following:2 (1) Nonprofit cemeteries which are owned or operated by any 3 recognized religious denomination which qualifies for an exemption 4 from real estate taxation under RCW 84.36.020 on any of its churches 5 or the ground upon which any of its churches are or will be built; 6 ((or))7 (2) Any cemetery controlled and operated by a coroner, county, 8 city, town, or cemetery district; or9 (3) A family burial ground established pursuant to chapter 68.--- 10 RCW (the new chapter created in section 22 of this act).11 Sec. 15. RCW 68.20.010 and 1943 c 247 s 42 are each amended to 12 read as follows:13 ((It)) Except as otherwise provided in chapter 68.--- RCW (the 14 new chapter created in section 22 of this act), it is unlawful for 15 any corporation, copartnership, firm, trust, association, or 16 individual to engage in or transact any of the businesses of a 17 cemetery within this state except by means of a corporation duly 18 organized for that purpose.19 Sec. 16. RCW 68.20.140 and 1987 c 331 s 33 are each amended to 20 read as follows:21 (1) This chapter does not apply to any cemetery controlled and 22 operated by a coroner, county, city, town, or cemetery district.23 (2) This chapter does not apply to any family burial ground 24 established pursuant to chapter 68.--- RCW (the new chapter created 25 in section 22 of this act).26 NEW SECTION. Sec. 17. A new section is added to chapter 68.28 27 RCW to read as follows:28 This chapter does not apply to mausoleums and columbaria 29 constructed on a family burial ground established pursuant to chapter 30 68.--- RCW (the new chapter created in section 22 of this act).31 Sec. 18. RCW 68.50.130 and 2019 c 432 s 21 are each amended to 32 read as follows:33 Every person who performs a disposition of any human remains, 34 except as otherwise provided by law, in any place, except in a 35 cemetery, a family burial ground, or a building dedicated exclusively 36 p. 7 SHB 2239.SL   Item 9.1       Packet pg. 76/125 for religious purposes, is guilty of a misdemeanor. Disposition of 1 human remains following cremation, alkaline hydrolysis, or natural 2 organic reduction may also occur on private property, with the 3 consent of the property owner; and on public or government lands or 4 waters with the approval of the government agency that has either 5 jurisdiction or control, or both, of the lands or waters.6 Sec. 19. RCW 84.36.020 and 2022 c 84 s 1 are each amended to 7 read as follows:8 The following real and personal property shall be exempt from 9 taxation:10 (1)(a) All lands, buildings, and personal property required for 11 necessary administration and maintenance, used, or to the extent 12 used, exclusively for public burying grounds or cemeteries without 13 discrimination as to race, color, national origin or ancestry;14 (b) The exemption provided by this subsection (1) does not apply 15 to family burial grounds established pursuant to chapter 68.--- RCW 16 (the new chapter created in section 22 of this act);17 (2)(a) All churches, personal property, and the ground, not 18 exceeding five acres in area, upon which a church of any nonprofit 19 recognized religious denomination is or must be built, together with 20 a parsonage, convent, and buildings and improvements required for the 21 maintenance and safeguarding of such property. The area exempted must 22 in any case include all ground covered by the church, parsonage, 23 convent, and buildings and improvements required for the maintenance 24 and safeguarding of such property and the structures and ground 25 necessary for street access, parking, light, and ventilation, but the 26 area of unoccupied ground exempted in such cases, in connection with 27 church, parsonage, convent, and buildings and improvements required 28 for the maintenance and safeguarding of such property, shall not 29 exceed the equivalent of one hundred twenty by one hundred twenty 30 feet except where additional unoccupied land may be required to 31 conform with state or local codes, zoning, or licensing requirements. 32 The parsonage and convent need not be on land contiguous to the 33 church property. Except as otherwise provided in this subsection, to 34 be exempt the property must be wholly used for church purposes.35 (b) If the rental income or donations, if applicable, are 36 reasonable and do not exceed the maintenance and operation expenses 37 attributable to the portion of the property loaned or rented, the 38 exemption provided by this subsection (2) is not nullified by:39 p. 8 SHB 2239.SL   Item 9.1       Packet pg. 77/125 (i) The loan or rental of property otherwise exempt under this 1 subsection (2) to a nonprofit organization, association, or 2 corporation, or school to conduct an eleemosynary activity;3 (ii) The rental or use of the property by any individual, group, 4 or entity, where such rental or use is not otherwise authorized by 5 this subsection (2), for not more than fifty days in each calendar 6 year, and the property is not used for pecuniary gain or to promote 7 business activities for more than fifteen of the fifty days in each 8 calendar year. The fifty and fifteen-day limitations provided in this 9 subsection (2)(b)(ii) do not include days during which setup and 10 takedown activities take place immediately preceding or following a 11 meeting or other event by an individual, group, or entity using the 12 property as provided in this subsection (2)(b)(ii). The 15-day and 13 50-day limitations provided in this subsection (2)(b)(ii) do not 14 apply to the use of the property for pecuniary gain or for business 15 activities if the property is used for activities related to a 16 qualifying farmers market, as defined in RCW 66.24.170, and all 17 income received from rental or use of the exempt property is used for 18 capital improvements to the exempt property, maintenance and 19 operation of the exempt property, or exempt purposes. The exempt 20 property may be used for up to 53 days for the purposes of a 21 qualifying farmers market; or22 (iii) An inadvertent use of the property in a manner inconsistent 23 with the purpose for which exemption is granted, if the inadvertent 24 use is not part of a pattern of use. A pattern of use is presumed 25 when an inadvertent use is repeated in the same assessment year or in 26 two or more successive assessment years.27 Sec. 20. RCW 64.06.020 and 2021 c 256 s 3 and 2021 c 25 s 1 are 28 each reenacted and amended to read as follows:29 (1) In a transaction for the sale of improved residential real 30 property, the seller shall, unless the buyer has expressly waived the 31 right to receive the disclosure statement under RCW 64.06.010, or 32 unless the transfer is otherwise exempt under RCW 64.06.010, deliver 33 to the buyer a completed seller disclosure statement in the following 34 format and that contains, at a minimum, the following information:35 INSTRUCTIONS TO THE SELLER36 Please complete the following form. Do not leave any spaces blank. If 37 the question clearly does not apply to the property write "NA." If 38 p. 9 SHB 2239.SL   Item 9.1       Packet pg. 78/125 the answer is "yes" to any * items, please explain on attached 1 sheets. Please refer to the line number(s) of the question(s) when 2 you provide your explanation(s). For your protection you must date 3 and sign each page of this disclosure statement and each attachment. 4 Delivery of the disclosure statement must occur not later than five 5 business days, unless otherwise agreed, after mutual acceptance of a 6 written contract to purchase between a buyer and a seller.7 NOTICE TO THE BUYER8 THE FOLLOWING DISCLOSURES ARE MADE BY SELLER ABOUT THE CONDITION OF 9 THE PROPERTY LOCATED AT. . . . . . . . . . . . . . . . . . . . . . . 10 ("THE PROPERTY"), OR AS LEGALLY DESCRIBED ON ATTACHED EXHIBIT A.11 SELLER MAKES THE FOLLOWING DISCLOSURES OF EXISTING MATERIAL FACTS OR 12 MATERIAL DEFECTS TO BUYER BASED ON SELLER'S ACTUAL KNOWLEDGE OF THE 13 PROPERTY AT THE TIME SELLER COMPLETES THIS DISCLOSURE STATEMENT. 14 UNLESS YOU AND SELLER OTHERWISE AGREE IN WRITING, YOU HAVE THREE 15 BUSINESS DAYS FROM THE DAY SELLER OR SELLER'S AGENT DELIVERS THIS 16 DISCLOSURE STATEMENT TO YOU TO RESCIND THE AGREEMENT BY DELIVERING A 17 SEPARATELY SIGNED WRITTEN STATEMENT OF RESCISSION TO SELLER OR 18 SELLER'S AGENT. IF THE SELLER DOES NOT GIVE YOU A COMPLETED 19 DISCLOSURE STATEMENT, THEN YOU MAY WAIVE THE RIGHT TO RESCIND PRIOR 20 TO OR AFTER THE TIME YOU ENTER INTO A SALE AGREEMENT.21 THE FOLLOWING ARE DISCLOSURES MADE BY SELLER AND ARE NOT THE 22 REPRESENTATIONS OF ANY REAL ESTATE LICENSEE OR OTHER PARTY. THIS 23 INFORMATION IS FOR DISCLOSURE ONLY AND IS NOT INTENDED TO BE A PART 24 OF ANY WRITTEN AGREEMENT BETWEEN BUYER AND SELLER.25 FOR A MORE COMPREHENSIVE EXAMINATION OF THE SPECIFIC CONDITION OF 26 THIS PROPERTY YOU ARE ADVISED TO OBTAIN AND PAY FOR THE SERVICES OF 27 QUALIFIED EXPERTS TO INSPECT THE PROPERTY, WHICH MAY INCLUDE, WITHOUT 28 LIMITATION, ARCHITECTS, ENGINEERS, LAND SURVEYORS, PLUMBERS, 29 ELECTRICIANS, ROOFERS, BUILDING INSPECTORS, ON-SITE WASTEWATER 30 TREATMENT INSPECTORS, OR STRUCTURAL PEST INSPECTORS. THE PROSPECTIVE 31 BUYER AND SELLER MAY WISH TO OBTAIN PROFESSIONAL ADVICE OR 32 INSPECTIONS OF THE PROPERTY OR TO PROVIDE APPROPRIATE PROVISIONS IN A 33 CONTRACT BETWEEN THEM WITH RESPECT TO ANY ADVICE, INSPECTION, DEFECTS 34 OR WARRANTIES.35 Seller . . . . is/ . . . . is not occupying the property.36 37 I. SELLER'S DISCLOSURES: p. 10 SHB 2239.SL   Item 9.1       Packet pg. 79/125 1 2 3 *If you answer "Yes" to a question with an asterisk (*), please explain your answer and attach documents, if available and not otherwise publicly recorded. If necessary, use an attached sheet. 4 1. TITLE 5 6 [ ] Yes [ ] No [ ] Don't know A. Do you have legal authority to sell the property? If no, please explain. 7 8 [ ] Yes [ ] No [ ] Don't know *B. Is title to the property subject to any of the following? 9 (1) First right of refusal 10 (2) Option 11 (3) Lease or rental agreement 12 (4) Life estate? 13 14 15 [ ] Yes [ ] No [ ] Don't know *C. Are there any encroachments, boundary agreements, or boundary disputes? 16 17 [ ] Yes [ ] No [ ] Don't know *D. Is there a private road or easement agreement for access to the property? 18 19 20 21 [ ] Yes [ ] No [ ] Don't know *E. Are there any rights-of-way, easements, or access limitations that may affect the Buyer's use of the property? 22 23 24 [ ] Yes [ ] No [ ] Don't know *F. Are there any written agreements for joint maintenance of an easement or right-of-way? 25 26 27 [ ] Yes [ ] No [ ] Don't know *G. Is there any study, survey project, or notice that would adversely affect the property? 28 29 [ ] Yes [ ] No [ ] Don't know *H. Are there any pending or existing assessments against the property? 30 31 32 33 34 [ ] Yes [ ] No [ ] Don't know *I. Are there any zoning violations, nonconforming uses, or any unusual restrictions on the property that would affect future construction or remodeling? 35 36 [ ] Yes [ ] No [ ] Don't know *J. Is there a boundary survey for the property? p. 11 SHB 2239.SL   Item 9.1       Packet pg. 80/125 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 [ ] Yes [ ] No [ ] Don't know *K. Are there any covenants, conditions, or restrictions recorded against the property? NOTICE TO THE BUYER: Covenants or deed restrictions based on race, creed, sexual orientation, or other protected class were voided by RCW 49.60.224 and are unenforceable. Washington law allows for the illegal language to be struck by bringing an action in superior court or by the free recording of a restrictive covenant modification document. Many county auditor websites provide a short form with instructions on this process. 17 2. WATER 18 A. Household Water 19 20 21 22 23 24 25 (1) The source of water for the property is: [ ] Private or publicly owned water system [ ] Private well serving only the subject property . . . . . . *[ ] Other water system 26 27 [ ] Yes [ ] No [ ] Don't know *If shared, are there any written agreements? 28 29 30 31 [ ] Yes [ ] No [ ] Don't know *(2) Is there an easement (recorded or unrecorded) for access to and/or maintenance of the water source? 32 33 [ ] Yes [ ] No [ ] Don't know *(3) Are there any problems or repairs needed? 34 35 36 37 [ ] Yes [ ] No [ ] Don't know (4) During your ownership, has the source provided an adequate year-round supply of potable water? If no, please explain. p. 12 SHB 2239.SL   Item 9.1       Packet pg. 81/125 1 2 3 4 [ ] Yes [ ] No [ ] Don't know *(5) Are there any water treatment systems for the property? If yes, are they [ ] Leased [ ] Owned 5 6 7 8 9 [ ] Yes [ ] No [ ] Don't know *(6) Are there any water rights for the property associated with its domestic water supply, such as a water right permit, certificate, or claim? 10 11 12 13 [ ] Yes [ ] No [ ] Don't know (a) If yes, has the water right permit, certificate, or claim been assigned, transferred, or changed? 14 15 16 17 *(b) If yes, has all or any portion of the water right not been used for five or more successive years? 18 19 20 [ ] Yes [ ] No [ ] Don't know *(7) Are there any defects in the operation of the water system (e.g. pipes, tank, pump, etc.)? 21 B. Irrigation Water 22 23 24 25 [ ] Yes [ ] No [ ] Don't know (1) Are there any irrigation water rights for the property, such as a water right permit, certificate, or claim? 26 27 28 29 [ ] Yes [ ] No [ ] Don't know *(a) If yes, has all or any portion of the water right not been used for five or more successive years? 30 31 32 [ ] Yes [ ] No [ ] Don't know *(b) If so, is the certificate available? (If yes, please attach a copy.) 33 34 35 36 [ ] Yes [ ] No [ ] Don't know *(c) If so, has the water right permit, certificate, or claim been assigned, transferred, or changed? p. 13 SHB 2239.SL   Item 9.1       Packet pg. 82/125 1 2 3 4 5 6 [ ] Yes [ ] No [ ] Don't know *(2) Does the property receive irrigation water from a ditch company, irrigation district, or other entity? If so, please identify the entity that supplies water to the property: 7 C. Outdoor Sprinkler System 8 9 [ ] Yes [ ] No [ ] Don't know (1) Is there an outdoor sprinkler system for the property? 10 11 [ ] Yes [ ] No [ ] Don't know *(2) If yes, are there any defects in the system? 12 13 14 [ ] Yes [ ] No [ ] Don't know *(3) If yes, is the sprinkler system connected to irrigation water? 15 16 3. SEWER/ON-SITE SEWAGE SYSTEM 17 18 19 20 21 22 23 A. The property is served by: [ ] Public sewer system, [ ] On-site sewage system (including pipes, tanks, drainfields, and all other component parts) [ ] Other disposal system, please describe: 24 25 26 27 [ ] Yes [ ] No [ ] Don't know B. If public sewer system service is available to the property, is the house connected to the sewer main? If no, please explain. 28 29 30 31 32 [ ] Yes [ ] No [ ] Don't know *C. Is the property subject to any sewage system fees or charges in addition to those covered in your regularly billed sewer or on-site sewage system maintenance service? 33 34 D. If the property is connected to an on-site sewage system: p. 14 SHB 2239.SL   Item 9.1       Packet pg. 83/125 1 2 3 4 5 [ ] Yes [ ] No [ ] Don't know *(1) Was a permit issued for its construction, and was it approved by the local health department or district following its construction? 6 (2) When was it last pumped? 7 . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 9 10 [ ] Yes [ ] No [ ] Don't know *(3) Are there any defects in the operation of the on-site sewage system? 11 [ ] Don't know (4) When was it last inspected? 12 . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 By whom: . . . . . . . . . . . . . . . . . . 14 15 16 [ ] Don't know (5) For how many bedrooms was the on-site sewage system approved? 17 . . . . . . . . . . . . . . . . . . bedrooms 18 19 20 21 [ ] Yes [ ] No [ ] Don't know E. Are all plumbing fixtures, including laundry drain, connected to the sewer/on-site sewage system? If no, please explain: . . . . . . . . . . . . . . . . . . 22 23 [ ] Yes [ ] No [ ] Don't know *F. Have there been any changes or repairs to the on-site sewage system? 24 25 26 27 28 [ ] Yes [ ] No [ ] Don't know G. Is the on-site sewage system, including the drainfield, located entirely within the boundaries of the property? If no, please explain. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29 30 31 32 33 [ ] Yes [ ] No [ ] Don't know *H. Does the on-site sewage system require monitoring and maintenance services more frequently than once a year? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34 35 36 37 38 NOTICE: IF THIS RESIDENTIAL REAL PROPERTY DISCLOSURE STATEMENT IS BEING COMPLETED FOR NEW CONSTRUCTION WHICH HAS NEVER BEEN OCCUPIED, THE SELLER IS NOT REQUIRED TO COMPLETE THE QUESTIONS LISTED IN ITEM 4. STRUCTURAL OR ITEM 5. SYSTEMS AND FIXTURES p. 15 SHB 2239.SL   Item 9.1       Packet pg. 84/125 1 4. STRUCTURAL 2 3 [ ] Yes [ ] No [ ] Don't know *A. Has the roof leaked within the last five years? 4 5 [ ] Yes [ ] No [ ] Don't know *B. Has the basement flooded or leaked? 6 7 [ ] Yes [ ] No [ ] Don't know *C. Have there been any conversions, additions, or remodeling? 8 9 [ ] Yes [ ] No [ ] Don't know *(1) If yes, were all building permits obtained? 10 11 [ ] Yes [ ] No [ ] Don't know *(2) If yes, were all final inspections obtained? 12 13 [ ] Yes [ ] No [ ] Don't know D. Do you know the age of the house? If yes, year of original construction: 14 15 16 [ ] Yes [ ] No [ ] Don't know *E. Has there been any settling, slippage, or sliding of the property or its improvements? 17 18 19 [ ] Yes [ ] No [ ] Don't know *F. Are there any defects with the following: (If yes, please check applicable items and explain.) 20 □ Foundations □ Decks □ Exterior Walls 21 □ Chimneys □ Interior Walls □ Fire Alarm 22 □ Doors □ Windows □ Patio 23 □ Ceilings □ Slab Floors □ Driveways 24 □ Pools □ Hot Tub □ Sauna 25 □ Sidewalks □ Outbuildings □ Fireplaces 26 □ Garage Floors □ Walkways □ Siding 27 □ Other □ Woodstoves □ Elevators 28 29 □ Incline Elevators □ Stairway Chair Lifts □ Wheelchair Lifts 30 31 32 33 [ ] Yes [ ] No [ ] Don't know *G. Was a structural pest or "whole house" inspection done? If yes, when and by whom was the inspection completed? . . . . . . . . . . . . . . . . . . . . . 34 35 36 [ ] Yes [ ] No [ ] Don't know H. During your ownership, has the property had any wood destroying organism or pest infestation? 37 [ ] Yes [ ] No [ ] Don't know I. Is the attic insulated? p. 16 SHB 2239.SL   Item 9.1       Packet pg. 85/125 1 [ ] Yes [ ] No [ ] Don't know J. Is the basement insulated? 2 5. SYSTEMS AND FIXTURES 3 4 5 6 *A. If any of the following systems or fixtures are included with the transfer, are there any defects? If yes, please explain. 7 8 9 [ ] Yes [ ] No [ ] Don't know Electrical system, including wiring, switches, outlets, and service 10 11 12 [ ] Yes [ ] No [ ] Don't know Plumbing system, including pipes, faucets, fixtures, and toilets 13 [ ] Yes [ ] No [ ] Don't know Hot water tank 14 [ ] Yes [ ] No [ ] Don't know Garbage disposal 15 [ ] Yes [ ] No [ ] Don't know Appliances 16 [ ] Yes [ ] No [ ] Don't know Sump pump 17 [ ] Yes [ ] No [ ] Don't know Heating and cooling systems 18 19 [ ] Yes [ ] No [ ] Don't know Security system [ ] Owned [ ] Leased 20 Other . . . . . . . . . . . . . . . . . . . . . . 21 22 23 24 *B. If any of the following fixtures or property is included with the transfer, are they leased? (If yes, please attach copy of lease.) 25 [ ] Yes [ ] No [ ] Don't know Security system . . . . . . 26 [ ] Yes [ ] No [ ] Don't know Tanks (type): . . . . . . 27 28 [ ] Yes [ ] No [ ] Don't know Satellite dish . . . . . . Other: . . . . . . 29 30 31 *C. Are any of the following kinds of wood burning appliances present at the property? 32 [ ] Yes [ ] No [ ] Don't know (1) Woodstove? 33 [ ] Yes [ ] No [ ] Don't know (2) Fireplace insert? 34 [ ] Yes [ ] No [ ] Don't know (3) Pellet stove? 35 [ ] Yes [ ] No [ ] Don't know (4) Fireplace? p. 17 SHB 2239.SL   Item 9.1       Packet pg. 86/125 1 2 3 4 5 6 7 [ ] Yes [ ] No [ ] Don't know If yes, are all of the (1) woodstoves or (2) fireplace inserts certified by the U.S. Environmental Protection Agency as clean burning appliances to improve air quality and public health? 8 9 10 11 12 [ ] Yes [ ] No [ ] Don't know D. Is the property located within a city, county, or district or within a department of natural resources fire protection zone that provides fire protection services? 13 14 15 16 17 18 [ ] Yes [ ] No [ ] Don't know E. Is the property equipped with carbon monoxide alarms? (Note: Pursuant to RCW 19.27.530, seller must equip the residence with carbon monoxide alarms as required by the state building code.) 19 20 21 22 23 24 25 [ ] Yes [ ] No [ ] Don't know F. Is the property equipped with smoke detection devices? (Note: Pursuant to RCW 43.44.110, if the property is not equipped with at least one smoke detection device, at least one must be provided by the seller.) 26 27 [ ] Yes [ ] No [ ] Don't know G. Does the property currently have internet service? 28 [ ] Don't know Provider . . . . . . 29 30 31 6. HOMEOWNERS' ASSOCIATION/COMMON INTERESTS p. 18 SHB 2239.SL   Item 9.1       Packet pg. 87/125 1 2 3 4 5 6 7 8 9 [ ] Yes [ ] No [ ] Don't know A. Is there a Homeowners' Association? Name of Association and contact information for an officer, director, employee, or other authorized agent, if any, who may provide the association's financial statements, minutes, bylaws, fining policy, and other information that is not publicly available: 10 11 [ ] Yes [ ] No [ ] Don't know B. Are there regular periodic assessments: 12 13 $ . . . per [ ] Month [ ] Year [ ] Other . . . . . . . . . . . . . . . . . . . . . . . 14 15 [ ] Yes [ ] No [ ] Don't know *C. Are there any pending special assessments? 16 17 18 19 20 21 22 [ ] Yes [ ] No [ ] Don't know *D. Are there any shared "common areas" or any joint maintenance agreements (facilities such as walls, fences, landscaping, pools, tennis courts, walkways, or other areas co- owned in undivided interest with others)? 23 7. ENVIRONMENTAL 24 25 26 27 [ ] Yes [ ] No [ ] Don't know *A. Have there been any flooding, standing water, or drainage problems on the property that affect the property or access to the property? 28 29 30 [ ] Yes [ ] No [ ] Don't know *B. Does any part of the property contain fill dirt, waste, or other fill material? 31 32 33 34 [ ] Yes [ ] No [ ] Don't know *C. Is there any material damage to the property from fire, wind, floods, beach movements, earthquake, expansive soils, or landslides? 35 36 37 [ ] Yes [ ] No [ ] Don't know D. Are there any shorelines, wetlands, floodplains, or critical areas on the property? p. 19 SHB 2239.SL   Item 9.1       Packet pg. 88/125 1 2 3 4 5 6 7 [ ] Yes [ ] No [ ] Don't know *E. Are there any substances, materials, or products in or on the property that may be environmental concerns, such as asbestos, formaldehyde, radon gas, lead-based paint, fuel or chemical storage tanks, or contaminated soil or water? 8 9 [ ] Yes [ ] No [ ] Don't know *F. Has the property been used for commercial or industrial purposes? 10 11 [ ] Yes [ ] No [ ] Don't know *G. Is there any soil or groundwater contamination? 12 13 14 15 16 17 [ ] Yes [ ] No [ ] Don't know *H. Are there transmission poles or other electrical utility equipment installed, maintained, or buried on the property that do not provide utility service to the structures on the property? 18 19 [ ] Yes [ ] No [ ] Don't know *I. Has the property been used as a legal or illegal dumping site? 20 21 [ ] Yes [ ] No [ ] Don't know *J. Has the property been used as an illegal drug manufacturing site? 22 23 24 [ ] Yes [ ] No [ ] Don't know *K. Are there any radio towers in the area that cause interference with cellular telephone reception? 25 26 27 [ ] Yes [ ] No [ ] Don't know L. Does the property include a family burial ground, mausoleum, or columbarium? 28 29 8. MANUFACTURED AND MOBILE HOMES 30 31 If the property includes a manufactured or mobile home, 32 33 34 [ ] Yes [ ] No [ ] Don't know *A. Did you make any alterations to the home? If yes, please describe the alterations: . . . . . . . . . . 35 36 [ ] Yes [ ] No [ ] Don't know *B. Did any previous owner make any alterations to the home? p. 20 SHB 2239.SL   Item 9.1       Packet pg. 89/125 1 2 3 [ ] Yes [ ] No [ ] Don't know *C. If alterations were made, were permits or variances for these alterations obtained? 4 5 9. FULL DISCLOSURE BY SELLERS 6 A. Other conditions or defects: 7 8 9 [ ] Yes [ ] No [ ] Don't know *Are there any other existing material defects affecting the property that a prospective buyer should know about? 10 B. Verification: 11 12 13 14 15 16 17 18 19 20 The foregoing answers and attached explanations (if any) are complete and correct to the best of my/our knowledge and I/we have received a copy hereof. I/we authorize all of my/our real estate licensees, if any, to deliver a copy of this disclosure statement to other real estate licensees and all prospective buyers of the property. 21 DATE . . . . . . . . . SELLER . . . . . . . . . . . . SELLER . . . . . . . . . . . . . . . 22 NOTICE TO THE BUYER 23 24 25 26 27 INFORMATION REGARDING REGISTERED SEX OFFENDERS MAY BE OBTAINED FROM LOCAL LAW ENFORCEMENT AGENCIES. THIS NOTICE IS INTENDED ONLY TO INFORM YOU OF WHERE TO OBTAIN THIS INFORMATION AND IS NOT AN INDICATION OF THE PRESENCE OF REGISTERED SEX OFFENDERS. 28 II. BUYER'S ACKNOWLEDGMENT 29 30 31 32 A.Buyer hereby acknowledges that: Buyer has a duty to pay diligent attention to any material defects that are known to Buyer or can be known to Buyer by utilizing diligent attention and observation. 33 34 35 B.The disclosures set forth in this statement and in any amendments to this statement are made only by the Seller and not by any real estate licensee or other party. p. 21 SHB 2239.SL   Item 9.1       Packet pg. 90/125 1 2 3 4 C.Buyer acknowledges that, pursuant to RCW 64.06.050(2), real estate licensees are not liable for inaccurate information provided by Seller, except to the extent that real estate licensees know of such inaccurate information. 5 6 7 D.This information is for disclosure only and is not intended to be a part of the written agreement between the Buyer and Seller. 8 9 10 11 E.Buyer (which term includes all persons signing the "Buyer's acceptance" portion of this disclosure statement below) has received a copy of this Disclosure Statement (including attachments, if any) bearing Seller's signature. DISCLOSURES CONTAINED IN THIS DISCLOSURE STATEMENT ARE PROVIDED BY 12 SELLER BASED ON SELLER'S ACTUAL KNOWLEDGE OF THE PROPERTY AT THE TIME 13 SELLER COMPLETES THIS DISCLOSURE STATEMENT. UNLESS BUYER AND SELLER 14 OTHERWISE AGREE IN WRITING, BUYER SHALL HAVE THREE BUSINESS DAYS FROM 15 THE DAY SELLER OR SELLER'S AGENT DELIVERS THIS DISCLOSURE STATEMENT 16 TO RESCIND THE AGREEMENT BY DELIVERING A SEPARATELY SIGNED WRITTEN 17 STATEMENT OF RESCISSION TO SELLER OR SELLER'S AGENT. YOU MAY WAIVE 18 THE RIGHT TO RESCIND PRIOR TO OR AFTER THE TIME YOU ENTER INTO A SALE 19 AGREEMENT.20 BUYER HEREBY ACKNOWLEDGES RECEIPT OF A COPY OF THIS DISCLOSURE 21 STATEMENT AND ACKNOWLEDGES THAT THE DISCLOSURES MADE HEREIN ARE THOSE 22 OF THE SELLER ONLY, AND NOT OF ANY REAL ESTATE LICENSEE OR OTHER 23 PARTY.24 DATE . . . . . . . BUYER . . . . . . . . . BUYER. . . . . . . . . . 25 (2) If the disclosure statement is being completed for new 26 construction which has never been occupied, the disclosure statement 27 is not required to contain and the seller is not required to complete 28 the questions listed in item 4. Structural or item 5. Systems and 29 Fixtures.30 (3) The seller disclosure statement shall be for disclosure only, 31 and shall not be considered part of any written agreement between the 32 buyer and seller of residential property. The seller disclosure 33 statement shall be only a disclosure made by the seller, and not any 34 real estate licensee involved in the transaction, and shall not be 35 construed as a warranty of any kind by the seller or any real estate 36 licensee involved in the transaction.37 p. 22 SHB 2239.SL   Item 9.1       Packet pg. 91/125 NEW SECTION. Sec. 21. A new section is added to chapter 43.334 1 RCW to read as follows:2 The Washington state department of archaeology and historic 3 preservation shall by rule develop procedures for issuing to a 4 property owner a permit to disinter human remains from a family 5 burial ground established under chapter 68.--- RCW (the new chapter 6 created in section 22 of this act) and reinter the remains in another 7 lawful place for disposition of human remains.8 NEW SECTION. Sec. 22. Sections 2 through 8 of this act 9 constitute a new chapter in Title 68 RCW.10 NEW SECTION. Sec. 23. Section 20 of this act takes effect 11 January 1, 2027.12 Passed by the House March 12, 2026. Passed by the Senate March 6, 2026. Approved by the Governor March 24, 2026. Filed in Office of Secretary of State March 25, 2026. --- END --- p. 23 SHB 2239.SL   Item 9.1       Packet pg. 92/125 <all other values> Interstate Principal Arterial Minor Arterial; Collector Local Street; On Ramp <all other values> 0 1 2 City of Edmonds City of Lynnwood City of Mountlake Terrace Unincorporated King Co; Unincorpo City of Woodway City of Arlington;Cityof Bothell;City  Item 9.1       Packet pg. 93/125 CITY OF EDMONDS, WASHINGTON ORDINANCE NO. AN ORDINANCE OF THE CITY OF EDMONDS, WASHINGTON, ESTABLISHING AN INTERIM REGULATION TO PROHIBIT FAMILY BURIAL GROUNDS WITHIN THE CITY ON A TEMPORARY BASIS WHEREAS, during the 2026 legislative session, the Washington Legislature adopted Substitute House Bill 2239, enacted as Chapter 173, Laws of 2026, relating to family burial grounds on privately owned property; and WHEREAS, SHB 2239 becomes effective on June 11, 2026, and establishes a new statutory framework under which family burial grounds may be established on privately owned property, subject to the requirements and limitations set forth in state law; and WHEREAS, SHB 2239 reflects the Legislature’s intent to provide greater flexibility and options for individuals and families in choosing places of interment and to honor individual and family connectivity with land; and WHEREAS, SHB 2239 also recognizes that local governments may regulate family burial grounds through applicable official controls, and the City Council finds that the City has not yet had adequate time to evaluate whether, where, and under what conditions family burial grounds should be allowed within the City; and WHEREAS, the City’s existing zoning, nuisance, public health, and other regulations were not drafted with family burial grounds in mind and do not presently contain standards specifically addressing the siting, review, operation, maintenance, disclosure, mapping, access, setbacks, buffers, recordkeeping, or long-term protection of family burial grounds; and WHEREAS, the establishment of family burial grounds may raise public welfare issues that differ from ordinary residential or accessory uses; and WHEREAS, the City Council further finds that, absent interim controls, property owners may seek to establish family burial grounds before the City has adopted appropriate permanent regulations, thereby creating vested or established uses that could frustrate or impair the City’s ability to adopt effective local standards; and WHEREAS, the City Council does not intend by this ordinance to reject or preclude the policy choices reflected in SHB 2239, but instead intends to preserve the status quo for a limited period while the City evaluates appropriate local regulations consistent with state law; and WHEREAS, temporary prohibition of new family burial grounds is necessary to allow the City to review SHB 2239, evaluate the City’s existing development regulations, consider potential local standards, and conduct appropriate public process; and   Item 9.1       Packet pg. 94/125 WHEREAS, RCW 36.70A.390 authorizes the City to adopt an interim official control, provided that a public hearing is held within at least sixty days if the control is adopted without a prior public hearing, and further provides that such controls may be effective for up to six months unless extended or renewed as provided by law; and WHEREAS, the City Council finds that an interim official control temporarily prohibiting the establishment, creation, expansion, or use of property as a family burial ground is necessary for the immediate preservation of the public health, safety, and welfare; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF EDMONDS DOES ORDAIN AS FOLLOWS: Section 1. Prohibition of Family Burial Grounds. Section 16.00.030 of the Edmonds Community Development Code, which currently shows as a repealed code section, shall henceforth be entitled “Family burial grounds prohibited” and shall read as follows: “No person may establish, create, expand, or otherwise use their property for a family burial ground, as defined in SHB 2239, within the City.” Section 2. Duration of Interim Regulations. As long as the City holds a public hearing on the interim regulations, the interim regulations shall not terminate until six months after the effective date of this ordinance, unless it is repealed sooner. Section 3. Public Hearing on Interim regulations. Pursuant to RCW 36.70A.390 and RCW 35A.63.220, the City Council shall hold a public hearing on this interim regulation within sixty (60) days of its adoption. In this case, the hearing shall be held on June 23, 2026, unless the city council, by subsequently adopted resolution, provides for a different hearing date. Section 4. Findings of Fact. The city council hereby adopts the recitals above as its findings of fact justifying the adoption of this ordinance. Section 5. Severability. If any section, sentence, clause or phrase of this ordinance should be held to be unconstitutional or unlawful by a court of competent jurisdiction, such   Item 9.1       Packet pg. 95/125 invalidity or unconstitutionality shall not affect the validity or constitutionality of any other section, sentence, clause or phrase of this ordinance. Section 6. Effective Date. This ordinance, being an exercise of a power specifically delegated to the City legislative body, is not subject to referendum and shall take effect five (5) days after passage and publication of an approved summary thereof consisting of the title. APPROVED: MAYOR MIKE ROSEN ATTEST/AUTHENTICATED: CITY CLERK, LUKE LONIE   Item 9.1       Packet pg. 96/125 APPROVED AS TO FORM: OFFICE OF THE CITY ATTORNEY: BY JEFF TARADAY FILED WITH THE CITY CLERK: PASSED BY THE CITY COUNCIL: PUBLISHED: EFFECTIVE DATE: ORDINANCE NO.   Item 9.1       Packet pg. 97/125 1 SUMMARY OF ORDINANCE NO. __________ of the City of Edmonds, Washington On the ____ day of ___________, 2026, the City Council of the City of Edmonds, passed Ordinance No. _____________. A summary of the content of said ordinance, consisting of the title, provides as follows: AN ORDINANCE OF THE CITY OF EDMONDS, WASHINGTON, ESTABLISHING AN INTERIM REGULATION TO PROHIBIT FAMILY BURIAL GROUNDS WITHIN THE CITY ON A TEMPORARY BASIS . The full text of this Ordinance will be mailed upon request. DATED this _____ day of ________________, 2026. CITY CLERK, LUKE LONIE   Item 9.1       Packet pg. 98/125 City Council Agenda Item 9.2 June 2, 2026 - Regular Meeting TITLE:Adoption of the 2027-2032 6-year Transportation Improvement Program (TIP) (Second Reading) DEPARTMENT:Engineering PRESENTER:Mike De Lilla/Bertrand Hauss NEEDED FROM COUNCIL:Action RECOMMENDATION:Move to adopt a resolution of the City Council of the City of Edmonds, Washington, approving and adopting the 2027-2032 Transportation Improvement Program (TIP) and directing filing of the adopted program with the Washington State Department of Transportation. BUDGET: Total Dollar Amount:N/A ☐ Approved in Budget Fund(s):N/A ☐ Budget Reallocation Required ☒ No Budget Impact PROBLEM/ISSUE STATEMENT: RCW 35.77.010 requires each city to annually update and adopt their Transportation Improvement Program (TIP) prior to July 1st. CONTEXT, ANALYSIS, & ALTERNATIVES: The 6-Year Transportation Improvement Program (TIP) is a transportation planning document that identifies funded, partially funded, and unfunded projects that are planned or needed over the next six calendar years. The TIP also identifies the expenditures and secured / reasonably expected revenues for each of the projects included in the TIP. The City practice in preparing the TIP each year has been to keep it financially constrained the first 3 years (2027-2029), but not the last 3 years (2030-2032). This approach ensures that a list of projects, for the first three years, have reasonably expected funding sources and an actionable schedule for the full six years. The last TIP document was completed in 2025. Some of the projects in the TIP are shown as funded through secured or unsecured Federal / State grants, as well as local funds. Due to a shortfall in transportation funding, a number of unsecured State and Federal transportation grants have been programmed to fund projects beginning in 2030. Most transportation grants are competitive, and the success of how many grants are secured in the future will depend on other transportation needs and funding requests in the region. Projects not identified in this document may not be eligible for Federal/State funding. RECOMMENDATION: Move to adopt a resolution of the City Council of the City of Edmonds, Washington, approving and adopting the 2027-2032 Transportation Improvement Program (TIP) and directing filing of the adopted program with the Washington State Department of Transportation. BUDGET IMPACTS:   Item 9.2       Packet pg. 99/125 N/A ITEM HISTORY: May 19, 2026 – this item was presented to the Parks and Public Works Committee. May 26, 2026 – a Public Hearing was held at the regular City Council meeting. ADDITIONAL INFORMATION: ATTACHMENTS: Attachment 1 – TIP Attachment 2 – Resolution Attachment 3 – Presentation   Item 9.2       Packet pg. 100/125 City of Edmonds Six-Year Transportation Improvement Program (2027-2032) Project (2027-2032) Phase(s)Total Cost Preservation/Maintenance Projects1. Annual Street Preservation Grind pavement, overlay, chip seal, microsurfacing, Possible Grant Engineering $1,500,000 (Federal, unsecured)$750,000 $750,000 Program , slurry seal, and curb ramp upgrades && $9,270,000 (Fund 125, Fund 126)$1,545,000 $1,545,000 $1,545,000 $1,545,000 $1,545,000 $1,545,000 Local Funds Construction $6,990,000 (Local, unidentified)$1,165,000 $1,165,000 $1,165,000 $1,165,000 $1,165,000 $1,165,000 2. 76th Ave. W Overlay from Grind pavement, 2" overlay, and curb ramp upgrades Secured Grant Design $750,000 (Federal, secured)$750,000 Hwy 99 to 220th St. SW && $0 (State) Local Funds Construction $355,000 (Local, Fund 125, Fund 126)$150,000 $205,000 3. Olympic View Dr. Overlay from Grind pavement, overlay Secured Grant $11,250 (Federal, secured)$11,250 196th St. SW to Talbot Rd curb ramps uprades, and vaned grates catch basin upgrades &Construction $0 (State) Local Funds $3,750 (Local, Fund 125, Fund 126)$3,750 4. Citywide Signal Upgrade traffic signal elements and Engineering $0 (Federal) Improvements improve technology Local Funds &$0 (State) Construction $180,000 (Local, Fund 126)$30,000 $30,000 $30,000 $30,000 $30,000 $30,000 5. Puget Dr. @ OVD Signal Upgrades Upgrade traffic signal Possible grant Engineering $311,000 (Federal, unsecured)$51,500 $283,000 &&$0 (State) Local Funds Construction $311,000 (Local)$51,500 $283,000 6. 100th Ave. W @ 238th St. SW Rebuild traffic signal system Engineering $0 (Federal) Signal Upgrades with new signal mast arms and Possible Grant &$996,000 (State, unsecured)$180,000 $846,000 new vehicle detection Construction $0 (Local) 7. Main St. @ 3rd Signal Upgrades Upgrade traffic signal Possible grant Engineering $377,000 (Federal, unsecured)$54,000 $216,000 & &$0 (State) Local Funds Construction $147,000 (Local, unidentifiedl)$54,000 $216,000 TOTAL $2,905,000 $3,695,000 $3,490,000 $3,023,000 $5,010,000 $3,172,000 Safety / Capacity Projects8. SR-99 Revitalization Project (from 244th St. SW to 238th St. SW)Installation of planter strip, bike lane, lighting upgrades, utility upgrades (including conversion of Secured Grant, Design, ROW,$0 (Federal) Stage 3 (out of total of 9 Stages along Hwy 99)overhead utility lines to underground), capacity improvements at Hwy 99 @ 238th St SW $0 (Federal, unsecured) (additional northbound left turn lane).WSDOT funds, and $23,799,000 (State, secured)$4,192,000 $10,000,000 $9,607,000 &$0 (State, unsecured) Local Funds Construction $0 (Local) 9. SR-99 Revitalization Project from 224th St. SW to 220th St. SW Installation of planter strip, bike lane, lighting upgrades, utility upgrades (including conversion of Secured Grant Design,$2,646,000 (Federal, secured)$2,646,000 Stage 4 (out of total of 9 Stages of Hwy 99)overhead utility lines to underground), capacity improvements at Hwy 99 @ 220th St SW $29,180,000 (Federal, unsecured)$4,080,000 $13,100,000 $12,000,000 (additional left turn lane for northbound, southbound, and westbound movements)Possible Grant, & ROW, and $0 (State, secured) Local Funds Construction $2,770,000 (Local, Traffic Impact Fees)$2,295,000 $475,000 10. SR-104 ITS Adaptive System Install ITS Adaptive System along SR-104 from Secured Grants,Engineering,$101,000 (Federal, secured)$101,000 236th St. SW to 226th St. SW Possible Grants,$3,681,000 (Federal, unsecured)$3,681,000 & & $44,000 (Local)$44,000 Local Funds Construction $610,000 (Local, unidentified)$610,000 11. 76th Ave. W ITS Adaptive System Install ITS Adaptive System along 76th Ave. W from Possible Grants Engineering,$0 (State) 220th St. SW to 206th St. SW & & $1,635,000 (Federal, unsecured)$245,000 $1,390,000 Local Funds Construction $1,635,000 (Local, unidentified)$245,000 $1,390,000 12. SR-99 Revitalization Project from 220h St. SW to 216th St. SW Installation of planter strip,bike lane, lighting upgrades, utility upgrades (including conversion of Possible Grant $2,318,000 (Federal, unsecured)$515,000 $773,000 $1,030,000 Stage 9 (out of total of 9 Stages along Hwy 99)overhead utility lianes to underground), and signal improvements at Hwy 99 @ 216th St. SW.& Design $0 (State) Local Funds $2,318,000 (Local, unidentified)$515,000 $773,000 $1,030,000 13. SR-99 Revitalization Project from 238th St. SW to 234th St. SW Installation of planter strip,bike lane, lighting upgrades, and utility upgrades (including Possible Grant $515,000 (Federal, unsecured)$515,000 Stage 6 (out of total of 9 Stages along Hwy 99)conversion of overhead utility lines to underground)& Design $0 (State) Local Funds $515,000 (Local, unidentified)$515,000 14. 76th Ave. W @ 220th St. SW Intersection Re-design intersection to reduce intersection delay and Secured Grant,Design, $8,218,000 (Federal, unsecured)$8,218,000 Improvements improve level of service (LOS). Sidewalk widening, bike lane extension and various utility $4,265,000 (Federal,secured)$135,000 $2,100,000 $2,030,000 improvements (including conversion of overhead utility Possible Grant, &ROW, & $520,000 (Local, Fund 421)$10,000 $10,000 $500,000 lines to underground) are also included in the project.$120,000 (Local, Fund 422)$10,000 $10,000 $100,000 Local Funds Construction $1,972,000 (Local, traffic impact fees)$45,000 $328,000 $317,000 $1,282,000 15. 84th Ave. W from 238th St. SW to 220th St. SW Widen roadway to add northbound and southbound left turn lanes at key intersections Possible grant & Design $1,481,000 (Federal, unsecured)$258,000 $450,000 $773,000 (220th St SW and 228th St. SW), bike lanes, and sidewalks. & $0 (State) Local Funds ROW $4,416,000 (Local, unidentified)$773,000 $1,351,000 $2,292,00016. Main St. @ 9th Ave. Installation of traffic signal or mini-roundabout.Possible grant Engineering $750,000 (Federal, unsecured)$124,000 $644,000 && $0 (State) Local Funds Construction $750,000 (Local, Traffic Impact Fees)$124,000 $644,000 17. Westgate / SR-104 @ 100th Ave. W Possible Grants Engineering, $4,750,000 (Federal, unsecured) $500,000 $1,250,000 $3,000,000 & ROW &$0 (State) Intersection Access Management and Bicycle Improvements for both northbound and southbound movements.Local Funds Construction $0 (Local) TOTAL $9,478,000 $17,003,000 $25,054,000 $29,690,000 $8,665,000 $9,155,000 HIGH HIGH MEDIUM MEDIUM 20322027Project Name Purpose Grant Opportunity Source(s)Priority 2028 2029 2030 2031 MEDIUM Provide active transportation safety improvements within proximity to intersection by providing better access n/a n/a n/a n/a n/a n/a n/a HIGH HIGH MEDIUM MEDIUM MEDIUM Page 1   Item 9.2       Packet pg. 101/125 City of Edmonds Six-Year Transportation Improvement Program (2027-2032) Project (2027-2032) Phase(s)Total Cost 20322027Project Name Purpose Grant Opportunity Source(s)Priority 2028 2029 2030 2031 Active Transportation Projects18. Multi-Use path on 9th Ave. N / Caspers St. / Puget Dr. Install multi-use path along 9th Ave. N from 3rd Ave. N to Olympic View Dr.Possible Grant Engineering $9,836,000 (Federal, unsecured)$618,000 $618,000 $8,600,000 from 3rd Ave. N to Olympic View Dr. & ROW, & $0 (State) Local Funds Construction $2,576,000 (Local, unidentified)$618,000 $618,000 $1,340,000 19. Multi-use path on SR-104 from Sunset Ave. to Install multi-use path on SR-104 from Sunset Ave. to 100th Ave. W Possible Grant Engineering $28,510,000 (Federal, unsecured)$1,905,000 $1,905,000 $24,700,000 100th Ave. W & ROW, & $0 (State) Local Funds Construction $720,000 (Local, unidentified)$360,000 $360,000 20. Multi-use path on 212th St. SW from 74th Ave. W Install multi-use path on 212th St. SW from 74th Ave. W to SR-99 Possible Grant Engineering $6,181,000 (Federal, unsecured)$773,000 $464,000 $4,944,000 to SR-99 & ROW, & $0 (State) Local Funds Construction $464,000 (Local, unidentified)$464,000 21. 240th St. SW / 78th Ave. W Walkway Install sidewalk on 240th St. SW / 78th Ave, W from Hwy 99 to 236th St. SW Possible Grant Engineering $0 (Federal) from Hwy 99 to 236th St. SW & &$7,543,000 (State, unsecured)$743,000 $6,800,000 Local Funds Construction $1,071,000 (Local, unidentified)$1,071,000 22. Bike lanes along Main St from Increase roadway width and install eastbound bike lane Possible Grant Engineering $8,246,000 (Federal, unsecured)$773,000 $773,000 $6,700,000 Ferry Terminal to 6th Ave. along Main St from Ferry Terminal to 6th Ave. & &$0 (State) Local Funds Construction $1,546,000 (Local, unidentified)$773,000 $773,000 23. Bike lanes along 9th Ave. N from Main St. to Restripe and install bike lanes on 9th Ave. N from Main St. to Caspers St.Possible Grant Engineering $0 (Federal) Caspers St. & &$866,000 (State, unsecured)$31,000 $835,000 Local Funds Construction $866,000 (Local, unidentified)$31,000 $835,000 24. Bike lanes along Main St. from 9th Ave. to Restripe Main St. from 9th Ave. N to 84th Ave with bike lanes on both sides of the street Possible Grant Engineering $555,000 (Federal, unsecured)$555,000 Five Corners / 84th Ave. N & &$0 (State) Local Funds Construction $87,000 (Local, unidentified)$87,000 25. Bike lanes along 238th St. SW with roadway widening from Increase roadway width and install bike lanes on both sides Possible Grant Engineering $506,000 (Federal, unsecured)$506,000 SR-104 to 84th Ave. W of 238th St .SW from SR-104 to 84th Ave. W. & &$0 (State) Local Funds Construction $79,000 (Local, unidentified)$79,000 26. Bike Lanes along 76th Ave. W from Restripe and install bike lanes along 76th Ave. W from Hwy 99 to 220th St. SW Possible Grant Engineering $109,000 (Federal, unsecured)$16,000 $93,000 Hwy 99 to 220th St. SW & &$0 (State) Local Funds Construction $21,200 (Local, unidentified)$15,000 $6,200 27. Maplewood Walkway from Main St. to Install sidewalk on Maplewood St. from Main St. to 200th St. SW,Engineering $3,100,000 (Federal, unsecured)$500,000 $2,600,000 200th St. SW creating connection to Maplewood Elementary and Yost Park.Possible Grant &$0 (State) Construction $0 (Local) 28. 80th Ave. W Walkway from Install sidewalk on 80th Ave. W from 212th St. SW to 206th St. SW, Engineering $4,800,000 (Federal, unsecured)$400,000 $390,000 $4,010,000 212th St. SW to 206th St. SW creating connections to Chase Lake and College Place Possible Grant &$0 (State) Elementary Schools. Construction $0 (Local) 29. 232nd St. SW Walkway from 100th Ave. W to Install sidewalk on one side of 232nd St. SW Possible Grant Engineering $2,317,000 (Federal, unsecured)$350,000 $1,967,000 SR-104 & & $0 (State) Local Funds Construction $2,317,000 (Local, unidentified)$350,000 $1,967,000 30. 236th St. SW Walkway from Hwy 99 to Provide sidewalk on one side of 236th St. SW Possible Grant Engineering $2,550,000 (Federal, unsecured)$425,000 $2,125,000 76th Ave. W & & $0 (State) Local Funds Construction $0 (Local) 31. 236th St. SW Walkway from 94th Ave. W to 84th Ave. W Provide sidewalk on one side of 236th St. SW Possible Grant Engineering $1,537,000 (Federal, unsecured)$232,000 $1,305,000 & & $0 (State) Local Funds Construction $1,527,000 (Local, unidentified)$232,000 $1,295,000 32. 84th Ave. W Walkway from 238th St. SW to Provide sidewalk on east side of 84th Ave. W and on the west side of the street $0 (Federal) 234th St. SW from intersections to Community Transit bus stops. Possible Grant Design $2,459,000 (State, unsecured)$386,000 $237,000 $1,836,000 & &$36,400 (Local, Fund 421)$5,200 $5,200 $26,000 Local Funds Construction $123,500 (Local, Fund 422)$38,600 $38,600 $46,300 $0 (Local ) 33. 218th St. SW Walkway Install sidewalk along missing link.Possible Grant Engineering $3,430,000 (Federal, unsecured)$278,000 $3,152,000 & & $0 (State) from 76th Ave. W to 84th Ave. W Local Funds Construction $278,000 (Local, unidentified)$278,000 34. Maple St. Walkway from Install sidewalk along missing link.Possible Grant Engineering $0 (Federal) & & $515,000 (State, unsecured)$77,000 $438,000 8th Ave. to 9th Ave. Local Funds Construction $515,000 (Local, unidentified)$77,000 $438,000 35. 88th Ave. W Walkway Install sidewalk along missing link.Possible Grant Engineering $0 (Federal) from 200th St. SW to 196th St. SW & & $1,185,000 (State, unsecured)$165,000 $1,020,000 Local Funds Construction $1,185,000 (Local, unidentified)$165,000 $1,020,000 36. Robin Hood Lane Walkway Possible Grant Engineering $0 (Federal) from 106th Ave. W to Hickman Park Install sidewalk along missing link.& & $4,065,000 (State, unsecured)$610,000 $3,455,000 Local Funds Construction $0 (Local) 37. SR-104 / Pine St Walkway: SR-104 from mid-block crossing Complete sidewalk missing links to improve pedestrian safety Engineering $0 (Federal) ~ 400' north of Pine St. to Pine St. and Pine St. from and connectivity to Edmonds Transit Station. Possible Grant & $3,376,000 (State unsecured)$282,000 $282,000 $2,812,000 SR-104 to 9th Ave. S Construction $0 (Local) 38. SR-104 @ 76th Ave. W Non-motorized Install ADA curb ramps, extend bike lanes, and complete signal Possible Grant Engineering, $0 (Federal) Transportation Improvements modifications in order to improve non-motorized transportation safety &ROW, and $2,634,000 (State, unsecured)$448,000 $515,000 $1,671,000 or alternative feasibility study (west SR-104 @ 76th Ave. signal /owned by Shoreline)Local Funds Construction $0 (Local) 39. 7th Ave. Curb Ramp upgrades Upgrades of all non-compliant ADA curb ramps Secured Grant Engineering $0 (Federal from Main St. to Caspers St./ SR-524 and improvements to mid-block pedestrian crossing leading to & & $11,700 (State, secured)$11,700 Civic Park. Local Funds Construction $3,300 (Local)$3,300 40. Pedestrian Safety Program Complete pedestrian safety improvements at pedestrian crossings Engineering $0 (Federal) such as RRFB's, Flashing LED's at stop signs, signage, and pedestrian Local funds &$0 (State) enhancements at traffic signals. Construction $120,000 (Local, unidentified)$20,000 $20,000 $20,000 $20,000 $20,000 $20,000 Upgrade (23) curb ramps to meet ADA Standards Secured Grant Engineering $580,000 (Federal, secured)$580,000 41.2027 Citywide Pedestrian Improvements along Bowdoin Ave., 3rd Ave. S, and 76th Ave. W & &$0 n/a (State) Local Funds Construction $173,300 (Local)$173,300 42. Citywide Active Transportation Enhancements Installation of bulb-outs and ADA curb ramp upgrades at (13) intersection Possible Grant Engineering $2,076,000 (Federal)$378,000 $1,698,000 & & $0 n/a (State) throughout the City. Local Funds Construction $0 (Local) 43. Citywide Lighting Improvements Install street light poles at various locations throughout the City Engineering $580,000 (Federal, secured)$580,000 in order.to address serious injury collisions.Secured Grant &$0 (State) Construction $0 (Local) TOTAL $1,368,300 $20,000 $20,000 $3,902,800 $31,072,000 $67,652,300 MEDIUM MEDIUM MEDIUM MEDIUM n/a n/a n/a MEDIUM MEDIUM MEDIUM MEDIUM MEDIUM MEDIUM MEDIUM HIGH HIGH HIGH HIGH HIGH HIGH HIGH MEDIUM MEDIUM MEDIUM Page 2   Item 9.2       Packet pg. 102/125 City of Edmonds Six-Year Transportation Improvement Program (2027-2032) Project (2027-2032) Phase(s)Total Cost 20322027Project Name Purpose Grant Opportunity Source(s)Priority 2028 2029 2030 2031 Traffic Calming / Non-motorized Transportation Safety Projects 44. Traffic Calming Program / Traffic circles, speed cushions, Engineering $0 (Federal) Non-Motorized Transportation radar feedback signs, bulb-outs, etc.Local Funds only &$0 (State) Safety Construction $132,000 (Local, Fund 126)$22,000 $22,000 $22,000 $22,000 $22,000 $22,000 45. Interurban Trail SR-104 Overpass Feasibility Study for the addition of an active transportation bridge above SR-104 (connecting Possible $0 (Federal) Interurban Trail between Edmonds and City of Shoreline) Grant Study $412,000 (State, unsecured) $412,000 $0 (Local) TOTAL $22,000 $22,000 $22,000 $434,000 $22,000 $22,000 Ferry / Waterfront Projects 46 Ferry Storage Improvements from Provide additional ferry storage area closer to the Ferry Terminal Engineering $428,000 (Federal, unsecured)$428,000 Dayton St. to Pine St.(through striping revisions / C-Curb addition)Possible Grant & $0 (State) Construction $0 (Local) TOTAL $0 $0 $0 $428,000 $0 $0 Traffic Planning Projects 47.Ciitywide ADA Transition Plan Complete a compliance evaluation of all existing ADA $0 (Federal) curb ramps, sidewalk, City Buildings, and Park Facilities as well as long range plan Local Funds Only Planning $0 (State) on how to address all those deficiencies. $469,000 (Local, unidentified)$469,000 48. Pavement Rating Analyze the pavement condition of all arterial, collector, $0 (Federal) Study and local streets to determine the stretches to be repaved Local Funds Only Planning $0 (State) as part of future annual overlays.$104,000 (Local / Fund 125 / Fund 126)$52,000 $52,000 49. Transportation Plan Update Update Transportation Plan (current Plan was completed in 2024)$0 (Federal) Local Funds Only Planning $0 (State) $422,000 (Local)$10,000 $412,000 TOTAL $10,000 $52,000 $469,000 $0 $464,000 $0Total$228,267,400 $13,783,300 $20,792,000 $29,055,000 $40,792,800 $43,843,000 $80,001,300 Project Name Purpose Reason Total Federal $4,053,250 $6,930,000 $15,880,000 $28,898,500 $19,677,000 $57,010,000 Safety Action Plan Indentify list of projects to addrress serious injury and fatal collisions Completed Total Federal (Secured)$4,053,250 $2,850,000 $2,030,000 $0 $0 $0 (to be identified in Infrastructure Bill)Total Federal (Unsecured)$0 $4,080,000 $13,850,000 $28,898,500 $19,677,000 $57,010,000 4th Ave. W Corrdor Enhancements Complete corridor enhancements between Main St. and Bell St. Removed from CIP Total State $4,203,700 $10,000,000 $9,607,000 $2,482,000 $10,367,000 $11,232,000 Total State (Secured)$4,203,700 $10,000,000 $9,607,000 $0 $0 $0 Total State (Unsecured)$0 $0 $0 $2,482,000 $10,367,000 $11,232,000 Project Name Purpose 2027 Citywide Pedestrian Improvements Added bulb-outs and ADA compliant curb ramps at (23) corners Total Local Fund $5,526,350 $3,862,000 $3,568,000 $9,412,300 $13,799,000 $11,759,300 throughout the City. Total Local (Fund 112)$230,600 $0 $0 $51,500 $695,000 $0 Citywide Active Transportation Enhancements Completed pedestrian crossing enhancements at various locations Total Local (Fund 125 / Fund 126) $1,750,750 $1,854,000 $1,597,000 $1,597,000 $1,649,000 $1,597,000 where pedestrian collisions have previously occurred. Toal Local (Fund 421)$10,000 $10,000 $0 $505,200 $5,200 $26,000 Total Local (Fund 422)$10,000 $10,000 $0 $138,600 $38,600 $46,300 Total Local (Fund 423)$0 $0 $0 $0 $0 $0 Total Local (Traffic Impact Fees)$2,340,000 $803,000 $317,000 $1,406,000 $644,000 $0 Total Local (General Fund)$0 $0 $0 $0 $0 $0 Total Local (unidentified)$1,185,000 $1,185,000 $1,654,000 $5,714,000 $10,767,200 $10,090,000 n/a MEDIUM n/a n/a n/a n/a Removed projects from 2026-2031 TIP New projects added to 2027-2032 TIP (shown in DARK GREEN) Page 3   Item 9.2       Packet pg. 103/125 - 1 - RESOLUTION NO. ______ A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, APPROVING AND ADOPTING THE 2027-2032 TRANSPORTATION IMPROVEMENT PROGRAM (TIP) AND DIRECTING FILING OF THE ADOPTED PROGRAM WITH THE WASHINGTON STATE DEPARTMENT OF TRANSPORTATION. WHEREAS, RCW 35.77.010 requires the legislative body of each city and town to prepare and adopt a comprehensive transportation program for the ensuing six calendar years setting forth the projects and programs of regional significance; and WHEREAS, City staff have prepared the required program, known as the Transportation Improvement Program (TIP); and WHEREAS, the TIP identifies all planned projects over the next six years, along with the appropriate funding source(s); and WHEREAS, the City is required to file a copy of its adopted program with the Washington State Department of Transportation (WSDOT) not more than thirty days after its adoption; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: Section 1. Recitals. The foregoing recitals are incorporated and fully made a part of this Resolution. Section 2. Adoption of Program. The City Council hereby approves and adopts the Transportation Improvement Program pursuant to the requirements of RCW 35.77.010. A copy of the adopted Transportation Improvement Program for the years 2027 to 2032 is attached hereto as Exhibit A and incorporated by this reference as fully as if herein set forth.   Item 9.2       Packet pg. 104/125 - 2 - Section 3. Effective Dates. This Resolution shall take effect immediately. The Transportation Improvement Program shall take effect on June 3rd, 2026 and continue in full force and effect until amended. Section 4. Filing of Program. The City Clerk is hereby requested and directed to file a certified copy of the Transportation Improvement Program with the Washington State Department of Transportation. Section 5. Severability. If any one or more sections, subsections, or sentences of this Resolution are held to be unconstitutional or invalid, such decision shall not affect the validity of the remaining portion of this Resolution and the same shall remain in full force and effect. RESOLVED this ___ day of ________________, 2026. APPROVED: MAYOR, MIKE ROSEN ATTEST/AUTHENTICATED: CITY CLERK, LUKE LONIE FILED WITH THE CITY CLERK: PASSED BY THE CITY COUNCIL: RESOLUTION NO.   Item 9.2       Packet pg. 105/125 6-Year Transportation Improvement Program 2027-2032 June 2, 2026 Bertrand Hauss, Transportation Engineer   Item 9.2       Packet pg. 106/125 Introduction I. Construction projects in 2026 II. Scheduled construction projects (2027 / 2028) III. Other projects in 2027-2032 TIP IV. Summary recently secured grants V. Next Steps Q & A   Item 9.2       Packet pg. 107/125 •Revised Code of Washington (RCW) requires that each city update their TIP by July 1st (RCW 35.77.010). •Document contains all significant transportation projects that a City possibly plans to undertake in the next six years (for all modes of transportation). •City of Edmonds policy: TIP financially constrained first three years. •Federal Grants, State Grants, and Local funds are programmed as revenue source(s) for TIP projects. •2027-2032 TIP consistent with 2024 Transportation Plan o Most HIGH Priority projects and certain MEDIUM Priority projects in Transportation Plan included in TIP Introduction   Item 9.2       Packet pg. 108/125 I. Construction Projects in 2026 OVD Overlay from 196th St. SW to Talbot Rd. (Project #3) Project Description •Overlay of OVD from 196th St. SW to Talbot Rd. and ADA curb ramp upgrades. Schedule o Design 2025 o Construction 2025-2026 Construction Funding •Secured Federal Grant $1,384,500 •Local Funds o Fund 125 & 126 $457,500   Item 9.2       Packet pg. 109/125 7th Ave. N Curb Ramp Upgrades (Project # 39) Schedule •Design 2025 •Construction 2026 Construction Funding •Secured TIB Grant $379,600 •Local Funds •Fund 125 & 126 $105,000 Project Description •Upgrade all curb ramps along 7th Ave. N from Main St. to Caspers St. and active transportation enhancements at mid-block crossing accessing Civic Park   Item 9.2       Packet pg. 110/125 Pedestrian Safety Program (Project #40) Schedule •Construction Summer / Fall 2026 Funding •Local funds •Fund 126 $20,180 Project Description •Installation of “TURNING VEHICLES / YIELD TO PEDESTRIANS” message sign at Hwy 99 @ 238th St. SW when pedestrian phase activated (sign facing eastbound movement on signal mast arm) and Pedestrian Push Button post additions at SR-104 @ 100th Ave. W.   Item 9.2       Packet pg. 111/125 Traffic Calming Program (Project #44) Schedule Construction Fall 2026 Funding Local funds Fund 126 $80,000 Project Description Installation of traffic calming devices along certain stretches (based on on-going evaluation results)   Item 9.2       Packet pg. 112/125 2026 Traffic Signal Program (Project #4) Schedule Construction Fall 2026 Funding Local funds Fund 126 $30,000 Project Description Installation of Flashing Yellow Arrow (FYA) at SR-104 @ 236th St. SW (pending favorable contractor bid)   Item 9.2       Packet pg. 113/125 II. Construction Projects in 2027 / 2028 2027 Overlay Program Schedule •Design 2026 •Construction 2027 Construction Funding •REET 1 $770,000 •REET 2 $770,000 Annual Funding Goal $3,200,000 per year Project Description •Overlay along several stretches throughout the City   Item 9.2       Packet pg. 114/125 Citywide Lighting Improvements (Project #43) Schedule •Design 2025 •Construction 2026 Project Funding •Secured Federal HSIP Grant $700,000 Project Description •Completion of lighting enhancements at various intersections / active transportation mid-block crossings throughout the City   Item 9.2       Packet pg. 115/125 2027 Citywide Pedestrian Improvements (Project #41) Schedule •Design 2026 •Construction 2027 Project Funding •Secured TIB Grant $680,000 •Local Match $203,500 Project Description •Upgrade (23) curb ramps to meet current ADA Standards along Bowdoin Way between 95th Pl. W and 84th Ave. W, 3rd Ave. S @ Giltner, and 76th Ave. W @ 236th   Item 9.2       Packet pg. 116/125 Other Projects in 2026-2031 TIP Corridor Improvements •84th Ave. W from 238th St. SW to 212 St. SW (Project #15) 2030-2032 •SR-99 Revitalization from 244th to 238th Stage 3 (Project #8) 2022-2029 •SR-99 Revitalization from 220th to 224th Stage 4 (Project #9) 2022-2030 •SR-99 Revitalization from 220th to 216th Stage 9 (Project #12) 2030-2032 •SR-104 Adaptive System from 236th to 226th (Project #10) 2022-2030 •76th Ave. Adaptive System from 220th St. to 206th St. (Project #11) 2030-2031 Signal Upgrades •Puget Dr. @ OVD (Project #5) 2030-2031 •238th St. SW @ 100th Ave. W (Project #6) 2030-2031 •Main St. @ 3rd Ave. (Project # 7) 2031-2032   Item 9.2       Packet pg. 117/125 III. Other Projects in 2026-2031 TIP Intersection Improvements •76th Ave. W @ 220th St. SW (Project #14) 2021-2030 •Main St. @ 9th Ave. (Project #16) 2030-2031   Item 9.2       Packet pg. 118/125 Other Projects in 2026-2031 TIP Active Transportation Projects •84th Ave. W Walkway from 238th to 234th (Project #32) 2024-2032 •Multi-use path 9th Ave. N from 3rd Ave. N to OVD (Project #18) 2030-2032 •Multi-use path SR-104 from Sunset Ave to 100th Ave. W (Project 19) 2030-2032 •240th St. Walkway from Hwy 99 to 236th St. SW (Project #21) 2030-2031 •SR-104 @ 100th St. Bicycle Improvements (Project #17) 2030-2032 •Robin Hood Lane Walkway (Project #36) 2031-2032 •Interurban Trail SR-104 Overpass (Project #45) 2030 •236th St. SW from 84th Ave. to Hwy 99 (Project #31) 2031-2032 •Walkway projects within proximity to schools / parks o Maplewood Dr. Walkway (Project #27) 2030-2031 o 80th Ave. Walkway from 212nd St. SW to 206th St. SW (Project #28) 2030-2032   Item 9.2       Packet pg. 119/125 Studies / Planning Documents •Pavement Rating Study •ADA Transition Plan •Transportation Plan Update Other Projects in 2027-2032 TIP   Item 9.2       Packet pg. 120/125 IV. Summary of secured transportation grants (between 2022 and 2026) Award Date Amount SecuredPhase Grant ProgramProject Name Apr-22$22,500,000 Design / ROW / Construction for specific stages State Funds (through Move Ahead WA) Hwy 99 Revitalization from 244th St. SW to 210th ST. SW (Project #10) Nov-22$700,000 ConstructionSTP / Federal OVD Overlay from 196th to Talbot (Project #3) Nov-22$2,597,500 ROWSTP / Federal Hwy 99 Revitalization from 220th St. SW to 224th St. SW (Stage 4 / Project #9) $25,797,500 2022 Total   Item 9.2       Packet pg. 121/125 Nov-25$680,000 Design / ConstructionTIB2027 Citywide Pedestrian Improvements (Project #41) $680,000 2025 Total Sep-24$700,000 Design / Construction HSIPCitywide Lighting Improvements (Project #43) Oct-24$750,000Construction STBG / Federal 76th Ave. W Overlay from Hwy 99 to 220th St. SW (Project #2) Oct-24$2,798,000ROWCMAQ / Federal 76th Ave @ 220th St Intersection Improvements (Project #14) Nov-24$379,600ConstructionTIB7thAve. N Curb Ramps (Project #39) $4,627,6002024 Total Award Date Amount SecuredPhase Grant ProgramProject Name May - 26$684,500 ConstructionAdditional STP / Federal OVD Overlay from 196th to Talbot (Project #3) $684,500 2026 Total   Item 9.2       Packet pg. 122/125 TOTAL SECURED TRANSPORTATION GRANTS / APPROPRIATIONS OVER LAST 5 YEARS (from 2022 – 2026) $31,789,600   Item 9.2       Packet pg. 123/125 V. Next Steps •May 26th Public Hearing / Presentation •June 2nd Council Meeting for Final Approval   Item 9.2       Packet pg. 124/125 Questions ?????   Item 9.2       Packet pg. 125/125