Loading...
HomeMy WebLinkAbout2026-10-14 Study Session Packet Edmonds City Council Agenda October 14, 2026 Posted: 10/9/2026 3:19 PM Page 1 Agenda Edmonds City Council Study Session CITY COUNCIL CONFERENCE ROOM 121 - 5TH AVENUE N, EDMONDS, WA 98020 ZOOM: HTTPS://ZOOM.US/J/95798484261 PHONE: +1 253 215 8782 MEETING ID: 957 9848 4261 OCTOBER 14, 2026, 3:00 PM STAFF AND COUNCILMEMBERS ATTEND STUDY SESSIONS VIRTUALLY, AND MEMBERS OF THE PUBLIC ARE ENCOURAGED TO ATTEND THE SAME WAY. IF MEMBERS OF THE PUBLIC CANNOT ACCESS THE VIRTUAL MEETING WITH THEIR PERSONAL DEVICES, A MONITOR IS PROVIDED AT THE CITY COUNCIL CONFERENCE ROOM AT 121 5TH AVE N, EDMONDS WA. 1. CALL TO ORDER 2. STUDY SESSION ITEMS 1. Presentation of 2027 - 2032 Capital Facilities Plan (CFP) and Capital Improvement Program (CIP) First Reading – Public Works and Utilities (60 minutes) 2. Park Impact Fee Study and Code Revision Presentation ( First Reading – Parks and Recreation (45 minutes) 3. ITEMS FOR FUTURE CONSENT ADJOURNMENT For disability accommodations, materials in alternate formats, accessibility information, or language interpretation/ translation needs, please contact the City Clerk at 425-775-2525 at your earliest opportunity. Providing at least 72-hour notice will help ensure availability. City Council Agenda Item 2.1 October 14, 2026 - Study Session TITLE:Presentation of 2027 - 2032 Capital Facilities Plan (CFP) and Capital Improvement Program (CIP) (First Reading) DEPARTMENT:Public Works and Utilities PRESENTER:Mike De Lilla/Angie Feser/Andy Rheaume NEEDED FROM COUNCIL:Informational RECOMMENDATION:No action required by Council as this is the departments’ informational presentation of the capital plans and programs. BUDGET: Total Dollar Amount:n/a ☐ Approved in Budget Fund(s):n/a ☐ Budget Reallocation Required ☒ No Budget Impact PROBLEM/ISSUE STATEMENT: The City’s Capital Facilities Plan (CFP) and Capital Improvement Program (CIP) are reviewed and approved by City Council on an annual basis and this needs to be completed by the of 2026. This process includes a presentation, Public Hearing and approval during three different council meetings to allow for public input and council consideration. CONTEXT, ANALYSIS, & ALTERNATIVES: The City of Edmonds Capital Facilities Plan (CFP) is a key planning document that guides how the city plans for growth. Updated and adopted at least every two years, it's a six-year plan that identifies capital projects that expand or create new facilities and infrastructure to support the city's projected population growth. This plan is different from the Capital Improvement Program (CIP), which includes projects to preserve existing facilities. Both the CFP and the preservation projects from the CIP are part of a single six-year document that outlines all projected timelines, expenditures and funding sources for the city's capital projects. The Public Works and the Parks and Recreation departments are responsible for developing, implementing and managing their capital programs and projects. The proposed CIP/CFP projects, which are prioritized in the Water, Sewer, Storm, Transportation Comprehensive Plans and the Parks, Recreation and Open Space Plan are reflected in their respective capital plans. The complete capital documents are included in this agenda packet. Both attachments contain lists, detailed information sheets, funding sources and estimated costs for all projects. RECOMMENDATION: No action required by Council as this is the departments’ informational presentation of the capital plans and programs.   Item 2.1       Packet pg. 2/238   Item 2.1       Packet pg. 2/238 BUDGET IMPACTS: These six-year capital plans and programs are fundamentally planning documents with estimated cost expenditures and related funding sources. Approval of the documents are not necessarily approving the projects expenditures as that is accomplished using a Decision Package mechanism during the Council’s adoption of the city budget. In addition, specific project expenditures are authorized through the city’s Purchasing Policy procedures. ITEM HISTORY: September 9, 2026 – presented to Planning Board ADDITIONAL INFORMATION: The next step in Council’s consideration for adoption is Public Hearing scheduled for October 27, 2026 with adoption consideration by Council scheduled for November 2, 2026. The Public Hearing presentation by staff will be a brief summary of the capital programs, an opportunity for public comments as well as opportunity for questions and answers with Council and staff. ATTACHMENTS: Attachment 1 – Public Works CIP/CFP Attachment 2 – Parks CIP/CFP   Item 2.1       Packet pg. 3/238   Item 2.1       Packet pg. 3/238 CITY OF EDMONDS PUBLIC WORKS PROPOSED 2027-2032 CAPITAL FACILITIES PLAN & CAPITAL IMPROVEMENT PROGRAM   Item 2.1       Packet pg. 4/238   Item 2.1       Packet pg. 4/238 2027-2032 CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 5 11 23 45 PRESERVATION/ MAINTENANCE SAFETY/ CAPACITY ANALYSIS NON-MOTORIZED TRANSPORTATION FERRY RELATED TRAFFIC CALMING TRAFFIC PLANNING 82 93 WATER STORMWATER 98 112 118 134 CONTENTS 84 86 106 102 EDMONDS MARSH ESTUARY RESTORATION PERRINVILLE CREEK BASIN COMPLIANCE RELATED 110 SEWER FACILITIES WASTEWATER TREATMENT PLANT CFP/CIP COMPARISON 2026-2027 159 3 TRANSPORTATION AND UTILITY MAP FACILITIES AND WWTP MAP TRANSPORTATION 4   Item 2.1       Packet pg. 5/238   Item 2.1       Packet pg. 5/238 î î î î î î îî î î î î î î î î î î î î î î îPWS-02 PWS-02 PWD-01 PWD-04 PWD-03 PWD-17 PWD-23 PWD-05PWD-28 PWT-05 PWT-06 PWT-07 PWT-17 PWT-18 PWT-19 PWT-21 PWT-22 PWT-23 PWT-24 PWT-43 PWT-28 PWT-06 PWT-01 PWT-52 PWT-52 PWT-106 PWT-106 PWW-11 PWW-11 PWW-02PWW-02PWT-65 PWT-69 PWT-64 PWT-16 PWT-99 PWT-15 PWT-13 PWT-12 PWT-105 PWT-11 PWT-04 PWT-51 PWT-10 PWT-14 PWT-101 PWT-68 PWT-03 PWT-08 PWT-61 PWT-20 PWT-25 PWT-09 PWT-100 PWT-37 PWT-87 PWT-48 PWT-49 PWT-36 PWT-55 PWT-91 PWT-93 PWT-89 PWT-79 PWT-96 PWT-32 PWT-42 PWT-41 PWT-46 PWT-102 PWT-73 PWT-31PWT-86 PWT-85 PWT-33 PWT-47 PWT-75 PWT-30 PWT-50 PWT-77 PWT-88PWT-35 PWT-40 PWT-29PWT-90 PWT-80 PWT-76 PWT-81 PWT-34 PWT-92 PWT-84 PWT-71 PWT-45 PWT-78 PWT-83 PWT-74 PWT-72 PWS-11 ¯ September 2026 Public Works & Utilities Department TRANSPORTATION & UTILITY PROJECTS MAP * Site specific projects only. Citywide/annual citywide projects not shown. Projects Sewer Stormwater Street/Intersection Project Non-Motorized Transportation Project WaterSewer î Street/Intersection Project Non-Motorized Transportation Project   Item 2.1       Packet pg. 6/238   Item 2.1       Packet pg. 6/238 PWF-02 PWF-03PWF-04 PWF-05PWF-09 PWF-11 PWF-16 PWF-16 PWF-17 PWF-18PWF-23PWF-13 PWF-14 PWF-15 PWF-25 PWP-04PWP-06 PWP-01 PWP-08PWP-10PWP-11PWP-13PWP-14PWP-16PWP-18PWP-19PWP-20PWP-21PWP-22PWP-23PWP-24PWP-25PWP-26PWP-27PWP-28PWP-29PWP-30 ¯ September 2026 Public Works & Utilities Department FACILITIES & WWTP PROJECTS MAP * Site specific projects only. Citywide/annual citywide projects not shown. Projects Facilities WWTP PWP-29PWP-30 PWF-01 PWF-03 PWF-05 PWF-07 PWF-09 PWF-10 PWF-11 PWF-16 PWF-23 PWF-13 PWF-15 PWF-27 PWF-25PWP-04 PWP-28 PWP-06 PWP-27 PWP-01 PWP-08PWP-09PWP-10PWP-11PWP-12PWP-13PWP-14PWP-15PWP-16PWP-17 PWP-18PWP-19PWP-20PWP-21PWP-22PWP-23PWP-24PWP-25PWP-26 4t h A v e S 4th A v e N 6th A v e S 7t h A v e N Walnut St 2nd A v e N 2n d A v e S 7t h A v e S Bell S t 6th A v e S Bell St Sprague St Edmonds St Bell S t Dayton St Main S t Maple St Alder St Dayton St Walnut St MAIN S T 5T H A V E S 3RD AVE S WMAIN ST MAIN ST 3RD A V E N ED M O N D S W A Y   Item 2.1       Packet pg. 7/238   Item 2.1       Packet pg. 7/238 TRANSPORTATION September 2026 DRAFT 1.4 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 5   Item 2.1       Packet pg. 8/238   Item 2.1       Packet pg. 8/238 TRANSPORTATION SEPTEMBER 2026 DRAFT 1.4 #CFP Project 2027 2028 2029 2030 2031 2032 2027-32 Total 2033-47 Grand Total PRESERVATION/ MAINTENANCE PWT-01 Annual Street Preservation Program $2,630,000 $2,630,000 $2,630,000 $2,630,000 $2,630,000 $2,630,000 $15,780,000 $39,450,000 $55,230,000 PWT-04 Main St Overlay from 6th Ave to 8th Ave $20,000 $0 $0 $0 $0 $0 $20,000 $0 $20,000 PWT-05 Puget Dr @ OVD Signal Upgrades $0 $0 $0 $104,000 $575,000 $0 $679,000 $0 $679,000 PWT-06 Signal Upgrades - 100th Ave @ 238th St SW $0 $0 $0 $192,000 $896,000 $0 $1,088,000 $0 $1,088,000 PWT-07 Main St @ 3rd Signal Upgrades $0 $0 $0 $128,000 $444,000 $0 $572,000 $0 $572,000 PWT-28 175th St SW Slope Repair $0 $0 $0 $174,000 $1,155,000 $0 $1,329,000 $0 $1,329,000 PWT-61 Olympic View Dr Overlay - 196th / SR-524 to Talbot Rd $1,831,000 $6,000 $0 $0 $0 $0 $1,837,000 $0 $1,837,000 PWT-68 88th Avenue Overlay and Sidewalk Repair $10,000 $0 $0 $0 $0 $0 $10,000 $0 $10,000 PWT-69 7th Avenue Sidewalk Repair $0 $0 $0 $159,000 $668,000 $0 $827,000 $0 $827,000 PWT-103 P 7th Ave N Pedestrian Improvements $2,000 $0 $0 $0 $0 $0 $2,000 $0 $2,000 PWT-104 76th Ave W Overlay from 220th St SW to SR- 99 $150,000 $868,000 $0 $0 $0 $0 $1,018,000 $0 $1,018,000 SAFETY/ CAPACITY ANALYSIS PWT-08 228th St SW from Hwy 99 to 95th Pl W Corridor $0 $0 $0 $3,180,000 $4,770,000 $9,540,000 $17,490,000 $9,500,000 $26,990,000 PWT-10 P Hwy 99 Revitalization Project - Stage 3 $5,109,659 $1,754,000 $10,000,000 $9,607,000 $0 $0 $26,470,659 $0 $26,470,659 PWT-11 P Hwy 99 Revitalization Project - Stage 4 $3,528,140 $7,430,000 $1,880,000 $13,100,000 $12,000,000 $0 $37,938,140 $0 $37,938,140 PWT-12 P Hwy 99 Revitalization Project - Stage 5 $0 $0 $0 $0 $0 $500,000 $500,000 $54,500,000 $55,000,000 PWT-13 P Hwy 99 Revitalization Project - Stage 6 $0 $0 $0 $0 $500,000 $1,000,000 $1,500,000 $24,000,000 $25,500,000 PWT-14 P Hwy 99 Revitalization Project - Stage 7 $0 $0 $0 $0 $0 $0 $0 $46,500,000 $46,500,000 6   Item 2.1       Packet pg. 9/238   Item 2.1       Packet pg. 9/238 TRANSPORTATION SEPTEMBER 2026 DRAFT 1.4 #CFP Project 2027 2028 2029 2030 2031 2032 2027-32 Total 2033-47 Grand Total PWT-15 P Hwy 99 Revitalization Project - Stage 8 $0 $0 $0 $0 $0 $0 $0 $43,500,000 $43,500,000 PWT-16 P Hwy 99 Revitalization Project - Stage 9 $0 $0 $0 $0 $1,060,000 $1,060,000 $2,120,000 $22,500,000 $24,620,000 PWT-17 P 196th St SW / 88th Ave W Intersection Improvements $0 $0 $0 $0 $0 $0 $0 $1,590,000 $1,590,000 PWT-18 P Main St @ 9th Ave Intersection Improvements $0 $0 $0 $229,000 $1,255,000 $0 $1,484,000 $0 $1,484,000 PWT-19 P 76th Ave W @ 220th St SW Intersection Improvements $2,178,000 $1,209,000 $0 $3,370,000 $3,300,000 $0 $10,057,000 $0 $10,057,000 PWT-20 P SR-104 Adaptive System - 236th to 226th $80,000 $0 $0 $4,132,000 $0 $0 $4,212,000 $0 $4,212,000 PWT-21 SR-104 @ 100th Ave W Intersection Improvements $0 $0 $0 $455,000 $1,431,000 $2,990,000 $4,876,000 $0 $4,876,000 PWT-22 SR-104 @ 95th Pl W Intersection Improvements $0 $0 $0 $0 $0 $0 $0 $318,000 $318,000 PWT-23 P SR-104 @ 238th St SW Intersection Improvements $0 $0 $0 $0 $0 $0 $0 $1,708,000 $1,708,000 PWT-24 P Olympic View Dr @ 76th Ave W Intersection Improvements $0 $0 $0 $0 $0 $0 $0 $1,500,000 $1,500,000 PWT-25 P 84th Ave W (212th St SW to 238th St SW)$0 $0 $0 $0 $0 $0 $0 $17,800,000 $17,800,000 PWT-43 SR-104 @ 76th Ave W Intersection Improvements $0 $0 $0 $515,000 $2,304,000 $0 $2,819,000 $0 $2,819,000 PWT-59 Traffic Signal Program $30,280 $30,280 $0 $0 $0 $0 $60,560 $0 $60,560 PWT-97 P 76th Ave W Adaptive System from 206th St SW to 220th St SW $0 $0 $0 $461,000 $2,613,000 $0 $3,074,000 $0 $3,074,000 PWT-98 Citywide Lighting Improvements $5,000 $0 $0 $0 $0 $0 $5,000 $0 $5,000 NON-MOTORIZED TRANSPORTATION PWT-29 P 232nd St SW Walkway from 100th Ave to SR- 104 $0 $0 $0 $684,000 $3,874,000 $0 $4,558,000 $0 $4,558,000 PWT-31 P 236th St SW Walkway from Hwy 99 to 76th Ave W $0 $0 $0 $371,000 $2,014,000 $0 $2,385,000 $0 $2,385,000 PWT-32 P 84th Ave W Walkway from 238th St SW to 234th St SW $0 $0 $0 $159,000 $403,000 $2,332,000 $2,894,000 $0 $2,894,000 7   Item 2.1       Packet pg. 10/238   Item 2.1       Packet pg. 10/238 TRANSPORTATION SEPTEMBER 2026 DRAFT 1.4 #CFP Project 2027 2028 2029 2030 2031 2032 2027-32 Total 2033-47 Grand Total PWT-33 P 80th Ave W Walkway from 212th St SW to 206th St SW $0 $0 $0 $0 $456,000 $2,612,000 $3,068,000 $0 $3,068,000 PWT-34 P 80th Ave W Walkway from 188th St SW to Olympic View Dr $0 $0 $0 $0 $0 $0 $0 $6,678,000 $6,678,000 PWT-35 P 218th St SW Walkway from 76th Ave W to 84th Ave W $0 $0 $0 $0 $0 $0 $0 $4,133,000 $4,133,000 PWT-36 P Walnut St Walkway from 6th Ave S to 7th Ave S $0 $0 $0 $0 $0 $0 $0 $424,000 $424,000 PWT-40 P Maplewood Dr Walkway from Main St to 200th St SW $0 $0 $0 $371,000 $371,000 $4,028,000 $4,770,000 $0 $4,770,000 PWT-43 P SR-104 @ 76th Ave W Non-Motorized Transportation Improvements $0 $0 $0 $515,000 $2,304,000 $0 $2,819,000 $0 $2,819,000 PWT-45 P SR-104 / Pine S Walkway from HAWK to Pine / SR-104 to 9th $0 $0 $0 $0 $0 $0 $0 $7,207,000 $7,207,000 PWT-47 P 104th Ave W / Robinhood Ln Walkway from 238th St to 106th Ave W $0 $0 $0 $0 $0 $0 $0 $2,332,000 $2,332,000 PWT-56 P Pedestrian Improvements (2027)$753,500 $0 $0 $0 $0 $0 $753,500 $0 $753,500 PWT-60 Pedestrian Safety Program $20,180 $20,180 $0 $0 $0 $0 $40,360 $0 $40,360 PWT-71 P Caspers / 9th Ave N / Puget Multi-Use path from Admiral Way to Olympic View Dr $0 $0 $0 $1,060,000 $1,060,000 $10,700,000 $12,820,000 $0 $12,820,000 PWT-72 P SR-104 Multi-Use path from 100th Ave W to Main St $0 $0 $0 $2,650,000 $5,300,000 $21,200,000 $29,150,000 $0 $29,150,000 PWT-73 P 212th St SW Multi-Use path from 74th Ave W to Hwy 99 $0 $0 $0 $0 $530,000 $1,590,000 $2,120,000 $3,392,000 $5,512,000 PWT-74 P SR-104 Multi-Use path from 100th Ave W to 244th St SW $0 $0 $0 $1,590,000 $2,120,000 $4,240,000 $7,950,000 $16,430,000 $24,380,000 PWT-75 Main St Bike lanes from the Ferry Terminal to 6th Ave $0 $0 $0 $0 $0 $0 $0 $9,010,000 $9,010,000 PWT-76 P 240th St SW / 78th Ave W Walkway from Hwy 99 to 236th St SW $0 $0 $0 $318,000 $318,000 $4,150,000 $4,786,000 $0 $4,786,000 PWT-77 P 9th Ave N Bike lanes from Main St to Caspers St $0 $0 $0 $0 $53,000 $244,000 $297,000 $0 $297,000 PWT-78 P Main St Bike lanes from 9th Ave to 84th Ave W $0 $0 $0 $118,000 $741,200 $0 $859,200 $0 $859,200 PWT-79 P 238th St SW bike lanes from SR-104 to 84th Ave W $0 $0 $0 $85,000 $488,000 $0 $573,000 $0 $573,000 8   Item 2.1       Packet pg. 11/238   Item 2.1       Packet pg. 11/238 TRANSPORTATION SEPTEMBER 2026 DRAFT 1.4 #CFP Project 2027 2028 2029 2030 2031 2032 2027-32 Total 2033-47 Grand Total PWT-80 P 236th St SW Walkway from 94th Ave W to 84th Ave W $0 $0 $0 $530,000 $2,756,000 $0 $3,286,000 $0 $3,286,000 PWT-81 P Sunset Ave Multi-Use path from Caspers St to 3rd Ave N / SR-104 $0 $0 $0 $0 $0 $0 $0 $5,700,000 $5,700,000 PWT-83 P Olympic View Dr Multi-Use path from 76th Ave W to City Limits $0 $0 $0 $0 $0 $0 $0 $19,000,000 $19,000,000 PWT-84 P 196th St SW Multi-Use path from 88th Ave W to 76th Ave W $0 $0 $0 $0 $0 $0 $0 $9,800,000 $9,800,000 PWT-87 P Maple St Walkway from 8th Ave to 9th Ave $0 $0 $0 $0 $0 $0 $0 $979,000 $979,000 PWT-88 P 218th St SW Walkway from 84th Ave W to 76th Ave W $0 $0 $0 $0 $0 $0 $0 $4,134,000 $4,134,000 PWT-89 P 88th Ave W Walkway from 200th St SW to 196th St SW $0 $0 $0 $0 $0 $0 $0 $2,279,000 $2,279,000 PWT-91 P Olympic Ave Walkway from Olympic View Dr to Puget Dr $0 $0 $0 $0 $0 $0 $0 $1,325,000 $1,325,000 PWT-92 P Meadowdale Beach Rd Walkway from 75th Pl W to Olympic View Dr $0 $0 $0 $0 $0 $0 $0 $7,000,000 $7,000,000 PWT-93 P 6th Ave Walkway from Elm Way to Pine St $0 $0 $0 $0 $0 $0 $0 $1,166,000 $1,166,000 PWT-96 P 234th St SW Walkway from Hwy 99 to 76th Ave W $0 $0 $0 $0 $0 $0 $0 $2,491,000 $2,491,000 PWT-102 P 224th St SW bike lanes from 76th Ave W to Interurban Trail through re-striping $0 $0 $0 $159,000 $0 $0 $159,000 $0 $159,000 PWT-105 P 7th Ave Walkway from Daley St to SR-524 / 196th St SW $0 $0 $0 $145,000 $908,000 $0 $1,053,000 $0 $1,053,000 PWT-107 Pedestrian Improvements (2028)$345,000 $1,500,000 $0 $0 $0 $0 $1,845,000 $0 $1,845,000 FERRY RELATED PWT-51 Ferry Storage Improvements from Pine St to Dayton St $0 $0 $0 $66,000 $375,000 $0 $441,000 $0 $441,000 TRAFFIC CALMING PWT-52 Traffic Calming Program $60,000 $60,000 $60,000 $60,000 $60,000 $60,000 $360,000 $900,000 $1,260,000 TRAFFIC PLANNING PWT-53 ADA Transition Plan (Right-of-Way) Update $0 $0 $0 $482,000 $0 $0 $482,000 $0 $482,000 9   Item 2.1       Packet pg. 12/238   Item 2.1       Packet pg. 12/238 TRANSPORTATION SEPTEMBER 2026 DRAFT 1.4 #CFP Project 2027 2028 2029 2030 2031 2032 2027-32 Total 2033-47 Grand Total PWT-54 Transportation Plan Update $9,634 $0 $0 $0 $477,000 $0 $486,634 $0 $486,634 PWT-99 SR-104 Overpass Feasibility Study $0 $0 $0 $435,000 $0 $0 $435,000 $0 $435,000 PWT-100 Olympic View Dr Active Transportation Feasibility Study $0 $0 $0 $164,000 $0 $0 $164,000 $0 $164,000 PWT-101 196th St SW Active Transportation Feasibility Study $0 $0 $0 $0 $0 $0 $0 $164,000 $164,000 PWT-106 Feasibility Study Main @ 9th Ave and Walnut @ 9th Ave $75,000 $0 $0 $0 $0 $0 $75,000 $0 $75,000 EXPENSE TOTAL $16,837,393 $15,507,460 $14,570,000 $48,398,000 $60,209,200 $68,876,000 $224,398,053 $367,410,000 $591,808,053 Funding Source 2027 2028 2029 2030 2031 2032 2027-32 Total 2033-47 Grand Total Federal Grants $6,347,345 $4,790,410 $0 $0 $0 $0 $11,137,755 $0 $11,137,755 Fund 112 - Street (Gas Tax & Multi-Modal) $9,634 $0 $0 $0 $477,000 $0 $486,634 $0 $486,634 Fund 125 - REET $1,788,540 $1,377,000 $750,000 $1,055,300 $914,600 $750,000 $6,635,440 $11,250,000 $17,885,440 Fund 126 - REET $1,868,720 $1,487,460 $810,000 $1,115,300 $974,600 $810,000 $7,066,080 $12,150,000 $19,216,080 State Grants $5,683,859 $7,689,375 $10,000,000 $9,607,000 $0 $0 $32,980,234 $0 $32,980,234 Transportation Impact Fees $1,139,295 $163,215 $0 $0 $0 $0 $1,302,510 $0 $1,302,510 Unsecured Funding $0 $0 $3,010,000 $36,340,400 $57,116,000 $67,316,000 $163,782,400 $339,023,000 $502,805,400 Unsecured Grants $0 $0 $0 $280,000 $727,000 $0 $1,007,000 $4,987,000 $5,994,000 FUNDING TOTAL $16,837,393 $15,507,460 $14,570,000 $48,398,000 $60,209,200 $68,876,000 $224,398,053 $367,410,000 $591,808,053 10   Item 2.1       Packet pg. 13/238   Item 2.1       Packet pg. 13/238 PRESERVATION/MAINTENANCE September 2026 DRAFT 1.4 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 11   Item 2.1       Packet pg. 14/238   Item 2.1       Packet pg. 14/238 Maintains the City's pavement infrastructure and reduces the need for larger capital investment to rebuild City streetsBenefitMaintains the City's pavement infrastructure and reduces the need for larger capital investment to rebuild City streets Description Annual pavement preservation program to maintain City streets. $2.6M per year ANNUAL STREET PRESERVATION PROGRAM PWT-01 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $130,000 $130,000 $130,000 $130,000Design $130,000 $1,950,000$130,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000Construction $2,500,000 $37,500,000$2,500,000 $2,630,000Expense Total $2,630,000 $2,630,000 $2,630,000 $2,630,000 $39,450,000$2,630,000 $1,315,000 $1,315,000 $750,000 $750,000Fund 125 - REET $750,000 $11,250,000$750,000 $1,315,000 $1,315,000 $750,000 $750,000Fund 126 - REET $750,000 $11,250,000$750,000 $0 $0 $1,130,000 $1,130,000Unsecured Funding $1,130,000 $16,950,000$1,130,000 $2,630,000Funding Source Total $2,630,000 $2,630,000 $2,630,000 $2,630,000 $39,450,000$2,630,000 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 12   Item 2.1       Packet pg. 15/238   Item 2.1       Packet pg. 15/238 Improve pavement conditions, pedestrian accessibility (with ADA curb ramps) and bike safety on this segment of Main Street.Benefit Improve pavement conditions, pedestrian accessibility (with ADA curb ramps) and bike safety on this segment of Main Street. Description The project will provide a full-width grind and pavement overlay of Main St from 6th Ave to 8th Ave. This project also includes upgrading all non-compliant ADA pedestrian curb ramps within the project limits, an eastbound bike lane and westbound bike sharrow markings. $1,855,000 MAIN ST OVERLAY FROM 6TH AVE TO 8TH AVE PWT-04 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $20,000 $0 $0 $0Construction $0 $0$0 $20,000Expense Total $0 $0 $0 $0 $0$0 $10,000 $0 $0 $0Fund 125 - REET $0 $0$0 $10,000 $0 $0 $0Fund 126 - REET $0 $0$0 $20,000Funding Source Total $0 $0 $0 $0 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 13   Item 2.1       Packet pg. 16/238   Item 2.1       Packet pg. 16/238 This upgrade will provide safer roadway conditions since the hanging signal heads will be replaced with fixed signal heads on mast arms.Benefit This upgrade will provide safer roadway conditions since the hanging signal heads will be replaced with fixed signal heads on mast arms. Description The project will rebuild the existing traffic signal and remove the signal heads currently on span wire and install standard traffic signal poles with mast arms. $679,000 PUGET DR @ OVD SIGNAL UPGRADES PWT-05 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $0 $0 $0 $104,000Design $0 $0$0 $0 $0 $0 $0Construction $575,000 $0$0 $0Expense Total $0 $0 $104,000 $575,000 $0$0 $0 $0 $0 $104,000Unsecured Funding $575,000 $0$0 $0Funding Source Total $0 $0 $104,000 $575,000 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 14   Item 2.1       Packet pg. 17/238   Item 2.1       Packet pg. 17/238 The existing traffic signal is near the end of its anticipated service life.Benefit The existing traffic signal is near the end of its anticipated service life. Description Install new traffic signal poles and upgrade existing vehicle detection system. $1,088,000 SIGNAL UPGRADES - 100TH AVE @ 238TH ST SW PWT-06 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $0 $0 $0 $192,000Design $0 $0$0 $0 $0 $0 $0Construction $896,000 $0$0 $0Expense Total $0 $0 $192,000 $896,000 $0$0 $0 $0 $0 $192,000Unsecured Funding $896,000 $0$0 $0Funding Source Total $0 $0 $192,000 $896,000 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 15   Item 2.1       Packet pg. 18/238   Item 2.1       Packet pg. 18/238 The existing traffic signal is near the end of its anticipated service life.Benefit The existing traffic signal is near the end of its anticipated service life. Description Install new traffic signal poles and upgrade existing vehicle detection system. $572,000 MAIN ST @ 3RD SIGNAL UPGRADES PWT-07 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $0 $0 $0 $128,000Design $0 $0$0 $0 $0 $0 $0Construction $444,000 $0$0 $0Expense Total $0 $0 $128,000 $444,000 $0$0 $0 $0 $0 $128,000Unsecured Funding $444,000 $0$0 $0Funding Source Total $0 $0 $128,000 $444,000 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 16   Item 2.1       Packet pg. 19/238   Item 2.1       Packet pg. 19/238 Improve access and safety for pedestrians of all abilities to Civic Park and other destination points within proximity to 7th Ave N.Benefit Improve access and safety for pedestrians of all abilities to Civic Park and other destination points within proximity to 7th Ave N. Description Reconstruction of approximately 13 ramps and installation of a raised crosswalk along 7th Ave between Bell St and SR-524 $484,180 7TH AVE N PEDESTRIAN IMPROVEMENTS PWT-103 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $2,000 $0 $0 $0Construction $0 $0$0 $2,000Expense Total $0 $0 $0 $0 $0$0 $1,000 $0 $0 $0Fund 125 - REET $0 $0$0 $1,000 $0 $0 $0Fund 126 - REET $0 $0$0 $2,000Funding Source Total $0 $0 $0 $0 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 17   Item 2.1       Packet pg. 20/238   Item 2.1       Packet pg. 20/238 Improve pavement condition and improve accessibility for pedestrians of all abilities (as well possibly bicycle users with bike lane additions)Benefit Improve pavement condition and improve accessibility for pedestrians of all abilities (as well possibly bicycle users with bike lane additions) Description Pavement overlay along 76th Ave from 220th St SW to SR-99 along with ADA pedestrian curb ramp upgrades. The addition of bike lanes on both sides of the stretch will be considered (following completion of parking study). The addition of bike lanes along this stretch was ranked as HIGH PRIORITY PROJECT (in 2024 Transportation Plan). $1,018,000 76TH AVE W OVERLAY FROM 220TH ST SW TO SR-99 PWT-104 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $150,000 $0 $0 $0Design $0 $0$0 $0 $868,000 $0 $0Construction $0 $0$0 $150,000Expense Total $868,000 $0 $0 $0 $0$0 $0 $750,000 $0 $0Federal Grants $0 $0$0 $75,000 $59,000 $0 $0Fund 125 - REET $0 $0$0 $75,000 $59,000 $0 $0Fund 126 - REET $0 $0$0 $150,000Funding Source Total $868,000 $0 $0 $0 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 18   Item 2.1       Packet pg. 21/238   Item 2.1       Packet pg. 21/238 Repair roadway and stabilize slope embankment.Benefit Repair roadway and stabilize slope embankment. Description The project will stabilize the roadway subgrade and embankment and rebuild the damaged pavement on 175th St SW. $1,329,000 175TH ST SW SLOPE REPAIR PWT-28 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $0 $0 $0 $174,000Design $0 $0$0 $0 $0 $0 $0Construction $1,155,000 $0$0 $0Expense Total $0 $0 $174,000 $1,155,000 $0$0 $0 $0 $0 $174,000Unsecured Funding $1,155,000 $0$0 $0Funding Source Total $0 $0 $174,000 $1,155,000 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 19   Item 2.1       Packet pg. 22/238   Item 2.1       Packet pg. 22/238 Improve pavement condition and improve accessibility for pedestrians of all abilities.Benefit Improve pavement condition and improve accessibility for pedestrians of all abilities. Description Pavement overlay along Olympic View Dr, from 196th St SW / SR-524 to Talbot Road, along with ADA pedestrian curb ramp upgrades. $2,000,000 OLYMPIC VIEW DR OVERLAY - 196TH / SR- 524 TO TALBOT RD PWT-61 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $1,831,000 $6,000 $0 $0Construction $0 $0$0 $1,831,000Expense Total $6,000 $0 $0 $0 $0$0 $1,374,500 $0 $0 $0Federal Grants $0 $0$0 $228,250 $3,000 $0 $0Fund 125 - REET $0 $0$0 $228,250 $3,000 $0 $0Fund 126 - REET $0 $0$0 $1,831,000Funding Source Total $6,000 $0 $0 $0 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 20   Item 2.1       Packet pg. 23/238   Item 2.1       Packet pg. 23/238 Improve pavement conditions, pedestrian accessibility (with ADA curb ramps) and pedestrian safety.Benefit Improve pavement conditions, pedestrian accessibility (with ADA curb ramps) and pedestrian safety. Description This project will resurface 88th Ave and improve the existing asphalt sidewalk on the east side of 88th Ave from 196th St SW to 185th Pl SW in the Seaview neighborhood. All City utilities along this section of 88th Ave have been upgraded in recent years and the street is ready to pave. Curb ramps will be upgraded and portions of the existing sidewalk that are currently in failure will be repaired. $1,180,000 88TH AVENUE OVERLAY AND SIDEWALK REPAIR PWT-68 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $10,000 $0 $0 $0Construction $0 $0$0 $10,000Expense Total $0 $0 $0 $0 $0$0 $5,000 $0 $0 $0Fund 125 - REET $0 $0$0 $5,000 $0 $0 $0Fund 126 - REET $0 $0$0 $0 $0 $0 $0Fund 423 - Sewer Utility $0 $0$0 $10,000Funding Source Total $0 $0 $0 $0 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 21   Item 2.1       Packet pg. 24/238   Item 2.1       Packet pg. 24/238 Improve pedestrian access and safety to Civic Park and other destination points within proximity to 7th Ave N.Benefit Improve pedestrian access and safety to Civic Park and other destination points within proximity to 7th Ave N. Description Reconstruction of approximately 600 LF of existing sidewalk and curb and gutter along the frontage of Civic Park on 7th Ave N. $827,000 7TH AVENUE SIDEWALK REPAIR PWT-69 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $0 $0 $0 $159,000Design $0 $0$0 $0 $0 $0 $0Construction $668,000 $0$0 $0Expense Total $0 $0 $159,000 $668,000 $0$0 $0 $0 $0 $159,000Unsecured Funding $668,000 $0$0 $0Funding Source Total $0 $0 $159,000 $668,000 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 22   Item 2.1       Packet pg. 25/238   Item 2.1       Packet pg. 25/238 SAFETY/CAPACITY ANALYSIS September 2026 DRAFT 1.4 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 23   Item 2.1       Packet pg. 26/238   Item 2.1       Packet pg. 26/238 This project would improve active transportation safety and traffic flows along this corridor. Community Transit would then explore the feasibility of creating a new east- west bus route along 228th St SW, if this project moves forward (creating more direct connection between Edmonds Transit Station and Mountlake Terrace Transit Station). Benefit This project would improve active transportation safety and traffic flows along this corridor. Community Transit would then explore the feasibility of creating a new east- west bus route along 228th St SW, if this project moves forward (creating more direct connection between Edmonds Transit Station and Mountlake Terrace Transit Station). Description Widen 228th St SW from Hwy. 99 to 95th Pl. W to three lanes (with center two-way left turn lane) or left turn lane at key intersections, with curb and gutter, sidewalks, and bike lanes on both sides of the street. The section of 228th St SW between 92nd Ave W and 80th Ave W is within Snohomish County. This project ranked as LOW PRIORITY in 2024 Transportation Plan. $26,990,000 228TH ST SW FROM HWY 99 TO 95TH PL W CORRIDOR PWT-08 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $0 $0 $0 $3,180,000Design $1,590,000 $0$0 $0 $0 $0 $0Right of Way $3,180,000 $0$0 $0 $0 $0 $0Construction $0 $9,500,000$9,540,000 $0Expense Total $0 $0 $3,180,000 $4,770,000 $9,500,000$9,540,000 $0 $0 $0 $3,180,000Unsecured Funding $4,770,000 $9,500,000$9,540,000 $0Funding Source Total $0 $0 $3,180,000 $4,770,000 $9,500,000$9,540,000 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 24   Item 2.1       Packet pg. 27/238   Item 2.1       Packet pg. 27/238 Improve aesthetics, safety, and user experience along this segment of the Hwy 99 corridor.Benefit Improve aesthetics, safety, and user experience along this segment of the Hwy 99 corridor. Description The Stage 3 Highway 99 project limits are from 244th St SW to ~400 feet north of 238th St SW. The project will provide new sidewalk, landscaped planter strips, street lighting, separated bike lanes, ADA compliant pedestrian curb ramps and utility improvements (including undergrounding of overhead utility lines). The project will also widen the intersection of Highway 99 and 238th St SW to provide a second northbound left turn lane and widen 238th St from Highway 99 to 84th Ave for this additional lane and bike lane addition. This project was ranked as HIGH PRIORITY in 2024 Transportation Plan. $29,500,000 HWY 99 REVITALIZATION PROJECT - STAGE 3 PWT-10 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $1,803,659 $610,000 $0 $0Design $0 $0$0 $3,306,000 $1,144,000 $0 $0Right of Way $0 $0$0 $0 $0 $10,000,000 $9,607,000Construction $0 $0$0 $5,109,659Expense Total $1,754,000 $10,000,000 $9,607,000 $0 $0$0 $5,109,659 $1,754,000 $10,000,000 $9,607,000State Grants $0 $0$0 $0 $0 $0 $0Unsecured Funding $0 $0$0 $5,109,659Funding Source Total $1,754,000 $10,000,000 $9,607,000 $0 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 25   Item 2.1       Packet pg. 28/238   Item 2.1       Packet pg. 28/238 Improve aesthetics, safety, and user experience. In addition, future economic development would be improved.Benefit Improve aesthetics, safety, and user experience. In addition, future economic development would be improved. Description The Stage 4 Highway 99 project limits are from 224th St SW to ~800 feet north of 220th St SW. The project will provide new sidewalk, landscaped planter strips, street lighting, separated bike lanes, ADA compliant pedestrian curb ramps and utility improvements (including undergrounding of overhead utility lines). The project will also widen the intersection of Highway 99 and 220th St SW to provide a second left turn lane for the northbound, southbound, and westbound movements. A multi-use path will be added on the north side of 220th St SW from Hwy 99 to the Interurban Trail. This project was ranked as HIGH PRIORITY in 2024 Transportation Plan. $38,500,000 HWY 99 REVITALIZATION PROJECT - STAGE 4 PWT-11 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $2,253,140 $2,200,000 $700,000 $0Design $0 $0$0 $1,275,000 $5,230,000 $1,180,000 $0Right of Way $0 $0$0 $0 $0 $0 $13,100,000Construction $12,000,000 $0$0 $3,528,140Expense Total $7,430,000 $1,880,000 $13,100,000 $12,000,000 $0$0 $845,265 $0 $0 $0Transportation Impact Fees $0 $0$0 $2,682,875 $1,494,625 $0 $0Federal Grants $0 $0$0 $0 $5,935,375 $0 $0State Grants $0 $0$0 $0 $0 $1,880,000 $13,100,000Unsecured Funding $12,000,000 $0$0 $3,528,140Funding Source Total $7,430,000 $1,880,000 $13,100,000 $12,000,000 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 26   Item 2.1       Packet pg. 29/238   Item 2.1       Packet pg. 29/238 Improve aesthetics, safety, and user experience. In addition, future economic development will be improved along the corridor.Benefit Improve aesthetics, safety, and user experience. In addition, future economic development will be improved along the corridor. Description Along Hwy 99 from 216th St SW to 212th St SW, the project will add a planter strip on both sides of the street, new street lighting, separated bike lanes, better stormwater management, targeted utility replacements, including undergrounding of overhead utilities, landscaping and other softscape treatments to identify the area as being in Edmonds. This project ranked as LOW PRIORITY in 2024 Transportation Plan. $55,000,000 HWY 99 REVITALIZATION PROJECT - STAGE 5 PWT-12 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $0 $0 $0 $0Design, ROW, and Construction $0 $54,500,000$500,000 $0Expense Total $0 $0 $0 $0 $54,500,000$500,000 $0 $0 $0 $0Unsecured Funding $0 $54,500,000$500,000 $0Funding Source Total $0 $0 $0 $0 $54,500,000$500,000 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 27   Item 2.1       Packet pg. 30/238   Item 2.1       Packet pg. 30/238 Improve aesthetics, safety, and user experience. In addition, future economic development would be improved along the corridor.Benefit Improve aesthetics, safety, and user experience. In addition, future economic development would be improved along the corridor. Description Along Hwy 99 from 238th St SW to 234th St SW, the project will add a planter strip on both sides of the street, new street lighting, separated bike lanes, better stormwater management, targeted utility replacements, including undergrounding of overhead utilities, landscaping and other softscape treatments to identify the area as being in Edmonds. This project was ranked as MEDIUM PRIORITY in 2024 Transportation Plan. $25,500,000 HWY 99 REVITALIZATION PROJECT - STAGE 6 PWT-13 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $0 $0 $0 $0Design, ROW, and Construction $500,000 $24,000,000$1,000,000 $0Expense Total $0 $0 $0 $500,000 $24,000,000$1,000,000 $0 $0 $0 $0Unsecured Funding $500,000 $24,000,000$1,000,000 $0Funding Source Total $0 $0 $0 $500,000 $24,000,000$1,000,000 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 28   Item 2.1       Packet pg. 31/238   Item 2.1       Packet pg. 31/238 Improve aesthetics, safety, and user experience. In addition, future economic development would be improved along the corridor.Benefit Improve aesthetics, safety, and user experience. In addition, future economic development would be improved along the corridor. Description Along Hwy 99 from 234th St SW to 228th St SW, the project will add a planter strip on both sides of the street, new street lighting, separated bike lanes, better stormwater management, targeted utility replacements, including undergrounding of overhead utilities, landscaping and other softscape treatments to identify the area as being in Edmonds. This project was ranked as MEDIUM PRIORITY in 2024 Transportation Plan. $46,500,000 HWY 99 REVITALIZATION PROJECT - STAGE 7 PWT-14 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $0 $0 $0 $0Design, ROW, and Construction $0 $46,500,000$0 $0Expense Total $0 $0 $0 $0 $46,500,000$0 $0 $0 $0 $0Unsecured Funding $0 $46,500,000$0 $0Funding Source Total $0 $0 $0 $0 $46,500,000$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 29   Item 2.1       Packet pg. 32/238   Item 2.1       Packet pg. 32/238 Improve aesthetics, safety, and user experience. In addition, future economic development would be improved along the corridor.Benefit Improve aesthetics, safety, and user experience. In addition, future economic development would be improved along the corridor. Description Along Hwy 99 from 228th St SW to 224th St SW, the project will add a planter strip on both sides of the street, new street lighting, separated bike lanes, better stormwater management, targeted utility replacements, including undergrounding of overhead utilities, landscaping and other softscape treatments to identify the area as being in Edmonds. This project is ranked as MEDIUM PRIORITY in 2024 Transportation Plan. $43,500,000 HWY 99 REVITALIZATION PROJECT - STAGE 8 PWT-15 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $0 $0 $0 $0Design, ROW, and Construction $0 $43,500,000$0 $0Expense Total $0 $0 $0 $0 $43,500,000$0 $0 $0 $0 $0Unsecured Funding $0 $43,500,000$0 $0Funding Source Total $0 $0 $0 $0 $43,500,000$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 30   Item 2.1       Packet pg. 33/238   Item 2.1       Packet pg. 33/238 Improve aesthetics, safety, and user experience. In addition, future economic development would be improved along the corridor.Benefit Improve aesthetics, safety, and user experience. In addition, future economic development would be improved along the corridor. Description Along Hwy 99 from approximately 500 feet north of 220th St SW to 216th St SW, the project will add a planter strip on both sides of the street, new street lighting, separated bike lanes, better stormwater management, targeted utility replacements, undergrounding of overhead utilities, landscaping and other softscape treatments to identify the area as being in Edmonds. This project was ranked as MEDIUM PRIORITY in 2024 Transportation Plan. $24,600,000 HWY 99 REVITALIZATION PROJECT - STAGE 9 PWT-16 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $0 $0 $0 $0Design, ROW, and Construction $1,060,000 $22,500,000$1,060,000 $0Expense Total $0 $0 $0 $1,060,000 $22,500,000$1,060,000 $0 $0 $0 $0Unsecured Funding $1,060,000 $22,500,000$1,060,000 $0Funding Source Total $0 $0 $0 $1,060,000 $22,500,000$1,060,000 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 31   Item 2.1       Packet pg. 34/238   Item 2.1       Packet pg. 34/238 Improve traffic flow characteristics and safety at the intersection. The improvements would improve the LOS, meeting City LOS Standards. Delays and queuing would increase along 196th St SW. Benefit Improve traffic flow characteristics and safety at the intersection. The improvements would improve the LOS, meeting City LOS Standards. Delays and queuing would increase along 196th St SW. Description Install traffic signal at the intersection of 196th St SW @ 88th Ave W. An alternative solution consists in the restriction of northbound and southbound movements to right- turn only (prohibiting left turn and through movements). This is same alternative as one concluded by consultant in a 2007 Study but not recommended by City Council. This could be implemented as an alternate solution, or as an interim solution until traffic signal warrants are met. The existing LOS is F (below City Standards: LOS D). The addition of a signal would improve This project was ranked as LOW PRIOIRITY in the 2024 Transportation Plan. $1,590,000 196TH ST SW / 88TH AVE W INTERSECTION IMPROVEMENTS PWT-17 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $0 $0 $0 $0Design $0 $240,000$0 $0 $0 $0 $0Construction $0 $1,350,000$0 $0Expense Total $0 $0 $0 $0 $1,590,000$0 $0 $0 $0 $0Unsecured Funding $0 $1,590,000$0 $0Funding Source Total $0 $0 $0 $0 $1,590,000$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 32   Item 2.1       Packet pg. 35/238   Item 2.1       Packet pg. 35/238 The existing intersection is stop-controlled for all approaches and the projected intersection LOS in 2044 is LOS F (below the City’s concurrency standards: LOS D). The installation of a traffic signal would improve the intersection delay to LOS B. Benefit The existing intersection is stop-controlled for all approaches and the projected intersection LOS in 2044 is LOS F (below the City’s concurrency standards: LOS D). The installation of a traffic signal would improve the intersection delay to LOS B. Description Installation of a traffic signal or mini-roundabout. The preliminary cost estimate for a new traffic signal is $1,410,000 for all project phases. A conceptual cost estimate for a mini-roundabout is approximately $500,000. This project was ranked as MEDIUM PRIORITY in 2024 Transportation Plan. $1,484,000 MAIN ST @ 9TH AVE INTERSECTION IMPROVEMENTS PWT-18 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $0 $0 $0 $229,000Design $0 $0$0 $0 $0 $0 $0Construction $1,255,000 $0$0 $0Expense Total $0 $0 $229,000 $1,255,000 $0$0 $0 $0 $0 $229,000Unsecured Funding $1,255,000 $0$0 $0Funding Source Total $0 $0 $229,000 $1,255,000 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 33   Item 2.1       Packet pg. 36/238   Item 2.1       Packet pg. 36/238 Reduce the intersection delay and improve the Level of Service (LOS). The projected LOS in 2044 would be improved from LOS F to LOS D. Improve active transportation conditions. Benefit Reduce the intersection delay and improve the Level of Service (LOS). The projected LOS in 2044 would be improved from LOS F to LOS D. Improve active transportation conditions. Description Reconfigure eastbound lanes to a left turn lane and through/ right turn lane. Add eastbound and westbound dedicated left turn lanes with a protected-permitted phase. Provide right turn overlap for westbound movement during southbound left turn phase. Additional improvements include wider sidewalk, bike lanes, street lighting, and various utility improvements (including conversion overhead utility lines to underground). A multi-use path will be added along 220th St SW from 76th Ave W to Hwy 99. This project was ranked as MEDIUM PRIORITY in 2024 Transportation Plan . $11,000,000 76TH AVE W @ 220TH ST SW INTERSECTION IMPROVEMENTS PWT-19 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $143,000 $108,000 $0 $0Design $0 $0$0 $2,035,000 $1,101,000 $0 $0Right of Way $0 $0$0 $0 $0 $0 $3,370,000Construction $3,300,000 $0$0 $2,178,000Expense Total $1,209,000 $0 $3,370,000 $3,300,000 $0$0 $294,030 $163,215 $0 $0Transportation Impact Fees $0 $0$0 $1,883,970 $1,045,785 $0 $0Federal Grants $0 $0$0 $0 $0 $0 $3,370,000Unsecured Funding $3,300,000 $0$0 $2,178,000Funding Source Total $1,209,000 $0 $3,370,000 $3,300,000 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 34   Item 2.1       Packet pg. 37/238   Item 2.1       Packet pg. 37/238 Improve traffic flows along this regional corridor / principal arterial with a current Average Daily Traffic (ADT) of ~ 25,000 vehicles per day.Benefit Improve traffic flows along this regional corridor / principal arterial with a current Average Daily Traffic (ADT) of ~ 25,000 vehicles per day. Description The project will add a traffic signal adaptive system on a 1.25-mile segment of SR104 from 236th St to 226th St. The system will monitor and synchronize the timing of five existing signalized intersections (SR104 @ 236th St, SR104 @ 232nd St, SR104 @ 95th Pl, SR104 @ 100th Ave, SR104 @ 226th St) and improve traffic flows along SR104. This project was identified as MEDIUM PRIORITY in 2024 Transportation Plan. $4,600,000 SR-104 ADAPTIVE SYSTEM - 236TH TO 226TH PWT-20 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $80,000 $0 $0 $0Design $0 $0$0 $0 $0 $0 $4,132,000Construction $0 $0$0 $80,000Expense Total $0 $0 $4,132,000 $0 $0$0 $56,000 $0 $0 $0Federal Grants $0 $0$0 $12,000 $0 $0 $279,000Fund 125 - REET $0 $0$0 $12,000 $0 $0 $279,000Fund 126 - REET $0 $0$0 $0 $0 $0 $3,574,000Unsecured Funding $0 $0$0 $80,000Funding Source Total $0 $0 $4,132,000 $0 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 35   Item 2.1       Packet pg. 38/238   Item 2.1       Packet pg. 38/238 Improve access and safety at the signalized intersection and improve active transportation safety.Benefit Improve access and safety at the signalized intersection and improve active transportation safety. Description Implement Westgate Circulation Access Plan, install mid-block pedestrian crossing along 100th Ave W, improve safety to access the driveways within proximity to the intersection, and re-striping of 100th Ave W with the potential addition of bike lanes. This project was identified in the SR-104 Completed Streets Corridor Analysis (completed in 2015) and ranked as MEDIUM PRIORITY in 2024 Transportation Plan. $4,876,000 SR-104 @ 100TH AVE W INTERSECTION IMPROVEMENTS PWT-21 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $0 $0 $0 $455,000Design $0 $0$0 $0 $0 $0 $0Right of Way $1,431,000 $0$0 $0 $0 $0 $0Construction $0 $0$2,990,000 $0Expense Total $0 $0 $455,000 $1,431,000 $0$2,990,000 $0 $0 $0 $455,000Unsecured Funding $1,431,000 $0$2,990,000 $0Funding Source Total $0 $0 $455,000 $1,431,000 $0$2,990,000 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 36   Item 2.1       Packet pg. 39/238   Item 2.1       Packet pg. 39/238 Improve intersection safety for pedestrians and vehicles.Benefit Improve intersection safety for pedestrians and vehicles. Description Upgrade all ADA Curb Ramps; and add C-Curb for access management. This project was identified in the SR-104 Complete Streets Corridor Analysis (completed in 2015) and ranked as LOW PRIORITY in 2024 Transportation Plan. $318,000 SR-104 @ 95TH PL W INTERSECTION IMPROVEMENTS PWT-22 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $0 $0 $0 $0Design, ROW, Construction $0 $318,000$0 $0Expense Total $0 $0 $0 $0 $318,000$0 $0 $0 $0 $0Unsecured Funding $0 $318,000$0 $0Funding Source Total $0 $0 $0 $0 $318,000$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 37   Item 2.1       Packet pg. 40/238   Item 2.1       Packet pg. 40/238 Improve vehicular and pedestrian safety. The existing Level of Service (LOS) at this intersection is LOS F and will be improved to LOS C with these improvements (meet City LOS Standards). Benefit Improve vehicular and pedestrian safety. The existing Level of Service (LOS) at this intersection is LOS F and will be improved to LOS C with these improvements (meet City LOS Standards). Description Install traffic signal. This project was identified in the SR-104 Complete Street Corridor Analysis (completed in 2015). This project was identified as LOW PRIORITY in 2024 Transportation Plan. $1,708,000 SR-104 @ 238TH ST SW INTERSECTION IMPROVEMENTS PWT-23 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $0 $0 $0 $0Design $0 $256,000$0 $0 $0 $0 $0Construction $0 $1,452,000$0 $0Expense Total $0 $0 $0 $0 $1,708,000$0 $0 $0 $0 $0Unsecured Funding $0 $1,708,000$0 $0Funding Source Total $0 $0 $0 $0 $1,708,000$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 38   Item 2.1       Packet pg. 41/238   Item 2.1       Packet pg. 41/238 The improvement will reduce the intersection delay. The projected Level of Service is LOS F in 2044, which is below the City’s concurrency standards (LOS D). The project will improve the Level of Service to LOS B. Benefit The improvement will reduce the intersection delay. The projected Level of Service is LOS F in 2044, which is below the City’s concurrency standards (LOS D). The project will improve the Level of Service to LOS B. Description Install traffic signal (the intersection currently stop controlled for all movements (identified as LOW PRIORITY PROJECT in 2024 Transportation Plan). This intersection is a shared intersection with City of Lynnwood. $1,500,000 OLYMPIC VIEW DR @ 76TH AVE W INTERSECTION IMPROVEMENTS PWT-24 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $0 $0 $0 $0Design, ROW, Construction $0 $1,500,000$0 $0Expense Total $0 $0 $0 $0 $1,500,000$0 $0 $0 $0 $0Unsecured Funding $0 $1,500,000$0 $0Funding Source Total $0 $0 $0 $0 $1,500,000$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 39   Item 2.1       Packet pg. 42/238   Item 2.1       Packet pg. 42/238 Improve traffic flow, access and active transportation use with the addition of left turn lane at selected intersections, sidewalks, bike lanes on both sides of the street, and street lighting. Benefit Improve traffic flow, access and active transportation use with the addition of left turn lane at selected intersections, sidewalks, bike lanes on both sides of the street, and street lighting. Description Widen 84th Ave W to curb and gutter, bike lanes, sidewalk on each side of the street and addition of left turn lane at selected key intersections. This project was ranked as MEDIUM PRIORITY in 2024 Transportation Plan. The segment of 84th Ave W from 230th St SW to 220th St SW is within Snohomish County ROW. $17,800,000 84TH AVE W (212TH ST SW TO 238TH ST SW) PWT-25 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $0 $0 $0 $0Design, ROW, Construction $0 $17,800,000$0 $0Expense Total $0 $0 $0 $0 $17,800,000$0 $0 $0 $0 $0Unsecured Funding $0 $17,800,000$0 $0Funding Source Total $0 $0 $0 $0 $17,800,000$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 40   Item 2.1       Packet pg. 43/238   Item 2.1       Packet pg. 43/238 Improve access, safety and delay at the intersection for vehicles and active transportation users.Benefit Improve access, safety and delay at the intersection for vehicles and active transportation users. Description Extend bike lanes within proximity to intersection in northbound and southbound directions. Add westbound right turn lane along SR-104 (125' storage length). This project was ranked as MEDIUM PRIORITY in 2024 Transportation Plan. $2,819,000 SR-104 @ 76TH AVE W INTERSECTION IMPROVEMENTS PWT-43 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $0 $0 $0 $515,000Design, ROW, and Construction $2,304,000 $0$0 $0Expense Total $0 $0 $515,000 $2,304,000 $0$0 $0 $0 $0 $515,000Unsecured Funding $2,304,000 $0$0 $0Funding Source Total $0 $0 $515,000 $2,304,000 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 41   Item 2.1       Packet pg. 44/238   Item 2.1       Packet pg. 44/238 Improve reliability of traffic signal operation.Benefit Improve reliability of traffic signal operation. Description This program started in 2019 and provides new signal upgrades, such as vehicle detection at intersections, new vehicle/pedestrian head equipment and other signal- related upgrades. These improvements will improve the safety of the City’s transportation system. $30,280 TRAFFIC SIGNAL PROGRAM PWT-59 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $1,000 $1,000 $0 $0Design $0 $0$0 $29,280 $29,280 $0 $0Construction $0 $0$0 $30,280Expense Total $30,280 $0 $0 $0 $0$0 $15,140 $0 $0 $0Fund 125 - REET $0 $0$0 $15,140 $30,280 $0 $0Fund 126 - REET $0 $0$0 $30,280Funding Source Total $30,280 $0 $0 $0 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 42   Item 2.1       Packet pg. 45/238   Item 2.1       Packet pg. 45/238 Improve traffic flows along the entire corridor and reduce intersection delays at signalized intersections (220th St SW, 216th St SW, 212th St SW, and 206th St SW).Benefit Improve traffic flows along the entire corridor and reduce intersection delays at signalized intersections (220th St SW, 216th St SW, 212th St SW, and 206th St SW). Description Installation of a signal adaptive system along 76th Ave W from 206th St SW to 220th St. This project was ranked as HIGH PRIORITY in 2024 Transportation Plan. $3,074,000 76TH AVE W ADAPTIVE SYSTEM FROM 206TH ST SW TO 220TH ST SW PWT-97 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $0 $0 $0 $461,000Design $0 $0$0 $0 $0 $0 $0Construction $2,613,000 $0$0 $0Expense Total $0 $0 $461,000 $2,613,000 $0$0 $0 $0 $0 $461,000Unsecured Funding $2,613,000 $0$0 $0Funding Source Total $0 $0 $461,000 $2,613,000 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 43   Item 2.1       Packet pg. 46/238   Item 2.1       Packet pg. 46/238 Improve night-time intersection safety of all users.Benefit Improve night-time intersection safety of all users. Description Install new light poles at key intersections where serious injury collisions have occurred recently. The intersections include 76th Ave W @ Interurban Trail, 8th Ave S @ 14th St SW, 76th Ave W @ 200th St SW, SR-524 @ 9th Ave N, 84th Ave W @ 236th St SW, and Dayton St. between Railroad Tracks and SR-104. $700,000 CITYWIDE LIGHTING IMPROVEMENTS PWT-98 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $5,000 $0 $0 $0Construction $0 $0$0 $5,000Expense Total $0 $0 $0 $0 $0$0 $5,000 $0 $0 $0Federal Grants $0 $0$0 $5,000Funding Source Total $0 $0 $0 $0 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 44   Item 2.1       Packet pg. 47/238   Item 2.1       Packet pg. 47/238 NON-MOTORIZED TRANSPORTATION September 2026 DRAFT 1.4 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 45   Item 2.1       Packet pg. 48/238   Item 2.1       Packet pg. 48/238 This project would improve pedestrian safety, connecting Scriber Lake School / ball fields to a residential area and a principal arterial.Benefit This project would improve pedestrian safety, connecting Scriber Lake School / ball fields to a residential area and a principal arterial. Description Install sidewalk along 232nd St SW from 100th Ave W to SR-104. This project ranks as MEDIUM PRIORITY in 2024 Transportation Plan. $4,558,000 232ND ST SW WALKWAY FROM 100TH AVE TO SR-104 PWT-29 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $0 $0 $0 $684,000Design $0 $0$0 $0 $0 $0 $0Construction $3,874,000 $0$0 $0Expense Total $0 $0 $684,000 $3,874,000 $0$0 $0 $0 $0 $684,000Unsecured Funding $3,874,000 $0$0 $0Funding Source Total $0 $0 $684,000 $3,874,000 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 46   Item 2.1       Packet pg. 49/238   Item 2.1       Packet pg. 49/238 This project would improve pedestrian safety along a stretch on the east side of Highway 99, linking Hwy 99 to a minor arterial.Benefit This project would improve pedestrian safety along a stretch on the east side of Highway 99, linking Hwy 99 to a minor arterial. Description Install sidewalk along 236th St SW from Hwy 99 to 76th Ave W. This project ranked as HIGH PRIORITY in the 2024 Transportation Plan. $2,385,000 236TH ST SW WALKWAY FROM HWY 99 TO 76TH AVE W PWT-31 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $0 $0 $0 $371,000Design $0 $0$0 $0 $0 $0 $0Construction $2,014,000 $0$0 $0Expense Total $0 $0 $371,000 $2,014,000 $0$0 $0 $0 $0 $371,000Unsecured Funding $2,014,000 $0$0 $0Funding Source Total $0 $0 $371,000 $2,014,000 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 47   Item 2.1       Packet pg. 50/238   Item 2.1       Packet pg. 50/238 This project would improve pedestrian safety, adding a sidewalk along a minor arterial with Average Daily Traffic of ~ 5,000 vehicles per day.Benefit This project would improve pedestrian safety, adding a sidewalk along a minor arterial with Average Daily Traffic of ~ 5,000 vehicles per day. Description The walkway project proposed approximately 1,000 LF of new sidewalk on the east side of 84th Ave W with ADA compliant pedestrian curb ramps. This project was ranked as MEDIUM PRIORITY in 2024 Transportation Plan. $2,894,000 84TH AVE W WALKWAY FROM 238TH ST SW TO 234TH ST SW PWT-32 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $0 $0 $0 $159,000Design $159,000 $0$0 $0 $0 $0 $0ROW $244,000 $0$0 $0 $0 $0 $0Construction $0 $0$2,332,000 $0Expense Total $0 $0 $159,000 $403,000 $0$2,332,000 $0 $0 $0 $159,000Unsecured Funding $403,000 $0$2,332,000 $0Funding Source Total $0 $0 $159,000 $403,000 $0$2,332,000 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 48   Item 2.1       Packet pg. 51/238   Item 2.1       Packet pg. 51/238 The improvements will improve active transportation safety (including for school kids due to proximity of several schools).Benefit The improvements will improve active transportation safety (including for school kids due to proximity of several schools). Description Install sidewalk along 80th Ave W from 206th St SW to 212th St SW with curb and gutter. This project was ranked as MEDIUM PRIORITY in the 2024 Transportation Plan. $3,068,000 80TH AVE W WALKWAY FROM 212TH ST SW TO 206TH ST SW PWT-33 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $0 $0 $0 $0Construction $0 $0$2,612,000 $0 $0 $0 $0Design $456,000 $0$0 $0Expense Total $0 $0 $0 $456,000 $0$2,612,000 $0 $0 $0 $0Unsecured Funding $456,000 $0$2,612,000 $0Funding Source Total $0 $0 $0 $456,000 $0$2,612,000 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 49   Item 2.1       Packet pg. 52/238   Item 2.1       Packet pg. 52/238 This project would improve pedestrian safety along a collector street with connections to / from a residential street to Seaview Park and Snohomish County Park along Olympic View Dr. Benefit This project would improve pedestrian safety along a collector street with connections to / from a residential street to Seaview Park and Snohomish County Park along Olympic View Dr. Description Install sidewalk along 80th Ave W from 188th St SW to OVD. This project ranked as MEDIUM PRIORITY in 2024 Transportation Plan. $6,678,000 80TH AVE W WALKWAY FROM 188TH ST SW TO OLYMPIC VIEW DR PWT-34 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $0 $0 $0 $0Design $0 $1,000,000$0 $0 $0 $0 $0Construction $0 $5,678,000$0 $0Expense Total $0 $0 $0 $0 $6,678,000$0 $0 $0 $0 $0Unsecured Funding $0 $6,678,000$0 $0Funding Source Total $0 $0 $0 $0 $6,678,000$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 50   Item 2.1       Packet pg. 53/238   Item 2.1       Packet pg. 53/238 The improvements will improve pedestrian safety with the addition of a sidewalk on one side of street, providing sidewalk connections to Chase Lake Elementary School on 84th Ave W. Benefit The improvements will improve pedestrian safety with the addition of a sidewalk on one side of street, providing sidewalk connections to Chase Lake Elementary School on 84th Ave W. Description Install sidewalk along 218th St SW from 76th Ave W to 84th Ave W with curb and gutter. This project ranked as MEDIUM PRIORITY in 2024 Transportation Plan. $4,133,000 218TH ST SW WALKWAY FROM 76TH AVE W TO 84TH AVE W PWT-35 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $0 $0 $0 $0Construction $0 $3,513,000$0 $0 $0 $0 $0Design $0 $620,000$0 $0Expense Total $0 $0 $0 $0 $4,133,000$0 $0 $0 $0 $0Unsecured Funding $0 $4,133,000$0 $0Funding Source Total $0 $0 $0 $0 $4,133,000$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 51   Item 2.1       Packet pg. 54/238   Item 2.1       Packet pg. 54/238 This project will improve pedestrian safety along this stretch with the Downtown Edmonds. This short stretch would complete a short missing sidewalk link.Benefit This project will improve pedestrian safety along this stretch with the Downtown Edmonds. This short stretch would complete a short missing sidewalk link. Description Install sidewalk on the south side of Walnut St from 6th Ave S to 7th Ave S. This project is ranked as MEDIUM PRIORITY in 2024 Transportation Plan. $424,000 WALNUT ST WALKWAY FROM 6TH AVE S TO 7TH AVE S PWT-36 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $0 $0 $0 $0Design $0 $85,000$0 $0 $0 $0 $0Construction $0 $339,000$0 $0Expense Total $0 $0 $0 $0 $424,000$0 $0 $0 $0 $0Unsecured Funding $0 $424,000$0 $0Funding Source Total $0 $0 $0 $0 $424,000$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 52   Item 2.1       Packet pg. 55/238   Item 2.1       Packet pg. 55/238 Create pedestrian connection between Maplewood Elementary School on 200th St SW and Main St, by encouraging kids to use non-motorized transportation to walk to / from school. Benefit Create pedestrian connection between Maplewood Elementary School on 200th St SW and Main St, by encouraging kids to use non-motorized transportation to walk to / from school. Description Construct sidewalk on Maplewood Dr. from Main St to 200th St SW (~ 2,700’). A sidewalk currently exists on 200th St SW from Main St to 76th Ave W, adjacent to Maplewood Elementary School (ranked in Medium Priority Ranking List of the 2024 Transportation Plan). $4,770,000 MAPLEWOOD DR WALKWAY FROM MAIN ST TO 200TH ST SW PWT-40 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $0 $0 $0 $371,000Design $371,000 $0$0 $0 $0 $0 $0Construction $0 $0$4,028,000 $0Expense Total $0 $0 $371,000 $371,000 $0$4,028,000 $0 $0 $0 $371,000Unsecured Funding $371,000 $0$4,028,000 $0Funding Source Total $0 $0 $371,000 $371,000 $0$4,028,000 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 53   Item 2.1       Packet pg. 56/238   Item 2.1       Packet pg. 56/238 Improve active transportation safety along the Interurban Trail (Regional Trail linking Seattle to Everett).Benefit Improve active transportation safety along the Interurban Trail (Regional Trail linking Seattle to Everett). Description Extend bike lanes within proximity of the intersection in northbound and southbound directions. Install APS on all corner and new ADA curb ramps. This project was ranked as MEDIUM PRIORITY in 2024 Transportation Plan. $2,819,000 SR-104 @ 76TH AVE W NON-MOTORIZED TRANSPORTATION IMPROVEMENTS PWT-43 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $0 $0 $0 $515,000Design, ROW, and Construction $2,304,000 $0$0 $0Expense Total $0 $0 $515,000 $2,304,000 $0$0 $0 $0 $0 $515,000Unsecured Funding $2,304,000 $0$0 $0Funding Source Total $0 $0 $515,000 $2,304,000 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 54   Item 2.1       Packet pg. 57/238   Item 2.1       Packet pg. 57/238 This project will improve pedestrian connectivity between the residential areas along 3rd Ave S to Downtown Edmonds and City Park.Benefit This project will improve pedestrian connectivity between the residential areas along 3rd Ave S to Downtown Edmonds and City Park. Description Installation of sidewalk with ADA curb ramps along SR-104 from the HAWK signal to Pine St and along Pine St from SR-104 to 9th Ave S. This project ranked as MEDIUM PRIORITY in 2024 Transportation Plan. $7,207,000 SR-104 / PINE S WALKWAY FROM HAWK TO PINE / SR- 104 TO 9TH PWT-45 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $0 $0 $0 $0Construction $0 $1,081,000$0 $0 $0 $0 $0Design $0 $6,126,000$0 $0Expense Total $0 $0 $0 $0 $7,207,000$0 $0 $0 $0 $0Unsecured Funding $0 $7,207,000$0 $0Funding Source Total $0 $0 $0 $0 $7,207,000$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 55   Item 2.1       Packet pg. 58/238   Item 2.1       Packet pg. 58/238 This project would improve pedestrian safety along this stretch, creating a active transportation connection between a local park (Hickman Park) and Sherwood Elementary / residential areas within proximity. Benefit This project would improve pedestrian safety along this stretch, creating a active transportation connection between a local park (Hickman Park) and Sherwood Elementary / residential areas within proximity. Description Install sidewalk along 104th Ave W from 238th St SW to 106th Ave W, with curb and gutter. This project ranked as MEDIUM PRIOIRTY in 2024 Transportation Plan. $2,332,000 104TH AVE W / ROBINHOOD LN WALKWAY FROM 238TH ST TO 106TH AVE W PWT-47 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $0 $0 $0 $0Design $0 $350,000$0 $0 $0 $0 $0Construction $0 $1,982,000$0 $0Expense Total $0 $0 $0 $0 $2,332,000$0 $0 $0 $0 $0Unsecured Grants $0 $2,332,000$0 $0Funding Source Total $0 $0 $0 $0 $2,332,000$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 56   Item 2.1       Packet pg. 59/238   Item 2.1       Packet pg. 59/238 Improve active transportation safety.Benefit Improve active transportation safety. Description The project consists of installing ADA compliant curb ramps throughout the City along Bowdoin Ave from Yost Park to Five Corners, 3rd Ave. N @ Giltner, and 76th Ave. W @ 236th St. SW. $891,733 PEDESTRIAN IMPROVEMENTS (2027) PWT-56 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $753,500 $0 $0 $0Construction $0 $0$0 $753,500Expense Total $0 $0 $0 $0 $0$0 $89,650 $0 $0 $0Fund 125 - REET $0 $0$0 $89,650 $0 $0 $0Fund 126 - REET $0 $0$0 $574,200 $0 $0 $0State Grants $0 $0$0 $753,500Funding Source Total $0 $0 $0 $0 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 57   Item 2.1       Packet pg. 60/238   Item 2.1       Packet pg. 60/238 Improve active transportation safety at pedestrian crossings. Safety improvements at such locations will increase the number of active transportation users on our streets (since this will feel more comfortable using the existing facilities). Benefit Improve active transportation safety at pedestrian crossings. Safety improvements at such locations will increase the number of active transportation users on our streets (since this will feel more comfortable using the existing facilities). Description This program started in 2019 and will provide pedestrian safety improvements, such as additional signage / striping, flashing LED’s around stop signs, or other improvements. These improvements will improve the safety of the City’s transportation system. $20,180 PEDESTRIAN SAFETY PROGRAM PWT-60 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $1,000 $1,000 $0 $0Design $0 $0$0 $19,180 $19,180 $0 $0Construction $0 $0$0 $20,180Expense Total $20,180 $0 $0 $0 $0$0 $20,180 $20,180 $0 $0Fund 126 - REET $0 $0$0 $20,180Funding Source Total $20,180 $0 $0 $0 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 58   Item 2.1       Packet pg. 61/238   Item 2.1       Packet pg. 61/238 Improve active transportation safety along this corridor with an ADT ranging from 6,000 vpd to 10,000 vpd.Benefit Improve active transportation safety along this corridor with an ADT ranging from 6,000 vpd to 10,000 vpd. Description Installation of 10' multi-use path along Caspers / 9th Ave N Puget Dr., creating new active transportation connections. This project was ranked as HIGH PRIORITY in 2024 Transportation Plan. $12,820,000 CASPERS / 9TH AVE N / PUGET MULTI-USE PATH FROM ADMIRAL WAY TO OLYMPIC VIEW DR PWT-71 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $0 $0 $0 $1,060,000Design $1,060,000 $0$0 $0 $0 $0 $0Construction $0 $0$10,700,000 $0Expense Total $0 $0 $1,060,000 $1,060,000 $0$10,700,000 $0 $0 $0 $1,060,000Unsecured Funding $1,060,000 $0$10,700,000 $0Funding Source Total $0 $0 $1,060,000 $1,060,000 $0$10,700,000 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 59   Item 2.1       Packet pg. 62/238   Item 2.1       Packet pg. 62/238 Improve active transportation safety along this corridor with an ADT of ranging from 13,000 vpd to 25,000 vpd.Benefit Improve active transportation safety along this corridor with an ADT of ranging from 13,000 vpd to 25,000 vpd. Description Installation of 10' multi-use path along SR-104 from 100th Ave W to Main St, creating new active transportation connections. This project was considered a HIGH PRIORITY in 2024 Transportation Plan. $29,150,000 SR-104 MULTI-USE PATH FROM 100TH AVE W TO MAIN ST PWT-72 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $0 $0 $0 $2,650,000Design $2,650,000 $0$0 $0 $0 $0 $0Construction $0 $0$21,200,000 $0 $0 $0 $0Right of Way $2,650,000 $0$0 $0Expense Total $0 $0 $2,650,000 $5,300,000 $0$21,200,000 $0 $0 $0 $2,650,000Unsecured Funding $5,300,000 $0$21,200,000 $0Funding Source Total $0 $0 $2,650,000 $5,300,000 $0$21,200,000 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 60   Item 2.1       Packet pg. 63/238   Item 2.1       Packet pg. 63/238 Improve active transportation safety along this corridor with an ADT of approximately 12,500 vpd.Benefit Improve active transportation safety along this corridor with an ADT of approximately 12,500 vpd. Description Installation of 10' multi-use path along 212th St SW from 74th Ave W to Hwy 99, creating new active transportation connections. This project was considered a HIGH PRIORITY in 2024 Transportation Plan. $5,512,000 212TH ST SW MULTI- USE PATH FROM 74TH AVE W TO HWY 99 PWT-73 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $0 $0 $0 $0Design $530,000 $0$530,000 $0 $0 $0 $0Right of Way $0 $0$1,060,000 $0 $0 $0 $0Construction $0 $3,392,000$0 $0Expense Total $0 $0 $0 $530,000 $3,392,000$1,590,000 $0 $0 $0 $0Unsecured Funding $530,000 $3,392,000$1,590,000 $0Funding Source Total $0 $0 $0 $530,000 $3,392,000$1,590,000 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 61   Item 2.1       Packet pg. 64/238   Item 2.1       Packet pg. 64/238 Improve active transportation safety along this corridor with an ADT of approximately 25,000 vpd, connecting Westgate Village to southern portion of Edmonds.Benefit Improve active transportation safety along this corridor with an ADT of approximately 25,000 vpd, connecting Westgate Village to southern portion of Edmonds. Description Installation of 10' multi-use path along SR-104 from 100th Ave W to 244th St SW, creating new active transportation connections. This project was considered a HIGH PRIORITY in 2024 Transportation Plan. $24,380,000 SR-104 MULTI-USE PATH FROM 100TH AVE W TO 244TH ST SW PWT-74 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $0 $0 $0 $1,590,000Design $2,120,000 $0$0 $0 $0 $0 $0Right of Way $0 $0$4,240,000 $0 $0 $0 $0Construction $0 $16,430,000$0 $0Expense Total $0 $0 $1,590,000 $2,120,000 $16,430,000$4,240,000 $0 $0 $0 $1,590,000Unsecured Funding $2,120,000 $16,430,000$4,240,000 $0Funding Source Total $0 $0 $1,590,000 $2,120,000 $16,430,000$4,240,000 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 62   Item 2.1       Packet pg. 65/238   Item 2.1       Packet pg. 65/238 Improve active transportation safety along this corridor with an ADT of approximately 6,500 vpd, connecting the Ferry Terminal to the heart of Downtown Edmonds.Benefit Improve active transportation safety along this corridor with an ADT of approximately 6,500 vpd, connecting the Ferry Terminal to the heart of Downtown Edmonds. Description Installation of bike lane for the eastbound uphill movement on Main St from the Ferry Terminal to 6th Ave W. This addition is possible with the roadway widening. $8,860,000 MAIN ST BIKE LANES FROM THE FERRY TERMINAL TO 6TH AVE PWT-75 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $0 $0 $0 $0Design $0 $1,590,000$0 $0 $0 $0 $0Right of Way $0 $1,060,000$0 $0 $0 $0 $0Construction $0 $6,360,000$0 $0Expense Total $0 $0 $0 $0 $9,010,000$0 $0 $0 $0 $0Unsecured Funding $0 $9,010,000$0 $0Funding Source Total $0 $0 $0 $0 $9,010,000$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 63   Item 2.1       Packet pg. 66/238   Item 2.1       Packet pg. 66/238 Improve active transportation safety along this stretch, linking a residential area (on east side of Highway 99) to Highway 99.Benefit Improve active transportation safety along this stretch, linking a residential area (on east side of Highway 99) to Highway 99. Description Installation of sidewalk along 240th St SW / 78th Ave, W from Hwy 99 to 236th St SW. This project was identified as HIGH PRIORITY in 2024 Transportation Plan $4,786,000 240TH ST SW / 78TH AVE W WALKWAY FROM HWY 99 TO 236TH ST SW PWT-76 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $0 $0 $0 $318,000Design $318,000 $0$0 $0 $0 $0 $0Construction $0 $0$4,150,000 $0Expense Total $0 $0 $318,000 $318,000 $0$4,150,000 $0 $0 $0 $318,000Unsecured Funding $318,000 $0$4,150,000 $0Funding Source Total $0 $0 $318,000 $318,000 $0$4,150,000 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 64   Item 2.1       Packet pg. 67/238   Item 2.1       Packet pg. 67/238 This addition creates safer bicycle conditions along this corridor with Average Daily Traffic (ADT) of 4,000 vehicles per day.Benefit This addition creates safer bicycle conditions along this corridor with Average Daily Traffic (ADT) of 4,000 vehicles per day. Description Installation of bike lanes along 9th Ave N from Main St to Caspers St through restriping. This project was ranked HIGH PRIORITY in 2024 Transportation Plan. $297,000 9TH AVE N BIKE LANES FROM MAIN ST TO CASPERS ST PWT-77 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $0 $0 $0 $0Design $53,000 $0$0 $0 $0 $0 $0Construction $0 $0$244,000 $0Expense Total $0 $0 $0 $53,000 $0$244,000 $0 $0 $0 $0Unsecured Funding $53,000 $0$244,000 $0Funding Source Total $0 $0 $0 $53,000 $0$244,000 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 65   Item 2.1       Packet pg. 68/238   Item 2.1       Packet pg. 68/238 Improve bicycle safety along this corridor with Average Daily Traffic (ADT) of 8,000 vehicles per day and reduce speed through the addition of landscaped raised median along portion of the stretch. Benefit Improve bicycle safety along this corridor with Average Daily Traffic (ADT) of 8,000 vehicles per day and reduce speed through the addition of landscaped raised median along portion of the stretch. Description Addition of bike lanes along Main St from 9th Ave to 84th Ave W through the re- striping of this corridor.. This project is identified as a HIGH PRIORITY in 2024 Transportation Plan. $859,000 MAIN ST BIKE LANES FROM 9TH AVE TO 84TH AVE W PWT-78 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $0 $0 $0 $118,000Design $0 $0$0 $0 $0 $0 $0Construction $741,200 $0$0 $0Expense Total $0 $0 $118,000 $741,200 $0$0 $0 $0 $0 $11,800Fund 125 - REET $74,100 $0$0 $0 $0 $0 $11,800Fund 126 - REET $74,100 $0$0 $0 $0 $0 $94,400Unsecured Funding $593,000 $0$0 $0Funding Source Total $0 $0 $118,000 $741,200 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 66   Item 2.1       Packet pg. 69/238   Item 2.1       Packet pg. 69/238 Improve bicycle safety along this principal arterial with a new connection within the bicycle network.Benefit Improve bicycle safety along this principal arterial with a new connection within the bicycle network. Description Addition of bike lanes on both sides of 238th St SW from SR-104 to 84th Ave W through roadway widening. This project was ranked as HIGH PRIORITY in 2024 Transportation Plan. $573,000 238TH ST SW BIKE LANES FROM SR-104 TO 84TH AVE W PWT-79 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $0 $0 $0 $85,000Design $0 $0$0 $0 $0 $0 $0Construction $488,000 $0$0 $0Expense Total $0 $0 $85,000 $488,000 $0$0 $0 $0 $0 $85,000Unsecured Funding $488,000 $0$0 $0Funding Source Total $0 $0 $85,000 $488,000 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 67   Item 2.1       Packet pg. 70/238   Item 2.1       Packet pg. 70/238 Improve pedestrian safety along this local street (linking to Madrona Elementary School).Benefit Improve pedestrian safety along this local street (linking to Madrona Elementary School). Description Installation of sidewalk on one side of 236th St SW from 94th Ave to 84th Ave W. This project was ranked as HIGH PRIORITY in 2024 Transportation Plan. $3,286,000 236TH ST SW WALKWAY FROM 94TH AVE W TO 84TH AVE W PWT-80 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $0 $0 $0 $530,000Design $0 $0$0 $0 $0 $0 $0Construction $2,756,000 $0$0 $0Expense Total $0 $0 $530,000 $2,756,000 $0$0 $0 $0 $0 $530,000Unsecured Funding $2,756,000 $0$0 $0Funding Source Total $0 $0 $530,000 $2,756,000 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 68   Item 2.1       Packet pg. 71/238   Item 2.1       Packet pg. 71/238 Improve active transportation safety along this stretch, creating a connection from Downtown Edmonds along this very scenic local street.Benefit Improve active transportation safety along this stretch, creating a connection from Downtown Edmonds along this very scenic local street. Description Installation of multi-use path along Sunset Ave / Caspers St from 3rd Ave N to SR- 104.This project was identified as HIGH PRIORITY in 2024 Transportation Plan. $5,700,000 SUNSET AVE MULTI- USE PATH FROM CASPERS ST TO 3RD AVE N / SR-104 PWT-81 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $0 $0 $0 $0Design, ROW, and Construction $0 $5,700,000$0 $0Expense Total $0 $0 $0 $0 $5,700,000$0 $0 $0 $0 $0Unsecured Funding $0 $5,700,000$0 $0Funding Source Total $0 $0 $0 $0 $5,700,000$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 69   Item 2.1       Packet pg. 72/238   Item 2.1       Packet pg. 72/238 Improve active transportation safety along this collector street with Average Daily Traffic (ADT) of 4,500 vehicles per day.Benefit Improve active transportation safety along this collector street with Average Daily Traffic (ADT) of 4,500 vehicles per day. Description Installation of multi-use path along Olympic View Dr. from 76th Ave W to City limits. This project ranked as HIGH PRIORITY PROJECT in 2024 Transportation Plan. $19,000,000 OLYMPIC VIEW DR MULTI-USE PATH FROM 76TH AVE W TO CITY LIMITS PWT-83 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $0 $0 $0 $0Design, ROW, and Construction $0 $19,000,000$0 $0Expense Total $0 $0 $0 $0 $19,000,000$0 $0 $0 $0 $0Unsecured Funding $0 $19,000,000$0 $0Funding Source Total $0 $0 $0 $0 $19,000,000$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 70   Item 2.1       Packet pg. 73/238   Item 2.1       Packet pg. 73/238 Improve active transportation safety along this principal arterial (with Average Daily Traffic / ADT of 13,000 vehicles per day), connecting to commercial areas on the east side and parks / residential areas on the west side. Benefit Improve active transportation safety along this principal arterial (with Average Daily Traffic / ADT of 13,000 vehicles per day), connecting to commercial areas on the east side and parks / residential areas on the west side. Description Installation of multi-use path along 196th St SW from 88th Ave W to 76th Ave W. This project ranked as HIGH PRIOIRITY in 2024 Transportation Plan. $9,800,000 196TH ST SW MULTI- USE PATH FROM 88TH AVE W TO 76TH AVE W PWT-84 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $0 $0 $0 $0Design, ROW, and Construction $0 $9,800,000$0 $0Expense Total $0 $0 $0 $0 $9,800,000$0 $0 $0 $0 $0Unsecured Funding $0 $9,800,000$0 $0Funding Source Total $0 $0 $0 $0 $9,800,000$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 71   Item 2.1       Packet pg. 74/238   Item 2.1       Packet pg. 74/238 Improve pedestrian safety along this stretch within Downtown Edmonds and completing short missing link.Benefit Improve pedestrian safety along this stretch within Downtown Edmonds and completing short missing link. Description Installation of sidewalk along Maple St from 8th Ave to 9th Ave. This project ranked as MEDIUM PRIORITY in 2024 Transportation Plan. $979,000 MAPLE ST WALKWAY FROM 8TH AVE TO 9TH AVE PWT-87 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $0 $0 $0 $0Design $0 $147,000$0 $0 $0 $0 $0Construction $0 $832,000$0 $0Expense Total $0 $0 $0 $0 $979,000$0 $0 $0 $0 $0Unsecured Funding $0 $979,000$0 $0Funding Source Total $0 $0 $0 $0 $979,000$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 72   Item 2.1       Packet pg. 75/238   Item 2.1       Packet pg. 75/238 Improve pedestrian safety along this stretch, connecting two minor arterials with mostly residential area.Benefit Improve pedestrian safety along this stretch, connecting two minor arterials with mostly residential area. Description Installation of sidewalk along 218th St SW from 84th Ave W to 76th Ave W. This project was ranked as MEDIUM PRIORITY in 2024 Transportation Plan. $4,134,000 218TH ST SW WALKWAY FROM 84TH AVE W TO 76TH AVE W PWT-88 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $0 $0 $0 $0Construction $0 $3,514,000$0 $0 $0 $0 $0Design $0 $620,000$0 $0Expense Total $0 $0 $0 $0 $4,134,000$0 $0 $0 $0 $0Unsecured Funding $0 $4,134,000$0 $0Funding Source Total $0 $0 $0 $0 $4,134,000$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 73   Item 2.1       Packet pg. 76/238   Item 2.1       Packet pg. 76/238 Improve pedestrian safety along this collector street, providing connections from a residential area to Maplewood Park and Seaview Elementary School along 200th St SW Benefit Improve pedestrian safety along this collector street, providing connections from a residential area to Maplewood Park and Seaview Elementary School along 200th St SW Description Installation of sidewalk along 88th Ave W from 200th St SW to 196th St SW. This project was ranked as MEDIUM PRIORITY in 2024 Transportation Plan. $2,279,000 88TH AVE W WALKWAY FROM 200TH ST SW TO 196TH ST SW PWT-89 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $0 $0 $0 $0Design $0 $341,000$0 $0 $0 $0 $0Construction $0 $1,938,000$0 $0Expense Total $0 $0 $0 $0 $2,279,000$0 $0 $0 $0 $0Unsecured Funding $0 $2,279,000$0 $0Funding Source Total $0 $0 $0 $0 $2,279,000$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 74   Item 2.1       Packet pg. 77/238   Item 2.1       Packet pg. 77/238 Improve pedestrian safety along this stretch, connecting a residential area to both Yost Park and Edmonds Elementary School.Benefit Improve pedestrian safety along this stretch, connecting a residential area to both Yost Park and Edmonds Elementary School. Description Installation of sidewalk along Olympic Ave from Olympic View Dr. to Puget Dr. This project was ranked as MEDIUM PRIORITY in 2024 Transportation Plan. $1,325,000 OLYMPIC AVE WALKWAY FROM OLYMPIC VIEW DR TO PUGET DR PWT-91 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $0 $0 $0 $0Construction $0 $1,127,000$0 $0 $0 $0 $0Design $0 $198,000$0 $0Expense Total $0 $0 $0 $0 $1,325,000$0 $0 $0 $0 $0Unsecured Funding $0 $1,325,000$0 $0Funding Source Total $0 $0 $0 $0 $1,325,000$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 75   Item 2.1       Packet pg. 78/238   Item 2.1       Packet pg. 78/238 Improve pedestrian safety along this windy collector street (with Average Daily Traffic of approximately 1,000 vehicles per day), linking a minor arterial with a collector street.Benefit Improve pedestrian safety along this windy collector street (with Average Daily Traffic of approximately 1,000 vehicles per day), linking a minor arterial with a collector street. Description Installation of sidewalk along Meadowdale Beach Rd. from 75th Pl. W to Olympic View Dr.. This project was ranked as MEDIUM PRIORITY in 2024 Transportation Plan. $7,000,000 MEADOWDALE BEACH RD WALKWAY FROM 75TH PL W TO OLYMPIC VIEW DR PWT-92 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $0 $0 $0 $0Design $0 $1,000,000$0 $0 $0 $0 $0Construction $0 $6,000,000$0 $0Expense Total $0 $0 $0 $0 $7,000,000$0 $0 $0 $0 $0Unsecured Funding $0 $7,000,000$0 $0Funding Source Total $0 $0 $0 $0 $7,000,000$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 76   Item 2.1       Packet pg. 79/238   Item 2.1       Packet pg. 79/238 Improve pedestrian safety along this stretch, creating a connection between a residential and the Pine St Playfields.Benefit Improve pedestrian safety along this stretch, creating a connection between a residential and the Pine St Playfields. Description Installation of sidewalk along 6th Ave from Elm St to Pine St. This project was ranked as MEDIUM PRIORITY in 2024 Transportation Plan. $1,166,000 6TH AVE WALKWAY FROM ELM WAY TO PINE ST PWT-93 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $0 $0 $0 $0Design $0 $175,000$0 $0 $0 $0 $0Construction $0 $991,000$0 $0Expense Total $0 $0 $0 $0 $1,166,000$0 $0 $0 $0 $0Unsecured Funding $0 $1,166,000$0 $0Funding Source Total $0 $0 $0 $0 $1,166,000$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 77   Item 2.1       Packet pg. 80/238   Item 2.1       Packet pg. 80/238 Improve pedestrian safety along this local street on the east side of Highway 99 (linking principal arterial / Hwy 99 with minor arterial / 76th Ave W)Benefit Improve pedestrian safety along this local street on the east side of Highway 99 (linking principal arterial / Hwy 99 with minor arterial / 76th Ave W) Description Installation of sidewalk along 234th St SW from Hwy 99 to 76th Ave W. This project was ranked as MEDIUM PRIORITY as part of 2024 Transportation Plan. $2,491,000 234TH ST SW WALKWAY FROM HWY 99 TO 76TH AVE W PWT-96 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $0 $0 $0 $0Design $0 $375,000$0 $0 $0 $0 $0Construction $0 $2,116,000$0 $0Expense Total $0 $0 $0 $0 $2,491,000$0 $0 $0 $0 $0Unsecured Grants $0 $2,491,000$0 $0Funding Source Total $0 $0 $0 $0 $2,491,000$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 78   Item 2.1       Packet pg. 81/238   Item 2.1       Packet pg. 81/238 Improve bicycle safety with a new west-east connection across Highway 99 to / from the Interurban Trail.Benefit Improve bicycle safety with a new west-east connection across Highway 99 to / from the Interurban Trail. Description Addition of bike lanes along 224th St SW from 76th Ave W to Interurban Trail. The project was ranked as MEDIUM PRIORITY in 2024 Transportation Plan. $159,000 224TH ST SW BIKE LANES FROM 76TH AVE W TO INTERURBAN TRAIL THROUGH RE-STRIPING PWT-102 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $0 $0 $0 $159,000Design and Construction $0 $0$0 $0Expense Total $0 $0 $159,000 $0 $0$0 $0 $0 $0 $159,000Unsecured Funding $0 $0$0 $0Funding Source Total $0 $0 $159,000 $0 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 79   Item 2.1       Packet pg. 82/238   Item 2.1       Packet pg. 82/238 Completion of key missing link on both sides of the street, connecting to various destination points (total of 1,100 LF).Benefit Completion of key missing link on both sides of the street, connecting to various destination points (total of 1,100 LF). Description Installation of sidewalk along 7th Ave. N from Daley St. to SR-524 / 196th St. SW $1,053,000 7TH AVE WALKWAY FROM DALEY ST TO SR- 524 / 196TH ST SW PWT-105 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $0 $0 $0 $145,000Design $0 $0$0 $0 $0 $0 $0Construction $908,000 $0$0 $0Expense Total $0 $0 $145,000 $908,000 $0$0 $0 $0 $0 $14,500Fund 125 - REET $90,500 $0$0 $0 $0 $0 $14,500Fund 126 - REET $90,500 $0$0 $0 $0 $0 $116,000Unsecured Grants $727,000 $0$0 $0Funding Source Total $0 $0 $145,000 $908,000 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 80   Item 2.1       Packet pg. 83/238   Item 2.1       Packet pg. 83/238 Improve pedesrtian safety and accessibility through the upgrade of curb ramp and addition of bulb-outs (where feasible)Benefit Improve pedesrtian safety and accessibility through the upgrade of curb ramp and addition of bulb-outs (where feasible) Description Upgraded various curb ramps throughout the City (total of 41 curb ramps) $1,845,000 PEDESTRIAN IMPROVEMENTS (2028) PWT-107 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $345,000 $0 $0 $0Design $0 $0$0 $0 $1,500,000 $0 $0Construction $0 $0$0 $345,000Expense Total $1,500,000 $0 $0 $0 $0$0 $345,000 $1,500,000 $0 $0Federal Grants $0 $0$0 $345,000Funding Source Total $1,500,000 $0 $0 $0 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 81   Item 2.1       Packet pg. 84/238   Item 2.1       Packet pg. 84/238 FERRY RELATED September 2026 DRAFT 1.4 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 82   Item 2.1       Packet pg. 85/238   Item 2.1       Packet pg. 85/238 Reduce conflicts between ferry storage and access to local driveways.Benefit Reduce conflicts between ferry storage and access to local driveways. Description Modify existing lane channelization on SR104 to add vehicle storage for ferry users. WSDOT / WSF would be the lead agency for this project. $441,000 FERRY STORAGE IMPROVEMENTS FROM PINE ST TO DAYTON ST PWT-51 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $0 $0 $0 $66,000Design $0 $0$0 $0 $0 $0 $0Construction $375,000 $0$0 $0Expense Total $0 $0 $66,000 $375,000 $0$0 $0 $0 $0 $66,000Unsecured Funding $375,000 $0$0 $0Funding Source Total $0 $0 $66,000 $375,000 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 83   Item 2.1       Packet pg. 86/238   Item 2.1       Packet pg. 86/238 TRAFFIC CALMING September 2026 DRAFT 1.4 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 84   Item 2.1       Packet pg. 87/238   Item 2.1       Packet pg. 87/238 Reduce vehicle speeds on City streets that qualify under the City's Traffic Calming Policy.Benefit Reduce vehicle speeds on City streets that qualify under the City's Traffic Calming Policy. Description Install traffic calming devices along selected stretches throughout the City with speeding issues (through completion of detailed evaluation). This ongoing annual program started in 2015 and is included in the City's 6-year Transportation Improvement Program (TIP) and Capital Improvement Program (CIP). $22,000 TRAFFIC CALMING PROGRAM PWT-52 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $6,000 $6,000 $6,000 $6,000Design $6,000 $90,000$6,000 $54,000 $54,000 $54,000 $54,000Construction $54,000 $810,000$54,000 $60,000Expense Total $60,000 $60,000 $60,000 $60,000 $900,000$60,000 $60,000 $60,000 $60,000 $60,000Fund 126 - REET $60,000 $900,000$60,000 $60,000Funding Source Total $60,000 $60,000 $60,000 $60,000 $900,000$60,000 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 85   Item 2.1       Packet pg. 88/238   Item 2.1       Packet pg. 88/238 TRAFFIC PLANNING September 2026 DRAFT 1.4 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 86   Item 2.1       Packet pg. 89/238   Item 2.1       Packet pg. 89/238 Inventories and prioritizes ADA issues in the City right of way, as well as City buildings and parks facilities (in order to improve accessibility for all users)Benefit Inventories and prioritizes ADA issues in the City right of way, as well as City buildings and parks facilities (in order to improve accessibility for all users) Description The 2017 Transition Plan completed an ADA evaluation and prioritization of the City’s street right-of-way. This project will update the 2017 plan. The Plan will inventory physical barriers preventing accessibility and develop updated actions and preliminary cost estimates to address locations with non-ADA compliance. $482,000 ADA TRANSITION PLAN (RIGHT-OF-WAY) UPDATE PWT-53 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $0 $0 $0 $482,000Planning $0 $0$0 $0Expense Total $0 $0 $482,000 $0 $0$0 $0 $0 $0 $482,000Unsecured Funding $0 $0$0 $0Funding Source Total $0 $0 $482,000 $0 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 87   Item 2.1       Packet pg. 90/238   Item 2.1       Packet pg. 90/238 Based upon existing and projected future land use and travel patterns, the Transportation Plan describes roadway pedestrian, bicycle and transit infrastructure and services and provides an assessment of existing and projected future transportation needs. The Plan will establish the transportation priorities and guides the development of the six-year Transportation Improvement Program (TIP), Capital Improvement Program (CIP), Capital Facilities Plan (CFP) and introduce Multimodal Level of Service (MMLOS). Benefit Based upon existing and projected future land use and travel patterns, the Transportation Plan describes roadway pedestrian, bicycle and transit infrastructure and services and provides an assessment of existing and projected future transportation needs. The Plan will establish the transportation priorities and guides the development of the six-year Transportation Improvement Program (TIP), Capital Improvement Program (CIP), Capital Facilities Plan (CFP) and introduce Multimodal Level of Service (MMLOS). Description The Transportation Plan serves as the transportation element of the City’s Comprehensive Plan and was updated in 2024 in coordination with the 2024 Comprehensive Plan Update. A transportation impact fee was implemented in 2026. $477,000 TRANSPORTATION PLAN UPDATE PWT-54 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $9,634 $0 $0 $0Planning $477,000 $0$0 $9,634Expense Total $0 $0 $0 $477,000 $0$0 $9,634 $0 $0 $0Fund 112 - Street (Gas Tax & Multi-Modal) $477,000 $0$0 $9,634Funding Source Total $0 $0 $0 $477,000 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 88   Item 2.1       Packet pg. 91/238   Item 2.1       Packet pg. 91/238 Improve active transportation safety conditions along the Interurban Trail. The SR-104 @ 76th Ave W(current connection between City of Edmonds and City of Shoreline) has some existing safety issues and this addition would provide users with a safer alternate route. Benefit Improve active transportation safety conditions along the Interurban Trail. The SR-104 @ 76th Ave W(current connection between City of Edmonds and City of Shoreline) has some existing safety issues and this addition would provide users with a safer alternate route. Description Study to determine the feasibility of installing an overpass over SR-104, as part of an Interurban Trail connection between City of Edmonds and City of Shoreline. The study would include survey work (determination of ROW limits), conceptual plans, and preliminary total project cost. $435,000 SR-104 OVERPASS FEASIBILITY STUDY PWT-99 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $0 $0 $0 $435,000Planning $0 $0$0 $0Expense Total $0 $0 $435,000 $0 $0$0 $0 $0 $0 $435,000Unsecured Funding $0 $0$0 $0Funding Source Total $0 $0 $435,000 $0 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 89   Item 2.1       Packet pg. 92/238   Item 2.1       Packet pg. 92/238 Improve active transportation safety along this collector street with an Average Daily Traffic (ADT) of 4,500 vehicles per day.Benefit Improve active transportation safety along this collector street with an Average Daily Traffic (ADT) of 4,500 vehicles per day. Description Study to determine the feasibility of adding a multi-use path along Olympic View Dr. from SR-524 / 196th St SW to 76th Ave W. The study will consist of survey work, conceptual plans, and total preliminary project cost. $164,000 OLYMPIC VIEW DR ACTIVE TRANSPORTATION FEASIBILITY STUDY PWT-100 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $0 $0 $0 $164,000Design & Construction $0 $0$0 $0Expense Total $0 $0 $164,000 $0 $0$0 $0 $0 $0 $164,000Unsecured Grants $0 $0$0 $0Funding Source Total $0 $0 $164,000 $0 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 90   Item 2.1       Packet pg. 93/238   Item 2.1       Packet pg. 93/238 Improve active transportation safety along this principal arterial with an Average Daily Traffic (ADT) of ~ 14,000 vehicles per day.Benefit Improve active transportation safety along this principal arterial with an Average Daily Traffic (ADT) of ~ 14,000 vehicles per day. Description Study to determine the feasibility of adding a multi-use path along 196th St SW from Olympic View Dr. to 88th Ave W. The study will consist of survey work, conceptual plans, and total preliminary project cost. $164,000 196TH ST SW ACTIVE TRANSPORTATION FEASIBILITY STUDY PWT-101 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $0 $0 $0 $0Planning $0 $164,000$0 $0Expense Total $0 $0 $0 $0 $164,000$0 $0 $0 $0 $0Unsecured Grants $0 $164,000$0 $0Funding Source Total $0 $0 $0 $0 $164,000$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 91   Item 2.1       Packet pg. 94/238   Item 2.1       Packet pg. 94/238 Improve intersection safety and traffic flows through the intersection.Benefit Improve intersection safety and traffic flows through the intersection. Description Conversion of Main @ 9th and Walnut @ 9th to a mini-roundabout or traffic signal (feasibility study to determine possible options) $75,000 FEASIBILITY STUDY MAIN @ 9TH AVE AND WALNUT @ 9TH AVE PWT-106 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TRANSPORTATION Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $75,000 $0 $0 $0Design $0 $0$0 $75,000Expense Total $0 $0 $0 $0 $0$0 $37,500 $0 $0 $0Fund 126 - REET $0 $0$0 $37,500 $0 $0 $0Fund 125 - REET $0 $0$0 $75,000Funding Source Total $0 $0 $0 $0 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 92   Item 2.1       Packet pg. 95/238   Item 2.1       Packet pg. 95/238 WATER September 2026 DRAFT 1.4 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 93   Item 2.1       Packet pg. 96/238   Item 2.1       Packet pg. 96/238 WATER SEPTEMBER 2026 DRAFT 1.4 #CFP Project 2027 2028 2029 2030 2031 2032 2027-32 Total 2033-47 Grand Total PWW-02 2027 Water Comprehensive Plan Update $582,000 $0 $0 $0 $0 $0 $582,000 $0 $582,000 PWW-05 Phase 16 Water Replacement Program (2028)$84,000 $2,940,000 $0 $0 $0 $0 $3,024,000 $0 $3,024,000 PWW-06 Phase 17 Water Replacement Program (2029)$0 $616,000 $4,289,000 $0 $0 $0 $4,905,000 $0 $4,905,000 PWW-07 Phase 18 Water Replacement Program (2030)$0 $0 $641,000 $4,460,000 $0 $0 $5,101,000 $0 $5,101,000 PWW-08 Phase 19 Water Replacement Program (2031)$0 $0 $0 $666,000 $4,639,000 $0 $5,305,000 $0 $5,305,000 PWW-10 Phase 20 Water Replacement Program (2032)$0 $0 $0 $0 $693,000 $4,824,000 $5,517,000 $0 $5,517,000 PWW-20 Phase 21 Water Replacement Program (2033) & Future Projects $0 $0 $0 $0 $0 $721,000 $721,000 $115,476,000 $116,197,000 PWW-11 Yost & Seaview Reservoir Repairs & Upgrades $4,725,000 $1,200,000 $0 $0 $0 $0 $5,925,000 $0 $5,925,000 EXPENSE TOTAL $5,391,000 $4,756,000 $4,930,000 $5,126,000 $5,332,000 $5,545,000 $31,080,000 $115,476,000 $146,556,000 Funding Source 2027 2028 2029 2030 2031 2032 2027-32 Total 2033-47 Grand Total Fund 421 - Water Utility $5,391,000 $4,756,000 $4,930,000 $5,126,000 $5,332,000 $5,545,000 $31,080,000 $115,476,000 $146,556,000 FUNDING TOTAL $5,391,000 $4,756,000 $4,930,000 $5,126,000 $5,332,000 $5,545,000 $31,080,000 $115,476,000 $146,556,000 94   Item 2.1       Packet pg. 97/238   Item 2.1       Packet pg. 97/238 Maintain a high level of drinking water quality, improve overall system reliability, decrease probability of breakages and leakage, improve fire fighting flows, and decrease overall day to day maintenance costs. Benefit Maintain a high level of drinking water quality, improve overall system reliability, decrease probability of breakages and leakage, improve fire fighting flows, and decrease overall day to day maintenance costs. Description The existing water comprehensive plan was last updated in 2017 and is required to be updated by the State Dept of Health (DOH) every 10 years. This project would be a comprehensive evaluation of the City’s drinking water system, its replacement program, and operations. It will include recommendations for improvements or adjustments with recommended priorities for selecting future capital maintenance projects. $732,000 2027 WATER COMPREHENSIVE PLAN UPDATE PWW-02 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - WATER Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $582,000 $0 $0 $0Design $0 $0$0 $582,000Expense Total $0 $0 $0 $0 $0$0 $582,000 $0 $0 $0Fund 421 - Water Utility $0 $0$0 $582,000Funding Source Total $0 $0 $0 $0 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 95   Item 2.1       Packet pg. 98/238   Item 2.1       Packet pg. 98/238 Maintain a high level of drinking water quality, improve overall system reliability, decrease probability of breakages and leakage, improve fire flows, and decrease overall day to day maintenance costs. Benefit Maintain a high level of drinking water quality, improve overall system reliability, decrease probability of breakages and leakage, improve fire flows, and decrease overall day to day maintenance costs. Description Per the approved 2017 Water Comprehensive Plan, the projects will replace/maintain pipe and related appurtenances at various locations throughout the City due to old age, being undersized, need to increase flow or pressure, or more prone to breakage due to its material properties. $3.6 to $9.2 million/year PHASE 16-36 WATER REPLACEMENT PROJECTS (2027-47) PWW-05-10,20 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - WATER Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $54,000 $616,000 $641,000 $666,000Design $693,000 $15,003,000$720,000 $30,000 $2,940,000 $4,289,000 $4,460,000Construction $4,639,000 $100,473,000$4,825,000 $84,000Expense Total $3,556,000 $4,930,000 $5,126,000 $5,332,000 $115,476,000$5,545,000 $84,000 $3,556,000 $4,930,000 $5,126,000Fund 421 - Water Utility $5,332,000 $115,476,000$5,545,000 $84,000Funding Source Total $3,556,000 $4,930,000 $5,126,000 $5,332,000 $115,476,000$5,545,000 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 96   Item 2.1       Packet pg. 99/238   Item 2.1       Packet pg. 99/238 Maintain a high level of drinking water quality, improve overall system reliability, decrease probability of leakage, retrofit structures so that they meet current structural codes to improve their resiliency during earthquakes, and decrease overall day to day maintenance costs. Benefit Maintain a high level of drinking water quality, improve overall system reliability, decrease probability of leakage, retrofit structures so that they meet current structural codes to improve their resiliency during earthquakes, and decrease overall day to day maintenance costs. Description This work is being done to provide structural upgrades, repair leakages, and upgrades to our two underground potable water storage reservoirs. Preliminary findings completed in early 2023 were used to determine order of magnitude/preliminary costs and next steps for the now planned repairs and upgrades project. The Yost Reservoir report shows that it will need a major structural and seismic retrofit, plus repairs to address leakage from the reservoir. The report for the Seaview Reservoir shows similar issues as the Yost Reservoir, with a less serious leakage issue. $10,003,000 YOST & SEAVIEW RESERVOIR REPAIRS & UPGRADES PWW-11 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - WATER Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $4,725,000 $1,200,000 $0 $0Construction $0 $0$0 $4,725,000Expense Total $1,200,000 $0 $0 $0 $0$0 $4,725,000 $1,200,000 $0 $0Fund 421 - Water Utility $0 $0$0 $4,725,000Funding Source Total $1,200,000 $0 $0 $0 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 97   Item 2.1       Packet pg. 100/238   Item 2.1       Packet pg. 100/238 STORMWATER September 2026 DRAFT 1.4 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 98   Item 2.1       Packet pg. 101/238   Item 2.1       Packet pg. 101/238 STORMWATER SEPTEMBER 2026 DRAFT 1.4 #CFP Project 2027 2028 2029 2030 2031 2032 2027-32 Total 2033-47 Grand Total PWD-13 Phase 6 Storm Maintenance Project (2026)$775,000 $0 $0 $0 $0 $0 $775,000 $0 $775,000 PWD-14 Phase 7 Storm Maintenance Project (2028)$235,000 $1,919,000 $0 $0 $0 $0 $2,154,000 $0 $2,154,000 PWD-15 Phase 8 Storm Maintenance Project (2029)$0 $380,000 $1,975,000 $0 $0 $0 $2,355,000 $0 $2,355,000 PWD-16 Phase 9 Storm Maintenance Project (2030)$0 $0 $411,000 $2,053,000 $0 $0 $2,464,000 $0 $2,464,000 PWD-18 Phase 10 Storm Maintenance Project (2031)$0 $0 $0 $427,000 $2,135,000 $0 $2,562,000 $0 $2,562,000 PWD-25 Phase 11 Storm Maintenance Project (2032)$0 $0 $0 $0 $411,000 $2,220,000 $2,631,000 $0 $2,631,000 PWD-07 Phase 12 Storm Maintenance Project (2033) and Future Projects $0 $0 $0 $0 $0 $462,000 $462,000 $55,459,000 $55,921,000 EDMONDS MARSH ESTUARY RESTORATION PWD-01 Edmonds Marsh Water Quality Improvements (phase 1) $436,928 $2,000 $0 $0 $0 $0 $438,928 $0 $438,928 PWD-05 Edmonds Marsh Water Quality Improvements (phase 2) $421,840 $2,000 $0 $0 $0 $0 $423,840 $0 $423,840 PWD-28 Edmonds Marsh Preliminary Design $525,000 $260,640 $0 $0 $0 $0 $785,640 $0 $785,640 PERRINVILLE CREEK BASIN PWD-03 Perrinville Creek Flow Management Projects $112,000 $116,000 $120,000 $125,000 $130,000 $136,000 $739,000 $2,831,000 $3,570,000 PWD-04 P Lower Perrinville Creek Restoration Project $1,600,000 $1,150,000 $1,750,000 $0 $0 $0 $4,500,000 $0 $4,500,000 PWD-23 Perrinville Creek Basin Analysis Update $135,000 $0 $0 $0 $0 $0 $135,000 $0 $135,000 COMPLIANCE RELATED PWD-17 Storm and Surface Water Comprehensive Plan $160,000 $0 $0 $0 $0 $0 $160,000 $0 $160,000 EXPENSE TOTAL $4,400,768 $3,829,640 $4,256,000 $2,605,000 $2,676,000 $2,818,000 $20,585,408 $58,290,000 $78,875,408 99   Item 2.1       Packet pg. 102/238   Item 2.1       Packet pg. 102/238 STORMWATER SEPTEMBER 2026 DRAFT 1.4 Funding Source 2027 2028 2029 2030 2031 2032 2027-32 Total 2033-47 Grand Total Federal Grants $470,000 $183,640 $0 $0 $0 $0 $653,640 $0 $653,640 Fund 422 - Stormwater Utility $2,288,928 $3,267,000 $4,256,000 $2,605,000 $2,676,000 $2,818,000 $17,910,928 $58,290,000 $76,200,928 Marsh Preservation Fund $55,000 $27,000 $0 $0 $0 $0 $82,000 $0 $82,000 Private Citizen Cash Donation $0 $50,000 $0 $0 $0 $0 $50,000 $0 $50,000 Secured Grants $686,840 $2,000 $0 $0 $0 $0 $688,840 $0 $688,840 Unsecured Funding $900,000 $300,000 $0 $0 $0 $0 $1,200,000 $0 $1,200,000 FUNDING TOTAL $4,400,768 $3,829,640 $4,256,000 $2,605,000 $2,676,000 $2,818,000 $20,585,408 $58,290,000 $78,875,408 100   Item 2.1       Packet pg. 103/238   Item 2.1       Packet pg. 103/238 Improve system reliability and capacity, decrease breakages, and decrease overall day to day maintenance costs.Benefit Improve system reliability and capacity, decrease breakages, and decrease overall day to day maintenance costs. Description Annual storm drain replacement/maintenance projects. Projects propose to replace or rehab storm drain infrastructure in several locations throughout the City. Locations of work identified by City crews and staff via firsthand knowledge or video inspection results. Much of Edmonds stormwater infrastructure is past its useful lifespan and requires routine replacement or repair to preserve the function of the storm drain system. Failure to conduct annual maintenance projects will increase chances of storm drain system failures. $1.1 to $4.8 million/year PHASE 6-26 STORM MAINTENANCE PROJECTS (2026-46) PWD-07,13-16,18, 25 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - STORMWATER Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $785,000 $1,898,000 $1,975,000 $2,053,000Construction $2,135,000 $46,228,000$2,220,000 $285,000 $401,000 $405,000 $411,000Design $427,000 $9,231,000$444,000 $1,070,000Expense Total $2,299,000 $2,380,000 $2,464,000 $2,562,000 $55,459,000$2,664,000 $1,070,000 $2,299,000 $2,380,000 $2,464,000Fund 422 - Stormwater Utility $2,562,000 $55,459,000$2,664,000 $1,070,000Funding Source Total $2,299,000 $2,380,000 $2,464,000 $2,562,000 $55,459,000$2,664,000 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 101   Item 2.1       Packet pg. 104/238   Item 2.1       Packet pg. 104/238 EDMONDS MARSH ESTUARY RESTORATION September 2026 DRAFT 1.4 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 102   Item 2.1       Packet pg. 105/238   Item 2.1       Packet pg. 105/238 Improve water quality of stormwater discharging into the Edmonds Marsh from the west portions of SR-104 located near the marsh. The improvements will provide better habitat for the return of salmon to the marsh. Benefit Improve water quality of stormwater discharging into the Edmonds Marsh from the west portions of SR-104 located near the marsh. The improvements will provide better habitat for the return of salmon to the marsh. Description The project will be improving water quality of stormwater runoff by replacing existing catch basins along the west side of SR-104 funded via a DOE grant. The catch basins will be replaced with catch basins that include water filter cartridges. Staff proposes this effort in order to provide water quality mitigation for all discharges that directly enter the marsh from these locations. $615,000 EDMONDS MARSH WATER QUALITY IMPROVEMENTS (PHASE 1) PWD-01 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - STORMWATER Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $21,000 $0 $0 $0Design $0 $0$0 $415,928 $2,000 $0 $0Construction $0 $0$0 $436,928Expense Total $2,000 $0 $0 $0 $0$0 $198,928 $0 $0 $0Fund 422 - Stormwater Utility $0 $0$0 $238,000 $2,000 $0 $0Secured Grants $0 $0$0 $436,928Funding Source Total $2,000 $0 $0 $0 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 103   Item 2.1       Packet pg. 106/238   Item 2.1       Packet pg. 106/238 Improve water quality of stormwater discharging into the Edmonds Marsh from the east portions of SR-104 located near the marsh. The improvements will provide better habitat for the return of salmon to the marsh. Benefit Improve water quality of stormwater discharging into the Edmonds Marsh from the east portions of SR-104 located near the marsh. The improvements will provide better habitat for the return of salmon to the marsh. Description The project will be improving water quality of stormwater runoff by replacing existing catch basins along the east side of SR-104 via a state funded appropriation. The catch basins will be replaced with catch basins that include water filter cartridges. Staff proposes this effort in order to provide water quality mitigation for all discharges that directly enter the marsh from these locations. $565,000 EDMONDS MARSH WATER QUALITY IMPROVEMENTS (PHASE 2) PWD-05 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - STORMWATER Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $21,000 $0 $0 $0Design $0 $0$0 $400,840 $2,000 $0 $0Construction $0 $0$0 $421,840Expense Total $2,000 $0 $0 $0 $0$0 $73,000 $2,000 $0 $0Fund 422 - Stormwater Utility $0 $0$0 $348,840 $0 $0 $0Secured Grants $0 $0$0 $421,840Funding Source Total $2,000 $0 $0 $0 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 104   Item 2.1       Packet pg. 107/238   Item 2.1       Packet pg. 107/238 Improves water quality and restores critical wetland and estuarine habitat while establishing a feasible path toward long-term restoration of the Edmonds Marsh. The preliminary design will also support future permitting, grant applications, final design, and construction funding. Benefit Improves water quality and restores critical wetland and estuarine habitat while establishing a feasible path toward long-term restoration of the Edmonds Marsh. The preliminary design will also support future permitting, grant applications, final design, and construction funding. Description Develop preliminary designs for restoring tidal connectivity and improving water quality and wetland habitat within the Edmonds Marsh. The project will evaluate existing conditions, hydraulic and ecological considerations, and restoration alternatives to identify a preferred approach for future design and construction. $825,650 EDMONDS MARSH PRELIMINARY DESIGN PWD-28 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - STORMWATER Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $525,000 $260,640 $0 $0Design $0 $0$0 $525,000Expense Total $260,640 $0 $0 $0 $0$0 $470,000 $183,640 $0 $0Federal Grants $0 $0$0 $55,000 $27,000 $0 $0Marsh Preservation Fund $0 $0$0 $0 $50,000 $0 $0Private Citizen Cash Donation $0 $0$0 $525,000Funding Source Total $260,640 $0 $0 $0 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 105   Item 2.1       Packet pg. 108/238   Item 2.1       Packet pg. 108/238 PERRINVILLE CREEK BASIN September 2026 DRAFT 1.4 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 106   Item 2.1       Packet pg. 109/238   Item 2.1       Packet pg. 109/238 The project will reduce peak flows in Perrinville creek, improve fish passage and decrease creek bed scour during peak flow events.Benefit The project will reduce peak flows in Perrinville creek, improve fish passage and decrease creek bed scour during peak flow events. Description Reducing scouring flows to reduce sediments load in Perrinville Creek was identified in a previous basin report completed in 2015 as a critical element of restoring this creek which has been significantly impacted by urban development. The projects funded by this program are incremental steps toward recovering this stream run as adequate fish habitat. These efforts have become even more critical given recent challenges around the Perrinville Creek outfall area. This program is a fund for implementing projects within the Perrinville Creek basin to reduce scour flows in the creek. It allows staff flexibility to respond to ad-hoc opportunities such as rain garden cluster projects, or ensure matching funds are available for chasing grant applications for flow reductions projects. $112,000 to $247,000/year PERRINVILLE CREEK FLOW MANAGEMENT PROJECTS PWD-03 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - STORMWATER Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $11,200 $11,600 $12,000 $12,500Design $13,000 $301,000$14,000 $100,800 $104,400 $108,000 $112,500Construction $117,000 $2,530,000$122,000 $112,000Expense Total $116,000 $120,000 $125,000 $130,000 $2,831,000$136,000 $112,000 $116,000 $120,000 $125,000Fund 422 - Stormwater Utility $130,000 $2,831,000$136,000 $112,000Funding Source Total $116,000 $120,000 $125,000 $130,000 $2,831,000$136,000 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 107   Item 2.1       Packet pg. 110/238   Item 2.1       Packet pg. 110/238 The project will reduce City maintenance needs in the future and improve fish passage.Benefit The project will reduce City maintenance needs in the future and improve fish passage. Description The purpose of this project is to improve the environmental health of the creek necessary to support fish habitat, and to restore the storm water capacity. The project consists of the modifications to three structures that currently prevent fish passage and are undersized for the flows on the creek, (1) the culvert at the BNSF track, remove and replace with a fish-friendly culvert or bridge with adequate flow capacity, which will be led and funded by BNSF and the Tulalip Tribes using grant funds, (2) return flow to the creek between the high flow bypass structure and the BNSF culvert by blocking the structure and restoring creek capacity and (3) culvert at Talbot Road, will be removed and replaced with a fish-friendly culvert or bridge that provides adequate fish passage and storm water flow capacity. This project will increase the resiliency of the watershed by building the structures that mimic the natural channel performance necessary for fish habitat and stormwater flow capacity. The project also includes time and effort to research and apply for supplemental/additional funding sources for construction of the Edmonds portions of the work (Items 2 & 3). Due to the project complexity and number of stakeholders, the planning and design phase is estimated to be 2-years. Project estimated costs are for installation of the structure and reestablishment of the creek bed. Estimates do not include costs for relocation of existing utilities. $4,600,000 LOWER PERRINVILLE CREEK RESTORATION PROJECT PWD-04 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - STORMWATER Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $500,000 $50,000 $0 $0Design $0 $0$0 $1,100,000 $1,100,000 $1,750,000 $0Construction $0 $0$0 $1,600,000Expense Total $1,150,000 $1,750,000 $0 $0 $0$0 $700,000 $850,000 $1,750,000 $0Fund 422 - Stormwater Utility $0 $0$0 $900,000 $300,000 $0 $0Unsecured Funding $0 $0$0 $1,600,000Funding Source Total $1,150,000 $1,750,000 $0 $0 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 108   Item 2.1       Packet pg. 111/238   Item 2.1       Packet pg. 111/238 Improve overall basin and stream health by using green stormwater infrastructure methods. This will ensure that storm water runoff behaves as closely as possible to natural conditions rather than simply being collected and conveyed downstream. This includes infiltrating rainfall runoff as close as possible to where it fell. This will also decrease stream peak flows, which will decrease stream erosion and improve the overall stream habitat for aquatic life. Benefit Improve overall basin and stream health by using green stormwater infrastructure methods. This will ensure that storm water runoff behaves as closely as possible to natural conditions rather than simply being collected and conveyed downstream. This includes infiltrating rainfall runoff as close as possible to where it fell. This will also decrease stream peak flows, which will decrease stream erosion and improve the overall stream habitat for aquatic life. Description City of Edmonds and Lynnwood joint project to supplement/update the Perrinville Creek 2015 basin analysis that determined possible locations for projects that would help decrease the peak storm flows during high rain events. Project will be updated to reflect projects completed and also determine if there are other locations within the basin to aid in the reduction of peak flows in the basin. $649,200 PERRINVILLE CREEK BASIN ANALYSIS UPDATE PWD-23 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - STORMWATER Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $135,000 $0 $0 $0Study $0 $0$0 $135,000Expense Total $0 $0 $0 $0 $0$0 $35,000 $0 $0 $0Fund 422 - Stormwater Utility $0 $0$0 $100,000 $0 $0 $0Secured Grants $0 $0$0 $135,000Funding Source Total $0 $0 $0 $0 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 109   Item 2.1       Packet pg. 112/238   Item 2.1       Packet pg. 112/238 COMPLIANCE RELATED September 2026 DRAFT 1.4 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 110   Item 2.1       Packet pg. 113/238   Item 2.1       Packet pg. 113/238 A holistic summary of the City’s Stormwater system with recommended priorities for selecting future capital maintenance and improvements projects.Benefit A holistic summary of the City’s Stormwater system with recommended priorities for selecting future capital maintenance and improvements projects. Description The City of Edmonds (City) owns and operates an extensive system of drainage pipes, ditches, and other assets to convey stormwater runoff into streams, lakes, and Puget Sound to prevent and minimize damage to private property, streets, and other infrastructure. The City is faced with the challenge of conveying this runoff safely and cost-effectively while preventing or minimizing the adverse impacts of high flows (erosion, flooding, and sediment deposition) and of stormwater pollutants on water quality and aquatic habitat. In addition, recent state and federal stormwater regulations make it technically and financially challenging to address these issues while balancing utility ratepayer costs. To proactively address these challenges and remain in compliance with the State-mandated National Pollutant Discharge Elimination System Western Washington Phase II Municipal Stormwater Permit (NPDES Phase II permit) and other increasing regulatory requirements, the City is updating its current comprehensive storm and surface water management plan. This permit has and will continue to have a significant impact on the workload and operational budget of both the Engineering Division and the Storm Crews within the Public Works Department. Per the State Department of Ecology, the plan will also include the work findings from their required (Stormwater Management Action Plan) SMAP process of City drainage watersheds. Project will also include recommendations for stormwater utilities rates to be adjusted at the discretion of Council. $733,000 STORM AND SURFACE WATER COMPREHENSIVE PLAN PWD-17 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - STORMWATER Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $160,000 $0 $0 $0Design $0 $0$0 $160,000Expense Total $0 $0 $0 $0 $0$0 $160,000 $0 $0 $0Fund 422 - Stormwater Utility $0 $0$0 $160,000Funding Source Total $0 $0 $0 $0 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 111   Item 2.1       Packet pg. 114/238   Item 2.1       Packet pg. 114/238 SEWER September 2026 DRAFT 1.4 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 112   Item 2.1       Packet pg. 115/238   Item 2.1       Packet pg. 115/238 SEWER SEPTEMBER 2026 DRAFT 1.4 #CFP Project 2027 2028 2029 2030 2031 2032 2027-32 Total 2033-47 Grand Total PWS-02 2027 Sanitary Sewer Comprehensive Plan Update $350,000 $0 $0 $0 $0 $0 $350,000 $0 $350,000 PWS-05 Phase 13 Sewer Replacement (2026)$140,000 $0 $0 $0 $0 $0 $140,000 $0 $140,000 PWS-06 Phase 14 Sewer Replacement (2027)$2,800,000 $0 $0 $0 $0 $0 $2,800,000 $0 $2,800,000 PWS-07 Phase 15 Sewer Replacement (2028)$489,000 $2,740,000 $0 $0 $0 $0 $3,229,000 $0 $3,229,000 PWS-08 Phase 16 Sewer Replacement (2029)$0 $425,000 $2,391,000 $0 $0 $0 $2,816,000 $0 $2,816,000 PWS-10 Phase 5-24 Citywide CIPP Sewer Rehabilitation (2028-2042) $0 $611,000 $636,000 $662,000 $688,000 $714,000 $3,311,000 $14,764,000 $18,075,000 PWS-12 Phase 17 Sewer Replacement (2030)$0 $0 $442,000 $2,487,000 $0 $0 $2,929,000 $0 $2,929,000 PWS-13 Phase 19 Sewer Replacement (2032) & Future Projects $0 $0 $0 $0 $478,000 $2,688,000 $3,166,000 $66,352,000 $69,518,000 PWS-14 Phase 18 Sewer Replacement (2031)$0 $0 $0 $460,000 $2,586,000 $0 $3,046,000 $0 $3,046,000 PWS-11 Lake Ballinger Sewer $0 $0 $1,000,000 $6,000,000 $0 $0 $7,000,000 $0 $7,000,000 EXPENSE TOTAL $3,779,000 $3,776,000 $4,469,000 $9,609,000 $3,752,000 $3,402,000 $28,787,000 $81,116,000 $109,903,000 Funding Source 2027 2028 2029 2030 2031 2032 2027-32 Total 2033-47 Grand Total Fund 423 - Sewer Utility $3,779,000 $3,776,000 $4,469,000 $9,609,000 $3,752,000 $3,402,000 $28,787,000 $81,116,000 $109,903,000 FUNDING TOTAL $3,779,000 $3,776,000 $4,469,000 $9,609,000 $3,752,000 $3,402,000 $28,787,000 $81,116,000 $109,903,000 113   Item 2.1       Packet pg. 116/238   Item 2.1       Packet pg. 116/238 Improve system reliability and capacity, decrease infiltration and inflow, decrease breakages, and decrease overall day to day maintenance costs.Benefit Improve system reliability and capacity, decrease infiltration and inflow, decrease breakages, and decrease overall day to day maintenance costs. Description The existing sewer comprehensive plan was last updated in 2013 and is in need of an update. This project would be a comprehensive evaluation of the City’s sewer system, its replacement program and operations, with recommendations for improvements or adjustments and recommended priorities for selecting future capital maintenance projects. $500,000 2027 SANITARY SEWER COMPREHENSIVE PLAN UPDATE PWS-02 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - SEWER Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $350,000 $0 $0 $0Design $0 $0$0 $350,000Expense Total $0 $0 $0 $0 $0$0 $350,000 $0 $0 $0Fund 423 - Sewer Utility $0 $0$0 $350,000Funding Source Total $0 $0 $0 $0 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 114   Item 2.1       Packet pg. 117/238   Item 2.1       Packet pg. 117/238 Improve system reliability and capacity, decrease infiltration and inflow, decrease breakages, and decrease overall day to day maintenance costs.Benefit Improve system reliability and capacity, decrease infiltration and inflow, decrease breakages, and decrease overall day to day maintenance costs. Description Per the approved 2013 Sewer Comprehensive Plan, the projects will replace/rehab pipe and related appurtenances at various locations throughout the City due to old age, being undersized, need to increase capacity, or more prone to breakage due to its material properties. $2.7 to $5.6 million/year PHASE 14-32 SEWER REPLACEMENT (2027- 47) PWS-05-08,12,13, 14 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - SEWER Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $629,000 $425,000 $442,000 $460,000Design $478,000 $10,347,000$497,000 $2,810,000 $2,349,000 $2,391,000 $2,487,000Construction $2,586,000 $56,005,000$2,689,000 $3,439,000Expense Total $2,774,000 $2,833,000 $2,947,000 $3,064,000 $66,352,000$3,186,000 $3,439,000 $2,774,000 $2,833,000 $2,947,000Fund 423 - Sewer Utility $3,064,000 $66,352,000$3,186,000 $3,439,000Funding Source Total $2,774,000 $2,833,000 $2,947,000 $3,064,000 $66,352,000$3,186,000 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 115   Item 2.1       Packet pg. 118/238   Item 2.1       Packet pg. 118/238 Improve system reliability and capacity, decrease infiltration and inflow, decrease breakages, and decrease overall day to day maintenance costs.Benefit Improve system reliability and capacity, decrease infiltration and inflow, decrease breakages, and decrease overall day to day maintenance costs. Description Per the approved 2013 Sewer Comprehensive plan and current video inspections of sewer mains, the project will line existing sewer mains that are subject to root intrusion, infiltration and inflow, and damage that can be repaired by this trenchless method. 2027 and 2028 funds will be combined with the Annual Sewer Replacement Program. This is because the annual replacement rehab program for these years will be focusing on pipe lining as well thereby requiring only 1 design and 1 construction contract to administer. $587,000 to $1,283,000/year PHASE 5-24 CITYWIDE CIPP SEWER REHABILITATION (2028-2042) PWS-10 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - SEWER Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $0 $92,000 $96,000 $100,000Design $104,000 $2,152,000$108,000 $0 $519,000 $540,000 $562,000Construction $584,000 $12,612,000$606,000 $0Expense Total $611,000 $636,000 $662,000 $688,000 $14,764,000$714,000 $0 $611,000 $636,000 $662,000Fund 423 - Sewer Utility $688,000 $14,764,000$714,000 $0Funding Source Total $611,000 $636,000 $662,000 $688,000 $14,764,000$714,000 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 116   Item 2.1       Packet pg. 119/238   Item 2.1       Packet pg. 119/238 Improve system reliability and capacity, decrease infiltration and inflow, and decrease overall day to day maintenance costs. Improved access will help ease maintenance and access for emergencies, which will further decease any chance of potential sewer spills into Lake Ballinger. Benefit Improve system reliability and capacity, decrease infiltration and inflow, and decrease overall day to day maintenance costs. Improved access will help ease maintenance and access for emergencies, which will further decease any chance of potential sewer spills into Lake Ballinger. Description Per the approved 2013 Sewer Comprehensive plan and current video inspections of sewer mains, the sewer pipe along Lake Ballinger will require additional flow capacity in the near future. These improvements are needed to account for population growth, reduce Infiltration and Inflow from the pipe and improve maintenance and emergency access for this major trunk system. $7,000,000 LAKE BALLINGER SEWER PWS-11 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - SEWER Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $0 $0 $1,000,000 $1,000,000Design $0 $0$0 $0 $0 $0 $5,000,000Construction $0 $0$0 $0Expense Total $0 $1,000,000 $6,000,000 $0 $0$0 $0 $0 $1,000,000 $6,000,000Fund 423 - Sewer Utility $0 $0$0 $0Funding Source Total $0 $1,000,000 $6,000,000 $0 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 117   Item 2.1       Packet pg. 120/238   Item 2.1       Packet pg. 120/238 FACILITIES September 2026 DRAFT 1.4 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 118   Item 2.1       Packet pg. 121/238   Item 2.1       Packet pg. 121/238 FACILITIES SEPTEMBER 2026 DRAFT 1.4 #CFP Project 2027 2028 2029 2030 2031 2032 2027-32 Total 2033-47 Grand Total PWF-02 Cemetery Building $0 $0 $5,000 $2,500 $8,000 $0 $15,500 $0 $15,500 PWF-03 City Hall $0 $250,000 $65,000 $50,000 $50,000 $0 $415,000 $0 $415,000 PWF-04 Fishing Pier/Beach Ranger Station $0 $0 $3,000 $5,000 $3,500 $0 $11,500 $0 $11,500 PWF-05 Frances Anderson Center $325,000 $175,000 $125,000 $80,000 $80,000 $0 $785,000 $0 $785,000 PWF-09 Historic Log Cabin $0 $0 $2,000 $1,500 $3,000 $0 $6,500 $0 $6,500 PWF-11 Library $25,000 $20,000 $35,000 $25,000 $25,000 $0 $130,000 $0 $130,000 PWF-13 Old Public Works $0 $0 $24,519 $25,000 $25,000 $0 $74,519 $0 $74,519 PWF-14 Parks Maintenance Building $60,000 $20,000 $10,000 $10,000 $10,000 $0 $110,000 $0 $110,000 PWF-15 Public Safety $150,000 $0 $0 $80,000 $80,000 $0 $310,000 $0 $310,000 PWF-16 P Public Works Apron Repair $62,000 $62,000 $845,000 $0 $0 $0 $969,000 $0 $969,000 PWF-17 Wade James Theater $0 $0 $21,872 $25,000 $18,000 $0 $64,872 $0 $64,872 PWF-18 Yost Pool House $0 $0 $30,000 $25,000 $15,000 $0 $70,000 $0 $70,000 PWF-23 P Library Plaza Deck Waterproofing Project $0 $0 $0 $0 $4,900,000 $0 $4,900,000 $0 $4,900,000 PWF-25 P Police Station $0 $0 $0 $0 $100,000 $0 $100,000 $0 $100,000 EXPENSE TOTAL $622,000 $527,000 $1,166,391 $329,000 $5,317,500 $0 $7,961,891 $0 $7,961,891 Funding Source 2027 2028 2029 2030 2031 2032 2027-32 Total 2033-47 Grand Total Fund 125 - REET $560,000 $465,000 $125,000 $0 $0 $0 $1,150,000 $0 $1,150,000 Fund 421 - Water Utility $20,667 $20,666 $281,667 $0 $0 $0 $323,000 $0 $323,000 Fund 422 - Stormwater Utility $20,667 $20,667 $281,666 $0 $0 $0 $323,000 $0 $323,000 Fund 423 - Sewer Utility $20,666 $20,667 $281,667 $0 $0 $0 $323,000 $0 $323,000 Unsecured Funding $0 $0 $196,391 $329,000 $5,317,500 $0 $5,842,891 $0 $5,842,891 FUNDING TOTAL $622,000 $527,000 $1,166,391 $329,000 $5,317,500 $0 $7,961,891 $0 $7,961,891 119   Item 2.1       Packet pg. 122/238   Item 2.1       Packet pg. 122/238 Public owned facilities and properties are maintained to assure safe and efficient operating conditions and to assure to the protection of the asset throughout an expected lifespan Benefit Public owned facilities and properties are maintained to assure safe and efficient operating conditions and to assure to the protection of the asset throughout an expected lifespan Description This small structure houses the Edmonds Cemetery funerary services and the cemetery Sextant office. The building is in relatively good condition and has little deferred maintenance backlog. Minor security and communications updates will be needed as technology dictates. Projects: Minor repair and maintenance, heating system upgrade $5,000 (2029) CEMETERY BUILDING PWF-02 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - FACILITIES Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $0 $0 $5,000 $2,500Construction\Professional Services $8,000 $0$0 $0Expense Total $0 $5,000 $2,500 $8,000 $0$0 $0 $0 $5,000 $2,500Unsecured Funding $8,000 $0$0 $0Funding Source Total $0 $5,000 $2,500 $8,000 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 120   Item 2.1       Packet pg. 123/238   Item 2.1       Packet pg. 123/238 Public owned facilities and properties are maintained to assure safe and efficient operating conditions and to assure to the protection of the asset throughout an expected lifespan. Benefit Public owned facilities and properties are maintained to assure safe and efficient operating conditions and to assure to the protection of the asset throughout an expected lifespan. Description City Hall was built in 1979 and was operated as a private business office center until the City purchased and renovated the building in the 1990s. The City has operated Edmonds City Hall from this location since the renovations were completed. The building is in near original condition and needs substantial repair and maintenance. Projects: All old equipment needs replacement, including mechanical, electrical and plumbing systems, seismic updates, lobby remodel, entry awning re-glazing, Interior, ADA accessibility improvements, and aging air handling unit replacement or refurbishing. 2028: Upgrade/replace mechanical, electrical, and plumbing systems $250,000 (2028) CITY HALL PWF-03 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - FACILITIES Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $0 $250,000 $65,000 $50,000Construction\Professional Services $50,000 $0$0 $0Expense Total $250,000 $65,000 $50,000 $50,000 $0$0 $0 $250,000 $0 $0Fund 125 - REET $0 $0$0 $0 $0 $65,000 $50,000Unsecured Funding $50,000 $0$0 $0Funding Source Total $250,000 $65,000 $50,000 $50,000 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 121   Item 2.1       Packet pg. 124/238   Item 2.1       Packet pg. 124/238 Public owned facilities and properties are maintained to assure safe and efficient operating conditions and to assure to the protection of the asset throughout an expected lifespan. Benefit Public owned facilities and properties are maintained to assure safe and efficient operating conditions and to assure to the protection of the asset throughout an expected lifespan. Description The Pier was recently renovated and is generally in good condition. The Beach Ranger Office is a 1200 square foot office and restroom facility located near the east end of the pier. There are season programs and visitor support functions that operate out of this facility. Ranger office is mothballed currently and will be re-open if budgets allow, restroom facilities are still functional. $3,000 (2029) FISHING PIER/BEACH RANGER STATION PWF-04 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - FACILITIES Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $0 $0 $3,000 $5,000Construction\Professional Services $3,500 $0$0 $0Expense Total $0 $3,000 $5,000 $3,500 $0$0 $0 $0 $3,000 $5,000Unsecured Funding $3,500 $0$0 $0Funding Source Total $0 $3,000 $5,000 $3,500 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 122   Item 2.1       Packet pg. 125/238   Item 2.1       Packet pg. 125/238 Public owned facilities and properties are maintained to assure safe and efficient operating conditions and to assure to the protection of the asset throughout an expected lifespan. Benefit Public owned facilities and properties are maintained to assure safe and efficient operating conditions and to assure to the protection of the asset throughout an expected lifespan. Description The Frances Anderson Center serves as the City’s main recreation center offering arts, athletic and cultural programing year round. Due to the age and high usage of the building there are many building systems that are in need of replacement or restoration. Projects: replacement of heating boilers with electric alternatives that will add ventilation, cooling and heating; investment grade audit approved by City Council; window replacements; elevator replacement; ADA accessible door closures; plumbing drainage collector, restroom remodels (w/ gender neutral consideration). Replacement of all plumbing fixtures, addition of building security card readers, building HVAC & controls to maximize efficiency, fire sprinkler replacement, and Clean Building Act compliance efforts will be addressed by IGA. Areas of aging or damaged roof will also be replaced. 2027-28: Upgrade HVAC and controls, fix roof 2029: Replace plumbing fixtures $325,000 (2027) FRANCES ANDERSON CENTER PWF-05 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - FACILITIES Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $325,000 $175,000 $125,000 $80,000Construction\Professional Services $80,000 $0$0 $325,000Expense Total $175,000 $125,000 $80,000 $80,000 $0$0 $325,000 $175,000 $125,000 $0Fund 125 - REET $0 $0$0 $0 $0 $0 $80,000Unsecured Funding $80,000 $0$0 $325,000Funding Source Total $175,000 $125,000 $80,000 $80,000 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 123   Item 2.1       Packet pg. 126/238   Item 2.1       Packet pg. 126/238 Public owned facilities and properties are maintained to assure safe and efficient operating conditions and to assure to the protection of the asset throughout an expected lifespan. Benefit Public owned facilities and properties are maintained to assure safe and efficient operating conditions and to assure to the protection of the asset throughout an expected lifespan. Description This Historic log cabin is home to the Edmonds Chamber of Commerce visitor center, the structure was a purpose built cabin from the turn of the century. The structure is professionally maintained on a three year cycle by a log cabin specialist and requires only minor maintenance and upkeep annually. Projects: new thick cut shingle replacement, chinking of exterior log finish, interior lighting. $2,000 (2029) HISTORIC LOG CABIN PWF-09 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - FACILITIES Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $0 $0 $2,000 $1,500Construction\Professional Services $3,000 $0$0 $0Expense Total $0 $2,000 $1,500 $3,000 $0$0 $0 $0 $2,000 $1,500Unsecured Funding $3,000 $0$0 $0Funding Source Total $0 $2,000 $1,500 $3,000 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 124   Item 2.1       Packet pg. 127/238   Item 2.1       Packet pg. 127/238 Public owned facilities and properties are maintained to assure safe and efficient operating conditions and to assure to the protection of the asset throughout an expected lifespan. Benefit Public owned facilities and properties are maintained to assure safe and efficient operating conditions and to assure to the protection of the asset throughout an expected lifespan. Description The Edmonds Library is operated by the Sno-Isle Library system with exception of the Second floor Plaza room rental space. The library is a 19,000 square foot building built in 1982. The building hosts special event rentals and daily Library programming and community services. This is one of the City’s most heavily used buildings by the public and has significant deferred maintenance needs, including the building façade, roof and plaza deck waterproofing. Projects: Exterior façade and code updates, ADA access device upgrades or replacement, gender inclusive public restroom creation, Plaza Room restroom/changing facilities, Elevator modernization, building masonry restoration or building cladding, exterior stairway restoration, HVAC ventilation fan assessment, building breezeway remodel, roof replacement. 2027: elevator upgrade $25,000 (2027) LIBRARY PWF-11 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - FACILITIES Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $25,000 $20,000 $35,000 $25,000Construction\Professional Services $25,000 $0$0 $25,000Expense Total $20,000 $35,000 $25,000 $25,000 $0$0 $25,000 $20,000 $0 $0Fund 125 - REET $0 $0$0 $0 $0 $35,000 $25,000Unsecured Funding $25,000 $0$0 $25,000Funding Source Total $20,000 $35,000 $25,000 $25,000 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 125   Item 2.1       Packet pg. 128/238   Item 2.1       Packet pg. 128/238 Public owned facilities and properties are maintained to assure safe and efficient operating conditions and to assure to the protection of the asset throughout an expected lifespan. Benefit Public owned facilities and properties are maintained to assure safe and efficient operating conditions and to assure to the protection of the asset throughout an expected lifespan. Description This facility was built in 1965 to house the City’s Public Works Department, the building was converted in 1995 to tenant space and City storage, as well as Edmonds Police large evidence storage. This is a vital piece of property adjacent to the Waste Water Treatment Plant, and could be converted for utility use if regulatory requirements dictate. Building is primarily used as storage and will need some updates to maintain current operational readiness. Projects: HVAC replacements, roll-up door replacement, security camera system. $24,519 (2029) OLD PUBLIC WORKS PWF-13 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - FACILITIES Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $0 $0 $24,519 $25,000Construction\Professional Services $25,000 $0$0 $0Expense Total $0 $24,519 $25,000 $25,000 $0$0 $0 $0 $24,519 $25,000Unsecured Funding $25,000 $0$0 $0Funding Source Total $0 $24,519 $25,000 $25,000 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 126   Item 2.1       Packet pg. 129/238   Item 2.1       Packet pg. 129/238 Public owned facilities and properties are maintained to assure safe and efficient operating conditions and to assure to the protection of the asset throughout an expected lifespan. Benefit Public owned facilities and properties are maintained to assure safe and efficient operating conditions and to assure to the protection of the asset throughout an expected lifespan. Description This facility was built in 1967 by Ed Huntley who at the time was the City Facilities supervisor. The 4800 square foot facility now houses all City Facility Operations staff(11) and all of Park and Rec Parks Maintenance Staff(12+ seasonal help) This Facility is home to the City Carpentry Shop, Key Shop, City Flower program, Parks engine repair shop and Parks and Facilities maintenance supply storage as well as Parks and Facilities Manager offices. This Facility is near end of life and is undersized to support the departmental staffing that are assigned to this facility. Projects: maintenance and repair to maintain operational capacity, ADA restroom updates, Shop/offices floor replacements, eventual remodel and existing facilities to meet operational needs, additional safety and security systems. 2027: restroom upgrade 2028: floor replacements $60,000 (2027) PARKS MAINTENANCE BUILDING PWF-14 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - FACILITIES Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $60,000 $20,000 $10,000 $10,000Construction\Professional Services $10,000 $0$0 $60,000Expense Total $20,000 $10,000 $10,000 $10,000 $0$0 $60,000 $20,000 $0 $0Fund 125 - REET $0 $0$0 $0 $0 $10,000 $10,000Unsecured Funding $10,000 $0$0 $60,000Funding Source Total $20,000 $10,000 $10,000 $10,000 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 127   Item 2.1       Packet pg. 130/238   Item 2.1       Packet pg. 130/238 Public owned facilities and properties are maintained to assure safe and efficient operating conditions and to assure to the protection of the asset throughout an expected lifespan. Benefit Public owned facilities and properties are maintained to assure safe and efficient operating conditions and to assure to the protection of the asset throughout an expected lifespan. Description The Public Safety building houses Edmonds Police Department, Edmonds Municipal Court and the City Council Chambers. The building was built in 1999 encompassing 30,000 square feet of office, court and municipal government uses. The building houses one of the City emergency operations centers, large police training, simulator facilities and evidence processing and storage. The building has had minimal system updates over its life and has a significant amount of deferred maintenance and should be retrofitted with new fire sprinklers. Projects: air handler and outdoor ventilation unit replacements, elevator modernization, sleeping room remodel and gender specific/neutral accommodations, gender inclusive public restrooms, court's flat roof replacement. Refurbishment of building VAV ventilation boxes. 2027: roof replacement, elevator interior upgrade $150,000 (2027) PUBLIC SAFETY PWF-15 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - FACILITIES Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $150,000 $0 $0 $80,000Construction\Professional Services $80,000 $0$0 $150,000Expense Total $0 $0 $80,000 $80,000 $0$0 $150,000 $0 $0 $0Fund 125 - REET $0 $0$0 $0 $0 $0 $80,000Unsecured Funding $80,000 $0$0 $150,000Funding Source Total $0 $0 $80,000 $80,000 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 128   Item 2.1       Packet pg. 131/238   Item 2.1       Packet pg. 131/238 A new foundation, re-built apron and pavement transtion are necessary to address current and worsening access issues to existing vehicle bays. This work will also preserve the existing buried utilities beneath the apron. Benefit A new foundation, re-built apron and pavement transtion are necessary to address current and worsening access issues to existing vehicle bays. This work will also preserve the existing buried utilities beneath the apron. Description The existing concrete apron adjacent to the equipment bays at the Public Works Facilities building is settling due to poor fill/soil conditions beneath the apron. The settlement is creating access issues to the bays and will eventually impact buried utilities beneath the apron. A new foundation, re-built apron and pavement transition are necessary to address the problem. $1,010,000 PUBLIC WORKS APRON REPAIR PWF-16 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - FACILITIES Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $62,000 $62,000 $0 $0Design $0 $0$0 $0 $0 $845,000 $0Construction $0 $0$0 $62,000Expense Total $62,000 $845,000 $0 $0 $0$0 $20,667 $20,666 $281,667 $0Fund 421 - Water Utility $0 $0$0 $20,667 $20,667 $281,666 $0Fund 422 - Stormwater Utility $0 $0$0 $20,666 $20,667 $281,667 $0Fund 423 - Sewer Utility $0 $0$0 $62,000Funding Source Total $62,000 $845,000 $0 $0 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 129   Item 2.1       Packet pg. 132/238   Item 2.1       Packet pg. 132/238 Public owned facilities and properties are maintained to assure safe and efficient operating conditions and to assure to the protection of the asset throughout an expected lifespan. Benefit Public owned facilities and properties are maintained to assure safe and efficient operating conditions and to assure to the protection of the asset throughout an expected lifespan. Description This community theater was built by the Driftwood Players theater group in 1967 and was deeded to City ownership at a later date. The facility is 6,300 square feet in size and houses the Driftwood Players theatrical performances and City meetings. The City’s maintenance responsibilities are limited to large infrastructure, parking lot, roofing, and grounds. Projects: parking lot repair and recoating, gutter replacement, fire alarm replacement, $21,872 (2029) WADE JAMES THEATER PWF-17 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - FACILITIES Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $0 $0 $21,872 $25,000Construction\Professional Services $18,000 $0$0 $0Expense Total $0 $21,872 $25,000 $18,000 $0$0 $0 $0 $21,872 $25,000Unsecured Funding $18,000 $0$0 $0Funding Source Total $0 $21,872 $25,000 $18,000 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 130   Item 2.1       Packet pg. 133/238   Item 2.1       Packet pg. 133/238 Public owned facilities and properties are maintained to assure safe and efficient operating conditions and to assure to the protection of the asset throughout an expected lifespan. Benefit Public owned facilities and properties are maintained to assure safe and efficient operating conditions and to assure to the protection of the asset throughout an expected lifespan. Description This recreational facility houses the City’s aquatic programing and some Parks and Recreation programs. Built in 1971 the pool house historically was only operated seasonally. The tenant run aquatic programing is year round lap and team aquatic activities and will continue to support summer open swim programing. The facility requires minimal maintenance to remain operational and is subject to tenant lease terms of use. Projects: security updates, plumbing fixture updates, exterior door replacements, operational repair and maintenance to accommodate 365 operations, exterior lighting replacements, shower tile replacement. $30,000 (2029) YOST POOL HOUSE PWF-18 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - FACILITIES Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $0 $0 $30,000 $25,000Construction\Professional Services $15,000 $0$0 $0Expense Total $0 $30,000 $25,000 $15,000 $0$0 $0 $0 $30,000 $25,000Unsecured Funding $15,000 $0$0 $0Funding Source Total $0 $30,000 $25,000 $15,000 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 131   Item 2.1       Packet pg. 134/238   Item 2.1       Packet pg. 134/238 Maintaining building in operational and safe condition, in order to maintain partnership with Sno-Isle Library system. Preservation of the City’s physical assets in appropriate condition vs. the age of the facility and historic capital investment. Benefit Maintaining building in operational and safe condition, in order to maintain partnership with Sno-Isle Library system. Preservation of the City’s physical assets in appropriate condition vs. the age of the facility and historic capital investment. Description The Library Plaza Deck is essentially a green roof on the second floor of the Edmonds Sno-Isle Library. The deck surface was waterproofed and remodeled in 2003, since that project continuous water intrusion has occurred through the waterproof membrane. This water intrusion has been successfully mitigated over the years and has not been deemed a project of significance previously. In 2018 Western Specialty Contractors inspected the water intrusion and offered an initial ROM price to demolish and waterproof the existing plaza deck. Rebuilding the plaza deck and replacement of landscape, planters, grass, pavement, flashing and hand railings would be a separate construction project. The Parks Director in 2018 offered an estimate to replace landscaping and irrigations systems. In 2021 a draft structural report was performed by MLA Engineering to discover any structural consequences from the years of water intrusion, building was deemed structurally sound and water intrusion not factoring in to building structural stability. $4,900,000 (2031) LIBRARY PLAZA DECK WATERPROOFING PROJECT PWF-23 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - FACILITIES Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $0 $0 $0 $0Construction\Professional Services $4,900,000 $0$0 $0Expense Total $0 $0 $0 $4,900,000 $0$0 $0 $0 $0 $0Unsecured Funding $4,900,000 $0$0 $0Funding Source Total $0 $0 $0 $4,900,000 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 132   Item 2.1       Packet pg. 135/238   Item 2.1       Packet pg. 135/238 Benefit Description Feasibility Study to relocate the existing Police Station or create a new substation. Design, location and funding TBD. $100,000 (2031) POLICE STATION PWF-25 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - FACILITIES Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $0 $0 $0 $0Design $100,000 $0$0 $0Expense Total $0 $0 $0 $100,000 $0$0 $0 $0 $0 $0Unsecured Funding $100,000 $0$0 $0Funding Source Total $0 $0 $0 $100,000 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 133   Item 2.1       Packet pg. 136/238   Item 2.1       Packet pg. 136/238 WASTEWATER TREATMENT PLANT September 2026 DRAFT 1.4 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 134   Item 2.1       Packet pg. 137/238   Item 2.1       Packet pg. 137/238 WASTEWATER TREATMENT PLANT SEPTEMBER 2026 DRAFT 1.4 #CFP Project 2027 2028 2029 2030 2031 2032 2027-32 Total 2033-47 Grand Total PWP-01 WWTP Annual Capital Replacement In-House Projects $1,000,000 $1,250,000 $1,250,000 $1,300,000 $1,300,000 $0 $6,100,000 $0 $6,100,000 PWP-04 Nutrient Removal Project $650,000 $5,000,000 $5,000,000 $0 $0 $0 $10,650,000 $0 $10,650,000 PWP-06 Joint Sealant $60,000 $0 $0 $0 $0 $0 $60,000 $0 $60,000 PWP-08 Gasification Bypass (Class A Solids Production)$300,000 $0 $0 $0 $0 $0 $300,000 $0 $300,000 PWP-10 VFD Upgrades $250,000 $0 $0 $0 $0 $0 $250,000 $0 $250,000 PWP-11 Primary Clarifier 2 Rehab $300,000 $300,000 $0 $0 $0 $0 $600,000 $0 $600,000 PWP-13 ODS (Primary Sludge) Pump Replacement $350,000 $250,000 $0 $0 $0 $0 $600,000 $0 $600,000 PWP-14 Chlorine Contact Channel Sluice Gates Replacement $0 $375,000 $0 $0 $0 $0 $375,000 $0 $375,000 PWP-16 P NPW Pumping System Improvements $75,000 $0 $0 $0 $0 $0 $75,000 $0 $75,000 PWP-18 LPA Blower 303 and 305 Rehab $50,000 $50,000 $0 $0 $0 $0 $100,000 $0 $100,000 PWP-19 600 Bldg Electrical Rehab $250,000 $0 $0 $0 $0 $0 $250,000 $0 $250,000 PWP-20 600 Bldg Air Quality Rehab/Upgrade $125,000 $0 $0 $0 $0 $0 $125,000 $0 $125,000 PWP-21 Secondary Clarifier 2 Rehab $50,000 $800,000 $0 $0 $0 $0 $850,000 $0 $850,000 PWP-22 Instrumentation Upgrades and Replacement Program $200,000 $200,000 $200,000 $200,000 $0 $0 $800,000 $0 $800,000 PWP-23 Potable Water System Repair $25,000 $100,000 $0 $0 $0 $0 $125,000 $0 $125,000 PWP-24 Plant HVAC and Odor Control Upgrades $37,500 $37,500 $0 $0 $0 $0 $75,000 $0 $75,000 PWP-25 Valve Replacement program $250,000 $250,000 $250,000 $250,000 $250,000 $250,000 $1,500,000 $3,500,000 $5,000,000 PWP-26 Electrical Improvement Project $200,000 $200,000 $0 $0 $0 $0 $400,000 $0 $400,000 PWP-27 Disinfection System Rehab $500,000 $500,000 $0 $0 $0 $0 $1,000,000 $0 $1,000,000 135   Item 2.1       Packet pg. 138/238   Item 2.1       Packet pg. 138/238 WASTEWATER TREATMENT PLANT SEPTEMBER 2026 DRAFT 1.4 #CFP Project 2027 2028 2029 2030 2031 2032 2027-32 Total 2033-47 Grand Total PWP-28 P 400 Building Electrical System Repair and Replace $250,000 $0 $0 $0 $0 $0 $250,000 $0 $250,000 PWP-29 Secondary Clarifier #1 Floor Replacement $250,000 $750,000 $750,000 $0 $0 $0 $1,750,000 $0 $1,750,000 PWP-30 P SCADA and Control Systems Modernization $1,000,000 $0 $0 $0 $0 $0 $1,000,000 $0 $1,000,000 EXPENSE TOTAL $6,172,500 $10,062,500 $7,450,000 $1,750,000 $1,550,000 $250,000 $27,235,000 $3,500,000 $30,735,000 Funding Source 2027 2028 2029 2030 2031 2032 2027-32 Total 2033-47 Grand Total Fund 423 - Sewer Utility $3,135,013 $5,110,744 $3,783,855 $888,825 $787,245 $126,975 $13,832,657 $1,777,650 $15,610,307 City of Shoreline $585,770 $954,931 $707,005 $166,075 $147,095 $23,725 $2,584,602 $332,150 $2,916,752 Mountlake Terrace $1,430,168 $2,331,481 $1,726,165 $405,475 $359,135 $57,925 $6,310,350 $810,950 $7,121,300 Olympic View Water/Sewer District $1,021,549 $1,665,344 $1,232,975 $289,625 $256,525 $41,375 $4,507,393 $579,250 $5,086,643 FUNDING TOTAL $6,172,500 $10,062,500 $7,450,000 $1,750,000 $1,550,000 $250,000 $27,235,000 $3,500,000 $30,735,000 136   Item 2.1       Packet pg. 139/238   Item 2.1       Packet pg. 139/238 This project ensures that critical infrastructure is maintained and equipment is replaced in order to reduce risk to the City.Benefit This project ensures that critical infrastructure is maintained and equipment is replaced in order to reduce risk to the City. Description The WWTP Annual Capital Replacement In-House Projects is intended to maintain infrastructure and equipment to ensure that the treatment plant is well maintained. $1,000,000 (2026) WWTP ANNUAL CAPITAL REPLACEMENT IN- HOUSE PROJECTS PWP-01 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TREATMENT PLANT Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $200,000 $250,000 $250,000 $300,000Design $300,000 $0$0 $800,000 $1,000,000 $1,000,000 $1,000,000Construction $1,000,000 $0$0 $1,000,000Expense Total $1,250,000 $1,250,000 $1,300,000 $1,300,000 $0$0 $507,900 $634,875 $634,875 $660,270Fund 423 - Sewer Utility $660,270 $0$0 $231,700 $289,625 $289,625 $301,210Mountlake Terrace $301,210 $0$0 $165,500 $206,875 $206,875 $215,150Olympic View Water/Sewer District $215,150 $0$0 $94,900 $118,625 $118,625 $123,370City of Shoreline $123,370 $0$0 $1,000,000Funding Source Total $1,250,000 $1,250,000 $1,300,000 $1,300,000 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 137   Item 2.1       Packet pg. 140/238   Item 2.1       Packet pg. 140/238 This project will protect Puget Sound by reducing the amount of total nitrogen discharged and ensuring continued compliance with water quality requirements while still maintaining treatment capacity to support projected community growth over the next decade. Benefit This project will protect Puget Sound by reducing the amount of total nitrogen discharged and ensuring continued compliance with water quality requirements while still maintaining treatment capacity to support projected community growth over the next decade. Description The WA Dept of Ecology will reissue the City’s NPDES permit with new nutrient monitoring requirements that will ultimately lead to stringent effluent limits for total nitrogen. The wastewater treatment plant’s existing process was not designed for nitrogen removal and will require significant modifications to meet these new requirements. This capital improvement project will fund the engineering, design, and construction as necessary to achieve compliance while also providing adequate capacity to accommodate projected service-area growth over the next decade. $10,650,000 NUTRIENT REMOVAL PROJECT PWP-04 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TREATMENT PLANT Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $650,000 $0 $0 $0Design $0 $0$0 $0 $5,000,000 $5,000,000 $0Construction $0 $0$0 $650,000Expense Total $5,000,000 $5,000,000 $0 $0 $0$0 $330,135 $2,539,500 $2,539,500 $0Fund 423 - Sewer Utility $0 $0$0 $150,605 $1,158,500 $1,158,500 $0Mountlake Terrace $0 $0$0 $107,575 $827,500 $827,500 $0Olympic View Water/Sewer District $0 $0$0 $61,685 $474,500 $474,500 $0City of Shoreline $0 $0$0 $650,000Funding Source Total $5,000,000 $5,000,000 $0 $0 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 138   Item 2.1       Packet pg. 141/238   Item 2.1       Packet pg. 141/238 The project will maintain the infrastructure and repair several existing leaks.Benefit The project will maintain the infrastructure and repair several existing leaks. Description This project will be undertaken in 2027 and is intended to maintain infrastructure and equipment to ensure that the treatment plant is structurally sound and well maintained. The Treatment Plant is constructed primarily of concrete. Cracks or improperly sealed joints can result in leaks and serious water intrusion that may damage equipment or compromise building integrity. $60,000 JOINT SEALANT PWP-06 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TREATMENT PLANT Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $60,000 $0 $0 $0Construction $0 $0$0 $60,000Expense Total $0 $0 $0 $0 $0$0 $30,474 $0 $0 $0Fund 423 - Sewer Utility $0 $0$0 $13,902 $0 $0 $0Mountlake Terrace $0 $0$0 $9,930 $0 $0 $0Olympic View Water/Sewer District $0 $0$0 $5,694 $0 $0 $0City of Shoreline $0 $0$0 $60,000Funding Source Total $0 $0 $0 $0 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 139   Item 2.1       Packet pg. 142/238   Item 2.1       Packet pg. 142/238 Allow solids handling system redundancy and the ability to run the dryer unit independently in the event of a gasification system failure or repair. The dryer is capable of producing Class A biosolids, which would negate the need for temporary hauling and disposal of wet cake at a rate of up to $200,000/month. Benefit Allow solids handling system redundancy and the ability to run the dryer unit independently in the event of a gasification system failure or repair. The dryer is capable of producing Class A biosolids, which would negate the need for temporary hauling and disposal of wet cake at a rate of up to $200,000/month. Description This allows the ability to continue production of class A solids if/when the gasification system is shut down for repairs or preventative maintenance. The ability to produce and haul class A solids will eliminate a temporary but substantial cost increase hauling as this product is essentially the same in volume as biochar or concentrated minerals and is accepted at the local transfer station whereas if this option is not available, sludge will need to be loaded into trailers and hauled to Oregon as was done during the Carbon Recovery Project at a cost of up to $200,000 per month. This redundant solids processing mode was an option to add to the Carbon Recovery Project and was rejected by previous administration. Along with the savings in hauling costs, there will be no additional odor issues or daily sludge truck traffic in the adjacent neighborhood. $300,000 GASIFICATION BYPASS (CLASS A SOLIDS PRODUCTION) PWP-08 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TREATMENT PLANT Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $50,000 $0 $0 $0Design $0 $0$0 $250,000 $0 $0 $0Construction $0 $0$0 $300,000Expense Total $0 $0 $0 $0 $0$0 $152,370 $0 $0 $0Fund 423 - Sewer Utility $0 $0$0 $69,510 $0 $0 $0Mountlake Terrace $0 $0$0 $49,650 $0 $0 $0Olympic View Water/Sewer District $0 $0$0 $28,470 $0 $0 $0City of Shoreline $0 $0$0 $300,000Funding Source Total $0 $0 $0 $0 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 140   Item 2.1       Packet pg. 143/238   Item 2.1       Packet pg. 143/238 To keep critical equipment reliable and in working condition.Benefit To keep critical equipment reliable and in working condition. Description The WWTP has several VFD's (variable frequency drives) on various critical equipment influent pumps, effluent pumps, RAS/WAS pumps, aeration blowers, etc. These VFD's have an expected useful life of 15-20 years. Several of the VFD's here at the plant range in age between 20-30 years old. There have already been some failures and replacements made. These outdated VFD's need to be replaced to avoid a catastrophic failure event that could happen to these weakened state VFD's for any number of reasons, including abrupt starting and stopping due to power bumps/loss, switching from grid to generator power supply or just a parts failure. If multiple critical components fail simultaneously, then the plant may lose it's ability to treat wastewater that meets NPDES permit requirements resulting in pollution of our receiving waters and possible fines by our governing agency. $500,000 VFD UPGRADES PWP-10 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TREATMENT PLANT Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $50,000 $0 $0 $0Design $0 $0$0 $200,000 $0 $0 $0Construction $0 $0$0 $250,000Expense Total $0 $0 $0 $0 $0$0 $126,975 $0 $0 $0Fund 423 - Sewer Utility $0 $0$0 $57,925 $0 $0 $0Mountlake Terrace $0 $0$0 $41,375 $0 $0 $0Olympic View Water/Sewer District $0 $0$0 $23,725 $0 $0 $0City of Shoreline $0 $0$0 $250,000Funding Source Total $0 $0 $0 $0 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 141   Item 2.1       Packet pg. 144/238   Item 2.1       Packet pg. 144/238 Improve reliability of critical infrastructure as it is currently out of service and in a state of imminent failure. Ensure WWTP’s ability to treat wastewater up to its rated capacity and meet discharge permit requirements. Closing off dead corners will improve operational efficiency. Benefit Improve reliability of critical infrastructure as it is currently out of service and in a state of imminent failure. Ensure WWTP’s ability to treat wastewater up to its rated capacity and meet discharge permit requirements. Closing off dead corners will improve operational efficiency. Description Primary Clarifier #2 cage, center column, feedwell, corner sweeps, weir, counterweight, skimming device and rake arms need replacement due to severe corrosion. The steel has not been replaced since the original construction. Baffles will be installed to block-off corner dead zones to create a more circular flow pattern. The limited access will require that pieces be assembled inside the tank. The concrete structure also needs to be inspected and repaired as needed as corrosion of the concrete in spots has led to exposed rebar and may have compromised the structural integrity of the clarifier. The project was delayed in 2024 and a carryforward budget amendment will move funds to 2027-28 to complete project. $600,000 PRIMARY CLARIFIER 2 REHAB PWP-11 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TREATMENT PLANT Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $100,000 $0 $0 $0Design $0 $0$0 $200,000 $300,000 $0 $0Construction $0 $0$0 $300,000Expense Total $300,000 $0 $0 $0 $0$0 $152,370 $152,370 $0 $0Fund 423 - Sewer Utility $0 $0$0 $69,510 $69,510 $0 $0Mountlake Terrace $0 $0$0 $49,650 $49,650 $0 $0Olympic View Water/Sewer District $0 $0$0 $28,470 $28,470 $0 $0City of Shoreline $0 $0$0 $300,000Funding Source Total $300,000 $0 $0 $0 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 142   Item 2.1       Packet pg. 145/238   Item 2.1       Packet pg. 145/238 Improve reliability, redundancy and efficiency of the primary sludge and scum pumps by replacing 30+ year old pumps and improving piping system.Benefit Improve reliability, redundancy and efficiency of the primary sludge and scum pumps by replacing 30+ year old pumps and improving piping system. Description The ODS pumps are over 30 years old and are at the end of their useful life. The maintenance, reliability and efficiency of the primary sludge pumping system would be greatly improved by replacing the current diaphragm pumps with progressive cavity pumps. During this pump replacement, piping modifications would also be done to allow pumps to support more than one clarifier, improving system redundancy along with reliability. The project was delayed in 2025 and will carry forward into 2027. $600,000 ODS (PRIMARY SLUDGE) PUMP REPLACEMENT PWP-13 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TREATMENT PLANT Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $350,000 $250,000 $0 $0Construction $0 $0$0 $350,000Expense Total $250,000 $0 $0 $0 $0$0 $177,765 $126,975 $0 $0Fund 423 - Sewer Utility $0 $0$0 $81,095 $57,925 $0 $0Mountlake Terrace $0 $0$0 $57,925 $41,375 $0 $0Olympic View Water/Sewer District $0 $0$0 $33,215 $23,725 $0 $0City of Shoreline $0 $0$0 $350,000Funding Source Total $250,000 $0 $0 $0 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 143   Item 2.1       Packet pg. 146/238   Item 2.1       Packet pg. 146/238 To replace problematic, yet critical valves with more reliable technology that helps to ensure disinfection system functionality and the ability to continue to meet NPDES discharge permit requirements. Benefit To replace problematic, yet critical valves with more reliable technology that helps to ensure disinfection system functionality and the ability to continue to meet NPDES discharge permit requirements. Description Replace two gate valves and actuators at the inlets of the two chlorine contact channels. These gates have repeatedly failed. Repair is often expensive and time consuming, as access is an issue, so it is necessary to rent scaffolding and other equipment to make repairs. When a gate fails, it effectively cuts the disinfection capacity of the plant in half. These are critical pieces of equipment and need to be replaced with a different technology to improve performance and reliability. $375,000 CHLORINE CONTACT CHANNEL SLUICE GATES REPLACEMENT PWP-14 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TREATMENT PLANT Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $0 $75,000 $0 $0Design $0 $0$0 $0 $300,000 $0 $0Construction $0 $0$0 $0Expense Total $375,000 $0 $0 $0 $0$0 $0 $190,463 $0 $0Fund 423 - Sewer Utility $0 $0$0 $0 $86,888 $0 $0Mountlake Terrace $0 $0$0 $0 $62,063 $0 $0Olympic View Water/Sewer District $0 $0$0 $0 $35,588 $0 $0City of Shoreline $0 $0$0 $0Funding Source Total $375,000 $0 $0 $0 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 144   Item 2.1       Packet pg. 147/238   Item 2.1       Packet pg. 147/238 This project will fully restore and upgrade the existing non-potable water system and allow for much-needed redundancy.Benefit This project will fully restore and upgrade the existing non-potable water system and allow for much-needed redundancy. Description Relocate one NPW pump and replace one NPW pump. Repair, replace, and modify piping as needed to achieve full system functionality and redundancy. Current NPW system does not meet facility needs. Only one pump provides the needed system pressure to allow the standby generator to function. In the event of that pump failing, the standby generator (which is required as a backup power source per our NPDES permit) is not operable. $75,000 NPW PUMPING SYSTEM IMPROVEMENTS PWP-16 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TREATMENT PLANT Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $75,000 $0 $0 $0Construction $0 $0$0 $75,000Expense Total $0 $0 $0 $0 $0$0 $38,093 $0 $0 $0Fund 423 - Sewer Utility $0 $0$0 $17,378 $0 $0 $0Mountlake Terrace $0 $0$0 $12,413 $0 $0 $0Olympic View Water/Sewer District $0 $0$0 $7,118 $0 $0 $0City of Shoreline $0 $0$0 $75,000Funding Source Total $0 $0 $0 $0 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 145   Item 2.1       Packet pg. 148/238   Item 2.1       Packet pg. 148/238 As these are our medium sized blowers, this allows for more efficient and cost-saving operation of the LPA system.Benefit As these are our medium sized blowers, this allows for more efficient and cost-saving operation of the LPA system. Description Blowers are currently running at 75% capacity, are at the end of their useful life (30,000 hrs, put in service in 2017), and due for rebuild. Extending the budget because Blower 305 must be replaced in 2027. $105,000 LPA BLOWER 303 AND 305 REHAB PWP-18 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TREATMENT PLANT Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $50,000 $50,000 $0 $0Construction $0 $0$0 $50,000Expense Total $50,000 $0 $0 $0 $0$0 $25,395 $25,395 $0 $0Fund 423 - Sewer Utility $0 $0$0 $11,585 $11,585 $0 $0Mountlake Terrace $0 $0$0 $8,275 $8,275 $0 $0Olympic View Water/Sewer District $0 $0$0 $4,745 $4,745 $0 $0City of Shoreline $0 $0$0 $50,000Funding Source Total $50,000 $0 $0 $0 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 146   Item 2.1       Packet pg. 149/238   Item 2.1       Packet pg. 149/238 Rehab of the 600 bldg electrical system will result in a tremendous increase in the reliability of the critical systems within the 600 bldg including sludge dewatering, primary sludge pumping, high-pressure air, chemical disinfection pumps and several others. Benefit Rehab of the 600 bldg electrical system will result in a tremendous increase in the reliability of the critical systems within the 600 bldg including sludge dewatering, primary sludge pumping, high-pressure air, chemical disinfection pumps and several others. Description Both the high and low voltage electrical systems are in a degraded state and have functionality issues during periods of high demand, often resulting in equipment failure due to MCC or breaker failures. This is a critical system and is at the end of its useful life, being well over thirty years old. Work extended into 2027. $250,000 600 BLDG ELECTRICAL REHAB PWP-19 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TREATMENT PLANT Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $250,000 $0 $0 $0Construction $0 $0$0 $250,000Expense Total $0 $0 $0 $0 $0$0 $126,975 $0 $0 $0Fund 423 - Sewer Utility $0 $0$0 $57,925 $0 $0 $0Mountlake Terrace $0 $0$0 $41,375 $0 $0 $0Olympic View Water/Sewer District $0 $0$0 $23,725 $0 $0 $0City of Shoreline $0 $0$0 $250,000Funding Source Total $0 $0 $0 $0 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 147   Item 2.1       Packet pg. 150/238   Item 2.1       Packet pg. 150/238 Improve performance and reliability as well as lowering operational and maintenance costs for the systems mentioned above.Benefit Improve performance and reliability as well as lowering operational and maintenance costs for the systems mentioned above. Description Perform AQ system repairs and modifications from the prior years' AQ Evaluation Project to resolve the AQ issues within the 600 bldg with a focus on the lower level where H2S gas appears to be accumulating at levels that are high enough to do damage to sensitive electronic equipment such as VFD's, control boards and relay switches. These electronic failures cause shutdowns in the primary sludge pumping system, high pressure plant air system and sludge dewatering system. Work extended into 2027. $250,000 600 BLDG AIR QUALITY REHAB/UPGRADE PWP-20 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TREATMENT PLANT Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $125,000 $0 $0 $0Construction $0 $0$0 $125,000Expense Total $0 $0 $0 $0 $0$0 $63,488 $0 $0 $0Fund 423 - Sewer Utility $0 $0$0 $28,963 $0 $0 $0Mountlake Terrace $0 $0$0 $20,688 $0 $0 $0Olympic View Water/Sewer District $0 $0$0 $11,863 $0 $0 $0City of Shoreline $0 $0$0 $125,000Funding Source Total $0 $0 $0 $0 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 148   Item 2.1       Packet pg. 151/238   Item 2.1       Packet pg. 151/238 This will increase reliability/redundancy in the secondary system and help ensure the final effluent meets NPDES discharge permit standards.Benefit This will increase reliability/redundancy in the secondary system and help ensure the final effluent meets NPDES discharge permit standards. Description Secondary Clarifier 2 has reached the end of useful life as its components are over 30 years old and need to be replaced. Clarifier drive, drive motor and steel structure have corroded and need repair or replacement. Concrete and interior roof lining need to be evaluated and repaired if necessary. This work was not completed in 2026. Work extended into 2027/28. $450,000 SECONDARY CLARIFIER 2 REHAB PWP-21 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TREATMENT PLANT Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $50,000 $0 $0 $0Design $0 $0$0 $0 $800,000 $0 $0Construction $0 $0$0 $50,000Expense Total $800,000 $0 $0 $0 $0$0 $25,395 $406,320 $0 $0Fund 423 - Sewer Utility $0 $0$0 $11,585 $185,360 $0 $0Mountlake Terrace $0 $0$0 $8,275 $132,400 $0 $0Olympic View Water/Sewer District $0 $0$0 $4,745 $75,920 $0 $0City of Shoreline $0 $0$0 $50,000Funding Source Total $800,000 $0 $0 $0 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 149   Item 2.1       Packet pg. 152/238   Item 2.1       Packet pg. 152/238 The SCADA system has been recently upgraded, however, some of the controller locations have many unused/abandoned panel components (i.e. relays, timers, PLC systems) and wiring, making documentation and troubleshooting difficult. Existing system documentation, including panel drawings, I/O wiring drawings, network drawings, and control logic descriptions, is poor or non-existent. Lack of wire labels inside PLC cabinets is a safety issue and complicates maintenance and troubleshooting. This project includes a comprehensive SCADA masterplan that systematically and timely phases an approach to PLC replacement. Benefit The SCADA system has been recently upgraded, however, some of the controller locations have many unused/abandoned panel components (i.e. relays, timers, PLC systems) and wiring, making documentation and troubleshooting difficult. Existing system documentation, including panel drawings, I/O wiring drawings, network drawings, and control logic descriptions, is poor or non-existent. Lack of wire labels inside PLC cabinets is a safety issue and complicates maintenance and troubleshooting. This project includes a comprehensive SCADA masterplan that systematically and timely phases an approach to PLC replacement. Description The project is to improve the SCADA system for better accuracy and control. The project involves calibrating process-critical instrumentation, re-commissioning essential systems, and creating a detailed SCADA Masterplan for phased programmable logic controller (PLC) replacement. This programmatic approach will replace 7 PLCs, 26 flow meters, and 19 level sensors over the next ten years. $1,000,000 INSTRUMENTATION UPGRADES AND REPLACEMENT PROGRAM PWP-22 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TREATMENT PLANT Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $200,000 $200,000 $200,000 $200,000Construction $0 $0$0 $200,000Expense Total $200,000 $200,000 $200,000 $0 $0$0 $101,580 $101,580 $101,580 $101,580Fund 423 - Sewer Utility $0 $0$0 $46,340 $46,340 $46,340 $46,340Mountlake Terrace $0 $0$0 $33,100 $33,100 $33,100 $33,100Olympic View Water/Sewer District $0 $0$0 $18,980 $18,980 $18,980 $18,980City of Shoreline $0 $0$0 $200,000Funding Source Total $200,000 $200,000 $200,000 $0 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 150   Item 2.1       Packet pg. 153/238   Item 2.1       Packet pg. 153/238 The potable water system should not be used throughout the plant due to corrosive, particle fouled, and contaminated feed water. This directly impacts the condition (corrosion), and safe use of the safety showers and eyewash stations in the plant. There are instances where temporary hoses run potable water to areas of the plant where needed, but a more permanent solution should be implemented. This study will investigate the source of the potable water quality issues and evaluate the implementation of proposed repairs. Benefit The potable water system should not be used throughout the plant due to corrosive, particle fouled, and contaminated feed water. This directly impacts the condition (corrosion), and safe use of the safety showers and eyewash stations in the plant. There are instances where temporary hoses run potable water to areas of the plant where needed, but a more permanent solution should be implemented. This study will investigate the source of the potable water quality issues and evaluate the implementation of proposed repairs. Description A study will be completed to evaluate the deficiencies in potable water quality throughout the plant, especially in areas that affect the operation of safety showers and eyewash stations. The gasification system may need additional potable water, and this study will be performed in conjunction with long-term planning for the operation of the gasifier. The implementation of the potable water system improvements will also include the installation of all permanent safety shower and eyewash stations. No work was performed in 2026 - projected expenses carried over into 2028. $125,000 POTABLE WATER SYSTEM REPAIR PWP-23 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TREATMENT PLANT Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $25,000 $0 $0 $0Design $0 $0$0 $0 $100,000 $0 $0Construction $0 $0$0 $25,000Expense Total $100,000 $0 $0 $0 $0$0 $12,698 $50,790 $0 $0Fund 423 - Sewer Utility $0 $0$0 $5,793 $23,170 $0 $0Mountlake Terrace $0 $0$0 $4,138 $16,550 $0 $0Olympic View Water/Sewer District $0 $0$0 $2,373 $9,490 $0 $0City of Shoreline $0 $0$0 $25,000Funding Source Total $100,000 $0 $0 $0 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 151   Item 2.1       Packet pg. 154/238   Item 2.1       Packet pg. 154/238 Copper corrosion is present on various components and systems throughout the entire plant, evaluated during a condition assessment in September 2025. This condition is indicative of the presence of gases that are corrosive to copper elements, including MCC wiring and instrumentation, that can lead to gross electrical failures. Neighbors have issued complaints of environmental odors around and from within the plant boundaries, indicative of elevated hydrogen sulfide (H2S) levels. The project will include a study on balancing the exhaust and air supply systems, encapsulating and isolating H2S venting, and identifying critical areas for HVAC system refurbishment. The project will include the installation of monitoring equipment to optimize gas removal and treatment. Benefit Copper corrosion is present on various components and systems throughout the entire plant, evaluated during a condition assessment in September 2025. This condition is indicative of the presence of gases that are corrosive to copper elements, including MCC wiring and instrumentation, that can lead to gross electrical failures. Neighbors have issued complaints of environmental odors around and from within the plant boundaries, indicative of elevated hydrogen sulfide (H2S) levels. The project will include a study on balancing the exhaust and air supply systems, encapsulating and isolating H2S venting, and identifying critical areas for HVAC system refurbishment. The project will include the installation of monitoring equipment to optimize gas removal and treatment. Description This project will follow the 600 Bldg Air Quality Evaluation Project (PWP-20) in 2025 and expands the study area to the remaining plant buildings in 2026. The project will install air handling flow meters to perform a flow and mass H2S balance at screening headworks, solids removal, and primary clarifiers. The existing BioAir system will be evaluated for proper operation and optimization to improve performance. Annual or seasonal treatment may include chemical addition for H2S upstream of plant interceptors. The dumpster staging area will be encapsulated with shed walls and a high-capacity exhaust system to reduce neighborhood complaints. Recommendations from the study are planned to be implemented in 2027. Budget carried over into 2028. $75,000 PLANT HVAC AND ODOR CONTROL UPGRADES PWP-24 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TREATMENT PLANT Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $37,500 $37,500 $0 $0Construction $0 $0$0 $37,500Expense Total $37,500 $0 $0 $0 $0$0 $19,046 $19,046 $0 $0Fund 423 - Sewer Utility $0 $0$0 $8,689 $8,689 $0 $0Mountlake Terrace $0 $0$0 $6,206 $6,206 $0 $0Olympic View Water/Sewer District $0 $0$0 $3,559 $3,559 $0 $0City of Shoreline $0 $0$0 $37,500Funding Source Total $37,500 $0 $0 $0 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 152   Item 2.1       Packet pg. 155/238   Item 2.1       Packet pg. 155/238 A comprehensive valve program will include replacing 3-10 valves per year on a rotating basis, depending on size and cost, beginning with valves installed 15 years ago or more, with the intention to continually replace valves before the end of their expected 20-year lifespan. Notably, in year 1, the condition assessment in September 2025 documented isolation gate valves at the north and south wet wells inlet are difficult to operate and risk failing in their current position and must be replaced. Benefit A comprehensive valve program will include replacing 3-10 valves per year on a rotating basis, depending on size and cost, beginning with valves installed 15 years ago or more, with the intention to continually replace valves before the end of their expected 20-year lifespan. Notably, in year 1, the condition assessment in September 2025 documented isolation gate valves at the north and south wet wells inlet are difficult to operate and risk failing in their current position and must be replaced. Description This project implements a comprehensive valve replacement program to systematically replace valves throughout the plant, beginning with valves nearing the end of their useful life. For older valves, surrounding piping that is determined to be in poor condition will be replaced with the valve. The program is proposed for the next 15 years. $3,750,0000 VALVE REPLACEMENT PROGRAM PWP-25 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TREATMENT PLANT Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $250,000 $250,000 $250,000 $250,000Construction $250,000 $3,500,000$250,000 $250,000Expense Total $250,000 $250,000 $250,000 $250,000 $3,500,000$250,000 $126,975 $126,975 $126,975 $126,975Fund 423 - Sewer Utility $126,975 $1,777,650$126,975 $57,925 $57,925 $57,925 $57,925Mountlake Terrace $57,925 $810,950$57,925 $41,375 $41,375 $41,375 $41,375Olympic View Water/Sewer District $41,375 $579,250$41,375 $23,725 $23,725 $23,725 $23,725City of Shoreline $23,725 $332,150$23,725 $250,000Funding Source Total $250,000 $250,000 $250,000 $250,000 $3,500,000$250,000 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 153   Item 2.1       Packet pg. 156/238   Item 2.1       Packet pg. 156/238 The MCCs in Building 100 and Building 600 have electrical components more than 30 years old and have started to fail. Many low voltage breakers are in poor condition and failure would render critical equipment non-functional. The MCCs were determined to have inadequate ventilation, contributing to high moisture levels, increased corrosion of equipment, and frequent downtime. Several MCCs have unbalanced currents when measured at the Main Feeder Lugs during a condition assessment in September 2024. The backup electrical system does not have any procedures in place and staff have not been trained in operating the emergency generator; this project will include developing a standard operating procedure and training current staff. In addition, several buckets have openings in the door with temporary cardboard used as a ‘patch’ material following the previous removal and changing of components. FME devices are needed on all doors to meet NFPA 70E standards for electrical safety. This project would be additional work related to the rehab and upgrade of the ventilation and electrical systems in Building 600 and Building 100. Benefit The MCCs in Building 100 and Building 600 have electrical components more than 30 years old and have started to fail. Many low voltage breakers are in poor condition and failure would render critical equipment non-functional. The MCCs were determined to have inadequate ventilation, contributing to high moisture levels, increased corrosion of equipment, and frequent downtime. Several MCCs have unbalanced currents when measured at the Main Feeder Lugs during a condition assessment in September 2024. The backup electrical system does not have any procedures in place and staff have not been trained in operating the emergency generator; this project will include developing a standard operating procedure and training current staff. In addition, several buckets have openings in the door with temporary cardboard used as a ‘patch’ material following the previous removal and changing of components. FME devices are needed on all doors to meet NFPA 70E standards for electrical safety. This project would be additional work related to the rehab and upgrade of the ventilation and electrical systems in Building 600 and Building 100. Description The Electrical Improvement Project aims to enhance the reliability, safety, and efficiency of the electrical systems plant-wide. This project will rehabilitate or replace the motor control centers (MCCs), replace failing breakers, add foreign material exclusion (FME) devices, and conduct essential maintenance and inspections. $600,0000 ELECTRICAL IMPROVEMENT PROJECT PWP-26 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TREATMENT PLANT Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $200,000 $200,000 $0 $0Construction $0 $0$0 $200,000Expense Total $200,000 $0 $0 $0 $0$0 $101,580 $101,580 $0 $0Fund 423 - Sewer Utility $0 $0$0 $46,340 $46,340 $0 $0Mountlake Terrace $0 $0$0 $33,100 $33,100 $0 $0Olympic View Water/Sewer District $0 $0$0 $18,980 $18,980 $0 $0City of Shoreline $0 $0$0 $200,000Funding Source Total $200,000 $0 $0 $0 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 154   Item 2.1       Packet pg. 157/238   Item 2.1       Packet pg. 157/238 Maintain NPDES Permit compliance and protect human and environmental health, and minimize chemical or biological risk to Puget Sound receiving waters. Improve operational reliability and resilience. Benefit Maintain NPDES Permit compliance and protect human and environmental health, and minimize chemical or biological risk to Puget Sound receiving waters. Improve operational reliability and resilience. Description The current infrastructure for the dosing of sodium hypochlorite for disinfection, followed by sodium bisulfite for dechlorination prior to release of waters into Puget Sound has degraded and become unreliable, showing significant signs of aging, and requires immediate redesign and replacement. $500K to $1M DISINFECTION SYSTEM REHAB PWP-27 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TREATMENT PLANT Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $50,000 $0 $0 $0Design $0 $0$0 $450,000 $500,000 $0 $0Construction $0 $0$0 $500,000Expense Total $500,000 $0 $0 $0 $0$0 $253,950 $253,950 $0 $0Fund 423 - Sewer Utility $0 $0$0 $115,850 $115,850 $0 $0Mountlake Terrace $0 $0$0 $82,750 $82,750 $0 $0Olympic View Water/Sewer District $0 $0$0 $47,450 $47,450 $0 $0City of Shoreline $0 $0$0 $500,000Funding Source Total $500,000 $0 $0 $0 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 155   Item 2.1       Packet pg. 158/238   Item 2.1       Packet pg. 158/238 Assure complete electrical system safety, integrity, and reliability. Restore dependable power distribution and reduce the likelihood of unexpected failures, outages, or equipment damage from inconsistent power supply. Benefit Assure complete electrical system safety, integrity, and reliability. Restore dependable power distribution and reduce the likelihood of unexpected failures, outages, or equipment damage from inconsistent power supply. Description The 400 Building electrical system sustained significant damage during the 2022 flooding event. Emergency repairs were completed at that time to restore critical functions immediately following the incident; however, approximately 75% of electrical outlets and panels remain inoperative and require replacement. This condition presents reliability, safety, and operational concerns that affect day-to-day plant operations and maintenance activities. $250K 400 BUILDING ELECTRICAL SYSTEM REPAIR AND REPLACE PWP-28 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TREATMENT PLANT Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $250,000 $0 $0 $0I&C Replacement $0 $0$0 $250,000Expense Total $0 $0 $0 $0 $0$0 $126,975 $0 $0 $0Fund 423 - Sewer Utility $0 $0$0 $57,925 $0 $0 $0Mountlake Terrace $0 $0$0 $41,375 $0 $0 $0Olympic View Water/Sewer District $0 $0$0 $23,725 $0 $0 $0City of Shoreline $0 $0$0 $250,000Funding Source Total $0 $0 $0 $0 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 156   Item 2.1       Packet pg. 159/238   Item 2.1       Packet pg. 159/238 Replacement of the floor will extend the life of the tank, assure tank integrity, allow full rotation of the collection arm, prevent excessive stress on the drive unit and rake arms, and improve solids collection efficiency. Benefit Replacement of the floor will extend the life of the tank, assure tank integrity, allow full rotation of the collection arm, prevent excessive stress on the drive unit and rake arms, and improve solids collection efficiency. Description A large section of the tank floor in Secondary Clarifier #1 is buckling upward and created a bulge. This bulge indicates instability and a weakness in the flooring that could lead to rupture and that currently interferes with the rotational path of the clarifier rake arm that moves solids inside the tank to the collection sump. Continued operation under these conditions could result in damage to the rake arms, drive unit, and mechanical components. $1.75M SECONDARY CLARIFIER #1 FLOOR REPLACEMENT PWP-29 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TREATMENT PLANT Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $250,000 $0 $0 $0Design $0 $0$0 $0 $750,000 $750,000 $0Construction $0 $0$0 $250,000Expense Total $750,000 $750,000 $0 $0 $0$0 $126,975 $380,925 $380,925 $0Fund 423 - Sewer Utility $0 $0$0 $57,925 $173,775 $173,775 $0Mountlake Terrace $0 $0$0 $41,375 $124,125 $124,125 $0Olympic View Water/Sewer District $0 $0$0 $23,725 $71,175 $71,175 $0City of Shoreline $0 $0$0 $250,000Funding Source Total $750,000 $750,000 $0 $0 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 157   Item 2.1       Packet pg. 160/238   Item 2.1       Packet pg. 160/238 This project will modernize the wastewater treatment plant's aging SCADA, PLC, operational technology network, and control systems to improve reliability, cybersecurity, and long-term maintainability. Benefit This project will modernize the wastewater treatment plant's aging SCADA, PLC, operational technology network, and control systems to improve reliability, cybersecurity, and long-term maintainability. Description The wastewater treatment plant's SCADA, PLC, and operational infrastructure is aging, increasingly difficult to maintain, and lacks the reliability, cybersecurity, and documentation needed to support ongoing and long-term operations. $1,000,000 SCADA AND CONTROL SYSTEMS MODERNIZATION PWP-30 *Projects starting before 2027 include prior year expenditures. PUBLIC WORKS - TREATMENT PLANT Budget September 2026 DRAFT 1.4 Estimated Project Cost* Project Cost 2027 2028 2029 2030 2031 2033-472032 $300,000 $0 $0 $0Design $0 $0$0 $700,000 $0 $0 $0Construction $0 $0$0 $1,000,000Expense Total $0 $0 $0 $0 $0$0 $507,900 $0 $0 $0Fund 423 - Sewer Utility $0 $0$0 $231,700 $0 $0 $0Mountlake Terrace $0 $0$0 $165,500 $0 $0 $0Olympic View Water/Sewer District $0 $0$0 $94,900 $0 $0 $0City of Shoreline $0 $0$0 $1,000,000Funding Source Total $0 $0 $0 $0 $0$0 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 158   Item 2.1       Packet pg. 161/238   Item 2.1       Packet pg. 161/238 CFP/CIP COMPARISION 2026-2027 2027-2032 PUBLIC WORKS CAPITAL FACILITIES PLAN | CAPITAL IMPROVEMENTS PROGRAM 159   Item 2.1       Packet pg. 162/238   Item 2.1       Packet pg. 162/238 CFP / CIP COMPARISON (2026 TO 2027)SEPTEMBER 2026 DRAFT 1.4 Type CIP/CFP#Project Name Description Transportation PWT-105 7th Ave. N Walkway from Daley St. to SR-524 / 196th St. SW Added to CIP Transportation PWT-56 Pedestrian Improvements (2027)Added to CIP Transportation PWT-107 Pedestrian Improvements (2028)Added to CIP Transportation PWT-106 Feasibility Study (Main St. @ 9th Ave. / Walnut St. @ 9th Ave.)Added to CIP Storm PWD-28 Edmonds Marsh Preliminary Design Estimated future costs for stormwater project. Sewer PWS-13 Phase 19 Annual Sewer Replacement/Rehab (2032)Estimated future costs for sewerline replacements WWTP PWP-27 Disinfection System Rehab New project added due to emergent needs at WWTP WWTP PWP-28 400 Building Electrical System Repair and Replace New project added due to emergent needs at WWTP WWTP PWP-29 Secondary Clarifier #1 Floor Replacement New project added due to emergent needs at WWTP WWTP PWP-30 SCADA and Control Systems Modernization New project added due to emergent needs at WWTP WWTP PWP-06 Joint Sealant Reenabled. Added to 2027 budget WWTP PWP-11 Primary Clarifier 2 Rehab Reenabled and updated. Added to 2027-2028 budget Type Project No.Project Name Description Transportation PWT-04 Main St. Overlay from 6th Ave. to 8th Ave. Cost and funding revised, extended to 2027 Transportation PWT-05 Puget Dr. @ OVD Signal Upgrades Cost and funding revised, moved from 2028-2029 to 2030-2031 Transportation PWT-06 Signal Upgrades - 100th Ave @ 238th St. SW Cost and funding revised, moved from 2028-2029 to 2030-2031 Transportation PWT-28 175th St SW Slope Repair Cost and funding revised, moved from 2028-2029 to 2030-2031 Transportation PWT-07 Main St. @ 3rd Signal Upgrades Cost and funding revised, moved from 2028-2029 to 2030-2031 Transportation PWT-103 7th Ave. N Pedestrian Improvements Cost and funding revised, extended to 2027 Transportation PWT-104 76th Ave. W Overlay from 220th St. SW to Hwy 99 Cost and funding revised Transportation PWT-61 Olympic View Dr. Overlay from 196th to Talbot Rd. Cost and Funding revised, extended to 2027-2028 Transportation PWT-69 7th Ave. Sidewalk Repair Cost and funding revised, moved from 2028-2029 to 2030-2031 Transportation PWT-08 228th St. SW from Hwy 99 to 95th Pl. W Corridor Cost and funding revised, moved from 2029-2046 to 2030-2047 Transportation PWT-10 Hwy 99 Revitalization & Gateway Project - Stage 3 Cost and funding revised, extended to 2030 Transportation PWT-11 Hwy 99 Revitalization & Gateway Project - Stage 4 Cost and funding revised, extended to 2031 Transportation PWT-12 Hwy 99 Revitalization & Gateway Project - Stage 5 Cost and funding revised, moved to 2032-2047 Transportation PWT-13 Hwy 99 Revitalization & Gateway Project - Stage 6 Cost and funding revised, moved from 2032-2046 to 2031-2047 Transportation PWT-14 Hwy 99 Revitalization & Gateway Project - Stage 7 Cost and funding revised, moved from 2032-2046 to 2033-2047 Transportation PWT-15 Hwy 99 Revitalization & Gateway Project - Stage 8 Cost and funding revised, moved from 2032-2046 to 2033-2047 Transportation PWT-16 Hwy 99 Revitalization & Gateway Project - Stage 9 Cost and funding revised, moved from 2031-2047 Transportation PWT-17 SR 524 (196th St. SW) / 88th Ave. W - Intersection Improvements Cost and funding revised, moved from 2032-2046 to 2033-2047 Transportation PWT-18 Main St. @ 9th Ave. Intersection Improvements Cost and funding revised, moved from 2029-2030 to 2030-2031 Transportation PWT-19 76th Ave W @ 220th St. SW Intersection Improvements Cost and funding revised, moved from 2026-2029 to 2027-2031 Transportation PWT-20 SR-104 Adaptive System - 236th to 226th Cost and funding revised, moved from 2026-2029 to 2027-2030 PR O J E C T S A D D E D P R O J E C T S R E V I S E D PR O J E C T S R E V I S E D PR O J E C T S R E V I S E D PR O J E C T S R E V I S E D 160   Item 2.1       Packet pg. 163/238   Item 2.1       Packet pg. 163/238 CFP / CIP COMPARISON (2026 TO 2027)SEPTEMBER 2026 DRAFT 1.4 Type Project No.Project Name Description PR O J E C T S R E V I S E D PR O J E C T S R E V I S E D PR O J E C T S R E V I S E D PR O J E C T S R E V I S E D Transportation PWT-21 SR-104 @ 100th Ave W. Intersection Improvements Cost and funding revised, moved to 2030-2032 Transportation PWT-22 SR-104 @ 95th Pl. W Intersection Improvements Cost and funding revised, moved from 2032-2046 to 2033-2047 Transportation PWT-23 SR-104 @ 238th St. SW Intersection Improvements Cost and funding revised, moved from 2032-2046 to 2033-2047 Transportation PWT-43 SR-104 @ 76th Ave. W Intersection Improvements Cost and funding revised, moved to 2030-2031 Transportation PWT-24 Olympic View Dr @ 76th Ave. W Intersection Improvements Cost and funding revised, moved from 2032-2046 to 2033-2047 Transportation PWT-25 84th Ave W (212th St. SW to 238th St. SW)Cost and funding revised, moved from 2032-2046 to 2033-2047 Transportation PWT-43 SR-104 @ 76th Ave. W Intersection Improvements Cost and funding revised, moved from 2032-2046 to 2030-2031 Transportation PWT-97 76th Ave. W Adaptive System from 206th St SW to 220th St SW Cost and funding revised, moved to 2030-2031 Transportation PWT-98 Citywide Lighting Improvements Cost and funding revised Transportation PWT-29 232nd St. SW Walkway from 100th Ave. to SR-104 Cost and funding revised Transportation PWT-31 236th St. SW Walkway from Hwy 99 to 76th Ave. W Cost and funding revised Transportation PWT-32 84th Ave. W Walkway from 238th St. SW to 234th St. SW Cost and funding revised, moved from 2029-2030 to 2030-2031 Transportation PWT-33 80th Ave. Walkway from 212th St. SW to 206th St. SW Cost and funding revised, moved from 2032-2046 to 2031-2032 Transportation PWT-34 80th Ave. W Walkway from 188th St. SW to Olympic View Dr.Cost and funding revised, moved from 2032-2046 to 2033-2047 Transportation PWT-35 218th St. SW Walkway from 84th Ave. W to 76th Ave. W Cost and funding revised, moved from 2032-2046 to 2033-2047 Transportation PWT-36 Walnut St. Walkway from 6th Ave. S to 7th Ave. S Cost and funding revised, moved from 2032-2046 to 2033-2047 Transportation PWT-40 Maplewood Dr. Walkway from Main St. to 200th St. SW Cost and funding revised, moved from 2029-2031 to 2030-2032 Transportation PWT-45 SR-104 / Pine St. Walkway from HAWK signal to Pine / SR-104 to 9th Cost and funding revised, moved from 2032-2046 to 2033-2047 Transportation PWT-47 104th Ave W / Robinhood Ln Walkway from from 238th St. SW to 106th Ave WCost and funding revised, moved from 2032-2046 to 2033-2047 Transportation PWT-71 Caspers/9th Ave N/Puget Multi-Use path from Admiral Way to OVD Cost and funding revised, moved from 2029-2031 to 2030-2032 Transportation PWT-72 SR-104 Multi-Use path from Sunset Ave. to 100th Ave. W Cost and funding revised, moved from 2029-2031 to 2030-2032 Transportation PWT-73 212th St. SW Multi-Use path from 74th Ave. W to Hwy 99 Cost and funding revised, moved from 2029-2046 to 2031-2047 Transportation PWT-74 SR-104 Multi-Use path from 100th Ave. W to 244th St. SW Cost and funding revised, moved from 2029-2046 to 2030-2047 Transportation PWT-75 Main St. Bike lanes from Ferry Terminal to 6th Ave. Cost and funding revised, moved from 2029-2046 to 2033-2047 Transportation PWT-76 240th St. SW / 78th Ave. W SW from Hwy 99 to 236th St. SW Cost and funding revised, moved from 2029-2031 to 2030-2032 Transportation PWT-77 9th Ave. N Bike lanes from Main St. to Caspers St. Cost and funding revised, moved from 2029-2030 to 2031-2032 Transportation PWT-78 Main St. Bike Lanes from 9th Ave. to 84th Ave .W Cost and funding revised, moved from 2029-2030 to 2030-2031 Transportation PWT-79 238th St. SW Bike lanes from SR-104 to 84th Ave. W Cost and funding revised, moved to 2030-2031 Transportation PWT-80 236th St SW Walkway from 94th Ave W to 84th Ave W Cost and funding revised Transportation PWT-81 Sunset Ave. Multi-Use path from Caspers St. to 3rd Ave. N Cost and funding revised, moved from 2032-2046 to 2033-2047 Transportation PWT-83 Olympic View Dr. Muli-Use path from 76th Ave. W to City Limits Cost and funding revised, moved from 2032-2046 to 2033-2047 Transportation PWT-84 196th St. SW Multi-Use path from 88th Ave. W to 76th Ave. W Cost and funding revised, moved from 2032-2046 to 2033-2047 Transportation PWT-87 Maple St. Walkway from 8th Ave. S to 9th Ave. S Cost and funding revised, moved from 2032-2046 to 2033-2047 Transportation PWT-88 218th St SW Walkway from 84th Ave. to 76th Ave Cost and funding revised, moved from 2032-2046 to 2033-2047 Transportation PWT-89 88th Ave Walkway from 200th St. SW to 196th St. SW Cost and funding revised, moved from 2032-2046 to 2033-2047 PROJECTS REVISED P R O J E C T S R E V I S E D PR O J E C T S R E V I S E D PR O J E C T S R E V I S E D 161   Item 2.1       Packet pg. 164/238   Item 2.1       Packet pg. 164/238 CFP / CIP COMPARISON (2026 TO 2027)SEPTEMBER 2026 DRAFT 1.4 Type Project No.Project Name Description PR O J E C T S R E V I S E D PR O J E C T S R E V I S E D PR O J E C T S R E V I S E D PR O J E C T S R E V I S E D Transportation PWT-91 Olympic Ave. Walkway from Olympic View Dr. to Puget Dr Cost and funding revised, moved from 2032-2046 to 2033-2047 Transportation PWT-92 Meadowdale Beach Rd .Walkway from 75th Pl. W to Olympic View Dr. Cost and funding revised, moved from 2032-2046 to 2033-2047 Transportation PWT-93 6th Ave. S from Elm Way to Pine St Cost and funding revised, moved from 2032-2046 to 2033-2047 Transportation PWT-96 234th St. SW Walkway from Hwy 99 to 76th Ave. W Cost and funding revised, moved from 2032-2046 to 2033-2047 Transportation PWT-102 224th St. SW Bike Lanes from 76th Ave. W to Interurban Trail Cost and funding revised, moved to 2030 Transportation PWT-51 Ferry Storage Improvements from Pine St. to Dayton St.Cost and funding revised, moved from 2029-2030 to 2030-2031 Transportation PWT-53 ADA Transition Plan Moved from 2029 to 2030 Transportation PWT-54 Transportation Plan Update Cost and funding revised Transportation PWT-100 Olympic View Dr Feasibility Study Cost and funding revised, moved from 2032-2046 to 2030 Transportation PWT-101 196th St. SW Feasibility Study Cost and funding revised, moved from 2032-2046 to 2033-2047 Transportation PWT-99 SR-104 Overpass Feasibility Study Cost and funding revised, moved from 2029 to 2030 Transportation PWT-68 88th Ave Overlay and Sidewalk Repair Final completion extended to 2027 Water PWW-03-09,20Phase 16-36 Water Replacement Projects (2027-47)Construction funding revised for 2027, Phases moved one year out Water PWW-11 Yost & Seaview Reservoir Repairs & Upgrades Construction cost and funding extended to 2026-2028 Storm PWD-13-16,18Phase 6-26 Storm Maintenance Project Construction funding revised for 2027, Phases moved one year out Storm PWD-07 Phase 12 Storm Maintenance (2032)Estimated future costs for stormline replacements. Storm PWD-04 Lower Perrinville Creek Restoration Project Cost and Funding Updated Storm PWD-01 Edmonds Marsh Water Quality Improvements (Phase 1)Construction costs moved to 2027 Storm PWD-05 Edmonds Marsh Water Quality Improvements (Phase 2)Construction costs moved to 2027 Storm PWD-17 Storm and Surface Water Comprehensive Plan Final completion moved to 2027 Sewer PWS-05 Phase 13 Annual Sewer Replacement/Rehab Final completion moved to 2027 Sewer PWS-03-08,12,13Phase 14-32 Sewer Replacement Construction funding revised for 2027 Sewer PWS-10 Phase 5-9 Citywide CIPP Sewer Rehabilitation and Future Projects Construction funding revised for 2027 WWTP PWP-04 Nutrient Removal Project Project cost and timeline shifted from 2026-2028 budget to 2027- 2029. WWTP PWP-13 ODS (Primary Sludge) Pump Replacement Project costs and timeline shifted from 2026-2028 budget to 2027- 2028. WWTP PWP-16 NPW Pumping System Improvements Project costs and timeline shifted from 2026 budget to 2027. WWTP PWP-18 LPA Blower 303 and 305 Rehab Project costs and timeline revised and extended to 2028 WWTP PWP-19 600 Bldg Electrical Rehab Project costs and timeline shifted from 2026 budget to 2027. WWTP PWP-20 600 Bldg Air Quality Evaluation Construction work on ventilation system extended into 2027. WWTP PWP-21 Secondary Clarifier 2 Rehab Project costs and timeline shifted from 2026 budget to 2027-2028 PROJECTS REVISEDPROJECTS REVISED P R O J E C T S R E V I S E D PR O J E C T S R E V I S E D 162   Item 2.1       Packet pg. 165/238   Item 2.1       Packet pg. 165/238 CFP / CIP COMPARISON (2026 TO 2027)SEPTEMBER 2026 DRAFT 1.4 Type Project No.Project Name Description PR O J E C T S R E V I S E D PR O J E C T S R E V I S E D PR O J E C T S R E V I S E D PR O J E C T S R E V I S E D WWTP PWP-23 Potable Water System Repair Project costs and timeline shifted from 2026-2027 budget to 2027- 2028. WWTP PWP-24 Plant HVAC and Odor Control Upgrades Project costs and timeline shifted from 2026-2027 budget to 2027- 2028. WWTP PWP-25 Valve Replacement Program Project costs and timeline corrected to indicate ongoing annual expense Facilities PWF-02 Cemetery Building Six-year cost and funding (2027-2032) revised Facilities PWF-03 City Hall Six-year cost and funding (2027-2032) revised Facilities PWF-04 Fishing Pier/Beach Ranger Station Six-year cost and funding (2027-2032) revised Facilities PWF-05 Frances Anderson Center Six-year cost and funding (2027-2032) revised Facilities PWF-09 Historic Log Cabin Six-year cost and funding (2027-2032) revised Facilities PWF-10 Historical Museum Six-year cost and funding (2027-2032) revised Facilities PWF-11 Library Six-year cost and funding (2027-2032) revised Facilities PWF-13 Old Public Works Six-year cost and funding (2027-2032) revised Facilities PWF-14 Parks Maintenance Building Six-year cost and funding (2027-2032) revised Facilities PWF-15 Public Safety Six-year cost and funding (2027-2032) revised Facilities PWF-16 Public Works Apron Repair Six-year cost and funding (2027-2032) revised (Renamed from PW O&M) Facilities PWF-17 Wade James Theater Six-year cost and funding (2027-2032) revised Facilities PWF-18 Yost Pool House Six-year cost and funding (2027-2032) revised Facilities PWF-23 Library Plaza Deck Waterproofing Six-year cost and funding (2027-2032) revised Type Project No. Project Name Description Tranportation PWT-66 4th Avenue Cultural Corridor Removed Tranportation PWT-70 Safety Action Plan Completed Storm PWD-12 Phase 5 Storm Maintenance Project Final completion extended to 2027 Storm PWD-22 7317 Ballinger Way Floodplain Purchase & Structure Removal Completed Storm PWD-26 20719 86th Pl W Structure Removal and Rain Gardens Completed Facilities PWF-01 Boys and Girls Club Building demolished Facilities PWF-12 Meadowdale Club House Disabled - No projects planned in six-year projections WWTP PWP-17 600 Bldg Air Quality Evaluation Completed WWTP PWP-02 Carbon Recovery Project Removed WWTP PWP-05 Primary Clarifier Disabled - Further evaluation is required WWTP PWP-07 Vacuum Filter Disabled - Further evaluation is required PROJECTS REVISEDPROJECTS REVISEDPROJECTS REVISED P R O J E C T S R E V I S E D PR O J E C T S R E M O V E D 163   Item 2.1       Packet pg. 166/238   Item 2.1       Packet pg. 166/238 2027-2032 DRAFT CAPITAL FACILITIES PLAN & CAPITAL IMPROVEMENT PROGRAM DRAFT July 2026   Item 2.1       Packet pg. 167/238   Item 2.1       Packet pg. 167/238 Page 2 September 9, 2026 Members of the City Council, Planning Board, City Staff, and Edmonds Community, On behalf of the Parks & Recreation Department, I am pleased to present the City of Edmonds Draft 2027–2032 Capital Improvement Program (CIP) and Capital Facilities Plan (CFP). This document outlines our six-year strategy for stewarding the City’s parks, open spaces, and recreational facilities during a time in which thoughtful asset management is more important than ever. Edmonds is a mature and largely built-out community with park infrastructure that, in many cases, has served residents for decades. Much of this infrastructure such as playgrounds, boardwalks, trails, and specialized facilities such as Yost Pool are aging with some nearing, and in some situations, beyond their intended lifespan. At the same time, the city continues to navigate budgetary challenges and limited departmental staffing, both of which influence how we prioritize capital investment. For these reasons, this CFP/CIP centers on safety, asset sustainability, deferred maintenance and accessibility our community relies upon every day. Within these pages, you will find: • Priority repairs and replacements that address safety, deferred maintenance, and ADA accessibility. • Key natural-area restoration projects, including Shell Creek and the Edmonds Marsh. • Strategic investments in underserved neighborhoods through early acquisition and planning for new parks in the HWY 99 and Southeast Edmonds areas. • Targeted upgrades to essential facilities such as Yost Pool, playgrounds, trails, and park amenities. • Transparent cost estimates, funding sources, and multi-year schedules for projects. Our goal is straightforward: protect and sustain existing assets while making measured progress on long-term community priorities. Even in a challenging fiscal climate, these investments support public and user safety, equity, environmental health, and increased operational effectiveness across Edmonds’ park system. We are grateful for the ongoing support of the City Council, Planning Board, community partners, and Edmonds residents, businesses and visitors. Your engagement in the capital planning process ensures that the priorities reflect the needs, values, and aspirations of our community. Thank you for your thoughtful review of the 2027–2032 Draft CFP/CIP. Sincerely, Angie Feser, Edmonds Parks & Recreation Director 425-771-0256 Angie.Feser@Edmondswa.gov   Item 2.1       Packet pg. 168/238   Item 2.1       Packet pg. 168/238 P8 D20 D21R20 R19 P1D2 P4D1D9A1 R11R15 P5 ¯ August 2026 Parks & Recreation2027 - 2032 PARKS PROJECTS Projects 2027-28 2028-32 R19, P8 P5 R11 P4, D9, D1, A1P1, D2 R15 D20 D21, R20 R16R17 A3, P6, D15A4, P7, D18 Shell Creek Restoration Yost Pool Upgrades Woodway Campus Athletic Compex Johnson Property Marsh Boardwalk Replacement Edmonds Marsh RestorationParks Maintenance BuildingPool Replacement ADA Improvements & Replacement Citywide Park ImprovementsPlayground Replacement #1 Playground Replacement #2 Neighborhood Park HWY 99 Neighborhood Park SE 2 Page 3 P10, R12 P9, R8 Project Type: A: Acquisition – R: Replacement/Upgrade – P: Master Planning – D: Development (new) Non-site specific projects:   Item 2.1       Packet pg. 169/238   Item 2.1       Packet pg. 169/238 2027-2032 SIX-YEAR CAPITAL IMPROVEMENT PROGRAM and CAPITAL FACILITIES PLAN CFP Project #Project Site & Description 2027 2028 2029 2030 2031 2032 6-Year Total P8 R19 Shell Creek Restoration Phase 1 & 2 *CARRYFORWARD* Planning, design (phase 1) and renovation (phase 2). Project to provide improved environmental health and erosion control of Shell Creek in Yost Park, may include trail, bridge and boardwalk repair or relocation. 240,000$ $ 200,000 180,000$ -$ $ -$ -620,000$ X P9 R8 Playground Replacement #1 Replacement of aging playground and related improvements to improve ADA compliance. -$ 50,000$ 350,000$ -$ $ -$ -400,000$ R11 Yost Pool Upgrades & Renovation Repairs and renovations of 50+ year old pool as needed, to include a furture complete replaster of the pool lining. -$ 100,000$ 100,000$ -$ $ -$ -200,000$ X D20 Woodway Campus Athletic Complex - Phase I - Lighting In cooperation with the Edmonds School District, complete a community park and athletic complex at Former Woodway High School to include lighting and future construction of two additional fields. -$ $ 1,500,000 -$ -$ $ -$ -1,500,000$ D21 R20 Marsh Boardwalk Replacement Assessment of northwest Edmonds Marsh boardwalk for possible replacement. -$ -$ $ 25,000 -$ $ -$ -25,000$ X P10 R12 Playground Replacement #2 Replacement of aging playground and related improvements to improve ADA compliance. -$ -$ 50,000$ 350,000$ -$ $ -400,000$ X A3 P6 D15 Neighborhood Park - HWY 99 Acquisition, Master plan and development of a new neighborhood park near SR 99. -$ $ --$ 900,000$ $ 100,000 850,000$ 1,850,000$ X P5 Johnson Property Master plan for future use and expansion of Yost Park. Site development not included in estimate. -$ $ -$ --$ $ 50,000 -$ 50,000$ X A4 P7 D18 Neighborhood Park - SE 2 Master plan and development of a new neighborhood park in Southeast Edmonds (funding is in Parkland Acquisition program for purchase). -$ $ -$ --$ 700,000$ 100,000$ 800,000$ Project Type: A: Acquisition - R: Replacement/Upgrade - P: Master Planning - D: Development (new) Page 4  Item 2.1       Packet pg. 170/238  Item 2.1       Packet pg. 170/238 2027-2032 SIX-YEAR CAPITAL IMPROVEMENT PROGRAM and CAPITAL FACILITIES PLAN CFP Project #Project Site & Description 2027 2028 2029 2030 2031 2032 6-Year Total X R15 Pool Replacement Replacement of the existing Yost pool due to end of life cycle. Consideration of possible partnerships with design, location, and funding TBD. -$ $ -$ -$ --$ 30,000,000$ 30,000,000$ X P1 D2 Parks & Facilities Maintenance and Operations Building Replace and/or renovate Parks & Facilities Maintenance Shop located in City Park. Phase 1 - feasibility study. -$ $ -$ -$ -$ -$ --$ X A1 P4 D1 Edmonds Marsh Estuary Restoration (Willow Creek Daylighting) Aquisition, Master Plan development and implementation of the Edmonds Marsh to daylight the waterway connection of Puget Sound to the Edmonds Marsh and two fresh water creeks providing restoration of fresh water/salt water estuary and natural tidal exchange. (All expenses are TBD per Council direction in December 2022). TBD TBD TBD TBD TBD TBD -$ 240,000$ 350,000$ 2,205,000$ 1,250,000$ 850,000$ 30,950,000$ 35,845,000$ Project # PARKS CIP PROGRAMS 2027 2028 2029 2030 2031 2032 6-Year Total R16 ADA Improvements & Replacement Ongoing replacement or improvements to meet ADA standards within park system. 75,000$ $ 50,000 50,000$ 300,000$ $ 300,000 300,000$ 1,075,000$ R17 Citywide Park Improvements / Capital Replacement Program Ongoing program of funding allocation for regular, major and deferred maintenance, repair and replacement of parks amenities, structures and equipment (staff time allocation included). 640,000$ $ 645,000$ 651,000$ 657,000$ 663,000 669,000$ 3,925,000$ Debt Service and Interfund Transfers Debt service on two Civic Park bonds and Marina Beach Park acquisition.410,438$ $ 416,350$ 407,912$ 414,225$ 414,993 335,406$ 2,399,324$ 1,050,438$ 1,061,350$ 1,058,912$ 1,071,225$ 1,077,993$ 1,004,406$ 6,324,324$ 1,290,438$ 1,411,350$ 3,263,912$ 2,321,225$ 1,927,993$ 31,954,406$ 42,169,324$ (A) SUBTOTAL PARKS CIP/CFP PROJECTS (B) SUBTOTAL - PARKS CIP PROGRAMS (C) TOTAL PARKS CIP/CFP EXPENDITURES (A+B) Project Type: A: Acquisition - R: Replacement/Upgrade - P: Master Planning - D: Development (new) Page 5  Item 2.1       Packet pg. 171/238  Item 2.1       Packet pg. 171/238 2027-2032 SIX-YEAR CAPITAL IMPROVEMENT PROGRAM and CAPITAL FACILITIES PLAN PARKS CIP REVENUE 2027 2028 2029 2030 2031 2032 6-Year Total Real Estate Excise Tax (REET) I - Fund 126 - Debt Payments 410,438$ $ 416,350$ 407,912$ 414,225$ 414,993 335,406$ $ 2,480,105 Real Estate Excise Tax (REET) I - Fund 126 - Land Acquisition 100,000$ $ 100,000$ 100,000$ 100,000$ 100,000 100,000$ $ 600,000 Real Estate Excise Tax (REET) II - Fund 125 $ 955,000 $ 995,000 $ 1,006,000 $ 957,000 $ 963,000 $ 969,000 $ 5,586,000 Park Impact Fees - Fund 332-100 $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 1,500,000 Investment Interest (3%) $ 42,407 $ 54,528 $ 64,754 $ 32,992 $ 27,141 $ 30,998 $ 238,400 Donations $ - $ - $ - $ - $ - $ - $ - Bond Proceeds $ - $ - $ - $ - $ - $ - $ - Secured Grants $ - $ - $ - $ - $ - $ - $ - Unsecured Grants/Funding - non-land acquisition $ - $ - $ 1,000,000 $ - $ - $ 30,000,000 $ 1,000,000 1,707,845$ 1,765,878$ 2,778,666$ 1,704,217$ 1,705,134$ 31,635,404$ 11,404,505$ 2027 2028 2029 2030 2031 2032 (E)Beginning Fund Balance 2,163,469$ $ 2,505,877$ 2,810,404$ 2,275,158 1,358,150$ 835,291$ (D) Revenue 1,707,845$ $ 1,765,878$ 2,778,666$ 1,704,217 1,705,134$ 31,635,404$ (C)Expenditures 1,290,438$ $ 1,411,350$ 3,263,912$ 2,321,225 1,927,993$ 31,954,406$ 2,580,877$ 2,860,404$ 2,325,158$ 1,658,150$ 1,135,291$ 516,289$ Restricted Land Acquisition Funds: 1,315,325$ 1,415,325$ 1,515,325$ 715,325$ $ 115,325 215,325$ Available Funding (park impact fees & interest): 1,265,552$ 1,445,079$ 809,833$ 942,825$ 1,019,966$ 300,964$ (F) Ending Fund Balance (E+D-C) (D) TOTAL PARKS CIP REVENUE Parks Fund 6-Year Overview PARKS CAPITAL REVENUE & EXPENSE SUMMARY FUNDS 125, 126 & 332 Page 6  Item 2.1       Packet pg. 172/238  Item 2.1       Packet pg. 172/238 Page 7 2027-2032 Parks Capital Improvement Program & Capital Facilities Plan PROJECTS   Item 2.1       Packet pg. 173/238   Item 2.1       Packet pg. 173/238 Page 8 Parks & Recreation Shell Creek Restoration Phase 1 & 2 – P8, R19 Shell Creek Valley, Yost Park Project Summary: The project aims to rehabilitate and enhance the ecological integrity and public accessibility of the northern section of the 45-acre Yost Park. This project will focus on: •Habitat and environmental protection and enhancement •Mitigation, restoration and appropriate trail, bridge and boardwalk locations to address stream degradation •Replacement, relocation or elimination of pedestrian bridges, trails, and boardwalks •Removal or modification of aging concrete structures Following the completion of the Existing Conditions Analysis, the next phase will include: •Development of a detailed scope of work •Engagement of architecture, engineering, and ecological design professionals •Preparation of permitting documents and preliminary construction cost estimates •Restoration project completion Project Justification: Yost Park contains a segment of Shell Creek, a salmon-bearing stream that is currently experiencing environmental degradation. Key concerns include: •Erosion and sedimentation affecting streambed conditions and salmon spawning habitat •Closure of a pedestrian bridge due to erosion, limiting trail connectivity and park access •Deterioration of additional pedestrian bridges, which are approaching the end of their lifecycle These issues compromise both ecological health and public use of the park. Restoration efforts will improve habitat conditions, enhance recreational access, and support long-term sustainability. Continued on next page…   Item 2.1       Packet pg. 174/238   Item 2.1       Packet pg. 174/238 Page 9 Shell Creek Restoration Phase 1 & 2 – P8, R19 – continued. This project supports five goals and eleven objectives outlined in the City of Edmonds 2022 Parks, Recreation & Open Space (PROS) Plan. Additionally, recommendations 3.1 encourages the City to maintain, renovate, or replace aging or damaged infrastructure to ensure public accessibility, use and safety; recommendation 3.10 explicitly states the City should develop and implement stream management plans to restore degraded stream habitat in developed parks such as Shell Creek at Yost Park; recommendation 5.2 states the City should repair and improve or extend trails and boardwalks to allow improved public access to natural areas for nature / wildlife viewing, hiking and outdoor experience and finally, recommendation 6.2 to implement upgrades and improvements to park facilities to conform with the American with Disabilities Act (ADA) and ensure universal accessibility. Estimated Cost: Phase 1 - $250,000 & Phase 2 - $380,000 = $630,000 total 2027 2028 2029 2030 2031 2032 Total Planning & Design (P8) $240,000 $240,000 Construction (R19) – Bridge, Trail, Stream $200,000 $180,000 $380,000 Total Expenses $240,000 $200,000 $180,000 $620,000 Real Estate Excise Tax II – Fund 125 $240,000 $200,000 $180,000 $620,000 Total Revenue $240,000 $200,000 $180,000 $620,000 Unsecured Funding $0 $0 $0   Item 2.1       Packet pg. 175/238   Item 2.1       Packet pg. 175/238 Page 10 Parks & Recreation Playground Replacement #1– P9, R8 Project Summary: This project will revitalize one of the aging play areas in the Edmonds park system. Key components of the project include: • Replacement of the existing playground equipment • Design and construction of an ADA-accessible playground with new fall surfacing to meet current safety standards, including the potential for inclusive-level design to support children of all abilities As the smallest and most limited playground in the city’s inventory, Sierra Park’s 27 year old play area an example of one of the potential playgrounds that could be selected for replacement to better serve the surrounding community and promote equitable access to outdoor recreation. Project Justification: This project supports three goals and three objectives outlined in the City of Edmonds’ 2022 Parks, Recreation & Open Space (PROS) Plan. Additionally, recommendation 3.1 encourages ongoing investment in park infrastructure, and recommendation 3.4 explicitly calls for the replacement of playgrounds at Maplewood Hill Park, Sierra Park, and Yost Memorial Park, underscoring the importance and timeliness of this project. Estimated Cost: $400,000* 2027 2028 2029 2030 2031 2032 Total Planning & Design (P9) $50,000 $50,000 Construction (R8) – Playground Replacement $350,000 $350,000 Total Expenses $50,000 $350,000 $400,000 Park Impact Fees – Fund 332-100 $50,000 $350,000 $400,000 Total Revenue $50,000 $350,000 $400,000 Unsecured Funding $0 $0 $0 *Project is both in Capital Improvement Program (CIP) and Capital Facilities Plan (CFP)   Item 2.1       Packet pg. 176/238   Item 2.1       Packet pg. 176/238 Page 11 Parks & Recreation Yost Pool Upgrades & Renovation - R11 96th Ave W & Bowdoin Way, Yost Park Project Summary: This project involves future repair and maintenance of Yost Pool. Built in the early 1970s, the pool is now over 50 years old and requires ongoing maintenance to remain operational, safe, and compliant with modern standards. The work will include structural evaluation, surface restoration, and replacement of aging amenities. Project Justification: Yost Pool is a beloved community asset that supports year-round recreation, swim lessons, and public health. However, its aging infrastructure presents operational challenges. Without timely repairs, the facility risks reduced service or closure. The project is strongly supported by the City of Edmonds 2022 Parks, Recreation & Open Space (PROS) Plan, aligning with seven goals and eleven objectives. It also supports recommendations 3.1 and 6.2, which emphasize infrastructure renewal and climate-resilient design. Estimated Cost: $200,000 2027 2028 2029 2030 2031 2032 Total Construction (R11) $100,000 $100,000 $200,000 Total Expenses $100,000 $100,000 $200,000 Real Estate Excise Tax II - Fund 125 $100,000 $100,000 $200,000 Total Revenue $100,000 $100,000 $200,000 Unsecured Funding $0 $0 $0   Item 2.1       Packet pg. 177/238   Item 2.1       Packet pg. 177/238 Page 12 Parks & Recreation Woodway Campus Athletic Complex Phase 1 Lighting – D20 23200 100th Ave. W Project Summary: This project enhances a key multi-use athletic complex in Edmonds. Completion of phase 1 involves the addition of lighting to the existing field-turf fields. In coordination with the Edmonds School District, the property owner. The project includes engineering, permitting, installation, and long-term maintenance strategy development. Project Justification: Adding lighting to the Phase 1 field will significantly increase its year-round usability. Located in a densely populated area of Edmonds, the upgraded complex will significantly expand recreational access and programming capacity to respond to high demand. This partnership-driven improvement aligns with two goals and five objectives in City of Edmonds 2022 Parks, Recreation & Open Space (PROS) Plan, specifically recommendation 3.2, which encourages expanded partnerships with the Edmonds School District to increase public access to outdoor recreation. Due to the nature of both a public partnership and expansion of an existing facility, this project has strong potential for partial grant funding. Estimated Cost: Phase 1 Lighting: $1,500,000 2027 2028 2029 2030 2031 2032 Total Construction (D20) - Lighting $1,500,000 $1,500,000 Total Expenses $1,500,000 $1,500,000 Park Impact Fees – Fund 332-100 $500,000 $500,000 Total Revenue $500,000 $500,000 Unsecured Funding ($1,000,000) ($1,000,000) *Project is both in Capital Improvement Program (CIP) and Capital Facilities Plan (CFP) Phase 2 Phase 1   Item 2.1       Packet pg. 178/238   Item 2.1       Packet pg. 178/238 Page 13 Parks & Recreation Marsh Boardwalk Replacement – D21, R20 180 West Dayton, Edmonds Marsh Project Summary: This project initiates a comprehensive assessment of the aging Marsh Boardwalk. The work will evaluate the structural integrity of the existing boardwalk, including architecture and engineering design for potential repair or full replacement. It may also include the necessary development of construction drawings and the launch of a required and complex environmental permitting process, given the sensitive wetland estuary environment. Project Justification: The wooden deck of the boardwalk is approaching the end of its serviceable life, and early signs of structural settlement into the Marsh suggest potential safety risks. Without intervention, the boardwalk may need to be closed to the public due to unsafe surface conditions and trip hazards, limiting the only above surface access to one of Edmonds most ecologically significant and publicly cherished natural areas. This project supports five goals and eleven objectives outlined in the City of Edmonds’ 2022 Parks, Recreation & Open Space (PROS) Plan. It also advances recommendations 3.1, 3.10, 5.2, and 6.2, which emphasize infrastructure renewal, habitat protection, and climate-resilient design. Estimated Cost: $25,000 2027 2028 2029 2030 2031 2032 Total Planning & Design (D21) $25,000 $25,000 Construction (R20) Total Expenses $25,000 $25,000 Real Estate Excise Tax II - Fund 125 $25,000 $25,000 Total Revenue $25,000 $25,000 Unsecured Funding $0 $0   Item 2.1       Packet pg. 179/238   Item 2.1       Packet pg. 179/238 Page 14 Parks & Recreation Playground Replacement #2 – R12 Project Summary: This project will revitalize one of the aging play areas in the Edmonds park system. Key components of the project include: • Replacement of the existing playground equipment • Design and construction of an ADA-accessible playground with new fall surfacing to meet current safety standards, including the potential for inclusive-level design to support children of all abilities At 38 years old, the Maplewood Hill Park playground is the oldest playground in the Edmonds park system and currently consists of only a swing set. This playground is an example of one of the potential playgrounds that could be selected for replacement to better serve the surrounding community and promote equitable access to outdoor recreation. Project Justification: Replacing this aging play structure would enhance recreational opportunities for families and children, improve equity in park amenities, and support long-term operational sustainability. This improvement is supported by the City of Edmonds 2022 Parks, Recreation & Open Space (PROS) Plan, aligning with three goals and three objectives. It also supports recommendation 3.1, which emphasizes infrastructure renewal, and recommendation 3.4, which specifically calls for replacing playgrounds at Maplewood Hill Park, Sierra Park, and Yost Memorial Park. Estimated Cost: $400,000* 2027 2028 2029 2030 2031 2032 Total Planning & Design (P10) $50,000 $50,000 Construction (R12) – Playground Replacement $350,000 $350,000 Total Expenses $50,000 $350,000 $400,000 Park Impact Fees – Fund 332-100 $50,000 $350,000 $400,000 Total Revenue $50,000 $350,000 $400,000 Unsecured Funding $0 $0 $0 *Project is both in Capital Improvement Program (CIP) and Capital Facilities Plan (CFP)   Item 2.1       Packet pg. 180/238   Item 2.1       Packet pg. 180/238 Page 15 Parks & Recreation Neighborhood Park HWY 99 – P6 & D15 Project Summary: This project involves the acquisition, design, and development of a new neighborhood park in the HWY 99 corridor to address a significant gap in park services and inequities in parkland and recreation amenity distribution. Once a site is secured, a community-driven Master Plan will be developed to guide the park’s design and programming. Final development will be based on the outcomes of that plan, ensuring the park reflects the needs and priorities of nearby residents. Project Justification: The HWY 99 area is currently underserved by public parks, limiting access to outdoor recreation and green space for residents in this densely populated corridor. Creating a new neighborhood park will improve equity in park access, support community health, and enhance livability. The project is strongly supported by the City of Edmonds 2022 Parks, Recreation & Open Space (PROS) Plan, aligning with three goals and eleven objectives. It also supports recommendation 1, which calls for acquiring property for neighborhood parks in underserved areas such as the HWY 99 corridor, and recommendation 6.2, which emphasizes climate-resilient and community-centered park development. Estimated Cost: $1,850,000* 2027 2028 2029 2030 2031 2032 Total Acquisition – Neighborhood Park HWY 99 (A3) $900,000 $900,000 Planning – Neighborhood Park HWY 99 (P6) $100,000 $100,000 Construction – Neighborhood Park HWY 99 (D15) $850,000 $850,000 Total Expenses $900,000 $100,000 $850,000 $1,850,000 Real Estate Excise Tax I - Fund 126 $900,000 $900,000 Park Impact Fees – Fund 332-100 $100,000 $850,000 $950,000 Total Revenue $900,000 $100,000 $850,000 $1,850,000 Unsecured Funding $0 $0 $0 $0 *Project is both in Capital Improvement Program (CIP) and Capital Facilities Plan (CFP)   Item 2.1       Packet pg. 181/238   Item 2.1       Packet pg. 181/238 Page 16 Parks & Recreation Johnson Property - P5 9309 Bowdoin Way Project Summary: This project initiates the first phase of design for the 1-acre property donated by Shirley Johnson in 2021. Following the removal of the house, outbuildings, and invasive vegetation in 2023, the site is now secured and ready for planning. The master planning process will incorporate citywide goals from the Parks, Recreation & Open Space (PROS) Plan, site-specific opportunities and constraints, donation conditions, and robust community input to shape future design and use. The resulting plan will also serve as foundational documentation for future grant applications and phased improvements. Project Justification: This unique opportunity to transform a donated property into a public asset supports multiple strategic priorities in the City of Edmonds 2022 PROS Plan. The project aligns with five goals and eleven objectives. It also supports recommendation 3.1, which calls for maintaining, renovating, or replacing aging infrastructure to ensure public accessibility, safety, and usability. Estimated Cost: $50,000** 2027 2028 2029 2030 2031 2032 Total Planning & Design (P5) $50,000 $50,000 Total Expenses $50,000 $50,000 Park Impact Fees – Fund 332-100 $50,000 $50,000 Total Revenue $50,000 $50,000 Unsecured Funding $0 $0 *Project is both in Capital Improvement Program (CIP) and Capital Facilities Plan (CFP) **Project funding removed via council budget amendment in 2024   Item 2.1       Packet pg. 182/238   Item 2.1       Packet pg. 182/238 Page 17 Parks & Recreation Neighborhood Park SE 2 – A4, P7, D18 Project Summary: This project involves the acquisition, design, and future development of a new neighborhood park in the Southeast Edmonds area to address a longstanding gap in park services and inequities in parkland distribution. Once a site is acquired, a Master Plan will be developed in collaboration with the surrounding community to guide the park’s design, amenities, and programming. Final development will be based on the outcomes of that plan, ensuring the park reflects local needs and priorities. Project Justification: The Southeast Edmonds area is currently underserved by public parks, limiting access to outdoor recreation and green space for nearby residents. Creating a new neighborhood park will improve equity in park access, support community health, and enhance livability. This project is strongly supported by the City of Edmonds 2022 Parks, Recreation & Open Space (PROS) Plan, aligning with three goals and eleven objectives. It also supports recommendation 6.2, which emphasizes climate-resilient and community-centered park development, and recommendation 1, which calls for acquiring property for neighborhood parks in underserved areas such as the South Edmonds area and the HWY 99 corridor. Estimated Cost: $800,000* 2027 2028 2029 2030 2031 2032 Total Acquisition – Neighborhood Park SE 2 (A4) $700,000 $700,000 Planning – Neighborhood Park SE 2 (P7) $100,000 $100,000 Construction – Neighborhood Park SE 2 (D18) Total Expenses $700,000 $100,000 $800,000 Real Estate Excise Tax I - Fund 126 $700,000 $700,000 Park Impact Fees – Fund 332-100 $100,000 $100,000 Total Revenue $700,000 $100,000 $800,000 Unsecured Funding $0 $0 $0 *Project is both in Capital Improvement Program (CIP) and Capital Facilities Plan (CFP)   Item 2.1       Packet pg. 183/238   Item 2.1       Packet pg. 183/238 Page 18 Parks & Recreation Yost Pool Replacement – R15 96th Ave W & Bowdoin Way, Yost Park Project Summary: Yost Pool, built nearly 50 years ago, remains a vital recreational and wellness facility for Edmonds residents and visitors. It provides year-round access to swimming, water safety education for youth, and opportunities for healthy, active lifestyles across all age groups. This project proposes a full replacement of the aging facility to ensure long- term safety, accessibility, and operational sustainability. Funding has not yet been identified and may require partnerships and voter approval. Project Justification: The existing pool infrastructure is outdated and increasingly costly to maintain. A full replacement would modernize the facility, expand programming potential, and improve energy efficiency and accessibility. This project is supported by the City of Edmonds 2022 Parks, Recreation & Open Space (PROS) Plan, aligning with four goals and six objectives. It also supports recommendations 3.1, 4.1, 4.2, and 6.2, with recommendation 4 explicitly stating “replace Yost Pool.” Estimated Cost: $30,000,000* 2027 2028 2029 2030 2031 2032 Total Planning & Construction (R15) $30,000,000 $30,000,000 Total Expenses $30,000,000 $30,000,000 Real Estate Excise Tax II - Fund 125 Fund 332 Balance + Park Impact Fees Secured Grants Bonds Total Revenue $0 $0 Unsecured Funding ($30,000,000) ($30,000,000) *Project is both in Capital Improvement Program (CIP) and Capital Facilities Plan (CFP)   Item 2.1       Packet pg. 184/238   Item 2.1       Packet pg. 184/238 Page 19 Parks & Recreation Parks & Facilities Maintenance Building - P1 & D2 600 3rd Avenue South, City Park Project Summary: This project proposes the replacement of the aging Parks and Facilities Maintenance building located in City Park along with renovation of the adjacent yard area. The current facility, over 40 years old, is undersized and no longer meets the operational needs of staff, vehicles, equipment, and mechanical workspaces. It also lacks adequate employee support facilities, creating inefficiencies and safety concerns in daily operations. Project Justification: The Parks and Facilities Divisions have outgrown the existing space, which now serves multiple conflicting functions including equipment repair, locker room, meeting space, and limited computer access for more than 20 full-time employees. These constraints hinder work efficiency and compromise safety. Replacing the facility will improve operational capacity, staff well-being, and long-term maintenance of city parks and capital assets. This project is supported by the City of Edmonds 2022 Parks, Recreation & Open Space (PROS) Plan, aligning with Goal 9 Park Operations & Administration, Objectives 9.3 (enhance staff capacity and resources), and 9.9 (ensure safe and efficient maintenance facilities). Estimated Cost: TBD* *Project is both in Capital Improvement Program (CIP) and Capital Facilities Plan (CFP) 2027 2028 2029 2030 2031 2032 Total Planning & Design (P1) Construction (D2) Total Expenses TBD TBD TBD TBD TBD TBD TBD Real Estate Excise Tax II - Fund 125 Bond Proceeds Operating Contribution – General Fund Park Donations Total Revenue TBD TBD TBD TBD TBD TBD TBD Unsecured Funding TBD TBD TBD TBD TBD TBD TBD   Item 2.1       Packet pg. 185/238   Item 2.1       Packet pg. 185/238 Page 20 Parks & Recreation Edmonds Marsh-Estuary Expansion & Restoration - A1, P4, D9 & D1 Edmonds Marsh - City of Edmonds Marsh, Marina Beach Park and property owned by Unocal (Chevron) Project Summary: This transformative project seeks to reconnect the Puget Sound with the Edmonds Marsh near-shore estuary by restoring natural tidal exchange. It will impact the existing Marina Beach Park and its proposed renovation, including daylighting Willow Creek within the park and marsh. The project also envisions the acquisition or use of the adjacent 21-acre Unocal property to support a larger estuary restoration effort. Once acquired, an integrated restoration plan will be developed to reestablish tidal wetland functions that support salmon recovery, wildlife conservation, environmental education, and improved public access for recreation and nature viewing. Project Justification: Restoring the marsh estuary will enable salmon migration into Willow Creek, support migratory birds and waterfowl, reestablish native saltwater-freshwater ecosystems, and address climate impacts such as sea level rise. This project is strongly supported by the City of Edmonds 2022 Parks, Recreation & Open Space (PROS) Plan, aligning with five goals and eight objectives. It also supports recommendation 2.1 which states, develop a restoration plan for the Edmonds Marsh, recommendation 2.2 to expand the estuary to include the Unocal property, and recommendation 3.11 to enhance natural resource conservation and public access in waterfront areas. Estimated Cost: TBD Acquisition and Planning + Restoration + Marina Beach Park renovation* Continued on next page…   Item 2.1       Packet pg. 186/238   Item 2.1       Packet pg. 186/238 Page 21 Edmonds Marsh-Estuary Expansion & Restoration– continued. 2027 2028 2029 2030 2031 2032 Total Land Acquisition (A1) Master Plan (P4) Master Plan Implementation (D9) Restoration (D1) - TBD Total Expenses TBD TBD TBD TBD TBD TBD TBD Real Estate Excise Tax II - Fund 125 Real Estate Excise Tax I – Fund 126 Fund 332 Balance + Park Impact Fees Bond Proceeds Secured Grants Tree Fund 143 – Land Acquisition Park Donations Operating Contribution – General Fund Stormwater – Fund 422 Total Revenue TBD TBD TBD TBD TBD TBD TBD Unsecured Funding TBD TBD TBD TBD TBD TBD TBD *Project is both in Capital Improvement Program (CIP) and Capital Facilities Plan (CFP) Expense estimates and funding sources changed to TBD per Council direction December 2022. Project Accounting #M070   Item 2.1       Packet pg. 187/238   Item 2.1       Packet pg. 187/238 Page 22 2027-2032 Parks Capital Improvement & Capital Facilities Plan PROGRAMS   Item 2.1       Packet pg. 188/238   Item 2.1       Packet pg. 188/238 Page 23 Parks & Recreation ADA Improvements & Replacement – R16 Project Summary: This program addresses systemic accessibility upgrades across Edmonds parks, open spaces, trails, and recreation facilities. Examples include accessible restroom and playground access at Seaview Park, ADA upgrades at the Marina Beach Park dog park, and improved access to the Edmonds Marsh viewing pier and platform. Funding will support professional design, permitting, and construction coordination for these improvements. Project Justification: These upgrades are essential for compliance with ADA standards and building codes, and they reflect Edmonds commitment to universal access and inclusive design. Many existing facilities lack adequate accessibility, limiting use for residents with disabilities and mobility challenges. This project is supported by three goals and six objectives in the 2022 Parks, Recreation & Open Space (PROS) Plan. It also supports recommendation 3.1, which emphasizes “ensuring public accessibility,” recommendation 6.2, which calls for ADA-compliant improvements to park facilities, and recommendation 6.3, which specifically identifies restroom renovations at Olympic Beach, Seaview Park, and Brackett’s Landing North. Estimated Cost: $1,075,000 2027 2028 2029 2030 2031 2032 Total Construction (R16) $75,000 $50,000 $50,000 $300,000 $300,000 $300,000 $1,075,000 Total Expenses $75,000 $50,000 $50,000 $300,000 $300,000 $300,000 $1,075,000 Real Estate Excise Tax II - Fund 125 $75,000 $50,000 $50,000 $300,000 $300,000 $300,000 $1,075,000 Total Revenue $75,000 $50,000 $50,000 $300,000 $300,000 $300,000 $1,075,000 Unsecured Funding $0 $0 $0 $0 $0 $0   Item 2.1       Packet pg. 189/238   Item 2.1       Packet pg. 189/238 Page 24 Parks & Recreation Citywide Park Improvements / Capital Replacement Program - R17 Project Summary: This program addresses a significant backlog of deferred maintenance projects across Edmonds parks, open spaces, trails, and recreation facilities. With the hiring of a Parks Capital Project Manager in 2022, the City of Edmonds is now equipped to make steady progress on system-wide repairs, renovations, replacements, and ADA accessibility upgrades. Approximately 90% of the Project Manager’s salary and benefits are allocated directly to these capital improvement efforts. Funding will support design, permitting, and construction coordination for priority projects identified in the 2022 PROS Plan. Project Justification: Insufficiently maintained parks and facilities lead to excessive and avoidable costs, increased liability, and reduced public satisfaction. Addressing deferred maintenance is essential to preserving infrastructure, improving safety, and enhancing the quality of life for Edmonds residents. This program is supported by six goals, twenty-one objectives and five recommendations in the 2022 Parks, Recreation and Opens Space (PROS) Plan. Recommendation 3.1 is to “Maintain, renovate, or replace aging or damaged infrastructure in existing City properties to ensure public accessibility, use and safety” and additional recommendations are found in 3.7, 6.2, 6.3 and 6.4. Estimated Cost: $3,891,000 (6-year total) 2027 2028 2029 2030 2031 2032 Total Repair & Maintenance $300,000 $300,000 $300,000 $300,000 $300,000 $300,000 $1,800,000 Professional Services $150,000 $150,000 $150,000 $150,000 $150,000 $150,000 $900,000 Capital Projects Manager $190,000 $195,000 $201,000 $207,000 $213,000 $219,000 $1,225,000 Total Expenses $640,000 $645,000 $651,000 $657,000 $663,000 $669,000 $3,925,000 Real Estate Excise Tax II - Fund 125 $640,000 $645,000 $651,000 $657,000 $663,000 $669,000 $3,925,000 Total Revenue $640,000 $645,000 $651,000 $657,000 $663,000 $669,000 $3,925,000 Unsecured Funding $0 $0 $0 $0 $0 $0 $0   Item 2.1       Packet pg. 190/238   Item 2.1       Packet pg. 190/238 Page 25 2027-2032 Parks Capital Improvement & Capital Facilities Plan FUND DETAIL   Item 2.1       Packet pg. 191/238   Item 2.1       Packet pg. 191/238 REET I Fund 126 REET I (Fund 126) Restricted for Land Acquisition - Revenue 2027 2028 2029 2030 2031 2032 6-Year Total Land Acquisition "Fence" Beginning Balance $ 1,215,325 $ 1,315,325 $ 1,415,325 $ 1,515,325 $ 715,325 $ 115,325 $ 6,291,950 Land Acquisition Council Allocation $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 600,000 1,315,325$ 1,415,325$ 1,515,325$ 1,615,325$ 815,325$ 215,325$ 6,891,950$ 2027 2028 2029 2030 2031 2032 6-Year Total A1 Edmonds Marsh Estuary Restoration (Acquisition) $ - A3 Neighborhood Park - HWY 99 (Acquisition) $ 900,000 $ 900,000 A4 Neighborhood Park - SE2 (Acquisition) $ 700,000 $ 700,000 -$ -$ -$ 900,000$ 700,000$ -$ 4,100,000$ 1,315,325$ 1,415,325$ 1,515,325$ 715,325$ 115,325$ 215,325$ 2,791,950$ REET I (Fund 126) Expenditures - Non Land Acquisition 2027 2028 2029 2030 2031 2032 6-Year Total Debt Interest & Principal Marina Beach (ends 2031) $ 80,063 $ 81,975 $ 80,287 $ 83,600 $ 81,800 $ - $ 407,725 Debt Interest & Principal Civic Park (ends 2039) $ 330,375 $ 334,375 $ 327,625 $ 330,625 $ 333,193 $ 335,406 $ 1,991,599 410,438$ 416,350$ 407,912$ 414,225$ 414,993$ 335,406$ $ 2,399,324 REET II (Fund 125) Revenue 2027 2028 2029 2030 2031 2032 6-Year Total Real Estate Excise Tax (REET) II - Fund 125 $ 410,438 $ 416,350 $ 407,912 $ 414,225 $ 414,993 $ 335,406 $ 2,399,324 410,438$ 416,350$ 407,912$ 414,225$ 414,993$ 335,406$ 2,399,324$ (C) Ending Fund Balance (Land Acquisition) (A-B) (D) TOTAL PARKS REET I (Fund 126) Revenue (D) PARKS REET I (Fund 126) Expenditures - Non Land Acquisition (B) REET I (Fund 126) Restricted for Land Acquisition - Expenditures (A) REET I (Fund 126) Restricted for Land Acquisition - Revenue REET I (Fund 126) Restricted for Land Acquisition - Expenditures Page 26  Item 2.1       Packet pg. 192/238  Item 2.1       Packet pg. 192/238 REET II Fund 125 REET II (Fund 125) Expenditures 2027 2028 2029 2030 2031 2032 6-Year Total P8 Shell Creek Restoration Phase 1 (Yost Park) (Carryforward) $ 240,000 $ 240,000 R19 Shell Creek Restoration Phase 2 (Yost Park) (Carryforward) $ 200,000 $ 180,000 $ 380,000 R20 Marsh Boardwalk Replacement (Assessment) $ 25,000 $ 25,000 R11 Yost Pool Upgrades & Renovation $ 100,000 $ 100,000 $ 200,000 P4 Edmonds Marsh Estuary Restoration (Master Plan) $ - R16 ADA Improvements $ 75,000 $ 50,000 $ 50,000 $ 300,000 $ 300,000 $ 300,000 $ 1,075,000 R17 Citywide Park Improvements / Capital Replacement Program 450,000$ 450,000$ 450,000$ 450,000$ 450,000$ 450,000$ $ 2,700,000 Capital Projects Manager (90% Salary + Benefits)190,000$ 195,000$ 201,000$ 207,000$ 213,000$ 219,000$ $ 1,225,000 955,000$ 995,000$ 1,006,000$ 957,000$ 963,000$ 969,000$ 5,845,000$ REET II (Fund 125) Revenue 2027 2028 2029 2030 2031 2032 6-Year Total Real Estate Excise Tax (REET) II - Fund 125 $ 955,000 $ 995,000 $ 1,006,000 $ 957,000 $ 963,000 $ 969,000 $ 5,845,000 955,000$ 995,000$ 1,006,000$ 957,000$ 963,000$ 969,000$ 5,845,000$ (C) TOTAL PARKS REET II (Fund 125) Expenditures (D) TOTAL PARKS REET I (Fund 126) Revenue Project Type: A: Acquisition - R: Replacement/Upgrade - P: Master Planning - D: Development (new) Page 27  Item 2.1       Packet pg. 193/238  Item 2.1       Packet pg. 193/238 Fund 332 Fund 332 Expenditures - Unfunded / Future Grant Funded 2027 2028 2029 2030 2031 2032 6-Year Total D20 Woodway Campus Athletic Complex - Phase I - Lighting $ 1,000,000 $ 1,000,000 R15 Pool Replacement 30,000,000$ $ 30,000,000 D9 Edmonds Marsh Estuary Restoration (Master Plan Implementation) $ - P1 Parks Facilities M&O Building (Design) $ - $ - $ 1,000,000 -$ $ - $ 30,000,000 -$ 31,000,000$ Fund 332-000 Revenue 2027 2028 2029 2030 2031 2032 6-Year Total Unsecured Funding - Woodway Campus Athletic Complex Phase I $ 1,000,000 $ 1,000,000 Unsecured Funding (Bonds, Levy, Misc.) Pool Replacement $ 30,000,000 $ 30,000,000 Unsecured Grants - Marsh Estuary Restoration $ - Unsecured Funding Park Facilities M&O Building $ - $ - $ 1,000,000 -$ $ - $ 30,000,000 -$ 31,000,000$ 2027 2028 2029 2030 2031 2032 (E) Beginning Fund Balance (332)115,749$ 121,536$ 127,613$ 133,994$ 140,693$ 147,728$ (F) Investment Interest (5%)5,787$ 6,077$ 6,381$ 6,700$ 7,035$ 7,386$ (D) Revenue - Non Park Impact Fees $ - $ 1,000,000 -$ $ - $ 30,000,000 -$ (C) Expenditures $ - $ 1,000,000 -$ $ - $ 30,000,000 -$ 121,536$ 127,613$ 133,994$ 140,693$ 147,728$ 155,115$ Fund 332-100 Expenditures - Park Impact Fees 2027 2028 2029 2030 2031 2032 6-Year Total P9 Playground Replacement #1 - Design & Planning $ 50,000 $ 50,000 R8 Playground #1 Replacement - Construction $ 350,000 $ 350,000 D20 Woodway Campus Athletic Complex - Phase I - Lighting $ 500,000 $ 500,000 P10 Playground Replacement #2 - Design & Planning $ 50,000 $ 50,000 R12 Playground Replacement #2 - Construction $ 350,000 $ 350,000 D15 Neighborhood Park - HWY 99 (Park Development) $ 100,000 $ 850,000 $ 950,000 D18 Neighborhood Park - SE2 (Park Development)100,000$ $ 100,000 P5 Johnson Property (Master Plan) $ 50,000 $ 50,000 $ - 50,000$ 900,000$ 350,000$ 150,000$ 950,000$ 2,400,000$ 2027 2028 2029 2030 2031 2032 (E) Beginning Fund Balance (332-100) - Park Impact Fees 732,396$ 969,015$ 1,167,466$ 525,839$ 402,131$ 472,238$ (F) Investment Interest (5%)36,620$ 48,451$ 58,373$ 26,292$ 20,107$ 23,612$ (D) Revenue - Park Impact Fees Only 200,000$ 200,000$ 200,000$ 200,000$ 200,000$ 200,000$ (C) Expenditures $ - 50,000$ 900,000$ 350,000$ 150,000$ 950,000$ 969,015$ 1,167,466$ 525,839$ 402,131$ 472,238$ (254,150)$ (C) TOTAL Fund 332 Expenditures - Unfunded / Future Grant Funded (D) TOTAL Fund 332-000 Revenue Fund 332 Parks Fund 6-Year Overview (H) Ending Fund Balance (E+F+D-C) Project Type: A: Acquisition - R: Replacement/Upgrade - P: Master Planning - D: Development (new) Fund 332-100 - Park Impact Fee Summary (C) TOTAL Fund 332-100 Expenditures (I) Ending Fund Balance (E+F+D-C) Page 28  Item 2.1       Packet pg. 194/238  Item 2.1       Packet pg. 194/238 PARKS CIP / CFP COMPARISON 2027 - 32 vs. 2026-31 Type PROJECT NAME CFP DESCRIPTION Parks None Type PROJECT NAME CFP DESCRIPTION Parks Waterfront Buoys Installation Project Project completion scheduled for 2026. Type PROJECT NAME CFP CHANGE Parks Shell Creek Restoration Phase 1 & 2 Moved to 2027-29 vs. 2026-27. Parks Playground Replacement #1 X Did not specify specific playground such as Sierra Park in previous version. Parks Marsh Boardwalk Replacement Assessment moved to 2029 from 2028. Parks Yost Pool Upgrades & Renovation X Moved up to 2028 & 2029 from 2029 due to grant opportunity for efficiency study. Funding reduced by $150K. Parks Woodway Campus Athletic Complex - Phase I - Lighting X Moved from 2028 to 2029 to align with RCO grant cycle. Parks Playground Replacement #2 X Did not specify specific playground such as Maplewood Hill Park in previous version. Parks Neighborhood Park - HWY 99 X Acquisition moved to 2030 vs. 2028. Master Plan / Construction moved to 2031-32 vs. 2030-31. Parks Neighborhood Park - SE 2 X Acquisition moved to 2031 vs. 2030. Master Plan moved to 2032 vs. 2031. Parks Pool Replacement X Moved to 2032 vs. 2031 Parks ADA Improvements & Replacement Program 6-year funding increased $175K; funding now in every year vs. alternating years. PROJECTS REVISED PROJECTS ADDED PROJECTS REMOVED Page 29  Item 2.1       Packet pg. 195/238  Item 2.1       Packet pg. 195/238 City Council Agenda Item 2.2 October 14, 2026 - Study Session TITLE:Park Impact Fee Study and Code Revision Presentation (First Reading) DEPARTMENT:Parks and Recreation PRESENTER:Angie Feser, Director NEEDED FROM COUNCIL:Informational RECOMMENDATION:Informational presentation only, no formal staff recommendations. BUDGET: Total Dollar Amount:0 ☐ Approved in Budget Fund(s):N/A ☐ Budget Reallocation Required ☒ No Budget Impact PROBLEM/ISSUE STATEMENT: The City of Edmonds has two types of development impacts fees related to parks and traffic capital programs found in Edmonds City Code (ECC) 36.06. These fees are intended to offset the impacts of new development on the city's park and transportation systems by providing capital funding for improvements, expansion or new construction of park and street facilities and infrastructure. The collected impact fees are restricted and cannot be used for routine maintenance and operations. The fee charges are based on previously completed rate studies. In 2023 the State of Washington amended RCW 82.02 that now requires jurisdictions using impact fees to adopt fees which produce proportionately lower impact fees for smaller housing units. The options to calculate new residential housing fees include using square footage, number of bedrooms or trips generated. To inform the updated city code and fee program, a Park Impact Fee Study is being completed. This agenda item is a Council presentation of this study and potential code revisions needed to reflect the new PIF calculation approach. CONTEXT, ANALYSIS, & ALTERNATIVES: This presentation is for informational purposes only. No decisions are required. RECOMMENDATION: Informational presentation only, no formal staff recommendations. The final study and recommended code revisions will be presented to Council for consideration in the project’s next steps. BUDGET IMPACTS: No immediate budget impacts related to the introduction of the Park Impact Fee Study.   Item 2.2       Packet pg. 196/238   Item 2.2       Packet pg. 196/238 ITEM HISTORY: July 15, 2025 Interim Ordinance introduced to City Council July 22, 2025 Interim Ordinance approved by City Council August 19, 2025 City Council conducted Public Hearing on Interim Ordinance April 7, 2026 City Council approved budget amendment for Park Impact Fee study update funding June 16, 2026 Interim Ordinance Extension presented to Council Parks & Public Works Committee June 23, 2026 Interim Ordinance Extension City Council Public Hearing July 7, 2026 Interim Ordinance Extension City Council Regular Meeting ADDITIONAL INFORMATION: ATTACHMENTS: Edmonds Park Impact Fee Rate Study 2026.10.08 Park Impact Fee Edits City Code 2026.10.08   Item 2.2       Packet pg. 197/238   Item 2.2       Packet pg. 197/238 Edmonds Park Impact Fee Study October 2026   Item 2.2       Packet pg. 198/238   Item 2.2       Packet pg. 198/238 October 8, 2026 City of Edmonds | Park Impact Fee Study 2 2200 Sixth Avenue, Suite 1000 Seattle, Washington 98121 P (206) 324-8760 www.berkconsulting.com “Helping Communities and Organizations Create Their Best Futures” Founded in 1988, we are an interdisciplinary strategy and analysis firm providing integrated, creative and analytically rigorous approaches to complex policy and planning decisions. Our team of strategic planners, policy and financial analysts, economists, cartographers, information designers and facilitators work together to bring new ideas, clarity, and robust frameworks to the development of analytically- based and action-oriented plans. Project Team Kamal Raslan · Project Manager Lisa Grueter – Principal in Charge Katherine Goetz · Finance Lead   Item 2.2       Packet pg. 199/238   Item 2.2       Packet pg. 199/238 October 8, 2026 City of Edmonds | Park Impact Fee Study 3 Contents Introduction ..................................................................................................................................................... 4 Purpose ......................................................................................................................................................... 4 Impact Fee Definitions .......................................................................................................................... 4 Requirements for Impact Fee Rate Calculation ............................................................................... 6 Fee Calculations ............................................................................................................................................. 7 Anticipated Growth ................................................................................................................................... 7 Residential: Population, Housing, and Household Size .................................................................. 7 Non-Residential: Employment ............................................................................................................. 8 Funding Other than Impact Fees ......................................................................................................... 12 PROS Plan Level of Service (LOS) Standards ..................................................................................... 12 Capital Facilities Plan Review ............................................................................................................... 16 Identified Capital Projects ................................................................................................................. 16 Future Need ............................................................................................................................................. 20 Per Capita Investment Share of Need Measure ........................................................................... 20 Service Areas ............................................................................................................................................ 22 Unadjusted Rate Schedules – Capital Project Based ....................................................................... 22 Proportionate Share ................................................................................................................................ 25 Adjusted Rate Schedule ......................................................................................................................... 27 Appendix ....................................................................................................................................................... 29   Item 2.2       Packet pg. 200/238   Item 2.2       Packet pg. 200/238 October 8, 2026 City of Edmonds | Park Impact Fee Study 4 Introduction Purpose The City of Edmonds enacted park impact fees in 2013 to fund growth-driven capital needs in parks, open space, and trails. The City Council established parks impact fees through Ordinance 3934, and the current rates were last updated in 2016. Rates may be reviewed and adjusted by the Edmonds City Council as it deems necessary and appropriate per ECC 3.36.110. Since 2013, the City has adopted two updated Parks, Recreation, and Open Space (PROS) Plans with the most current in 2022. In addition, a new City Comprehensive Plan containing an updated Capital Facilities Element was adopted in 2024. The PROS Plan and related Parks Capital Plan are incorporated by reference in the Comprehensive Plan. These plans address growth over the period of 2024-2044. BERK consulting has prepared this rate study to address the City’s updated plans, help fulfill its levels of service and investment program, and develop a residential and non-residential rate schedule that is aligned with 2025 amendments to RCW 82.02.060 to account for the varied per- capita impacts from different sized housing units (based on number of bedrooms) and development types. This study outlines the purpose and requirements for impact fees, documents the technical assumptions and methodology for fee calculation, presents the findings from these calculations, and includes an updated capital projects list. Impact Fee Definitions Statutory Creation Impact fees authorized by the Growth Management Act are those fees charged by a local government on new development to recover a portion of the cost of capital facility improvements (called “system improvements” throughout the statute authorizing impact fees [RCW 82.02.090(9)]) needed to serve growth. The Washington State Legislature defined the intent of local impact fees in RCW 82.02.050: (1) It is the intent of the legislature: (a) To ensure that adequate facilities are available to serve new growth and development; (b) To promote orderly growth and development by establishing standards by which counties, cities, and towns may require, by ordinance, that new growth and development pay a proportionate share of the cost of new facilities needed to serve new growth and development; and (c) To ensure that impact fees are imposed through established procedures and criteria so that specific developments do not pay arbitrary fees or duplicative fees for the   Item 2.2       Packet pg. 201/238   Item 2.2       Packet pg. 201/238 October 8, 2026 City of Edmonds | Park Impact Fee Study 5 same impact. (2) Counties, cities, and towns … are authorized to impose impact fees on development activity as part of the financing for public facilities, provided that the financing for system improvements to serve new development must provide for a balance between impact fees and other sources of public funds and cannot rely solely on impact fees. Impact fees may be charged to help pay for four categories of system improvements: Public transportation and road facilities; Fire protection facilities; Schools; and Public parks, open space, and recreation facilities. Local governments are authorized to charge fees only for system improvements that are reasonably related to the new development, do not exceed a proportionate share of the costs of necessary system improvements, and are only used for system improvements that will reasonably benefit the new development (see Project Eligibility below; RCW 82.02.050(3)). In addition to restrictions on the types of projects eligible for impact fees, State law also requires that jurisdictions’ “financing for system improvements to serve new development must provide for a balance between impact fees and other sources of public funds” – i.e., impact fees cannot be the sole source of funding for eligible system improvements. According to the provisions of RCW 82.02.060, impact fees must be adjusted for other revenue sources that are paid by development, if such “payments are earmarked for or proratable to particular system improvements.” Likewise, the City must provide impact fee credit if the developer dedicates land or provides improvements identified in the City-adopted capital facilities plan as a requirement for development approval. Collected impact fees may only be spent on public facilities identified in a capital facilities plan and may only be spent on capital costs; impact fees may not be used to pay for operating expenses or maintenance activities (RCW82.02.050(4)). Additionally, RCW 82.02.060(1) states that impact fees schedule “… shall reflect the proportionate impact of new housing units, including multifamily and condominium units, based on the square footage, number of bedrooms, or trips generated, in the housing unit in order to produce a proportionally lower impact fee for smaller housing units…” In addition, ESSB 1337 (2023)1 provides that accessory dwelling units (ADUs) cannot be charged more than 50% of the impact fee for the primary unit. Potential Deficiencies Based on RCW 82.02.050(4), the capital facilities plan must identify “[d]eficiencies in public facilities serving existing development and the means by which existing deficiencies will be eliminated within a reasonable period of time,” and must distinguish such deficiencies from 1 https://app.leg.wa.gov/rcw/default.aspx?cite=36.70A.681   Item 2.2       Packet pg. 202/238   Item 2.2       Packet pg. 202/238 October 8, 2026 City of Edmonds | Park Impact Fee Study 6 “[a]dditional demands placed on existing public facilities by new development.” Deficiencies are determined by the level of service (LOS) standards that the City uses to measure the impact created by growth. The City of Edmonds’ Comprehensive Plan Capital Facilities Element adopts level of service standards listed in the 2022 Edmonds Parks Recreation and Open Space Plan by reference (see PROS Plan Level of Service (LOS) Standards section). Population and employment numbers are based on the 20-year Comprehensive Plan period of 2024 to 2044. To operationalize the Capital Facilities Element, the City regularly updates and adopts a 6-year Capital Facilities Plan (CFP); the CFP represents current capital activities and advances years of applicability within the City’s 20-year planning period. As of the time of this study’s adoption, the most recent CFP spans from 2027 to 2032. Some of the projects in the CFP address existing deficiencies; only those portions of these projects planned to accommodate future growth are considered in this study. Project Eligibility By law, impact fees can only be used for system improvements that benefit the new development and relate to the demand from new development. To the extent these projects extend parks capacity, the growth-related portion of capital project costs can be funded by impact fees. RCW 82.02.050(4) specifies that impact fees: (a) Shall only be imposed for system improvements that are reasonably related to the new development; (b) Shall not exceed a proportionate share of the costs of system improvements that are reasonably related to the new development; and (c) Shall be used for system improvements that will reasonably benefit the new development. Examples of the types of park development and improvement projects that are growth-related and impact-fee eligible include adding facilities at existing parks that increase capacity, such as new and expanded parks, new sports fields, adding lighting to existing fields (to extend operable hours), improving or creating paths and trails, replacing and expanding existing, outdated, and underused equipment. A list of the specific projects that the City identified as necessary to support growth is in the Identified Capital Projects section of this document. Requirements for Impact Fee Rate Calculation Impact fees must be assessed in accordance with the requirements of RCW 82.02 subsections 050 through 090. The schedule must be based on a formula or consistent method (RCW 82.02.060(1)). The fees must be adjusted for the share of future available funding sources. How the proportionate share reduction is calculated is guided by RCW 82.02.060: (1) …In determining proportionate share, the formula or other method of calculating impact fees shall incorporate, among other things, the following: (a) The cost of public facilities necessitated by new development;   Item 2.2       Packet pg. 203/238   Item 2.2       Packet pg. 203/238 October 8, 2026 City of Edmonds | Park Impact Fee Study 7 (b) An adjustment to the cost of the public facilities for past or future payments made or reasonably anticipated to be made by new development to pay for particular system improvements in the form of user fees, debt service payments, taxes, or other payments earmarked for or proratable to the particular system improvement; (c) The availability of other means of funding public facility improvements; (d) The cost of existing public facilities improvements; and (e) The methods by which public facilities improvements were financed. See the following Fee Calculations for the method in accordance with RCW 82.02.060. Fee Calculations Anticipated Growth Based on the 2027 to 2032 Capital Facilities Plan parks project list and demographic projections, this study incorporates growth for the ten-year expenditure window for collected impact fees, 2027 through 2036.2 The City of Edmonds Comprehensive Plan employment and household growth estimates for 2024 to 2044 were used as the baseline for this fee calculation. BERK also used past trends in employees by sector, April 1st estimates of residential population, average household size, and housing type data from the Office of Financial Management (OFM), U.S. Census Bureau’s American Community Survey (ACS), and the Census Longitudinal Employer-Household Dynamics dataset. BERK used either compound annual growth rate or share of employees by sector to adapt the 2044 Comprehensive Plan growth estimates to the 6-year CFP timeline and 10-year impact fee timeline. The estimates of number of employees by sector and square feet and household size by number of bedrooms below. Residential: Population, Housing, and Household Size As part of the most recent Comprehensive Plan periodic update, Snohomish County provided the City of Edmonds an allocation of households and employees to plan for between 2024 and 2044. BERK calculated annual growth rates for the Edmonds residential population and housing units using the compound annual growth rate to project from 2013 to 2023 OFM April 1st Population Estimates and Housing Estimates for the City of Edmonds. The OFM housing estimates and data from the U.S Census Bureau American Community Survey (ACS)3 were used to determine the share of growth by number of bedrooms in each dwelling unit. 2 RCW 82.02.070. 3 Based on a BERK calculation using data from ACS 2023 five-year estimates in Table B25010 "Average Household Size of Occupied Housing Units by Tenure." And table B25041 "Bedrooms." To determine number of bedrooms in each block group in Edmonds   Item 2.2       Packet pg. 204/238   Item 2.2       Packet pg. 204/238 October 8, 2026 City of Edmonds | Park Impact Fee Study 8 Exhibit 1 shows housing unit and residential population projections. This method assumes steady growth, but the city will experience a different, and likely uneven, actual growth pattern as projects are built during economic upturns and construction slows during recessions and economic downturns. Exhibit 1. Estimated and Projected Housing Units and Residential Population: 2023, 2027, 2032, 2036, and 2044 2023 Actuals 2027 Estimate 2032 Estimate (CFP Period) 2036 Estimate (Impact Fee Study Period) 2044 Growth Targets (Comprehensive Plan Period) Housing Units 19,599 20,223 22,220 23,920 28,073 Residential Population 43,370 44,372 47,507 50,174 55,966 Sources: City of Edmonds, 2024; OFM, 2026; BERK, 2026. Non-Residential: Employment The City provided estimates for employment and square footage growth by building type in Edmonds for 2023 to 2044, and assumptions of square feet per employee, by type. BERK projected employment and non-residential square footage by type using a compound annual growth rate for the impact fee period, shown below in Exhibit 2 and Exhibit 3. Exhibit 2. Projected Employment (Jobs) by Type: 2023, 2027, 2032, 2036, and 2044 (Rounded) NAICS Category 2023 Estimate 2027 Estimate 2032 Estimate (CFP Period) 2036 Estimate (Impact Fee Study Period) 2044 Growth Targets (Comprehensive Plan Period) Construction/Resource 823 833 893 943 1,054 Manufacturing 138 131 141 148 166 WTU (Warehousing, Transportation, Utilities) 636 497 533 563 629 Retail 1,903 1,971 2,112 2,232 2,492   Item 2.2       Packet pg. 205/238   Item 2.2       Packet pg. 205/238 October 8, 2026 City of Edmonds | Park Impact Fee Study 9 NAICS Category 2023 Estimate 2027 Estimate 2032 Estimate (CFP Period) 2036 Estimate (Impact Fee Study Period) 2044 Growth Targets (Comprehensive Plan Period) FIRE (Finance, Insurance, Real Estate) 791 832 892 942 1,052 Services/Health (exclude food service) 6,371 7,242 7,760 8,200 9,158 Government/Education 511 438 470 496 554 Restaurants 1,721 1,682 1,802 1,904 2,127 Total Jobs 12,894 13,626 14,600 15,430 17,232 Notes: FIRES indicates non-residential development in finance, insurance, and real estate. Employment estimates for 2026 were provided by these types but do not include all employment categories. Sources: Skagit County Council of Governments. 2024; BERK, 2026. Exhibit 3. Projected Non-Residential Development by Type, 2023, 2027, 2032, 2036, and 2044 (Rounded) Employment Type Square Feet per Employee by Type4 2023 Estimate 2027 Estimate 2032 Estimate (CFP Period) 2036 Estimate (Impact Fee Study Period) 2044 Growth Targets (Comp. Plan Period) Manufacturing 500 69,000 65,568 70,255 74,245 82,918 WTU (Warehousing, Transportation, Utilities) 1,000 636,000 497,426 532,986 563,256 629,051 Retail 700 1,332,100 1,379,503 1,478,122 1,562,070 1,744,539 FIRE (Finance, Insurance, Real Estate) 350 276,850 291,211 312,030 329,751 368,270 Services/Health (exclude food service) 400 2,548,400 2,896,785 3,103,873 3,280,152 3,663,315 Government/Education 300 153,300 131,481 140,880 148,881 166,272 4 Pulled from 2021 Buildable Lands Report for Snohomish County   Item 2.2       Packet pg. 206/238   Item 2.2       Packet pg. 206/238 October 8, 2026 City of Edmonds | Park Impact Fee Study 10 Employment Type Square Feet per Employee by Type4 2023 Estimate 2027 Estimate 2032 Estimate (CFP Period) 2036 Estimate (Impact Fee Study Period) 2044 Growth Targets (Comp. Plan Period) Restaurants 200 344,200 336,323 360,366 380,832 425,318 Employment Sq. Feet - 5,359,850 5,598,297 5,998,512 6,339,188 7,079,683 Note: Employment categories like construction and resources do not have square footage per employee estimates in the Snohomish County Buildable Lands Report as there are no physical locations associated with employees of those sectors. Warehousing, storage, and management of construction and resource-based employees are captured in other employment and commercial/industrial land use types. BERK is using the 2044 employment growth target as published in the Edmonds Comprehensive Plan. Sources: Edmonds Comprehensive Plan, 2024; Buildable Lands Report for Snohomish County, 2021; BERK, 2026. Resident-Equivalent Employees Employment growth can be linked to increased park usage by both the employees and non- resident visitors to businesses in Edmonds. Multiple jurisdictions in Washington have attempted to capture this increased usage resulting from growth by using the concept of resident-equivalent employee population.5 Equivalent population estimates are based on quantifying the amount of time that parks are available to each group. These estimates are not an estimate of usage, but of possible usage given the periods that parks are open. Based on hours of operation and U.S. Census Longitudinal Employer-Household Dynamics (LEHD) data on employee location, BERK used an assumption that an employee can access City parks 6.7% of the time a resident can access parks. Exhibit 4 and Exhibit 5 shows employee population, employment, and resident-equivalent employee estimates for the year 2023 (which reflect the most up to date LEHD Origin-Destination data) which was then extrapolated to estimate future resident-equivalent and service population. 5 Examples of other jurisdictions that have used resident-equivalent employe population include the cities of Issaquah, Redmond, Edmonds, and Montlake Terrace.   Item 2.2       Packet pg. 207/238   Item 2.2       Packet pg. 207/238 October 8, 2026 City of Edmonds | Park Impact Fee Study 11 Exhibit 4. Projected Employment and Resident-Equivalent Employee Population Living inside Edmonds Living outside Edmonds Total Population Working inside Edmonds 1,382 11,512 12,894 Population Working outside Edmonds 17,667 Not working 24,321 Total 43,370 Hours per week residential demand Working inside Edmonds 49* Working outside Edmonds 44** Not working 84 Hours per week non-residential demand Working inside Edmonds (estimated 1 hour for lunch/after work) 5.0 5.0 Total Weekly Residential Hours Total Weekly Non-residential hours Total hours Working inside Edmonds 67,718 57,560 125,278 Working outside Edmonds 777,348 777,348 Not working 2,042,964 2,042,964 Total 2,888,030 57,560 2,945,590 Hours per resident 66.59 Hours per employee (adjusted for employees who live and work in Edmonds) 4.46 Employee to Resident Conversion Factor 6.70% *12 hours open (average annual sunrise-sunset) less 8 hours working time, 5 days per week plus 12 hours on Saturday and Sunday. **Excludes “lunch break” hour where parks are available to those who live and work in Edmonds. Sources: City of Edmonds, 2025; BERK, 2026; LEHD 2023.   Item 2.2       Packet pg. 208/238   Item 2.2       Packet pg. 208/238 October 8, 2026 City of Edmonds | Park Impact Fee Study 12 Exhibit 5. Projected Service Population, 2023, 2027, 2032, 2036, and 2044 2023 Actual 2027 Estimate 2032 Estimate (CFP Period) 2036 Estimate (Impact Fee Study Period) 2044 Growth Targets (Comprehensive Plan Period) Residential Population 43,370 44,372 47,507 50,174 55,966 Non-Resident Employee Population 11,512 11,989 12,846 13,576 15,162 Resident Equivalent Employees (6.7%) 772 804 861 910 1,016 Total Service Population 44,142 45,176 48,368 51,084 56,982 Funding Other than Impact Fees BERK used historic actuals provided by the City to find the expected share of funding related to growth – please see Proportionate Share section of this document. PROS Plan Level of Service (LOS) Standards To collect park impact fees, the City of Edmonds must identify parks facilities and services necessary to support growth. By law, these projects must be listed in a CFP that includes the impact fee time period (RCW 82.02.050(4)). The Growth Management Hearings Board concluded in McVittie 1999 that local governments need a locally established minimum standard to provide the basis for objective measurement of need for those projects necessary to support growth (McVittie, 99-3-0016c, FDO, at 25), or a Level of Service (LOS) standard. The 2022 PROS Plan includes a complex approach to levels of service: Neighborhood, Community, and Open Space Parks: acres per 1,000 population – base level 4.22 acres per 1,000 (maintain current ratios) and target level of 6.75 acres per 1,000 (increase ratios if additional funding is available) Waterfront Parks and Special Use: No acreage standard Quality, Distribution (parks in a ½ mile), Usage: All Parks and Trails Residents are a primary user of parks but businesses (employees/visitors) in the city use parks, trails and recreation facilities and hold and attend community events in waterfront and special use parks and are part of the usage service levels. Collectively, the City provides capacity for a service population including residents and a share of employees. Thus, this rate study addresses a service population, which includes residents and resident- equivalent employees.   Item 2.2       Packet pg. 209/238   Item 2.2       Packet pg. 209/238 October 8, 2026 City of Edmonds | Park Impact Fee Study 13 BERK used the 2022 facility list and adopted acreage LOS standards from the Parks, Recreation, and Open Space Plan to estimate 2027 and 2036 acreage demand as well as how much of the demand can be attributed to growth rather than addressing existing facility deficits. An analysis of the quantitative level of service and acreage demand are shown in Exhibit 6.   Item 2.2       Packet pg. 210/238   Item 2.2       Packet pg. 210/238 October 8, 2026 City of Edmonds | Park Impact Fee Study 14 Exhibit 6. Edmonds Parks Existing Acreage, Acreage LOS Standard, and Recommended additions for Service Population (2027) Facility Type PROS 2022 LOS * 2022 PROS Plan Existing Acreage* 2027 LOS Acreage* 2027 Additional Acreage Demand 2036 LOS Recommended Acreage (based on PROS LOS)* 2036 Additional Acreage Demand 2036 Acreage Responding to Growth** 2036 Percent of Total Acre Acquisition - Future Growth Related*** Community Park 1.85 acres/ 1,000 79.2 82.1 2.9 94.7 15.5 12.6 81% Neighborhood Park 0.61 acre/1,000 26.2 27.1 0.9 31.2 5.0 4.2 83% Open Space 1.76 acres/1,000 75.6 78.1 2.5 90.1 14.5 12.0 83% Sources: City of Edmonds PROS Plan, 2022; BERK, 2026. * Based on Existing LOS in PROS Plan not the Proposed LOS Standard ** Difference between 2027 and 2036 goal acreage based on population estimates and acreage level of service *** Percent of acreage demand attributable to 2027 to 2036 growth only relative to existing LOS at time of PROS adoption Exhibit 6 provides a quantifiable assessment of public park acreage in Edmonds. These measures of acreage exclude additional recreation spaces within city limits including several acres of City-owned special use parks, Snohomish County-owned parks, or Edmonds School District-owned playgrounds and fields that are all available to the public (some with restricted hours, e.g. schools) and within city limits. In addition to acreage standards, the City has adopted additional LOS standards (Exhibit 7) to provide a more holistic view of demand for facilities over the planning period. The PROS plan has a qualitative LOS measurement that accounts for park quality as well as facility distribution and usage. These standards are based on the Washington State Recreation and Conservation Office (RCO) letter grading system with the most recent assessment from 2022 found below.   Item 2.2       Packet pg. 211/238   Item 2.2       Packet pg. 211/238 October 8, 2026 City of Edmonds | Park Impact Fee Study 15 Exhibit 7. Levels of Service with RCO Metric (System-wide) Criteria Assessment Type Metric for Value Value LOS Grade Quality Criteria Public Satisfaction Condition of Local City Parks (rated as Excellent or Good) 76.10% B Quality Criteria Public Satisfaction Condition of Trails in Parks (rated as Excellent or Good) 55.00% D Quality Criteria Agency-based Assessment Condition Assessment Rating of Existing Parks (3-point scale) 1.27 B Distribution Criteria* Parkland Access (within 1/2-mile Type traveled) Percent Service Area with Access to Active-Use City Parks 48.10% D Distribution Criteria* Parkland Access (within 1/2-mile Type traveled) Percent Service Area with Access to All Parks & Open Space 69.80% C Distribution Criteria* Trail System Access (within 1/2-mile traveled) Percent Service Area with Access to Recreational Trails 38.80% F Usage / Visitation Criteria Frequency of Park or Trail Usage Percent Visiting Parks at Least Multiple Times per Month 88.00% A *Note: The percentage of land area covered by service area walksheds is a proxy for the population within the residential portion of the city Source: City of Edmonds PROS Plan, 2022 p.72   Item 2.2       Packet pg. 212/238   Item 2.2       Packet pg. 212/238 October 8, 2026 City of Edmonds | Park Impact Fee Study 16 Capital Facilities Plan Review As part of the 2027-2032 Draft Capital Facilities Plan (CFP) & Capital Improvement Program (CIP), the City of Edmonds Parks and Recreation Department has identified parks capital projects that will be completed over the next 10 years. These projects include investments to support and facilitate the increased usage of existing parks and recreation assets to meet growing demand, as well as strategic expansions of the system as opportunities arise. The list of projects was assessed based on the ability to accommodate future growth over the impact fee period based on a park’s contributions to meeting the LOS standards described above. Identified Capital Projects As of the time of this study, the most recently adopted CFP covers the 2027 through 2032, and this rate study identifies additional projects for the 2033 to 2036 time period since the City may collect impact fees for a 10-year period. In addition to a description of each project, the CFP contains the annual cost estimates adjusted for inflation (Exhibit 8) as well as anticipated funding sources. The City and BERK aligned the project list with LOS standards and the proposal description to identify the percent of each project associated with capacity to accommodate 2027 to 2036 growth. Exhibit 9 summarizes the overall cost of system improvements that are attributable to growth and therefore impact fee eligible. Additional detail on the percent attributable to growth in the impact fee timeframe can be found in Exhibit 10. BERK calculated the cost of projects attributable to growth to be $5.68 million for the 2027 to 2036 time period. Key projects providing capacity as the community grows and that are designed to meet the levels of service (base acres), quality, usage demand, or distribution include: Playground Replacements #1 and #2: The portion of the replacements that expand playgrounds beyond replacement add capacity. Woodway Campus Athletic Complex - Phase I – Lighting: As part of a joint effort with the School District, improvements would improve lighting and fields which increases capacity for practice and games in an area of the City lacking public parkland. Neighborhood Park - HWY 99 and SE Edmonds: Adds park acres and addresses distribution level of service Yost Park Expansion and Improvement (via Johnson Property) Pine Street Park Improvements: new picnic and pathways added to the site increase capacity and address the City’s quality level of service The City will regularly review its CFP/CIP and periodically review its impact fee basis. Other projects identified over the next 10 years may also be eligible for impact fees when they meet level of service and add capacity to meet growth and demand for the City’s service population.   Item 2.2       Packet pg. 213/238   Item 2.2       Packet pg. 213/238 October 8, 2026 City of Edmonds | Park Impact Fee Study 17 Exhibit 8. Parks Capital Project List and Anticipated Funding Year, 2027 to 2036 Project List 2027 2028 2029 2030 2031 2032 2033 - 2036 Total Shell Creek Restoration $240,000 $200,000 $180,000 $0 $0 $0 $0 $620,000 Playground Replacement #1 $0 $50,000 $350,000 $0 $0 $0 $0 $400,000 Woodway Campus Athletic Complex - Phase I - Lighting $0 $0 $1,500,000 $0 $0 $0 $0 $1,500,000 Marsh Boardwalk Replacement $0 $0 $25,000 $0 $0 $0 $0 $25,000 Playground Replacement #2 $0 $0 $50,000 $350,000 $0 $0 $0 $400,000 Neighborhood Park - HWY 99 Acquisition $0 $0 $0 $900,000 $0 $0 $0 $900,000 Neighborhood Park - HWY 99 Development $0 $0 $0 $0 $100,000 $850,000 $0 $950,000 Johnson Property $0 $0 $0 $0 $50,000 $0 $300,000 $350,000 Neighborhood Park - SE 2 Acquisition $0 $0 $0 $0 $700,000 $0 $0 $700,000 Neighborhood Park - SE 2 Development $0 $0 $0 $0 $0 $100,000 $850,000 $950,000 Yost Pool Renovations and Upgrades $0 $120,000 $250,000 $0 $0 $0 $0 $370,000 Pool Replacement $0 $0 $0 $0 $0 $30,000,000 $0 $30,000,000 Parks & Facilities Maintenance and Operations Building $0 $0 $0 $0 $0 $0 $0 $0 Edmonds Marsh Estuary Restoration (Willow Creek Daylighting) $0 $0 $0 $0 $0 $0 $10,000,000 $10,000,000 Pine Street Park Improvements $0 $0 $0 $0 $0 $0 $225,000 $225,000 Total $240,000 $370,000 $2,355,000 $1,250,000 $850,000 $30,950,000 $11,375,000 $47,390,000 Source: Edmonds 2027 to 2032 Capital Facilities Plan; BERK, 2026   Item 2.2       Packet pg. 214/238   Item 2.2       Packet pg. 214/238 October 8, 2026 City of Edmonds | Park Impact Fee Study 18 Exhibit 9. Impact Fee Eligible System Improvement Projects, 2027 to 2032 Number of Improvement Projects Total Future Project Cost Total Identified Capital Need from Growth Percent of Cost Growth- Related Impact Fee Eligible Projects listed in CFP 9 $6,375,000 $5,687,500 89.22% Impact Fee Ineligible Projects listed in CFP 5 $41,015,000 $0 0% Total 14 $47,390,000 $5,687,500 12.00% Source: Edmonds 2027 to 2032 Capital Facilities Plan; EPRD/BERK work session, 08/2026; BERK, 2026 Exhibit 10. Parks Attributable to Growth Capital Project List, Total Anticipated Cost Attributable to Growth, 2027 to 2036 Project Description Total Anticipated Cost % Related to 2027 to 2036 Growth* $ Related to 2027 to 2036 Growth* Shell Creek Restoration Phase 1 & 2 *carryforward* Planning, design (phase 1) and renovation (phase 2). Project to provide improved environmental health and erosion control of Shell Creek in Yost Park, may include trail, bridge and boardwalk repair or relocation. $620,000 0% $0 Playground Replacement #1 Replacement of aging playground and related improvements to improve ADA compliance. $400,000 75% $300,000 Woodway Campus Athletic Complex - Phase I - Lighting In cooperation with the Edmonds School District, complete a community park and athletic complex at Former Woodway High School to include lighting and future construction of two additional fields. $1,500,000 75% $1,125,000 Marsh Boardwalk Replacement Assessment of northwest Edmonds Marsh boardwalk for possible replacement. $25,000 0% $0 Playground Replacement #2 Replacement of aging playground and related improvements to improve ADA compliance. $400,000 75% $300,000   Item 2.2       Packet pg. 215/238   Item 2.2       Packet pg. 215/238 October 8, 2026 City of Edmonds | Park Impact Fee Study 19 Neighborhood Park - HWY 99 Acquisition of a new neighborhood park near SR 99. $900,000 100% $900,000 Neighborhood Park - HWY 99 Master plan and development of a new neighborhood park near SR 99. $950,000 100% $950,000 Johnson Property Master plan for future use and expansion of Yost Park. Site development not included in estimate. $350,000 100% $350,000 Neighborhood Park - SE 2 Acquisition of new neighborhood park in Southeast Edmonds $700,000 100% $700,000 Neighborhood Park - SE 2 Master plan and development of a new neighborhood park in Southeast Edmonds. $950,000 100% $950,000 Yost Pool Renovations and Upgrades Planning Year 1/improvements Year 2 - 3 (grant dependent in Y1) $370,000 0% $0 Pool Replacement Replacement of the existing Yost pool due to end of life cycle. Consideration of possible partnerships with design, location, and funding TBD. $30,000,000 0% $0 Parks & Facilities Maintenance and Operations Building Replace and/or renovate Parks & Facilities Maintenance Shop located in City Park. Phase 1 - feasibility study. $0 0% $0 Edmonds Marsh Estuary Restoration (Willow Creek Daylighting) Acquisition, Master Plan development and implementation of the Edmonds Marsh to daylight the waterway connection of Puget Sound to the Edmonds Marsh and two freshwater creeks providing restoration of freshwater/saltwater estuary and natural tidal exchange. $10,000,000 0% $0 Pine Street Park Improvements New shelter, pathway, picnic tables and trees (design and installation) $225,000 50% $112,500 Total $47,390,000 12.00% $5,687,500** * Based on Edmonds Parks and Recreation Department/BERK work sessions, 08/2026. 09/2026, and 10/2026 **This is compared with the per capita system value below. The lesser of the capacity project costs or per capita system value investment is used in fees. Source: Edmonds 2027 to 2032 Capital Facilities Plan; BERK, 2026   Item 2.2       Packet pg. 216/238   Item 2.2       Packet pg. 216/238 October 8, 2026 City of Edmonds | Park Impact Fee Study 20 Future Need The City’s financial need related to parks growth is the lesser of two numbers: 1.Facility LOS Standards needs per capita: The future needs identified by the lesser of the levels of service identified in Exhibit 6 2.Growth-related project cost per capita: The capital projects that the City has identified. Any given LOS standard may suggest that the City will need to invest in capital projects at a level that is not physically or financially possible. For example, the City’s parks facilities-based LOS standard may suggest a necessary investment in an area where there is no land available. Exhibit 11 compares the expected per capita share of capital need using the facility LOS service standard and the planned capital projects that the City has identified. A secondary approach to determine the per capita share of capital need is to calculate the current system value, dividing it by current service population to determine the current rate of per capita investment in parks system. This is summarized below in Exhibit 12 and Exhibit 13. The per capita investment approach acts as the upper bound of per capita need and the capital project-based need is compared to this value and if it is higher, the lesser of the two values is used in the rates. The final per capita share of capital need that is used to calculate impact fees is between these two numbers. Exhibit 11. Parks Future Needs Identified by Identified Growth-Related Capital Projects New Resident Population, 2027 to 2036 5,803 New Employee Population, 2027 to 2036 1,803 New Resident-Equivalent Employees, 2027 to 2036 (6.7%) 106 New Service Population, 2027 to 2036 5,909 Identified Capital Need from Growth, 2027 to 2036 $5,687,500 Per Capita (Resident) Share of Capital Need (2027 to 2036) $980.10 Sources: City of Edmonds, 2026; LEHD, 2023; OFM, 2026; BERK, 2026. Per Capita Investment Share of Need Measure The secondary way to determine per capita share of need is based on existing value of Edmonds Park properties and facilities. The current value of the City’s park system was determined by the Washington Cities Insurance Authority (WCIA) in a report retrieved on January 26th, 2026. BERK then took the replacement value of the system as shown in the report and divided by the current service population to determine the average per capita investment in the parks system. The estimates are based on a combination of assessed land value of current park properties, including improvements, and depreciation based on the life span of the park facility or asset.   Item 2.2       Packet pg. 217/238   Item 2.2       Packet pg. 217/238 October 8, 2026 City of Edmonds | Park Impact Fee Study 21 Book Value of Parks System Data from WCIA was used to estimate the total book value of the parks system is estimated at $40.6 million. It should be noted that replacement value for park land is generally slightly higher than assessed value, since park land is often assessed below market value as government- owned property. This is compounded by rapidly rising land and construction costs, meaning that replacement value likely understates the amount of value that City has in its park land. The total per capita value of the City’s park system consisted of the combined values of land, buildings, and facilities divided by the City’s current resident population or, alternatively, the service population which combines residents with resident equivalent employees (REE). This can be seen in Exhibit 12. Additional value needed based on the service population growth over the impact fee period can be found in Exhibit 13. Exhibit 12. Book Value of Park System and Per Capita Investment Category Book Value (rounded)Resident Only REE Service Population 2026 Estimated Population 43,770 793 44,563 Land Value $15,060,587 Building Book Value $470,169 Equipment Book Value $103,130 Infrastructure/Improvement Book Value $24,986,528 Current Estimated Total Replacement Value $40,620,415 2026 Park System Investment Per Capita $928.04 $911.53* *This number is in use for impact fee calculations as it is lower than the per capita share of capital need Source: BERK, 2026 Exhibit 13. Additional Park System Investment Needed to Accommodate Growth New Resident Population, 2027 to 2036 5,803 New Employee Population, 2027 to 2036 1,803 New Resident-Equivalent Employees, 2027 to 2036 (6.7%) 106 New Service Population, 2027 to 2036 5,909 Per Capita Need based on 2026 Per Capita Investment $911.53 Additional Value Needed, 2027 to 2036 (Service Population) $5,386,088 Source: BERK, 2026   Item 2.2       Packet pg. 218/238   Item 2.2       Packet pg. 218/238 October 8, 2026 City of Edmonds | Park Impact Fee Study 22 Service Areas Since the City of Edmonds only has the authority to set impact fees on residential and non- residential developments within city limits, this rate study uses OFM-provided city limit residential population estimates and LEHD-based employee population, scaling for resident- equivalent employees to extrapolate the service population. Unadjusted Rate Schedules – Capital Project Based BERK found the expected fee by development type before adjusting for the expected proportionate share. BERK calculated fees depending upon the development type as follows: Residential – based on number of bedrooms Non-Residential: Warehousing, Transportation, Utilities (WTU) Non-Residential: Manufacturing Non-Residential: Finance, Insurance, Real Estate (FIRE) Non-Residential: Services and Health (excludes restaurants) Non-Residential: Restaurants Non-Residential: Government and Education For residential development, impact fees are charged per dwelling unit based on the number of bedrooms in the unit. To connect residential units, bedrooms, and resident population per unit, this study used information from the U.S. Census Bureau’s ACS 5-Year Estimates at the Census Block Group Level. The Appendix shows the calculations and methodology used to determine residential impact fees by bedroom number. The results are listed below in Exhibit 14. For impact fees collected on non-residential developments, fees are charged per 1,000 gross square feet of development. The unadjusted rates are as shown in Exhibit 15 and Exhibit 16. Exhibit 14. Population Per Household Estimates by Number of Bedrooms in Edmonds Number of Bedrooms* Average household Population = .4068 X bedroom number + 1.129 0 1.13 1 1.54 2 1.94 3 2.35 4 2.76 5+ 3.16 *ADUs cannot be charged more than 50% of the impact fee for the primary unit. Source: ACS, 2024; BERK, 2026.   Item 2.2       Packet pg. 219/238   Item 2.2       Packet pg. 219/238 October 8, 2026 City of Edmonds | Park Impact Fee Study 23 Exhibit 15. Unadjusted Residential Rate Schedules for Parks by Development Type Residential Units by Bedroom number 0 1 2 3 4 5+ Total Growth in Resident Population, 2027 to 2036 5,803 Identified System Value Investment Need 2027-2036 $5,386,088 Per Capita Share of System Value Investment Need 2027-2036 $911.53 Estimated Number of Residents per Unit 1.13 1.54 1.94 2.35 2.76 3.16 Unadjusted Park Impact Fee: Cost per bedroom in Primary Dwelling Unit $1,029.12 $1,399.93 $1,770.75 $2,141.56 $2,512.37 $2,883.18 Unadjusted Park Impact Fee: Cost per bedroom in Accessory Dwelling Unit $514.56 $699.97 $885.37 $1,070.78 $1,256.18 $1,441.59 Source: BERK, 2026.   Item 2.2       Packet pg. 220/238   Item 2.2       Packet pg. 220/238 October 8, 2026 City of Edmonds | Park Impact Fee Study 24 Exhibit 16. Unadjusted Non-Residential Rate Schedules for Parks by Development Type Manufacturing WTU (Warehousing, Transportation, Utilities) Retail FIRE (Finance, Insurance, Real Estate) Services/Health (exclude food service) Government /Education Restaurants Total Growth in Estimated Built Square Feet, 2027 to 2036 8,677 65,830 182,567 38,540 383,367 17,400 44,510 740,891 Identified System Value Investment Need 2027-2036 $5,386,088 Per Capita Share of System Value Investment Need 2027-2036 (Employees) $61.11 Estimated Number of Employees per 1,000 Sq. Ft 2.00 1.00 1.43 2.86 2.50 3.33 5.00 Unadjusted Park Impact Fee: Cost per 1,000 Gross Square Feet $122.21 $61.11 $87.30 $174.59 $152.77 $203.69 $305.54 Source: BERK, 2026. These schedules represent intermediary steps to a final rate schedule; each must be adjusted for the expected proportion of other non-impact fee future funding contributed by growth.   Item 2.2       Packet pg. 221/238   Item 2.2       Packet pg. 221/238 October 8, 2026 City of Edmonds | Park Impact Fee Study 25 Proportionate Share As required RCW 82.02.030(1), BERK calculated the proportionate share of future payments reasonably anticipated to be made by new development users in the form of fees, debt service payments, taxes, and other payments specific to the identified public facilities. Aside from parks impact fees, the City uses grants, contributions, and Real Estate Excise Taxes (REET) to fund park capital projects. Exhibit 17 shows the amount of parks capital REET expenditures that Edmonds has spent and is expected to spend over the time period. From 2015 to 2025, these are actual expenditures; for 2026 to 2045, BERK projected these expenditures into the future. Exhibit 17. Parks REET Expenditures: Actual and Projected, $2026 Sources: City of Edmonds, 2026; Edmonds Budget, 2026; BERK, 2026. $0 $500,000 $1,000,000 $1,500,000 $2,000,000 $2,500,000 $3,000,000 REET Expenditures (2026$) Projected Actual   Item 2.2       Packet pg. 222/238   Item 2.2       Packet pg. 222/238 October 8, 2026 City of Edmonds | Park Impact Fee Study 26 To project REET expenditures, BERK evaluated data shared from the City of Edmonds 2015 to 2025. These expenditures were inflation-adjusted to 2026 dollars using the U.S. City Average All Urban Consumer Price Index. REET expenditures were finally converted into per capita estimates for consistency with this study’s growth projection methodology. The City identified the annual amount of REET expected to be used for each park capital project. For simplicity and transparency, BERK used the portion of new service population as a rough indicator of the portion of REET from new growth. Exhibit 18 shows these calculations used to find the average per capita REET expenditures expected to be used for park capital projects stemming from growth. Exhibit 18. Proportionate Share of Expected REET Expenditures, $2026 Year Expected REET Expenditures for Park Capital Projects Estimated Total Service Population Additional Service Population Since 2026 Percent of Service Population from Growth Estimated Portion of Park Capital REET from Growth Per Capita Park Capital REET from Growth 2027 $1,114,627.34 45,176 613 1.4% $15,120.16 $24.67 2028 $1,136,919.89 45,797 1,234 2.7% $30,635.92 $24.83 2029 $1,159,658.29 46,427 1,864 4.0% $46,555.76 $24.98 2030 $1,182,851.45 47,065 2,502 5.3% $62,888.35 $25.13 2031 $1,206,508.48 47,712 3,150 6.6% $79,642.51 $25.29 2032 $1,230,638.65 48,368 3,806 7.9% $96,827.27 $25.44 2033 $1,255,251.43 49,034 4,471 9.1% $114,451.82 $25.60 2034 $1,280,356.45 49,708 5,145 10.4% $132,525.56 $25.76 2035 $1,305,963.58 50,391 5,829 11.6% $151,058.06 $25.92 2036 $1,332,082.86 51,084 6,522 12.8% $170,059.11 $26.08 Average Per Capita Park Capita Expected REET Expenditures from Growth $25.37 Note: All amounts shown in 2026 dollars Sources: City of Edmonds, 2026; BERK, 2026.   Item 2.2       Packet pg. 223/238   Item 2.2       Packet pg. 223/238 October 8, 2026 City of Edmonds | Park Impact Fee Study 27 Adjusted Rate Schedule BERK deducted the proportionate share REET expenditure estimates in the unadjusted rates to create adjusted rate schedules. These rate schedules represent the final rate study calculation of suggested impact fee rates. The adjusted rate schedules are presented in Exhibit 19 and Exhibit 20. Exhibit 19. Adjusted Residential Rate Schedules for Parks by Development Type Residential Units by Bedroom number 0 1 2 3 4 5 Total Growth in Resident Population, 2027 to 2036 5,803 Identified System Value Investment 2027-2036 $5,386,088 Per Capita Share of System Value Investment 2027-2036 $911.53 Estimated Number of Residents per Unit 1.13 1.54 1.94 2.35 2.76 3.16 Unadjusted Park Impact Fee: Cost per Primary Unit $1,029.12 $1,399.93 $1,770.75 $2,141.56 $2,512.37 $2,883.18 Unadjusted Park Impact Fee: Cost per Accessory Unit $514.56 $699.97 $885.37 $1,070.78 $1,256.18 $1,441.59 Expected Parks Capital REET Expenditures per Capita $25.37 Expected IF Revenue per Unit $28.64 $38.96 $49.28 $59.60 $69.92 $80.24 Adjusted Park Impact Fee: Cost per bedroom in Primary Dwelling Unit $1,000.48 $1,360.97 $1,721.46 $2,081.96 $2,442.45 $2,802.94 Adjusted Park Impact Fee: Cost per bedroom in Accessory Dwelling Unit $500.24 $680.49 $860.73 $1,040.98 $1,221.22 $1,401.47 Source: BERK, 2026.   Item 2.2       Packet pg. 224/238   Item 2.2       Packet pg. 224/238 October 8, 2026 City of Edmonds | Park Impact Fee Study 28 Exhibit 20. Adjusted Non-Residential Rate Schedules for Parks by Development Type Manufacturing WTU (Warehousing, Transportation, Utilities) Retail FIRE (Finance, Insurance, Real Estate) Services/Health (exclude food service) Government /Education Restaurants Total Growth in Estimated Built Square Feet, 2027 to 2036 8,677 65,830 182,567 38,540 383,367 17,400 44,510 740,891 Identified System Value Investment Need 2027-2036 $5,386,088 Per Capita Share of System Value Investment Need 2027-2036 (Employees) $61.11 Estimated Number of Employees per 1,000 Sq. Ft 2.00 1.00 1.43 2.86 2.50 3.33 5.00 Unadjusted Park Impact Fee: Cost per 1,000 Gross Square Feet $122.21 $61.11 $87.30 $174.59 $152.77 $203.69 $305.54 Expected Parks Capital REET Expenditures per Capita (Resident Equivalent Employee) $1.70 Expected REET Revenue per 1,000 Gross Square Feet $3.40 $1.70 $2.43 $4.86 $4.25 $5.67 $8.50 Adjusted Park Impact Fee Rates per 1,000 Gross Square Feet $118.81 $59.41 $84.87 $169.73 $148.52 $198.02 $297.03 Source: BERK, 2026.   Item 2.2       Packet pg. 225/238   Item 2.2       Packet pg. 225/238 October 8, 2026 City of Edmonds | Park Impact Fee Study 29 Appendix This appendix includes the calculations and methodology used to determine average household size by resident population and number of bedrooms in Edmonds. Exhibit 21. Average Household Size by Population and Number of Bedrooms in Edmonds Census Tract Block Group Average bedrooms Average pop per household 502 1 3.72 2.86 502 2 3.58 2.99 502 3 3.58 2.29 503 1 3.63 2.86 503 2 3.18 2.73 503 3 3.92 2.1 504.02 1 1.59 2.27 504.02 2 2.48 2.14 504.02 3 3.22 2.48 504.02 4 2.82 2.15 504.03 1 3.57 2.72 504.03 2 2.70 2.1 504.03 3 3.48 2.52 504.04 1 3.08 2.75 504.04 2 2.85 2.12 504.04 3 2.08 1.77 505.01 1 2.30 1.69 505.01 2 1.82 1.42 505.01 3 1.83 1.62 505.02 1 3.80 2.53 505.02 2 2.77 1.9 505.02 3 3.02 2.23 507 1 2.96 2.42 507 2 2.73 2.14 507 3 3.46 2.26 507 4 2.47 2.14 507 5 2.53 2.39 508 2 2.30 2.32 508 3 2.80 2.4 508 4 3.55 2.74 509 1 1.97 2.01 509 2 2.96 2.55 515 3 2.24 2.28 Source: ACS, 2023; BERK, 2026.   Item 2.2       Packet pg. 226/238   Item 2.2       Packet pg. 226/238 October 8, 2026 City of Edmonds | Park Impact Fee Study 30 Exhibit 22. Average Household Size Trend by Number of Bedrooms in Edmonds Source: ACS, 2024; BERK, 2026. y = 0.4068x + 1.129 R² = 0.4845 0 0.5 1 1.5 2 2.5 3 3.5 0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 Average population per household Average number of bedrooms   Item 2.2       Packet pg. 227/238   Item 2.2       Packet pg. 227/238 Page 1 of 11 The Edmonds City Code is current through Ordinance 4444, passed August 3, 2026. 3.36.020 Definitions. The following words and terms shall have the following meanings for the purposes of this chapter unless the context clearly requires otherwise. Terms otherwise not defined herein shall be defined pursuant to RCW 82.02.090 and ECDC Title 21 or given their usual and customary meaning. “Accessory dwelling unit” is defined in ECDC 21.05.015. “Bedroom” means any room in a dwelling or sleeping unit with an exterior window meeting emergency escape and opening requirements other than a kitchen, bathroom, living room, walk-in closet, or dining room, and equipped with a smoke alarm. This includes rooms such as dens, studies, offices, or other similar rooms that could be used or is intended to be used for sleeping purposes. A bedroom shall have a minimum size of 70 square feet with a minimum dimension of seven feet in any plan dimension. Rooms that meet these criteria will be considered bedrooms for the purpose of calculating impact fees. “Building permit” means an official document or certification which is issued by the building official and which authorizes the construction, alteration, enlargement, conversion, reconstruction, remodeling, rehabilitation, erection, demolition, moving or repair of a building or structure. “Capital facilities plan” means the capital facilities plan element of a comprehensive plan adopted by the city of Edmonds pursuant to Chapter 36.70A RCW, and such plan as amended. There are many references in state statutes to the “capital facilities plan” (CFP) as the basis for projects that are eligible for funding by impact fees. The parks element of the city of Edmonds comprehensive plan fulfills the requirements of RCW 82.02.050 et seq., pertaining to a “capital facilities plan,” and is considered to be the “capital facilities plan” (CFP) for the purpose of Edmonds’ impact fees for parks. The transportation element of the city of Edmonds comprehensive plan fulfills the requirements of RCW 82.02.050 et seq., pertaining to a “capital facilities plan,” and is considered to be the “capital facilities plan” (CFP) for the purpose of Edmonds’ impact fees for streets. Depending on the context, references to a CFP in the impact fee chapter, rate study, and procedures guide are interpreted as referring to either the parks element of the city of Edmonds comprehensive plan or the transportation element of the city of Edmonds comprehensive plan, including the projects eligible for impact fees listed in Appendix C of the procedures guide for the transportation impact fees.   Item 2.2       Packet pg. 228/238   Item 2.2       Packet pg. 228/238 Page 2 of 11 The Edmonds City Code is current through Ordinance 4444, passed August 3, 2026. “City” means the city of Edmonds. “Council” means the city council of the city of Edmonds. “Department” means the planning and development department. “Development activity” means any construction, expansion, or change in the use of a building or structure that creates additional demand and need for public facilities. “Development approval” means any written authorization from the city of Edmonds which authorizes the commencement of a development activity. “Director” means the director designated by the mayor to administer the impact fee program or that director’s designee. “Dwelling unit” is defined in ECDC 21.20.050. “Encumbered” means to reserve, set aside, or otherwise earmark the impact fees in order to pay for commitments, contractual obligations, or other liabilities incurred for public facilities. “Feepayer” is a person, corporation, partnership, an incorporated association, or any other similar entity, or department or bureau of any governmental entity or municipal corporation commencing a land development activity which creates the demand for additional capital facilities, and which requires the issuance of a building permit. “Feepayer” includes an applicant for an impact fee credit. “Hearing examiner” is defined in ECDC 21.40.010. “Impact fee” means a payment of money imposed by the city of Edmonds on development activity pursuant to this chapter as a condition of granting development approval in order to pay for the public facilities needed to serve new growth and development. “Impact fee” does not include a reasonable permit fee, an application fee, the administrative fee for collecting and handling school impact fees, the cost of reviewing independent fee calculations or any other charge or fee based upon the administrative costs of processing a development application. “Impact fee account” or “account” means the account(s) established for each type of public facility for which impact fees are collected. The accounts shall be established pursuant to ECC 3.36.080 and 3.36.090 and comply with the requirements of RCW 82.02.070.   Item 2.2       Packet pg. 229/238   Item 2.2       Packet pg. 229/238 Page 3 of 11 The Edmonds City Code is current through Ordinance 4444, passed August 3, 2026. “Independent fee calculation” means the impact fee calculation and/or economic documentation prepared by a feepayer to support the assessment of an impact fee other than by the use of the rates listed in ECC 3.36.120 and 3.36.125, or the calculations prepared by the director where none of the fee categories or fee amounts in ECC 3.36.120 and 3.36.125 accurately describe or capture the impacts of the new development on public facilities. “Interest” means the average interest rate earned in the last fiscal year by the city of Edmonds. “Low-income housing” means housing affordable to, and occupied by, a household whose income does not exceed 80 percent of area median income as reported by the United States Department of Housing and Urban Development for the Seattle-Bellevue metropolitan area. To be considered affordable, for the purpose of this definition, the combined monthly cost of the housing, including rent, utilities, and other charges for the applicable unit, may not exceed 30 percent of the household’s monthly income, adjusted for family size. “Occupancy permit” means the permit issued by the city of Edmonds authorizing the building to be occupied where a development activity results in a change in use of the preexisting structure, or the creation of a new use where none previously existed. “Owner” means the owner of record of real property, or a person with an unrestricted written option to purchase property; provided, that if the real property is being purchased under a recorded real estate contract, the purchaser shall be considered the owner of the real property. “Procedures guide” means the administrative guidance document prepared by the director pursuant to ECC 3.36.150. “Project improvements” means site improvements and facilities that are planned and designed to provide service for a particular development or users of the project and are not system improvements. No improvement or facility included in a capital facilities plan adopted by the council shall be considered a project improvement. “Public facilities” means the public parks, open space and recreation facilities owned by the city of Edmonds or other governmental entities in the context of the park impact fee and means the public streets and roads owned by the city of Edmonds or other governmental entities in the context of the street impact fee. “Rate study” means the “Rate Study for Impact Fees for Parks, Open Space and Recreation Facilities,” city of Edmonds, dated July 12, 2013, in the context of the park impact fee and means   Item 2.2       Packet pg. 230/238   Item 2.2       Packet pg. 230/238 Page 4 of 11 The Edmonds City Code is current through Ordinance 4444, passed August 3, 2026. the “Rate Study for Impact Fees for Roads,” city of Edmonds, dated October 29, 2009, in the context of the street impact fee. “Residential” or “residential development” means all types of construction intended for human habitation. This shall include, but is not limited to, single-family, duplex, triplex, and other multifamily development. This also includes the residential portion of mixed-use developments. “Service area” means the entire corporate limits of the city of Edmonds. “Significant past tax payment” means taxes exceeding five percent of the amount of the impact fee, and which were paid prior to the date the impact fee is assessed and were earmarked or proratable to the same system improvements for which the impact fee is assessed. “State” means the state of Washington. “System improvements” means public facilities that are included in the city of Edmonds capital facilities plan and are designed to provide service to service areas within the community at large, in contrast to project improvements. [Ord. 4423 § 1, 2026; Ord. 4299 § 4 (Exh. A), 2023; Ord. 4048 § 1, 2016; Ord. 4037 § 1 (Att. A), 2016; Ord. 3934 § 1 (Exh. A), 2013]. 3.36.030 Assessment and payment of impact fees. A. Required. The city shall collect impact fees, based on the rates in ECC 3.36.120 and 3.36.125, from any applicant seeking development approval from the city for any development activity within the city as provided herein, including the expansion of existing structures or uses or change of existing uses that creates additional demand for public facilities. 1. For the purposes of this chapter, development activity shall not include miscellaneous improvements that do not add any demand for public facilities, including, but not limited to, fences, walls, swimming pools accessory to a residential use, and signs. 2. For the purposes of this chapter, development activity shall not include replacement of a residential structure with a new residential structure of the same type at the same site or lot when such replacement occurs within 12 months of the demolition or destruction of the prior residential structure. Replacement of a residential structure with a new residential structure of the same type shall be interpreted to include any residential structure for which there is no increase in the number of residential units.   Item 2.2       Packet pg. 231/238   Item 2.2       Packet pg. 231/238 Page 5 of 11 The Edmonds City Code is current through Ordinance 4444, passed August 3, 2026. 3. For the purposes of this chapter, development activity shall not include alterations, expansions, enlargement, remodeling, rehabilitation or conversion of an existing dwelling unit where no additional dwelling units are created and the use is not changed. B. Timing and Calculation of Fees. Impact fees shall be assessed based upon the impact fee rates in effect at the time of issuance of the building permit, including but not limited to change of use permit or remodel permit. 1. For a change in use of an existing building or dwelling unit, including any alteration, expansion, replacement or new accessory building, the impact fee shall be the applicable impact fee for the new use, less an amount equal to the applicable impact fee for the prior use. 2. For mixed-use developments, impact fees shall be imposed for the proportionate share of each land use based on the applicable measurement in the impact fee rates set forth in ECC 3.36.120 and 3.36.125. 3. Where the impact fees imposed are determined by the square footage of the development, the building official will establish the gross floor area created by the proposed development. 4. Where the impact fees imposed are determined by the number of bedrooms in a residential development, the building official will determine the number of bedrooms based on the criteria set forth in ECC 3.36.020 in the proposed development for the purpose of impact fee calculation. 54. Applicants that have been awarded credits prior to the submittal of the complete building permit application pursuant to ECC 3.36.050 shall submit, along with the complete building permit application, a copy of the letter or certificate prepared by the director pursuant to ECC 3.36.050 setting forth the dollar amount of the credit awarded. 65. Applicants shall pay an administrative fee that covers the cost of staff time in administering the impact fee program. The amount of the administrative fee shall be established and updated from time to time by resolution of the city council. C. Payment. Unless deferred pursuant to ECC 3.36.160, impact fees shall be paid at the time the building permit or business license is issued by the city. The department shall not issue the required building permit or business license or other approval unless and until the impact fees   Item 2.2       Packet pg. 232/238   Item 2.2       Packet pg. 232/238 Page 6 of 11 The Edmonds City Code is current through Ordinance 4444, passed August 3, 2026. set forth in ECC 3.36.120 and 3.36.125 have been paid in the amount that they exceed exemptions or credits provided pursuant to ECC 3.36.040 or 3.36.050; provided, that building permits may be issued without impact fee payment when payment is deferred in accordance with ECC 3.36.160. [Ord. 4423 § 1, 2026; Ord. 4360 § 1 (Exh. A), 2024; Ord. 4048 § 1, 2016; Ord. 4037 § 1 (Att. A), 2016; Ord. 3934 § 1 (Exh. A), 2013]. 3.36.040 Exemptions. A. Except as provided for below, the following shall be exempted from the payment of all impact fees under this chapter: 1. Alteration of an existing nonresidential structure that does not involve a change in use and does not expand the usable space or add any residential units; 2. Miscellaneous improvements that do not expand usable space or add any bedrooms or residential units, including, but not limited to, fences, walls, swimming pools, and signs; 3. Demolition or moving of a structure; 4. Expansion of an existing structure that results in the addition of 100 square feet or less of gross floor area or that results in no additional bedrooms in a residential structure; 5. Replacement of a structure with a new structure of the same size and use at the same site or lot when a building permit application for such replacement is submitted to the city within 12 months of the demolition or destruction of the prior structure. Replacement of a structure with a new structure of the same size shall be interpreted to include any structure for which the gross square footage of the building will not be increased by more than 100 square feet or that results in no additional bedrooms in a residential structure; or 6. Alterations, expansions, enlargement, remodeling, rehabilitation or conversion of an existing dwelling unit where no additional bedrooms or dwelling units are created and the use is not changed. B. Low-income housing units shall be exempt from paying 80 percent of the transportation impact fees to the extent the units satisfy this subsection. Such exemption shall be conditioned upon the developer recording a covenant that prohibits using the low-income housing units for any purpose other than for low-income housing. At a minimum, the covenant must address price restrictions and household income limits for the low-income housing development and,   Item 2.2       Packet pg. 233/238   Item 2.2       Packet pg. 233/238 Page 7 of 11 The Edmonds City Code is current through Ordinance 4444, passed August 3, 2026. that if the property is converted to a use other than for low-income housing, the property owner must pay the applicable impact fees in effect at the time of conversion. The covenant shall also require the owner to submit an annual report to the city along with supporting documentation that shows that the low-income units are continuing to be rented in compliance with the covenant. The covenant shall be an obligation that runs with the land upon which the housing is located. The covenant shall be in a form acceptable to the city attorney and shall be recorded upon the developer’s payment of the remaining 20 percent of the street impact fee. C. Multifamily housing unit (with tax exemption under RCW 84.14.020(1)(a)(ii)(D)) and located within a station are (as defined in RCW 36.07A.030) – essentially within one-half-mile walkshed of a rail station or one-quarter-mile walkshed of a BRT Station shall be exempt from paying 50 percent of the transportation impact fee. D. Accessory Dwelling Units as defined by ECC 21.05.015 shall be exempt from paying 50 percent of the park impact fee. ED. Low-income housing units provided by nonprofit organizations such as, but not limited to, Habitat for Humanity, shall be exempt from paying 80 percent of the park impact fees under this chapter. Owners of low-income single-family dwelling units, condominiums and other low- income housing shall execute and record a lien against the property, in favor of the city, for a period of 10 years guaranteeing that the dwelling unit will continue to be used for low-income housing or that impact fees from which the low-income housing is exempted, plus interest, shall be paid. The lien against the property shall be subordinate only to the lien for general taxes. In the event that the development is no longer used for low-income rental housing, the owner shall pay the city the impact fee from which the owner or any prior owner was exempt, plus interest at the statutory rate. Any claim for an exemption for low-income owner occupied housing must be made no later than the time of application for a building permit. Any claim not so made shall be deemed waived. EF. Early learning facilities shall be exempt from paying 80 percent of street and park impact fees; provided, that the early learning facility satisfies the conditions of this subsection. Such exemption shall be conditioned upon the developer recording a covenant that requires that at least 25 percent of the children and families using the early learning facility qualify for state subsidized child care, including early childhood education and assistance under Chapter 43.216 RCW, and that provides that if the property is converted to a use other than for an early learning facility, the property owner must pay the applicable impact fees in effect at the time of   Item 2.2       Packet pg. 234/238   Item 2.2       Packet pg. 234/238 Page 8 of 11 The Edmonds City Code is current through Ordinance 4444, passed August 3, 2026. conversion, and that also provides that if at any point during a calendar year the early learning facility does not achieve the required percentage of children and families qualified for state subsidized child care using the early learning facility, the property owner must pay the remaining impact fee that would have been imposed on the development had there not been an exemption. The covenant shall also require the owner to submit an annual report to the city along with supporting documentation that shows that the early learning facility is in compliance with the covenant. The covenant shall be an obligation that runs with the land upon which the early learning facility is located. The covenant shall be in a form acceptable to the city attorney and shall be recorded upon the developer’s payment of the remaining 20 percent of the impact fees. GF. The director shall be authorized to determine whether a particular development activity falls within an exemption identified in this section, in any other section, or under other applicable law. Determinations of the director shall be in writing and shall be subject to the appeals procedures set forth in ECC 3.36.070. [Ord. 4423 § 1, 2026; Ord. 4397 § 5 (Exh. B), 2025; Ord. 4360 § 1 (Exh. A), 2024; Ord. 4268 § 1, 2022; Ord. 4048 § 1, 2016; Ord. 4037 § 1 (Att. A), 2016; Ord. 3934 § 1 (Exh. A), 2013]. 3.36.120 Park impact fee rates. The park impact fee rates in this section are generated from the formula for calculating impact fees set forth in the rate study, which is incorporated herein by reference. Except as otherwise provided for independent fee calculations in ECC 3.36.130, exemptions in ECC 3.36.040 and credits in ECC 3.36.050, all new developments in the city will be charged the park impact fee applicable to the type of development as follows: A. Effective October 1, 2014January 1, 2027: 1. Residential developments (per bedroom in each unit): Single-family house (detached or attached): $2,734.05 per dwelling unit. Residential Units by Bedroom number 0 1 2 3 4 5 Primary Dwelling Unit, cost per bedroom $1,000.48 $1,360.97 $1,721.46 $2,081.96 $2,442.45 $2,802.94   Item 2.2       Packet pg. 235/238   Item 2.2       Packet pg. 235/238 Page 9 of 11 The Edmonds City Code is current through Ordinance 4444, passed August 3, 2026. Accessory Dwelling Unit, cost per bedroom $500.24 $680.49 $860.73 $1,040.98 $1,221.22 $1,401.47 2. Accessory dwelling units: $1,367.03 per dwelling unit. 3. Multifamily residential housing (includes all middle housing types): $2,340.16 per dwelling unit. 4. Nonresidential development (by square footage of use type): $1.97 per square foot. Use type Rates per 1,000 Gross Square Feet Manufacturing $118.81 WTU (Warehousing, Transportation, Utilities) $59.41 Retail $84.87 FIRE (Finance, Insurance, Real Estate) $169.73 Services/Health (exclude food service) $148.52 Government/Education $198.02 Restaurants $297.03 [Ord. 4423 § 1, 2026; Ord. 4397 § 5 (Exh. B), 2025; Ord. 4360 § 1 (Exh. A), 2024; Ord. 4048 § 1, 2016; Ord. 4037 § 1 (Att. A), 2016; Ord. 3934 § 1 (Exh. A), 2013]. B. Bi-Annual: the park impact fee rate schedule shall be updated as part of the biennium budget process using the following procedure: 1. Fees for any renewal term thereafter shall be adjusted on an annual basis. Such fees shall increase by the12 month percentage change set forth in the October-October All- Urban Consumers Index (CPI-U) for the Seattle-Tacoma-Bellevue area . 2. The adjusted impact fee rates shall be effective January 1st. C. Revised Basis: The park impact fee schedule shall be reviewed, updated, and revised no later than five years after the effective date of this ordinance. The fee schedule shall be reviewed by the City Council as it deems necessary and appropriate in conjunction with the update of the Capital Facilities Plan element of the City’s Comprehensive Plan.   Item 2.2       Packet pg. 236/238   Item 2.2       Packet pg. 236/238 Page 10 of 11 The Edmonds City Code is current through Ordinance 4444, passed August 3, 2026. The Edmonds City Code is current through Ordinance 4444, passed August 3, 2026. Disclaimer: The city clerk’s office has the official version of the Edmonds City Code. Users should contact the city clerk’s office for ordinances passed subsequent to the ordinance cited above. City Website: www.edmondswa.gov Hosted by ICC Code Solutions.   Item 2.2       Packet pg. 237/238   Item 2.2       Packet pg. 237/238 Page 11 of 11 The Edmonds City Code is current through Ordinance 4444, passed August 3, 2026.   Item 2.2       Packet pg. 238/238   Item 2.2       Packet pg. 238/238