Fiber One Optic Cable Agrmt. Add. #21Project Services Addendum #21 to Fiber One Agreement Regarding Buying Existing Fiber Optic Cable Strands And Installation of Fiber Optic Cable for Washington State Department of Transportation This Project Services Addendum to the Fiber One Agreement is made by and among the following parties: the City of Seattle ("Seattle"), a Washington municipal corporation, acting by and through its Department of Information Technology ("Doin; Washington State Department of Transportation ("WSDOT"); King County Transportation ("King County"); City of Edmonds ("Edmonds"); City of Shoreline ("Shoreline"); Snohomish County ("Snohomish"); and University of Washington (UW). In this Addendum, the above named parties may be collectively referred to as "Project Participating Agencies". WHEREAS, Seattle, WSDOT, King County, Edmonds, Shoreline, Snohomish, and UW are Participating Agencies in the Fiber One Agreement; and WHEREAS, acting as Lead Agency, DoIT has existing fiber and will install fiber optic cable, and WSDOT would like to participate in the sharing of a fiber cable; and WHEREAS, DoIT, acting as Lead Agency, is installing a fiber optic cable on behalf of WSDOT; and WHEREAS, the Project Participating Agencies desire to memorialize the scope of the fiber installation, the arrangements for sharing the cost of the fiber installation, and the use of the fiber within the cables; NOW, THEREFORE, the parties hereby agree as follows: 1. Overview of the Project Scope The project scope covers the installation of dedicated fiber communication for future WSDOT highway and tunnel operation applications. 1.1. DoIT will install a 288 strand cable, 48 dedicated to WSDOT, from Aurora Av N & N Roy St to Aurora Av N & N 145th St in an existing innerduct and manholes that the City of Seattle owns. The rest of the strands in the cable will be listed as spare. 1.2. WSDOT will purchase 48 strands in an existing fiber from Aurora Av N & N 145th St (Seattle), through City of Shoreline, to the manhole at Aurora & 238th St (City of Edmonds) per the Fiber One Partnership's General Terms and Conditions, Exhibit A. O/V-.T- �6 Seattle Fiber One Agreement - Addend um_21—WSDOT Aurora_final.docx Page 1 of 5 2. Project Contact Information: The Project Manager for Washington State Department of Transportation (WSDOT) is Dave Lindberg, desk (206)805-5378, lindbed@wsdot.wa.gov. The Network Services Manager for WSDOT, Office of Information Technology is Randy Baker, Network Services Manager, desk (360) 705-7694, cell (360) 701-3146 , bakerra(@wsdot.wa.gov. Fiber Program Manager for the City of Seattle Department of Information Technology is Kris Henry - Simmons at (206) 684-0265, cell (206) 255-6258, kristine.henr-simmons Seattle. ov. 3. Project Description: As detailed in Exhibit B (Aurora from 145th St to 238th St Fiber Route Diagram) and incorporated as part of this addendum includes the following: 3.1 Backbone - Aurora from Roy St to 145th St, Exhibit B. Install a 288 single mode fiber cable using existing DoIT manholes and innerduct. The manhole locations are listed below. MH # Location Street/Sidewalk 1 On Aurora Av N, north of Roy St West, southbound lane 2 On Aurora Av N, north of Lee St West, southbound lane 3 On Aurora Av N, south of Crockett St West, southbound lane 4 Aurora Av N, south of McGraw St West, southbound lane 5 South side of Aurora Bridge, south of Queen Ann Dr West, southbound lane 6 North of Aurora Bridge, south of Fremont Av N West, southbound lane 7 On Aurora Av N, south of N 40th St West, southbound lane --8--J On Aurora Av N, south of N Allen PI West, southbound lane 9 On Aurora Av N, south of N 50th St West, southbound lane 10 1 On Aurora Av N, south of N 59th St West, southbound lane 11 On Aurora Av N, south of N 66th St West, southbound lane 12 On Aurora Av N, south of N 73rd St West, southbound lane 13 On Aurora Av N, north of N 80th St Center lane 14 On Aurora Av N, south of N 85th St Center lane 15 On Aurora Av N, south of N 87th St Center lane 16 On Aurora Av N, north of N 94th St Center lane 17 On Aurora Av N, south of N 105th St Center lane 18 On Aurora Av N, between 109th & 115th Center lane 19 1 On Aurora Av N, between 115th & 125th Center lane 20 On Aurora Av N, north of N 125th St Center lane 21 On Aurora Av N. south of N 130th St Center lane 22 On Aurora Av N, between 130th & 135th Center lane 23 On Aurora Av N, between 137th & 143rd Center lane 24 On Aurora Av N, south of N 143rd St Center lane 25 On Aurora Av N, south of N 145th St Center lane Seattle Fiber One Agreement - Addendum_21_WSDOT_Aurora_final.docx Page 2 of 5 3.2 Backbone — Aurora Av N from N 145th St (Seattle), through City of Shoreline, to 2381h St (City of Edmonds), Exhibit B. Buy 48 strands in an existing cable already shared by King County Transportation, City of Shoreline, Snohomish County, City of Edmonds, and University of Washington per the guidelines of the Fiber One Agreement's General Terms and Conditions. MH # Location 36 On Aurora Av N, south of N 238th St 35 On Aurora Av N, south of N 205th St 34 On Aurora Av N, south of N 199th St 33 On Aurora Av N, south of N 192nd St 32 On Aurora Av N, south of N 185th St 31 On Aurora Av N, south of N 175th St 30 On Aurora Av N, north of N 165th St 29 On Aurora Av N, north of N 163rd St 28 On Aurora Av N, south of N 160th St 27 On Aurora Av N, south of N 155th St 26 On Aurora Av N, north of N 145th St 25 On Aurora Av N, south of N 145th St 4. Project Participating Agencies Washington State Department of Transportation (WSDOT) 5. Lead Agency City of Seattle, Department of Information Technology (DoIT) 6. Project Manager Street I Sidewalk Center lane Center lane Center lane Center lane Center lane Center lane Center lane Center lane Center lane Center lane Center lane center lane Kris Henry -Simmons, City of Seattle, Department of Information Technology 7. Facility Owners (Top of Next Page) Aurora from Roy St to 145th St, Exhibit B. Install a 288 single mode fiber cable using existing DoIT manholes and innerduct. Aurora Av N from N 145th St (Seattle), through City of Shoreline, to 238th St (City of Edmonds), Exhibit B uses DoIT conduit and manhole to the City of Shoreline Right Of Way at N 145th St. At the City of Shoreline Right Of Way at N 145th St heading north, the conduit and manholes are shared by DoIT and City of Shoreline to the manhole at N 160th St. North of N 160th St the innerduct and manholes are owned by City of Shoreline to the Snohomish County line at 2051h St. North of the Snohomish County line the conduit and manhole is owned by City of Edmonds. Seattle Fiber One Agreement - Addendum-21—WSDOT—Aurora—final.docx Page 3 of 5 At this time there is no cost associated with using the DoIT, Shoreline, or Edmonds conduit and manhole system. 8. Project Budget, Contingency and Cost Sharing Method: The project budget has been set with a not -to -exceed amount of $531,006.40 , (Exhibit C). Cost Sharing of the project engineering, project management costs, the cost of the fiber, other material, and installation may be apportioned per the Fiber One Seattle Fiber Partners General Terms and Conditions, Exhibit A if an agency wants to use this fiber from Roy St. to 238cn 9. Billing: Billing for the WASHINGTON STATE DEPARTMENT OF TRANSPORTATION will be sent to: Office of Information Technology Vendor Payments PO Box 47430 Olympia, WA 98504-7430 WSDOTOITVENDORPAYMENTS@wsdot.wa. ov A courtesy copy of the invoice shall also be provided via email to the WSDOT Network Services Manager identified under Section 2 — Project Contact Information. 10. Contractual Framework and General Terms and Conditions: The Project Participating Agencies on this project adopt the Fiber One Agreement General Terms and Conditions (Exhibit A) for fiber sharing projects as part of this Addendum. The allocation of the existing and new fiber is subject to the same terms and conditions as if the fiber were installed as a shared project and the Participating Agencies accept the applicable Fiber One duties, limitations, and obligations. 11. Special Terms and Conditions: The Seattle Department of Information Technology, as the lead agency, will maintain management and maintenance responsibility for the fiber cables covered under this addendum. All connections or maintenance shall be completed by City of Seattle, Department of Information Technology, or its contractors on a cost -reimbursement basis, plus agreed upon overhead, consistent with the General Terms and Conditions. The underlying agreement explains how costs will be dispersed in section III, Relationship among Participating Agencies and the Lead Agency. 12. Schedule: It is estimated that the project will be completed by the end of December, 2011, or sooner if requested. Seattle Fiber One Agreement - Addend um_21_WSDOT Aurora_final.docx Page 4 of 5 IN WITNESS WHEREOF, THE PARTIES HERETO EXECUTE THIS AMENDMENT CITY OF SEATTLE WASHINGTON STATE DEPARTMENT OF TRANSPORTATION DEPARTMENT OF INFORMATION TECHNOLOGY By: AL By. Title: ` Fiber Program Manager Title: Asst. Secy., Administrative Operations Date: Date: CITY OF SHORELINE KING COUNTY By: By: Title: Title: Date: �13� 11 Date: UNIVE SITY/OF WASHINGTON CITY EDMO D BY: &L-e- By: IL i -� TiVe Date: Cv /-3 Title: Date: " p SNOHOMIS14 COUNTY By: Title: Date: A .o , _ vhC3. 43n13 C_.�v i" Seattle Fiber One Agreement - Addendum_21_WSDOT_Aurora_final.docx Page 5 of 5 C--s k;�; 19 Addendum #21 WSDOT Aurora Project Seattle Fiber Partners Buy 48 strands from N 145th (Seattle) to 238th (Edmonds) Install 288 strands (48 for WSDOT) from Roy St to N 145th St 2381h Gity fldmond$ - 405 tH ST of Shorefina =7Hsr -sarTla ST �a teaio er � M USTHST � Existing Fiber . Cable From # 145th St to 238th St ",i ' r J — �` 1om987 �6 fe f City Shoreline a� I City s + 117M [f 1 WOW . { M" 1. NOMMMWAIP Install New Fiber Cable From Bomar i Roy St to 145th St ' rirsau IT T'S e DO NOT COPY The City Legend This record is exempt from disclosure under RCW of Seattle Section 42.17.310(1)(ww) of the Public Disclosure pnAaced by the City of Seshia, Regional Water Bodies +mil RCW 42,17.250 at seq. This record has been MIT ', •' City Limb prepared, assembles or is maintained to prevent, prepared. mitigate or respond to crirninal terrorist acts. This 9,1e1e zi DoIT MRs in US Crossing Conduit Run Snohomish County flrtedals record is a specific and unique vulnerabitityr T=CM0"L1Tnx.MM A51WM ­ d assessment, or response or deployment plan, or is �•.�-+•-r•�+ compiled underlying data collected in preparation of, or that is essential to, such an assessment or plan. Public disclosure of this record would have a substantial likelihood of threatening public safety. r Ye YmtMAti•hfwr.4+Y�ryco^MeL 12o imrLja ORwa4Jp. rrCa /°xK dap, b,p A6 • pANd � �Sni ,b•I p.! n ®�I � Lllr IYN• T V C4 *, .0 d W d L a c.i m O aL LL R L O ca 3 Q s co M N O i+ d L 0 Q 06 O w N r0) ' CID 0000 C7 0 0 0 O't- NCO MCO r r O N N YS 00 r 0 O a Nl 0 'o O C7 C7 O LD O CD efj r Si7 h 6 00 00 N N O 2 C O O CDC LO CO 00 N CO r CO to M M w to N '�Y t- M O NM M' , = W E 'Q O " t17 0 LIM Co LID r COO ti N O O 0 20 Q r r r N N 00 v , GA to 4!3 cfi � fET ffi 40) VE fA fd? fi} 69 to O Y 00 O O O O O O O 'O -0 co O r ll*- O •N N kn h T 'OCr C J O CD CD O O O O r r of o 'Rl Sri f0 Cl) cn Ci> O M M l W I- � ,t 07 N r ice- m N y O �+ CyrCD N N r i$ N O y0f e � 6s d�J f� Ni fR fa Ni (& fA 69 0 o O 0 0 0 o cn a� 0 00 0 00 N •Q1 M O M O ON O If) 6 6 LO 00 -* O V N O � 0 O O CO O 47 O ti M O Cl) O (7 O 00 00 17 00 0 00 W y` to 0 LCj Lfj' M N. LO 00 co ti O V : M rLO CN 1~ - (i Z ea ffl ffl Efl f» fH 40 EA fFi ffl 4040 fA O O O O O O O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O I- h T 00 01 C- O f- O r r In l0 N �O N O O O O O 0 0 0 6 0 0 0 O CD N 00 w It m 00 O 00 O OO O O O O 0 O N OOU)m Mco 00 00-t NO Nf- M O C> Lq O "t LfCA CD O N� M r I` - 't N CO O OO 00 It N O N �r) N LO Li) Il- cl) r r CO CV h 0 t. r O'! h r. h 4 C O Cl) r N M r I M 00 O N N N N N 4f3 Efl d3 EA' 69 ff3 Ut . to fA d3 fA ffi v3 fJ] frs fJ9 eEr f!3 Ao" ert 40 "% e» r O O fh N N N co CD N co, M eD co 00 O O O O O O O O O O O O 0 0 O CD O O 0 0 0 0 0 0 0 0 O M O O Cn O O O. In r O O O O 0 LO co (` V m, LO COD 000 o0O Ld N to 6,3 613 H) 69 603 ffi (fi ffl 40 fA 61) w ffl e5 CD 0 O E `q -a O. O � r 0 � O CD O O o CD o u') 0 N r O 0 N00 x x y X X y 00 N L X OD OD N N cc)N y U ) CL 0 cm CD Cj 01 _ 6 !a C O fq y J C C C OCL D. 7+ ut E.+y O O Q O O cr. -14 c� it C 0 O i�� c U o v O O J c 0 iL y ��v3 — > �Q O ` ay_ +n a� 20 J J 0 ���� �tnssco 2��4a��i Ccry�' U �y�0 0 CO V L ~ C U F- (n j 0 0 1- L. �+ U O +L-' .0 Loco N 4] 10 i " O la Z y N „� CIO "I. 47 - y y io\± d 2 y r y r f0 JCS. �� � O O D �O � 47 = 4) CL Q. m LL F-UCL � J C O C OppUUJU7U) 7 fS CO CO F-LL JJ i6 L± V In Nr NfL' N N M 00 Ih uj N 000 � ti N N N M E!-J fA iH N N t 0 co 0 V N +�+ C O 07 v co o o� :. m M Z O O E c r, O 0 oy �,3 r. Lu N CA=F- w w N Q tU 0 Lo U C 0 CO Z `` to W CD �', CL F- c 0 CO O ti >, Q V +h* c 00 L o Q >o y 0E- 0 O U) L LL LLF- �+ 0) •� O � y a O - Z V 7 N Q w 0 �( ± t C)W0